[ Search ] [ Legislation ] [ Bill Summary ]
[ Home ] [ Back ] [ Bottom ]
90_HB0079 Appropriates $201,489,000 in FY97 funds from the Capital Development Fund to the Capital Development Board for specified Department of Corrections projects. Effective immediately. LRB9000874WHmg LRB9000874WHmg 1 AN ACT regarding appropriations. 2 Be it enacted by the People of the State of Illinois, 3 represented in the General Assembly: 4 Section 5. "An Act making appropriations and 5 reappropriations", Public Act 89-501, approved June 28, 1996, 6 is amended by adding Sections 3B, 3C, 3D, 3E, 3F, 3G, and 3H 7 to Article 77 as follows: 8 (P.A. 89-501, Article 77, Section 3B new) 9 Sec. 3B. In addition to any funds otherwise 10 appropriated, the sum of $42,750,000, or so much of that sum 11 as may be necessary, is appropriated from the Capital 12 Development Fund to the Capital Development Board for the 13 Department of Corrections for planning, design, construction, 14 equipment, and other necessary costs for a correctional 15 facility for juveniles. 16 (P.A. 89-501, Article 77, Section 3C new) 17 Sec. 3C. In addition to any funds otherwise appropriated, 18 the sum of $23,000,000, or so much of that sum as may be 19 necessary, is appropriated from the Capital Development Fund 20 to the Capital Development Board for the Department of 21 Corrections for planning and conversion of the Meyer Mental 22 Health Center to a correctional facility. 23 (P.A. 89-501, Article 77, Section 3D new) 24 Sec. 3D. In addition to any funds otherwise appropriated, 25 the sum of $400,000, or so much of that sum as may be 26 necessary, is appropriated from the Capital Development Fund 27 to the Capital Development Board for the Department of 28 Corrections for upgrading the plumbing system at Menard 29 Correctional Center. -2- LRB9000874WHmg 1 (P.A. 89-501, Article 77, Section 3E new) 2 Sec. 3E. In addition to any funds otherwise appropriated, 3 the sum of $950,000, or so much of that sum as may be 4 necessary, is appropriated from the Capital Development Fund 5 to the Capital Development Board for the Department of 6 Corrections for upgrading the coal handling system and 7 repairing or replacing the boiler system at Menard 8 Correctional Center. 9 (P.A. 89-501, Article 77, Section 3F new) 10 Sec. 3F. In addition to any funds otherwise appropriated, 11 the sum of $16,800,000, or so much of that sum as may be 12 necessary, is appropriated from the Capital Development Fund 13 to the Capital Development Board for the Department of 14 Corrections for completion of planning, site improvements, 15 utility upgrade, equipment, and construction of 2 housing 16 units, one at Graham Correctional Center and one at Logan 17 Correctional Center. 18 (P.A. 89-501, Article 77, Section 3G new) 19 Sec. 3G. In addition to any funds otherwise appropriated, 20 the sum of $7,000,000, or so much of that sum as may be 21 necessary, is appropriated from the Capital Development Fund 22 to the Capital Development Board for the Department of 23 Corrections for completion of planning, site improvements, 24 utility upgrade, equipment, and construction of a housing 25 unit at the Illinois Youth Center at Joliet. 26 (P.A. 89-501, Article 77, Section 3H new) 27 Section 3H. The following named amounts, or so much of 28 those amounts as may be necessary, are appropriated from the 29 Capital Development Fund to the Capital Development Board for 30 the Department of Corrections for the projects hereinafter 31 enumerated: -3- LRB9000874WHmg 1 STATEWIDE 2 For correction of deficiencies in water systems 3 at three correctional facilities ........... $ 100,000 4 For replacement of locks, windows and doors at 5 the following locations as set forth below: . 4,000,000 6 Dwight .........................291,400 7 IYC Harrisburg .................943,000 8 IYC Joliet .....................367,500 9 Menard .......................1,350,000 10 Pontiac .........................77,100 11 IYC Valley View ................500,000 12 Vienna .........................471,000 13 For planning, design, construction, equipment 14 and other necessary costs for the 15 Pinckneyville Medium Security Correctional 16 Facility ................................... 73,000,000 17 DANVILLE CORRECTIONAL CENTER 18 For renovation of interior and exterior walls, 19 in addition to funds previously appropriated 20 ............................................ 4,000,000 21 DIXON CORRECTIONAL CENTER 22 For renovation of the groundwater storage tank 23 and abatement of crawl space pipes in Bldgs. 24 26, 27 and 29 .............................. 700,000 25 DWIGHT CORRECTIONAL CENTER 26 For completion of medical unit, in addition to 27 funds previously appropriated .............. 3,500,000 28 For expansion of the Education Building and 29 Dietary and construction of a warehouse .... 4,700,000 30 EAST MOLINE CORRECTIONAL CENTER 31 For upgrading locking system, in addition to 32 funds previously appropriated .............. 800,000 33 ILLINOIS YOUTH CENTER - HARRISBURG 34 For upgrading the domestic water system ........ 675,000 -4- LRB9000874WHmg 1 For upgrading the HVAC system .................. 532,000 2 ILLINOIS YOUTH CENTER - PERE MARQUETTE 3 For upgrading the electrical distribution 4 system ..................................... 215,000 5 ILLINOIS YOUTH CENTER - VALLEY VIEW 6 For upgrading dormitory restrooms and fixtures, 7 in addition to funds previously 8 appropriated ............................... 550,000 9 JOLIET CORRECTIONAL CENTER 10 For upgrading the power house and installation 11 of a generator ............................. 407,000 12 STATEVILLE CORRECTIONAL CENTER - JOLIET 13 For replacement of the MSU ..................... 6,500,000 14 LINCOLN CORRECTIONAL CENTER 15 For upgrading the water softener system ........ 150,000 16 MENARD CORRECTIONAL CENTER - CHESTER 17 For upgrading roads and sidewalks .............. 310,000 18 For conversion of the Maintenance Building to an 19 inmate dormitory ........................... 250,000 20 For conversion of the Administration Building 21 basement to a courtroom and attorney 22 offices .................................... 100,000 23 For upgrading the steam and water distribution 24 systems, in addition to funds previously 25 appropriated ............................... 2,400,000 26 PONTIAC CORRECTIONAL CENTER 27 For renovation of main sally port .............. 300,000 28 VANDALIA CORRECTIONAL CENTER 29 For renovation of dormitory shower rooms ....... 450,000 30 VIENNA CORRECTIONAL CENTER 31 For upgrading the steam distribution system and 32 renovation of Powerhouse, in addition to 33 funds previously appropriated .............. 4,000,000 34 For installation of security fencing ........... 1,000,000 -5- LRB9000874WHmg 1 For upgrading air conditioning system and 2 replacement of cooling tower ............... 1,100,000 3 For upgrading the electrical, plumbing and HVAC 4 systems in four buildings .................. 850,000 5 Section 99. Effective date. This Act takes effect upon 6 becoming law.