Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process.
Recent laws may not yet be included in the ILCS database, but they are found on this site as
Public
Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the
Guide.
Because the statute database is maintained primarily for legislative drafting purposes,
statutory changes are sometimes included in the statute database before they take effect.
If the source note at the end of a Section of the statutes includes a Public Act that has
not yet taken effect, the version of the law that is currently in effect may have already
been removed from the database and you should refer to that Public Act to see the changes
made to the current law.
(225 ILCS 732/1-85)
Sec. 1-85. Presumption of pollution or diminution. (a) This Section establishes a rebuttable presumption for the purposes of evidence and liability under State law regarding claims of pollution or diminution of a water source and for use regarding the investigation and order authority under Section 1-83. (b) Unless rebutted by a defense established in subsection (c) of this Section, it shall be presumed that any person conducting or who has conducted high volume horizontal hydraulic fracturing operations shall be liable for pollution or diminution of a water supply if: (1) the water source is within 1,500 feet of the well |
|
(2) water quality data showed no pollution or
|
| diminution prior to the start of high volume horizontal hydraulic fracturing operations; and
|
|
(3) the pollution or diminution occurred during high
|
| volume horizontal hydraulic fracturing operations or no more than 30 months after the completion of the high volume horizontal hydraulic fracturing operations.
|
|
(c) To rebut the presumption established under this Section, a person presumed responsible must affirmatively prove by clear and convincing evidence any of the following:
(1) the water source is not within 1,500 feet of the
|
|
(2) the pollution or diminution occurred prior to
|
| high volume horizontal hydraulic fracturing operations or more than 30 months after the completion of the high volume horizontal hydraulic fracturing operations; or
|
|
(3) the pollution or diminution occurred as the
|
| result of an identifiable cause other than the high volume horizontal hydraulic fracturing operations.
|
|
(Source: P.A. 98-22, eff. 6-17-13.)
|