Illinois General Assembly

  Bills & Resolutions  
  Compiled Statutes  
  Public Acts  
  Legislative Reports  
  IL Constitution  
  Legislative Guide  
  Legislative Glossary  

 Search By Number
 (example: HB0001)
Search Tips

Search By Keyword

Illinois Compiled Statutes

 ILCS Listing   Public Acts  Search   Guide   Disclaimer

Information maintained by the Legislative Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process. Recent laws may not yet be included in the ILCS database, but they are found on this site as Public Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the Guide.

Because the statute database is maintained primarily for legislative drafting purposes, statutory changes are sometimes included in the statute database before they take effect. If the source note at the end of a Section of the statutes includes a Public Act that has not yet taken effect, the version of the law that is currently in effect may have already been removed from the database and you should refer to that Public Act to see the changes made to the current law.

210 ILCS 115/4

    (210 ILCS 115/4) (from Ch. 111 1/2, par. 714)
    Sec. 4. In order to obtain a permit to construct a new mobile home park the applicant shall file with the Department a written application and plan documents, including the following:
        (a) The full name and address of the applicant or
    
applicants, or names and addresses of the partners if the applicant is a partnership, or the names and addresses of the officers if the applicant is a corporation.
        (b) The address, location and legal description of
    
the tract of land upon which it is proposed to construct, operate and maintain a mobile home park.
        (c) The name of the mobile home park.
        (d) Detailed plans and specifications sealed by a
    
registered engineer or architect licensed to practice in the State of Illinois which include a general plot plan of the mobile home park with all sites and structures shown, the water supply system, the sewage disposal system, the electrical system, the fuel supply system, the lighting system, the method of disposal of solid waste, all streets and sidewalks, swimming and bathing facilities, fire hydrants and details of all auxiliary structures.
        (e) The number of mobile home sites proposed to be
    
constructed or licensed.
        (f) A statement of the fire-fighting facilities,
    
public or private, which are available to the mobile home park.
        (g) A plan review fee, which is nonrefundable. For
    
permits filed prior to the effective date of this amendatory Act of the 101st General Assembly, the fee shall be $100. For permits filed on or after the effective date of this amendatory Act of the 101st General Assembly, the fee shall be $500.
(Source: P.A. 101-454, eff. 8-23-19.)