(225 ILCS 732/1-5)
Sec. 1-5. Definitions. For the purposes of this Act, unless the context otherwise requires: "Agency" means the Illinois Environmental Protection Agency. "Aquatic life" means all fish, reptiles, amphibians, crayfish, and mussels. "Aquifer" means saturated (with groundwater) soils and geologic materials that are sufficiently permeable to readily yield economically useful quantities (at least 70 gallons per minute) of fresh water to wells, springs, or streams under ordinary hydraulic gradients.
"Aquifer" is limited to aquifers identified as major sand and gravel aquifers in the Illinois State Water Survey's Illinois Community Water Supply Wells map, Map Series 2006-01. "Base fluid" means the continuous phase fluid type, including, but not limited to, water used in a high volume horizontal hydraulic fracturing operation.
"BTEX" means benzene, toluene, ethylbenzene, and xylene.
"Chemical" means any element, chemical compound, or mixture of elements or compounds that has its own specific name or identity, such as a Chemical Abstracts Service number, regardless of whether the chemical is subject to the requirements of paragraph (2) of subsection (g) of 29 Code of Federal Regulations §1910.1200.
"Chemical Abstracts Service" means the division of the American Chemical Society that is the globally recognized authority for information on chemical substances.
"Chemical Abstracts Service number" or "CAS number" means the unique identification number assigned to a chemical by the Chemical Abstracts Service.
"Completion combustion device" means any ignition device, installed horizontally or vertically, used in exploration and production operations to combust otherwise vented emissions. "Delineation well" means a well drilled in order to determine the boundary of a field or producing reservoir. "Department" means the Illinois Department of Natural Resources.
"Diesel" means a substance having any one of the following Chemical Abstracts Service Registry numbers: 68334-30-5; 68476-34-6; 68476-30-2; 68476-31-3; 8008-20-6; or 68410-00-4. "Diesel" includes any additional substances regulated by the United States Environmental Protection Agency as diesel fuel used in hydraulic fracturing activities under the federal Safe Drinking Water Act. "Director" means the Director of Natural Resources.
"Enhanced oil recovery operation" means any secondary or tertiary recovery method used in an effort to recover hydrocarbons from a pool by injection of fluids, gases or other substances to maintain, restore, or augment natural reservoir energy, or by introducing gases, chemicals, other substances, or heat, or by in-situ combustion, or by any combination thereof. "Flare" means a thermal oxidation system using an open, enclosed, or semi-enclosed flame. "Flare" does not include completion combustion devices as defined in this Section.
"Flowback period" means the process of allowing fluids to flow from a well following a treatment, either in preparation for a subsequent phase of treatment or in preparation for cleanup and returning the well to production. "Flowback period" begins when the material the hydraulic fracturing fluid returns to the surface following hydraulic fracturing or re-fracturing. "Flowback period" ends with either well shut in or when the well is producing continuously to the flow line or to a storage vessel for collection, whichever occurs first.
"Fresh water" means surface and subsurface water in its natural state that is suitable for drinking water for human consumption, domestic livestock, irrigation, industrial, municipal and recreational purposes, that is capable of supporting aquatic life, and contains less than 10,000 ppm total dissolved solids.
"Gas" means all natural gas, including casinghead gas, and all other natural hydrocarbons not defined as oil.
"Groundwater" means any water below the land surface that is within the saturated zone or geologic materials where the fluid pressure in the pore space is equal to or greater than atmospheric pressure.
"Health professional" means a physician, physician assistant, nurse practitioner, a registered professional nurse, emergency medical technician, or other individual appropriately licensed or registered to provide health care services.
"High volume horizontal hydraulic fracturing operations" means all stages of a stimulation treatment of a horizontal well as defined by this Act by the pressurized application of more than 80,000 gallons per stage or more than 300,000 gallons total of hydraulic fracturing fluid and proppant to initiate or propagate fractures in a geologic formation to enhance extraction or production of oil or gas.
"High volume horizontal hydraulic fracturing permit" means the permit issued by the Department under this Act allowing high volume horizontal hydraulic fracturing operations to occur at a well site.
"High volume horizontal hydraulic fracturing treatment" shall have the same definition as "High volume horizontal hydraulic fracturing operations".
"Horizontal well" means a well with a wellbore drilled laterally at an angle of at least 80 degrees to the vertical and with a horizontal projection exceeding 100 feet measured from the initial point of penetration into the productive formation through the terminus of the lateral in the same common source of hydrocarbon supply.
"Hydraulic fracturing additive" means any chemical substance or combination of chemicals, including, but not limited to, any chemical or proppant that is added to a base fluid for the purposes of preparing a hydraulic fracturing fluid for a high volume horizontal hydraulic fracturing operation.
"Hydraulic fracturing flowback" means all hydraulic fracturing fluid and other fluids that return to the surface after a stage of high volume horizontal hydraulic fracturing operations has been completed and prior to the well being placed in production.
"Hydraulic fracturing fluid" means the mixture of the base fluid and all the hydraulic fracturing additives, used to perform high volume horizontal hydraulic fracturing.
"Hydraulic fracturing string" means any pipe or casing string used for the transport of hydraulic fracturing fluids during the conduct of the high volume horizontal hydraulic fracturing operations.
"Intake" means a pipe or other means to withdraw raw water from a water source.
"Landowner" means the legal title holder or owner of real property and includes an owner of an undivided interest, a life tenant, a remainderman, a public or private corporation, a trustee under an active trust, and the holder of the beneficial interest under a land trust. "Landowner" does not include a mortgagee, a trustee under a trust deed in the nature of a mortgage, a lien holder, or a lessee.
"Low pressure well" means a well with reservoir pressure and vertical well depth such that 0.445 times the reservoir pressure (in psia) minus 0.038 times the vertical well depth (in feet) minus 67.578 psia is less than the flow line pressure at the sales meter. "Nature preserve" shall have the same meaning as provided in Section 3.11 of the Illinois Natural Areas Preservation Act.
"Oil" means natural crude oil or petroleum and other hydrocarbons, regardless of gravity, which are produced at the well in liquid form by ordinary production methods or by the use of an oil and gas separator and which are not the result of condensation of gas after it leaves the underground reservoir.
"Operator" means the individual or entity controlling the right to drill or produce a horizontal well in accordance with the requirements of the Illinois Oil and Gas Act.
"Owner" shall have the same meaning as provided in Section 1 of the Illinois Oil and Gas Act.
"Perennial stream" means a stream that has continuous flow in its stream bed during all of the calendar year. "Permit" means a high volume horizontal hydraulic fracturing permit.
"Permittee" means a person holding a high volume horizontal hydraulic fracturing permit under this Act.
"Person" means any individual, partnership, co-partnership, firm, company, limited liability company, corporation, association, joint stock company, trust, estate, political subdivision, state agency, or any other legal entity or their legal representative, agent, or assigns.
"Pollution or diminution" means: (1) in groundwater, any of the following:
(A) detection of benzene or any other carcinogen |
| in any Class I, Class II, or Class III groundwater;
|
|
(B) detection of any constituent in item (i) of
|
| subparagraph (A) of paragraph (3) of subsection (a) of 35 Ill. Adm. Code 620.310 equal to or above the listed preventive response criteria in any Class I, Class II, or Class III groundwater;
|
|
(C) detection of any constituent in 35 Ill. Adm.
|
| Code 620.410 (a), (b), (c), (d) or (e) equal to or above the listed standard in any Class I, Class II, or Class III groundwater;
|
|
(D) detection of any constituent in Class III
|
| groundwater equal to or above a standard established under 35 Ill. Adm. Code 620.260; or
|
|
(E) detection of any constituent in Class I,
|
| Class II, or Class III groundwater equal to or above a cleanup objective listed in 35 Ill. Adm. Code 742.
|
|
(2) in surface water, exceeding any applicable
|
| numeric or narrative standard in 35 Ill. Adm. Code Part 302 or Part 304.
|
|
"Produced water" means water, regardless of chloride and total dissolved solids content, that is produced in conjunction with oil or natural gas production or natural gas storage operations, but does not include hydraulic fracturing flowback.
