Illinois Compiled Statutes
ILCS Listing
Public
Acts Search
Guide
Disclaimer
Information maintained by the Legislative
Reference Bureau
Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process.
Recent laws may not yet be included in the ILCS database, but they are found on this site as Public
Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the
Guide.
Because the statute database is maintained primarily for legislative drafting purposes,
statutory changes are sometimes included in the statute database before they take effect.
If the source note at the end of a Section of the statutes includes a Public Act that has
not yet taken effect, the version of the law that is currently in effect may have already
been removed from the database and you should refer to that Public Act to see the changes
made to the current law.
770 ILCS 60/1
(770 ILCS 60/1) (from Ch. 82, par. 1)
Sec. 1. Contractor defined; amount of lien; waiver of lien; attachment of lien; agreement to waive; when not enforceable.
(a) Any person who shall by any contract or contracts, express or
implied, or partly expressed or implied, with the owner of a lot or
tract of land, or with one whom the owner has authorized or knowingly
permitted to contract, to improve the lot or tract of land or for the purpose of improving the tract of land, or to manage a
structure under construction thereon, is known under this Act as a contractor and has a lien upon the whole of such lot or tract of land and upon adjoining or adjacent lots or tracts of land of such owner constituting the same premises and occupied or used in connection with such lot or tract of land as a place of residence or business; and in case the contract relates to 2 or more buildings, on 2 or more lots or tracts of land, upon all such lots and tracts of land and improvements thereon for the amount due to him or her for the material, fixtures, apparatus, machinery, services or labor, and interest at the rate of 10% per annum from the date the same is due. This lien extends to an estate in fee, for life, for years, or any other estate or any right of redemption or other interest that the owner may have in the lot or tract of land at the time of making such contract or may subsequently acquire and this lien attaches as of the date of the contract. (b) As used in subsection (a) of this Section, "improve" means to furnish labor, services, material, fixtures, apparatus or
machinery, forms or form work in the process of construction where
cement, concrete or like material is used for the purpose of or in the
building, altering, repairing or ornamenting any house or other building,
walk or sidewalk, whether the walk or sidewalk is on the land or bordering
thereon, driveway, fence or improvement or appurtenances to the lot or
tract of land or connected therewith, and upon, over or under a sidewalk,
street or alley adjoining; or fill, sod or excavate such lot or tract of
land, or do landscape work thereon or therefor; or raise or lower any house
thereon or remove any house thereto, or remove any house or other structure
therefrom, or perform any services or incur any expense as an architect,
structural engineer, professional engineer, land surveyor, registered interior designer, or
property manager in, for, or on a lot or tract of land for any such purpose;
or drill any water well thereon; or furnish or perform labor or services as
superintendent, time keeper, mechanic, laborer or otherwise, in the
building, altering, repairing or ornamenting of the same; or furnish
material, fixtures, apparatus, machinery, labor or services, forms or form
work used in the process of construction where concrete, cement or like
material is used, or drill any water well on the order of his agent,
architect, structural engineer, registered interior designer, or superintendent having charge of the
improvements, building, altering, repairing, or ornamenting the same. (c) The taking of additional
security by the contractor or sub-contractor is not a waiver of any
right of lien which he may have by virtue of this Act, unless made a
waiver by express agreement of the parties and the waiver is not
prohibited by this Act.
(d) An agreement to waive any right to enforce or claim any lien under this Act, or an agreement to subordinate the lien, where the agreement is in anticipation of and in consideration for the awarding of a contract or subcontract, either express or implied, to perform work or supply materials for an improvement upon real property is against public policy and unenforceable. This Section does not prohibit release of lien under subsection (b) of Section 35 of this Act, nor does it prohibit an agreement to subordinate a mechanics lien to a mortgage lien that secures a construction loan if that agreement is made after more than 50% of the loan has been disbursed to fund improvements to the property.
(Source: P.A. 100-920, eff. 8-17-18.)
|
|