"Proppant" means sand or any natural or man-made material that is used during high volume horizontal hydraulic fracturing operations to prop open the artificially created or enhanced fractures.
"Public water supply" means all mains, pipes, and structures through which water is obtained and distributed to the public, including wells and well structures, intakes and cribs, pumping stations, treatment plants, reservoirs, and storage tanks and appurtenances, collectively or severally, actually used or intended for use for the purpose of furnishing water for drinking or general domestic use, and which serves at least 15 service connections or which regularly serves at least 25 persons at least 60 days per year.
"Register of Land and Water Reserves" means the list of areas registered in accordance with Section 16 of the Illinois Natural Areas Preservation Act and Part 4010 of Title 17 of the Illinois Administrative Code.
"Release" means any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment.
"Serious violation" means any violation set forth in 62 Ill. Adm. Code 240.140(c).
"Service connection" means the opening, including all fittings and appurtenances, at the water main through which water is supplied to the user.
"Surface water" means all water that is open to the atmosphere and subject to surface runoff.
"Total water volume" means the total quantity of water from all sources used in the high volume horizontal hydraulic fracturing operations, including surface water, groundwater, produced water, or recycled water.
"True vertical depth" or "TVD" means the vertical distance from a depth in a planned or existing wellbore or well to a point at the surface.
"Water pollution" means any alteration of the physical, thermal, chemical, biological, or radioactive properties of any waters of the State, or the discharge of any contaminant into any water of the State, as will or is likely to create a nuisance or render the waters harmful, detrimental, or injurious to public health, safety, or welfare, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate uses, or to livestock, wild animals, birds, or fish or other aquatic life.
"Water source" means (1) any existing water well or developed spring used for human or domestic animal consumption, or (2) any river, perennial stream, aquifer, natural or artificial lake, pond, wetland listed on the Register of Land and Water Reserves, or reservoir.
"Well" means any drill hole required to be permitted under the Illinois Oil and Gas Act.
"Well site" means surface areas, including the well, occupied by all equipment or facilities necessary for or incidental to high volume horizontal hydraulic fracturing operations, drilling, production, or plugging a well.
"Wildcat well" means a well outside known fields or the first well drilled in an oil or gas field where no other oil and gas production exists.
"Wildlife" means any bird or mammal that are by nature wild by way of distinction from those that are naturally tame and are ordinarily living unconfined in a state of nature without the care of man.
(Source: P.A. 98-22, eff. 6-17-13.)
|
(225 ILCS 732/1-35)
Sec. 1-35. High volume horizontal hydraulic fracturing permit application. (a) Every applicant for a permit under this Act shall first register with the Department at least 30 days before applying for a permit. The Department shall make available a registration form within 90 days after the effective date of this Act. The registration form shall require the following information:
(1) the name and address of the registrant and any |
| parent, subsidiary, or affiliate thereof;
|
|
(2) disclosure of all findings of a serious violation
|
| or an equivalent violation under federal or state laws or regulations in the development or operation of an oil or gas exploration or production site via hydraulic fracturing by the applicant or any parent, subsidiary, or affiliate thereof within the previous 5 years; and
|
|
(3) proof of insurance to cover injuries, damages, or
|
| loss related to pollution or diminution in the amount of at least $5,000,000, from an insurance carrier authorized, licensed, or permitted to do this insurance business in this State that holds at least an A- rating by A.M. Best & Co. or any comparable rating service.
|
|
A registrant must notify the Department of any change in the information identified in paragraphs (1), (2), or (3) of this subsection (a) at least annually or upon request of the Department.
(b) Every applicant for a permit under this Act must submit the following information to the Department on an application form provided by the Department:
(1) the name and address of the applicant and any
|
| parent, subsidiary, or affiliate thereof;
|
|
(2) the proposed well name and address and legal
|
| description of the well site and its unit area;
|
|
(3) a statement whether the proposed location of the
|
| well site is in compliance with the requirements of Section 1-25 of this Act and a plat, which shows the proposed surface location of the well site, providing the distance in feet, from the surface location of the well site to the features described in subsection (a) of Section 1-25 of this Act;
|
|
(4) a detailed description of the proposed well to be
|
| used for the high volume horizontal hydraulic fracturing operations including, but not limited to, the following information:
|
|
(A) the approximate total depth to which the well
|
| is to be drilled or deepened;
|
|
(B) the proposed angle and direction of the well;
(C) the actual depth or the approximate depth at
|
| which the well to be drilled deviates from vertical;
|
|
(D) the angle and direction of any nonvertical
|
| portion of the wellbore until the well reaches its total target depth or its actual final depth; and
|
|
(E) the estimated length and direction of the
|
| proposed horizontal lateral or wellbore;
|
|
(5) the estimated depth and elevation, according to
|
| the most recent publication of the Illinois State Geological Survey of Groundwater for the location of the well, of the lowest potential fresh water along the entire length of the proposed wellbore;
|
|
(6) a detailed description of the proposed high
|
| volume horizontal hydraulic fracturing operations, including, but not limited to, the following:
|
|
(A) the formation affected by the high volume
|
| horizontal hydraulic fracturing operations, including, but not limited to, geologic name and geologic description of the formation that will be stimulated by the operation;
|
|
(B) the anticipated surface treating pressure
|
|
(C) the maximum anticipated injection treating
|
|
(D) the estimated or calculated fracture pressure
|
| of the producing and confining zones; and
|
|
(E) the planned depth of all proposed
|
| perforations or depth to the top of the open hole section;
|
|
(7) a plat showing all known previous wellbores
|
| within 750 feet of any part of the horizontal wellbore that penetrated within 400 vertical feet of the formation that will be stimulated as part of the high volume horizontal hydraulic fracturing operations;
|
|
(8) unless the applicant documents why the
|
| information is not available at the time the application is submitted, a chemical disclosure report identifying each chemical and proppant anticipated to be used in hydraulic fracturing fluid for each stage of the hydraulic fracturing operations including the following:
|
|
(A) the total volume of water anticipated to be
|
| used in the hydraulic fracturing treatment of the well or the type and total volume of the base fluid anticipated to be used in the hydraulic fracturing treatment, if something other than water;
|
|
(B) each hydraulic fracturing additive
|
| anticipated to be used in the hydraulic fracturing fluid, including the trade name, vendor, a brief descriptor of the intended use or function of each hydraulic fracturing additive, and the Material Safety Data Sheet (MSDS), if applicable;
|
|
(C) each chemical anticipated to be intentionally
|
| added to the base fluid, including for each chemical, the Chemical Abstracts Service number, if applicable; and
|
|
(D) the anticipated concentration in the base
|
| fluid, in percent by mass, of each chemical to be intentionally added to the base fluid;
|
|
(9) a certification of compliance with the Water Use
|
| Act of 1983 and applicable regional water supply plans;
|
|
(10) a fresh water withdrawal and management plan
|
| that shall include the following information:
|
|
(A) the source of the water, such as surface or
|
| groundwater, anticipated to be used for water withdrawals, and the anticipated withdrawal location;
|
|
(B) the anticipated volume and rate of each water
|
| withdrawal from each withdrawal location;
|
|
(C) the anticipated months when water withdrawals
|
| shall be made from each withdrawal location;
|
|
(D) the methods to be used to minimize water
|
| withdrawals as much as feasible; and
|
|
(E) the methods to be used for surface water
|
| withdrawals to minimize adverse impact to aquatic life.
|
|
Where a surface water source is wholly contained
|
| within a single property, and the owner of the property expressly agrees in writing to its use for water withdrawals, the applicant is not required to include this surface water source in the fresh water withdrawal and management plan;
|
|
(11) a plan for the handling, storage,
|
| transportation, and disposal or reuse of hydraulic fracturing fluids and hydraulic fracturing flowback. The plan shall identify the specific Class II injection well or wells that will be used to dispose of the hydraulic fracturing flowback. The plan shall describe the capacity of the tanks to be used for the capture and storage of flowback and of the lined reserve pit to be used, if necessary, to temporarily store any flowback in excess of the capacity of the tanks. Identification of the Class II injection well or wells shall be by name, identification number, and specific location and shall include the date of the most recent mechanical integrity test for each Class II injection well;
|
|
(12) a well site safety plan to address proper safety
|
| measures to be employed during high volume horizontal hydraulic fracturing operations for the protection of persons on the site as well as the general public. Within 15 calendar days after submitting the permit application to the Department, the applicant must provide a copy of the plan to the county or counties in which hydraulic fracturing operations will occur. Within 5 calendar days of its receipt, the Department shall provide a copy of the well site safety plan to the Office of the State Fire Marshal;
|
|
(13) a containment plan describing the containment
|
| practices and equipment to be used and the area of the well site where containment systems will be employed, and within 5 calendar days of its receipt, the Department shall provide a copy of the containment plan to the Office of the State Fire Marshal;
|
|
(14) a casing and cementing plan that describes the
|
| casing and cementing practices to be employed, including the size of each string of pipe, the starting point, and depth to which each string is to be set and the extent to which each string is to be cemented;
|
|
(15) a traffic management plan that identifies the
|
| anticipated roads, streets, and highways that will be used for access to and egress from the well site. The traffic management plan will include a point of contact to discuss issues related to traffic management. Within 15 calendar days after submitting the permit application to the Department, the applicant must provide a copy of the traffic management plan to the county or counties in which the well site is located, and within 5 calendar days of its receipt, the Department shall provide a copy of the traffic management plan to the Office of the State Fire Marshal;
|
|
(16) the names and addresses of all owners of any
|
| real property within 1,500 feet of the proposed well site, as disclosed by the records in the office of the recorder of the county or counties;
|
|
(17) drafts of the specific public notice and general
|
| public notice as required by Section 1-40 of this Act;
|
|
(18) a statement that the well site at which the high
|
| volume horizontal hydraulic fracturing operation will be conducted will be restored in compliance with Section 240.1181 of Title 62 of the Illinois Administrative Code and Section 1-95 of this Act;
|
|
(19) proof of insurance to cover injuries, damages,
|
| or loss related to pollution in the amount of at least $5,000,000; and
|
|
(20) any other relevant information which the
|
| Department may, by rule, require.
|
|
(c) Where an application is made to conduct high volume horizontal fracturing operations at a well site located within the limits of any city, village, or incorporated town, the application shall state the name of the city, village, or incorporated town and be accompanied with a certified copy of the official consent for the hydraulic fracturing operations to occur from the municipal authorities where the well site is proposed to be located. No permit shall be issued unless consent is secured and filed with the permit application. In the event that an amended location is selected, the original permit shall not be valid unless a new certified consent is filed for the amended location.
(d) The hydraulic fracturing permit application shall be accompanied by a bond as required by subsection (a) of Section 1-65 of this Act.
(e) Each application for a permit under this Act shall include payment of a non-refundable fee of $13,500. Of this fee, $11,000 shall be deposited into the Oil and Gas Resource Management Fund for the Department to use to administer and enforce this Act and otherwise support the operations and programs of the Office of Oil and Gas Resource Management. The remaining $2,500 shall be deposited into the Illinois Clean Water Fund for the Agency to use to carry out its functions under this Act. The Department shall not initiate its review of the permit application until the applicable fee under this subsection (e) has been submitted to and received by the Department.
(f) Each application submitted under this Act shall be signed, under the penalty of perjury, by the applicant or the applicant's designee who has been vested with the authority to act on behalf of the applicant and has direct knowledge of the information contained in the application and its attachments. Any person signing an application shall also sign an affidavit with the following certification:
"I certify, under penalty of perjury as provided by
|
| law and under penalty of refusal, suspension, or revocation of a high volume horizontal hydraulic fracturing permit, that this application and all attachments are true, accurate, and complete to the best of my knowledge.".
|
|
(g) The permit application shall be submitted to the Department in both electronic and hard copy format. The electronic format shall be searchable.
(h) The application for a high volume horizontal hydraulic fracturing permit may be submitted as a combined permit application with the operator's application to drill on a form as the Department shall prescribe. The combined application must include the information required in this Section. If the operator elects to submit a combined permit application, information required by this Section that is duplicative of information required for an application to drill is only required to be provided once as part of the combined application. The submission of a combined permit application under this subsection shall not be interpreted to relieve the applicant or the Department from complying with the requirements of this Act or the Illinois Oil and Gas Act.
(i) Upon receipt of a permit application, the Department shall have no more than 60 calendar days from the date it receives the permit application to approve, with any conditions the Department may find necessary, or reject the application for the high volume horizontal hydraulic fracturing permit. The applicant may waive, in writing, the 60-day deadline upon its own initiative or in response to a request by the Department.
(j) If at any time during the review period the Department determines that the permit application is not complete under this Act, does not meet the requirements of this Section, or requires additional information, the Department shall notify the applicant in writing of the application's deficiencies and allow the applicant to correct the deficiencies and provide the Department any information requested to complete the application. If the applicant fails to provide adequate supplemental information within the review period, the Department may reject the application.
(Source: P.A. 98-22, eff. 6-17-13; 98-756, eff. 7-16-14; 99-139, eff. 7-24-15.)
|
(225 ILCS 732/1-70)
Sec. 1-70. Well preparation, construction, and drilling. (a) This Section shall apply to all horizontal wells that are to be completed using high volume horizontal hydraulic fracturing operations under a high volume horizontal hydraulic fracturing permit. The requirements of this Section shall be in addition to any other laws or rules regarding wells and well sites.
(b) Site preparation standards shall be as follows: (1) The access road to the well site must be located |
| in accordance with access rights identified in the Illinois Oil and Gas Act and located as far as practical from occupied structures, places of assembly, and property lines of unleased property.
|
|
(2) Unless otherwise approved or directed by the
|
| Department, all topsoil stripped to facilitate the construction of the well pad and access roads must be stockpiled, stabilized, and remain on site for use in either partial or final reclamation. In the event it is anticipated that the final reclamation shall take place in excess of one year from drilling the well the topsoil may be disposed of in any lawful manner provided the operator reclaims the site with topsoil of similar characteristics of the topsoil removed.
|
|
(3) Piping, conveyances, valves, and tanks in contact
|
| with hydraulic fracturing fluid, hydraulic fracturing flowback, or produced water must be constructed of materials compatible with the composition of the hydraulic fracturing fluid, hydraulic fracturing flowback, and produced water.
|
|
(4) The improvement, construction, or repair of a
|
| publicly owned highway or roadway, if undertaken by the owner, operator, permittee, or any other private entity, shall be performed using bidding procedures outlined in the Illinois Department of Transportation rules governing local roads and streets or applicable bidding requirements outlined in the Illinois Procurement Code as though the project were publicly funded.
|
|
(c) Site maintenance standards shall be as follows:
(1) Secondary containment is required for all fueling
|
|
(2) Fueling tanks shall be subject to Section 1-25 of
|
|
(3) Fueling tank filling operations shall be
|
| supervised at the fueling truck and at the tank if the tank is not visible to the fueling operator from the truck.
|
|
(4) Troughs, drip pads, or drip pans are required
|
| beneath the fill port of a fueling tank during filling operations if the fill port is not within the secondary containment required by paragraph (1) of this subsection.
|
|
(d) All wells shall be constructed, and casing and cementing activities shall be conducted, in a manner that shall provide for control of the well at all times, prevent the migration of oil, gas, and other fluids into the fresh water and coal seams, and prevent pollution or diminution of fresh water. In addition to any of the Department's casing and cementing requirements, the following shall apply:
(1) All casings must conform to the current industry
|
| standards published by the American Petroleum Institute.
|
|
(2) Casing thread compound and its use must conform
|
| to the current industry standards published by the American Petroleum Institute.
|
|
(3) Surface casing shall be centralized at the shoe,
|
| above and below a stage collar or diverting tool, if run, and through usable-quality water zones. In non-deviated holes, pipe centralization as follows is required: a centralizer shall be placed every fourth joint from the cement shoe to the ground surface or to the bottom of the cellar. All centralizers shall meet specifications in, or equivalent to, API Spec 10D, Specification for Bow-Spring Casing Centralizers; API Spec 10 TR4, Technical Report on Considerations Regarding Selection of Centralizers for Primary Cementing Operations; and API RP 10D-2, Recommended Practice for Centralizer Placement and Stop Collar Testing. The Department may require additional centralization as necessary to ensure the integrity of the well design is adequate. All centralizers must conform to the current industry standards published by the American Petroleum Institute.
|
|
(4) Cement must conform to current industry standards
|
| published by the American Petroleum Institute and the cement slurry must be prepared to minimize its free water content in accordance with the current industry standards published by the American Petroleum Institute; the cement must also:
|
|
(A) secure the casing in the wellbore;
(B) isolate and protect fresh groundwater;
(C) isolate abnormally pressured zones, lost
|
| circulation zones, and any potential flow zones including hydrocarbon and fluid-bearing zones;
|
|
(D) properly control formation pressure and any
|
| pressure from drilling, completion and production;
|
|
(E) protect the casing from corrosion and
|
|
(F) prevent gas flow in the annulus.
(5) Prior to cementing any casing string, the
|
| borehole must be circulated and conditioned to ensure an adequate cement bond.
|
|
(6) A pre-flush or spacer must be pumped ahead of the
|
|
(7) The cement must be pumped at a rate and in a flow
|
| regime that inhibits channeling of the cement in the annulus.
|
|
(8) Cement compressive strength tests must be
|
| performed on all surface, intermediate, and production casing strings; after the cement is placed behind the casing, the operator shall wait on cement to set until the cement achieves a calculated compressive strength of at least 500 pounds per square inch, and a minimum of 8 hours before the casing is disturbed in any way, including installation of a blowout preventer. The cement shall have a 72-hour compressive strength of at least 1,200 psi, and the free water separation shall be no more than 6 milliliters per 250 milliliters of cement, tested in accordance with current American Petroleum Institute standards.
|
|
(9) A copy of the cement job log for any cemented
|
| casing string in the well shall be maintained in the well file and available to the Department upon request.
|
|
(10) Surface casing shall be used and set to a depth
|
| of at least 200 feet, or 100 feet below the base of the deepest fresh water, whichever is deeper, but no more than 200 feet below the base of the deepest fresh water and prior to encountering any hydrocarbon-bearing zones. The surface casing must be run and cemented as soon as practicable after the hole has been adequately circulated and conditioned.
|
|
(11) The Department must be notified at least 24
|
| hours prior to surface casing cementing operations. Surface casing must be fully cemented to the surface with excess cements. Cementing must be by the pump and plug method with a minimum of 25% excess cement with appropriate lost circulation material, unless another amount of excess cement is approved by the Department. If cement returns are not observed at the surface, the operator must perform remedial actions as appropriate.
|
|
(12) Intermediate casing must be installed when
|
| necessary to isolate fresh water not isolated by surface casing and to seal off potential flow zones, anomalous pressure zones, lost circulation zones and other drilling hazards.
|
|
Intermediate casing must be set to protect fresh
|
| water if surface casing was set above the base of the deepest fresh water, if additional fresh water was found below the surface casing shoe, or both. Intermediate casing used to isolate fresh water must not be used as the production string in the well in which it is installed, and may not be perforated for purposes of conducting a hydraulic fracture treatment through it.
|
|
When intermediate casing is installed to protect
|
| fresh water, the operator shall set a full string of new intermediate casing at least 100 feet below the base of the deepest fresh water and bring cement to the surface. In instances where intermediate casing was set solely to protect fresh water encountered below the surface casing shoe, and cementing to the surface is technically infeasible, would result in lost circulation, or both, cement must be brought to a minimum of 600 feet above the shallowest fresh water zone encountered below the surface casing shoe or to the surface if the fresh water zone is less than 600 feet from the surface. The location and depths of any hydrocarbon-bearing zones or fresh water zones that are open to the wellbore above the casing shoe must be confirmed by coring, electric logs, or testing and must be reported to the Department.
|
|
In the case that intermediate casing was set for a
|
| reason other than to protect strata that contains fresh water, the intermediate casing string shall be cemented from the shoe to a point at least 600 true vertical feet above the shoe. If there is a hydrocarbon-bearing zone capable of producing exposed above the intermediate casing shoe, the casing shall be cemented from the shoe to a point at least 600 true vertical feet above the shallowest hydrocarbon-bearing zone or to a point at least 200 feet above the shoe of the next shallower casing string that was set and cemented in the well (or to the surface if less than 200 feet).
|
|
(13) The Department must be notified prior to
|
| intermediate casing cementing operations. Cementing must be by the pump and plug method with a minimum of 25% excess cement. A radial cement bond evaluation log, or other evaluation approved by the Department, must be run to verify the cement bond on the intermediate casing. Remedial cementing is required if the cement bond is not adequate for drilling ahead.
|
|
(14) Production casing must be run and fully cemented
|
| to 500 feet above the top perforated zone, if possible. The Department must be notified at least 24 hours prior to production casing cementing operations. Cementing must be by the pump and plug method with a minimum of 25% excess cement.
|
|
(15) At any time, the Department, as it deems
|
| necessary, may require installation of an additional cemented casing string or strings in the well.
|
|
(16) After the setting and cementing of a casing
|
| string, except the conductor casing, and prior to further drilling, the casing string shall be tested with fresh water, mud, or brine to no less than 0.22 psi per foot of casing string length or 1,500 psi, whichever is greater but not to exceed 70% of the minimum internal yield, for at least 30 minutes with less than a 5% pressure loss, except that any casing string that will have pressure exerted on it during stimulation of the well shall be tested to at least the maximum anticipated treatment pressure. If the pressure declines more than 5% or if there are other indications of a leak, corrective action shall be taken before conducting further drilling and high volume horizontal hydraulic fracturing operations. The operator shall contact the Department's District Office for any county in which the well is located at least 24 hours prior to conducting a pressure test to enable an inspector to be present when the test is done. A record of the pressure test must be maintained by the operator and must be submitted to the Department on a form prescribed by the Department prior to conducting high volume horizontal hydraulic fracturing operations. The actual pressure must not exceed the test pressure at any time during high volume horizontal hydraulic fracturing operations.
|
|
(17) Any hydraulic fracturing string used in the high
|
| volume horizontal hydraulic fracturing operations must be either strung into a production liner or run with a packer set at least 100 feet below the deepest cement top and must be tested to not less than the maximum anticipated treating pressure minus the annulus pressure applied between the fracturing string and the production or immediate casing. The pressure test shall be considered successful if the pressure applied has been held for 30 minutes with no more than 5% pressure loss. A function-tested relief valve and diversion line must be installed and used to divert flow from the hydraulic fracturing string-casing annulus to a covered watertight steel tank in case of hydraulic fracturing string failure. The relief valve must be set to limit the annular pressure to no more than 95% of the working pressure rating of the casings forming the annulus. The annulus between the hydraulic fracturing string and casing must be pressurized to at least 250 psi and monitored.
|
|
(18) After a successful pressure test under paragraph
|
| (16) of this subsection, a formation pressure integrity test must be conducted below the surface casing and below all intermediate casing. The operator shall notify the Department's District Office for any county in which the well is located at least 24 hours prior to conducting a formation pressure integrity test to enable an inspector to be present when the test is done. A record of the pressure test must be maintained by the operator and must be submitted to the Department on a form prescribed by the Department prior to conducting high volume horizontal hydraulic fracturing operations. The actual hydraulic fracturing treatment pressure must not exceed the test pressure at any time during high volume horizontal hydraulic fracturing operations.
|
|
(e) Blowout prevention standards shall be set as follows:
(1) The operator shall use blowout prevention
|
| equipment after setting casing with a competent casing seat. Blowout prevention equipment shall be in good working condition at all times.
|
|
(2) The operator shall use pipe fittings, valves,
|
| and unions placed on or connected to the blow out prevention systems that have a working pressure capability that exceeds the anticipated pressures.
|
|
(3) During all drilling and completion operations
|
| when a blowout preventer is installed, tested, or in use, the operator or operator's designated representative shall be present at the well site and that person or personnel shall have a current well control certification from an accredited training program that is acceptable to the Department. The certification shall be available at the well site and provided to the Department upon request.
|
|
(4) Appropriate pressure control procedures and
|
| equipment in proper working order must be properly installed and employed while conducting drilling and completion operations including tripping, logging, running casing into the well, and drilling out solid-core stage plugs.
|
|
(5) Pressure testing of the blowout preventer and
|
| related equipment for any drilling or completion operation must be performed. Testing must be conducted in accordance with current industry standards published by the American Petroleum Institute. Testing of the blowout preventer shall include testing after the blowout preventer is installed on the well but prior to drilling below the last cemented casing seat. Pressure control equipment, including the blowout preventer, that fails any pressure test shall not be used until it is repaired and passes the pressure test.
|
|
(6) A remote blowout preventer actuator, that is
|
| powered by a source other than rig hydraulics, shall be located at least 50 feet from the wellhead and have an appropriate rated working pressure.
|
|
(Source: P.A. 98-22, eff. 6-17-13; 98-756, eff. 7-16-14.)
|
(225 ILCS 732/1-75)
Sec. 1-75. High volume horizontal hydraulic fracturing operations. (a) General. (1) During all phases of high volume horizontal |
| hydraulic fracturing operations, the permittee shall comply with all terms of the permit.
|
|
(2) All phases of high volume horizontal hydraulic
|
| fracturing operations shall be conducted in a manner that shall not pose a significant risk to public health, life, property, aquatic life, or wildlife.
|
|
(3) The permittee shall notify the Department by
|
| phone, electronic communication, or letter, at least 48 hours prior to the commencement of high volume horizontal hydraulic fracturing operations.
|
|
(b) Integrity tests and monitoring.
(1) Before the commencement of high volume horizontal
|
| hydraulic fracturing operations, all mechanical integrity tests required under subsection (d) of Section 1-70 and this subsection must be successfully completed.
|
|
(2) Prior to commencing high volume horizontal
|
| hydraulic fracturing operations and pumping of hydraulic fracturing fluid, the injection lines and manifold, associated valves, fracture head or tree and any other wellhead component or connection not previously tested must be tested with fresh water, mud, or brine to at least the maximum anticipated treatment pressure for at least 30 minutes with less than a 5% pressure loss. A record of the pressure test must be maintained by the operator and made available to the Department upon request. The actual high volume horizontal hydraulic fracturing treatment pressure must not exceed the test pressure at any time during high volume horizontal hydraulic fracturing operations.
|
|
(3) The pressure exerted on treating equipment
|
| including valves, lines, manifolds, hydraulic fracturing head or tree, casing and hydraulic fracturing string, if used, must not exceed 95% of the working pressure rating of the weakest component. The high volume horizontal hydraulic fracturing treatment pressure must not exceed the test pressure of any given component at any time during high volume horizontal hydraulic fracturing operations.
|
|
(4) During high volume horizontal hydraulic
|
| fracturing operations, all annulus pressures, the injection pressure, and the rate of injection shall be continuously monitored and recorded. The records of the monitoring shall be maintained by the operator and shall be provided to the Department upon request at any time during the period up to and including 5 years after the well is permanently plugged or abandoned.
|
|
(5) High volume horizontal hydraulic fracturing
|
| operations must be immediately suspended if any anomalous pressure or flow condition or any other anticipated pressure or flow condition is occurring in a way that indicates the mechanical integrity of the well has been compromised and continued operations pose a risk to the environment. Remedial action shall be undertaken immediately prior to recommencing high volume horizontal hydraulic fracturing operations. The permittee shall notify the Department within 1 hour of suspending operations for any matters relating to the mechanical integrity of the well or risk to the environment.
|
|
(c) Fluid and waste management.
(1) For the purposes of storage at the well site and
|
| except as provided in paragraph (2) of this subsection, hydraulic fracturing additives, hydraulic fracturing fluid, hydraulic fracturing flowback, and produced water shall be stored in above-ground tanks during all phases of drilling, high volume horizontal hydraulic fracturing, and production operations until removed for proper disposal. For the purposes of centralized storage off site for potential reuse prior to disposal, hydraulic fracturing additives, hydraulic fracturing fluid, hydraulic fracturing flowback, and produced water shall be stored in above-ground tanks.
|
|
(2) In accordance with the plan required by paragraph
|
| (11) of subsection (b) of Section 1-35 of this Act and as approved by the Department, the use of a reserve pit is allowed for the temporary storage of hydraulic fracturing flowback. The reserve pit shall be used only in the event of a lack of capacity for tank storage due to higher than expected volume or rate of hydraulic fracturing flowback, or other unanticipated flowback occurrence. Any reserve pit must comply with the following construction standards and liner specifications:
|
|
(A) the synthetic liner material shall have a
|
| minimum thickness of 24 mils with high puncture and tear strength and be impervious and resistant to deterioration;
|
|
(B) the pit lining system shall be designed to
|
| have a capacity at least equivalent to 110% of the maximum volume of hydraulic fracturing flowback anticipated to be recovered;
|
|
(C) the lined pit shall be constructed,
|
| installed, and maintained in accordance with the manufacturers' specifications and good engineering practices to prevent overflow during any use;
|
|
(D) the liner shall have sufficient elongation to
|
| cover the bottom and interior sides of the pit with the edges secured with at least a 12 inch deep anchor trench around the pit perimeter to prevent any slippage or destruction of the liner materials; and
|
|
(E) the foundation for the liner shall be free of
|
| rock and constructed with soil having a minimum thickness of 12 inches after compaction covering the entire bottom and interior sides of the pit.
|
|
(3) Fresh water may be stored in tanks or pits at
|
| the election of the operator.
|
|
(4) Tanks required under this subsection must be
|
| above-ground tanks that are closed, watertight, and will resist corrosion. The permittee shall routinely inspect the tanks for corrosion.
|
|
(5) Hydraulic fracturing fluids and hydraulic
|
| fracturing flowback must be removed from the well site within 60 days after completion of high volume horizontal fracturing operations, except that any excess hydraulic fracturing flowback captured for temporary storage in a reserve pit as provided in paragraph (2) of this subsection must be removed from the well site within 7 days.
|
|
(6) Tanks, piping, and conveyances, including valves,
|
| must be constructed of suitable materials, be of sufficient pressure rating, be able to resist corrosion, and be maintained in a leak-free condition. Fluid transfer operations from tanks to tanker trucks must be supervised at the truck and at the tank if the tank is not visible to the truck operator from the truck. During transfer operations, all interconnecting piping must be supervised if not visible to transfer personnel at the truck and tank.
|
|
(7) Hydraulic fracturing flowback must be tested for
|
| volatile organic chemicals, semi-volatile organic chemicals, inorganic chemicals, heavy metals, and naturally occurring radioactive material prior to removal from the site. Testing shall occur once per well site and the analytical results shall be filed with the Department and the Agency, and provided to the liquid oilfield waste transportation and disposal operators. Prior to plugging and site restoration, the ground adjacent to the storage tanks and any hydraulic fracturing flowback reserve pit must be measured for radioactivity.
|
|
(8) Hydraulic fracturing flowback may only be
|
| disposed of by injection into a Class II injection well that is below interface between fresh water and naturally occurring Class IV groundwater. Produced water may be disposed of by injection in a permitted enhanced oil recovery operation. Hydraulic fracturing flowback and produced water may be treated and recycled for use in hydraulic fracturing fluid for high volume horizontal hydraulic fracturing operations.
|
|
(9) Discharge of hydraulic fracturing fluids,
|
| hydraulic fracturing flowback, and produced water into any surface water or water drainage way is prohibited.
|
|
(10) Transport of all hydraulic fracturing fluids,
|
| hydraulic fracturing flowback, and produced water by vehicle for disposal must be undertaken by a liquid oilfield waste hauler permitted by the Department under Section 8c of the Illinois Oil and Gas Act. The liquid oilfield waste hauler transporting hydraulic fracturing fluids, hydraulic fracturing flowback, or produced water under this Act shall comply with all laws, rules, and regulations concerning liquid oilfield waste.
|
|
(11) Drill cuttings, drilling fluids, and drilling
|
| wastes not containing oil-based mud or polymer-based mud may be stored in tanks or pits. Pits used to store cuttings, fluids, and drilling wastes from wells not using fresh water mud shall be subject to the construction standards identified in paragraph (2) of this subsection (c). Drill cuttings not contaminated with oil-based mud or polymer-based mud may be disposed of onsite subject to the approval of the Department. Drill cuttings contaminated with oil-based mud or polymer-based mud shall not be disposed of onsite. Annular disposal of drill cuttings or fluid is prohibited.
|
|
(12) Any release of hydraulic fracturing fluid,
|
| hydraulic fracturing additive, or hydraulic fracturing flowback, used or generated during or after high volume horizontal hydraulic fracturing operations shall be immediately cleaned up and remediated pursuant to Department requirements. Any release of hydraulic fracturing fluid or hydraulic fracturing flowback in excess of 1 barrel, shall be reported to the Department. Any release of a hydraulic fracturing additive shall be reported to the Department in accordance with the appropriate reportable quantity thresholds established under the federal Emergency Planning and Community Right-to-Know Act as published in the Code of Federal Regulations (CFR), 40 CFR Parts 355, 370, and 372, the federal Comprehensive Environmental Response, Compensation, and Liability Act as published in 40 CFR Part 302, and subsection (r) of Section 112 of the federal Clean Air Act as published in 40 CFR Part 68. Any release of produced water in excess of 5 barrels shall be cleaned up, remediated, and reported pursuant to Department requirements.
|
|
(13) Secondary containment for tanks required under
|
| this subsection and additive staging areas is required. Secondary containment measures may include, as deemed appropriate by the Department, one or a combination of the following: dikes, liners, pads, impoundments, curbs, sumps, or other structures or equipment capable of containing the substance. Any secondary containment must be sufficient to contain 110% of the total capacity of the single largest container or tank within a common containment area. No more than one hour before initiating any stage of the high volume horizontal hydraulic fracturing operations, all secondary containment must be visually inspected to ensure all structures and equipment are in place and in proper working order. The results of this inspection must be recorded and documented by the operator, and available to the Department upon request.
|
|
(14) A report on the transportation and disposal of
|
| the hydraulic fracturing fluids and hydraulic fracturing flowback shall be prepared and included in the well file. The report must include the amount of fluids transported, identification of the company that transported the fluids, the destination of the fluids, and the method of disposal.
|
|
(15) Operators operating wells permitted under this
|
| Act must submit an annual report to the Department detailing the management of any produced water associated with the permitted well. The report shall be due to the Department no later than April 30th of each year and shall provide information on the operator's management of any produced water for the prior calendar year. The report shall contain information relative to the amount of produced water the well permitted under this Act produced, the method by which the produced water was disposed, and the destination where the produced water was disposed in addition to any other information the Department determines is necessary by rule.
|
|
(d) Hydraulic fracturing fluid shall be confined to the targeted formation designated in the permit. If the hydraulic fracturing fluid or hydraulic fracturing flowback are migrating into the freshwater zone or to the surface from the well in question or from other wells, the permittee shall immediately notify the Department and shut in the well until remedial action that prevents the fluid migration is completed. The permittee shall obtain the approval of the Department prior to resuming operations.
(e) Emissions controls.
(1) This subsection applies to all horizontal wells
|
| that are completed with high volume horizontal hydraulic fracturing.
|
|
(2) Except as otherwise provided in paragraph (8) of
|
| this subsection (e), permittees shall be responsible for managing gas and hydrocarbon fluids produced during the flowback period by routing recovered hydrocarbon fluids to one or more storage vessels or re-injecting into the well or another well, and routing recovered natural gas into a flow line or collection system, re-injecting the gas into the well or another well, using the gas as an on-site fuel source, or using the gas for another useful purpose that a purchased fuel or raw material would serve, with no direct release to the atmosphere.
|
|
(3) If it is technically infeasible or economically
|
| unreasonable to minimize emissions associated with the venting of hydrocarbon fluids and natural gas during the flowback period using the methods specified in paragraph (2) of this subsection (e), the permittee shall capture and direct the emissions to a completion combustion device, except in conditions that may result in a fire hazard or explosion, or where high heat emissions from a completion combustion device may negatively impact waterways. Completion combustion devices must be equipped with a reliable continuous ignition source over the duration of the flowback period.
|
|
(4) Except as otherwise provided in paragraph (8) of
|
| this subsection (e), permittees shall be responsible for minimizing the emissions associated with venting of hydrocarbon fluids and natural gas during the production phase by:
|
|
(A) routing the recovered fluids into storage
|
| vessels and (i) routing the recovered gas into a gas gathering line, collection system, or to a generator for onsite energy generation, providing that gas to the surface owner of the well site for use for heat or energy generation, or (ii) using another method other than venting or flaring; and
|
|
(B) employing sand traps, surge vessels,
|
| separators, and tanks as soon as practicable during cleanout operations to safely maximize resource recovery and minimize releases to the environment.
|
|
(5) If the permittee establishes that it is
|
| technically infeasible or economically unreasonable to minimize emissions associated with the venting of hydrocarbon fluids and natural gas during production using the methods specified in paragraph (4) of this subsection (e), the Department shall require the permittee to capture and direct any natural gas produced during the production phase to a flare. Any flare used pursuant to this paragraph shall be equipped with a reliable continuous ignition source over the duration of production. In order to establish technical infeasibility or economic unreasonableness under this paragraph (5), the permittee must demonstrate, for each well site on an annual basis, that taking the actions listed in paragraph (4) of this subsection (e) are not cost effective based on a site-specific analysis. Permittees that use a flare during the production phase for operations other than emergency conditions shall file an updated site-specific analysis annually with the Department. The analysis shall be due one year from the date of the previous submission and shall detail whether any changes have occurred that alter the technical infeasibility or economic unreasonableness of the permittee to reduce their emissions in accordance with paragraph (4) of this subsection (e).
|
|
(6) Uncontrolled emissions exceeding 6 tons per year
|
| from storage tanks shall be recovered and routed to a flare that is designed in accordance with 40 CFR 60.18 and is certified by the manufacturer of the device. The permittee shall maintain and operate the flare in accordance with manufacturer specifications. Any flare used under this paragraph must be equipped with a reliable continuous ignition source over the duration of production.
|
|
(7) The Department may approve an exemption that
|
| waives the flaring requirements of paragraphs (5) and (6) of this subsection (e) only if the permittee demonstrates that the use of the flare will pose a significant risk of injury or property damage and that alternative methods of collection will not threaten harm to the environment. In determining whether to approve a waiver, the Department shall consider the quantity of casinghead gas produced, the topographical and climatological features at the well site, and the proximity of agricultural structures, crops, inhabited structures, public buildings, and public roads and railways.
|
|
(8) For each wildcat well, delineation well, or low
|
| pressure well, permittees shall be responsible for minimizing the emissions associated with venting of hydrocarbon fluids and natural gas during the flowback period and production phase by capturing and directing the emissions to a completion combustion device during the flowback period and to a flare during the production phase, except in conditions that may result in a fire hazard or explosion, or where high heat emissions from a completion combustion device or flare may negatively impact waterways. Completion combustion devices and flares shall be equipped with a reliable continuous ignition source over the duration of the flowback period and the production phase, as applicable.
|
|
(9) On or after July 1, 2015, all flares used under
|
| paragraphs (5) and (8) of this subsection (e) shall (i) operate with a combustion efficiency of at least 98% and in accordance with 40 CFR 60.18; and (ii) be certified by the manufacturer of the device. The permittee shall maintain and operate the flare in accordance with manufacturer specifications.
|
|
(10) Permittees shall employ practices for control of
|
| fugitive dust related to their operations. These practices shall include, but are not limited to, the use of speed restrictions, regular road maintenance, and restriction of construction activity during high-wind days. Additional management practices such as road surfacing, wind breaks and barriers, or automation of wells to reduce truck traffic may also be required by the Department if technologically feasible and economically reasonable to minimize fugitive dust emissions.
|
|
(11) Permittees shall record and report to the
|
| Department on an annual basis the amount of gas flared or vented from each high volume horizontal hydraulic fracturing well. Three years after the effective date of the first high volume horizontal hydraulic fracturing well permit issued by the Department, and every 3 years thereafter, the Department shall prepare a report that analyzes the amount of gas that has been flared or vented and make recommendations to the General Assembly on whether steps should be taken to reduce the amount of gas that is being flared or vented in this State.
|
|
(f) High volume horizontal hydraulic fracturing operations completion report. Within 60 calendar days after the conclusion of high volume horizontal hydraulic fracturing operations, the operator shall file a high volume horizontal hydraulic fracturing operations completion report with the Department. A copy of each completion report submitted to the Department shall be provided by the Department to the Illinois State Geological Survey. The completion reports required by this Section shall be considered public information and shall be made available on the Department's website. The high volume horizontal hydraulic fracturing operations completion report shall contain the following information:
(1) the permittee name as listed in the permit
|
|
(2) the dates of the high volume horizontal hydraulic
|
|
(3) the county where the well is located;
(4) the well name and Department reference number;
(5) the total water volume used in the high volume
|
| horizontal hydraulic fracturing operations of the well, and the type and total volume of the base fluid used if something other than water;
|
|
(6) each source from which the water used in the high
|
| volume horizontal hydraulic fracturing operations was drawn, and the specific location of each source, including, but not limited to, the name of the county and latitude and longitude coordinates;
|
|
(7) the quantity of hydraulic fracturing flowback
|
|
(8) a description of how hydraulic fracturing
|
| flowback recovered from the well was disposed and, if applicable, reused;
|
|
(9) a chemical disclosure report identifying each
|
| chemical and proppant used in hydraulic fracturing fluid for each stage of the hydraulic fracturing operations including the following:
|
|
(A) the total volume of water used in the
|
| hydraulic fracturing treatment of the well or the type and total volume of the base fluid used in the hydraulic fracturing treatment, if something other than water;
|
|
(B) each hydraulic fracturing additive used in
|
| the hydraulic fracturing fluid, including the trade name, vendor, a brief descriptor of the intended use or function of each hydraulic fracturing additive, and the Material Safety Data Sheet (MSDS), if applicable;
|
|
(C) each chemical intentionally added to the base
|
| fluid, including for each chemical, the Chemical Abstracts Service number, if applicable; and
|
|
(D) the actual concentration in the base fluid,
|
| in percent by mass, of each chemical intentionally added to the base fluid;
|
|
(10) all pressures recorded during the high volume
|
| horizontal hydraulic fracturing operations; and
|
|
(11) any other reasonable or pertinent information
|
| related to the conduct of the high volume horizontal hydraulic fracturing operations the Department may request or require by administrative rule.
|
|
(Source: P.A. 98-22, eff. 6-17-13; 98-756, eff. 7-16-14.)
|
(225 ILCS 732/1-80)
Sec. 1-80. Water quality monitoring. (a) Each applicant for a high volume horizontal hydraulic fracturing permit shall provide the Department with a work plan to ensure accurate and complete sampling and testing as required under this Section. The work plan shall ensure compliance with the requirements of this Section and include, at a minimum, the following: (1) information identifying all water sources within |
| the range of testing under this Section;
|
|
(2) a sampling plan and protocol, including
|
| notification to the Department at least 7 calendar days prior to sample collection;
|
|
(3) the name and contact information of an
|
| independent third party under the supervision of a professional engineer or professional geologist that shall be designated to conduct sampling to establish a baseline as provided for under subsection (b) of this Section;
|
|
(4) the name and contact information of an
|
| independent third party under the supervision of a professional engineer or professional geologist that shall be designated to conduct sampling to establish compliance with monitoring as provided within subsection (c) of this Section;
|
|
(5) the name and contact information of an
|
| independent testing laboratory, certified to perform the required laboratory method, to conduct the analysis required under subsections (b) and (c) of this Section;
|
|
(6) proof of access and the right to test within the
|
| area for testing prescribed within subsection (b) of this Section during the duration of high volume horizontal hydraulic fracturing operations covered under the permit application, and copies of any non-disclosure agreements made under subsection (d) of this Section; and
|
|
(7) identification of practicable contingency
|
| measures, including provision for alternative drinking water supplies, which could be implemented in the event of pollution or diminution of a water source as provided for in Section 1-83.
|
|
(b) Prior to conducting high volume horizontal hydraulic fracturing operations on a well, a permittee shall retain an independent third party, as required within paragraph (3) of subsection (a) of this Section, and shall conduct baseline water quality sampling of all water sources within 1,500 feet of the well site prior to any fracturing activities. Where (i) there are no groundwater wells within 1,500 feet of a well site, or access to groundwater wells within 1,500 feet of the well site has been denied under subsection (d) of this Section, and (ii) the proposed well site is located within 1,500 feet horizontally from any portion of an aquifer, the permittee shall conduct sampling of the aquifer at the closest groundwater well with access to the aquifer to which the permittee has not been denied access under subsection (d) of this Section. Installation of a groundwater monitoring well is not required to satisfy the sampling requirements of this Section. The samples collected by the independent third party, under the supervision of a professional engineer or professional geologist, shall be analyzed by an independent testing laboratory in accordance with paragraph (4) of subsection (a) of this Section. Testing shall be done by collection of a minimum of 3 samples for each water source required to be tested under this Section. The permittee shall, within 7 calendar days after receipt of results of tests conducted under this subsection, submit the results to the Department or to the owner of the water source under a non-disclosure agreement under subsection (d) of this Section. The Department shall post the results on its website within 7 calendar days after receipt. The results shall, at a minimum, include a detailed description of the sampling and testing conducted under this subsection, the chain of custody of the samples, and quality control of the testing.
(c) After baseline tests are conducted under subsection (b) of this Section and following issuance of a permit by the Department, the permittee shall have all water sources which are subjected to sampling under subsection (b) of this Section sampled and tested in the same manner 6 months, 18 months, and 30 months after the high volume horizontal hydraulic fracturing operations have been completed. Sampling of a water source under this subsection is not required if the water source was sampled under this subsection or subsection (b) within the previous month. The permittee shall notify the Department at least 7 calendar days prior to taking the sample. The permittee shall, within 7 calendar days after receipt of results of tests conducted under this subsection (c), submit the results to the Department or to the owner of the water source pursuant to a non-disclosure agreement under subsection (d) of this Section. The results shall include, at a minimum, a detailed description of the sampling and testing conducted under this subsection, the chain of custody of the samples, and quality control of the testing.
(d) Sampling of private water wells or ponds wholly contained within private property shall not be required where the owner of the private property declines, expressly and in writing, to provide access or permission for sampling. If the owner of the private property declines to provide proof of his or her refusal to allow access in writing, the operator shall provide the Department evidence as to the good faith efforts that were made to secure the required documentation. Permits issued under this Act cannot be denied if the owner of the private property declines to provide proof of his or her refusal to allow access in writing and the permittee provides evidence that good faith efforts were made to gain access for the purposes of conducting tests. The owners of private property may condition access or permission for sampling of a private water well or pond wholly within the property or a portion of any perennial stream or river that flows through the property under a non-disclosure agreement, which must include the following terms and conditions:
(1) the permittee shall provide the results of the
|
| water quality testing to the property owners;
|
|
(2) the permittee shall retain the results of the
|
| water quality testing until at least one year after completion of all monitoring under this Section for review by the Department upon request;
|
|
(3) the permittee shall not file with the Department
|
| the results of the water quality testing, except under paragraph (4) of subsection (d) of this Section; and
|
|
(4) the permittee shall notify the Department within
|
| 7 calendar days of its receipt of the water quality data where any testing under subsection (c) of this Section indicates that concentrations exceed the standards or criteria referenced in the definition of pollution or diminution under Section 1-5 of this Act.
|
|
(e) Each set of samples collected under subsections (b) and (c) of this Section shall include analyses for:
(1) pH;
(2) total dissolved solids, dissolved methane,
|
| dissolved propane, dissolved ethane, alkalinity, and specific conductance;
|
|
(3) chloride, sulfate, arsenic, barium, calcium,
|
| chromium, iron, magnesium, selenium, cadmium, lead, manganese, mercury, and silver;
|
|
(4) BTEX; and
(5) gross alpha and beta particles to determine the
|
| presence of any naturally occurring radioactive materials.
|
|
Sampling shall, at a minimum, be consistent with the work plan and allow for a determination of whether any hydraulic fracturing additive or other contaminant has caused pollution or diminution for purposes of Sections 1-83 and 1-85 of this Act.
(Source: P.A. 98-22, eff. 6-17-13.)
|
(225 ILCS 732/1-97)
Sec. 1-97. Department mapping and reporting. On or before February 1, 2014, the Department shall, with the assistance of the Illinois State Geological Survey, submit a report to the General Assembly and Governor identifying the following in Illinois and include any recommendations for additional legislative or administrative action on these items: (a) the location of resources of shale gas and oil, conventional gas and oil, and process materials, including sand and other naturally occurring geologic materials used in high volume horizontal hydraulic fracturing operations;
(b) the potential impacts of high volume horizontal hydraulic fracturing operations on:
(1) sites owned, managed or leased by the Department;
(2) nature preserves;
(3) sites on the Register of Land and Water Reserves;
(4) the availability of water for human consumption |
| and general domestic use; and
|
|
(5) the potential for influencing natural seismic
|
|
Two years after the effective date of the first high volume horizontal hydraulic fracturing permit issued by the Department, and every 3 years thereafter, the Department shall prepare a report that examines the following:
(1) the number of high volume horizontal hydraulic
|
| fracturing permits issued by the Department, on an annual basis;
|
|
(2) a map showing the locations in this State where
|
| high volume horizontal hydraulic fracturing operations have been permitted by the Department;
|
|
(3) identification of the latest scientific research,
|
| best practices, and technological improvements related to high volume horizontal hydraulic fracturing operations and methods to protect the environment and public health;
|
|
(4) any confirmed environmental impacts in this State
|
| due to high volume horizontal hydraulic fracturing operations, including, but not limited to, any reportable release of hydraulic fracturing flowback, hydraulic fracturing fluid, and hydraulic fracturing additive;
|
|
(5) confirmed public health impacts in this State due
|
| to high volume horizontal hydraulic fracturing operations;
|
|
(6) a comparison of the revenues generated under
|
| subsection (e) of Section 1-35 of this Act to the Department's costs associated with implementing and administering provisions of this Act;
|
|
(7) a comparison of the revenues generated under
|
| subsection (e) of Section 1-87 of this Act to the Agency's costs associated with implementing and administering provisions of this Act;
|
|
(7.5) a summary of revenues generated annually from
|
| income, ad valorem, sales, and any other State and local taxes applicable to activity permitted under this Act by the Department, including an estimate of the income tax generated from lease payments and royalty payments;
|
|
(8) a description of any modifications to existing
|
| programs, practices, or rules related to high volume horizontal hydraulic fracturing operations made by the Department;
|
|
(9) any problems or issues the Department identifies
|
| as it implements and administers the provisions of this Act;
|
|
(10) any recommendations for legislative action by
|
| the General Assembly to address the findings in the report; and
|
|
(11) any other information the Department deems
|
| relevant regarding its specific experiences implementing and administering the provisions of this Act and, generally, high volume horizontal hydraulic fracturing operations.
|
|
The first report shall also examine any studies issued by the United States Environmental Protection Agency regarding high volume horizontal hydraulic fracturing operations. The report required by this Section shall be provided to the General Assembly and Governor.
(Source: P.A. 98-22, eff. 6-17-13.)
|