State of Illinois
90th General Assembly
Legislation

   [ Search ]   [ Legislation ]   [ Bill Summary ]
[ Home ]   [ Back ]   [ Bottom ]



90_HB2131

      70 ILCS 2605/11.3         from Ch. 42, par. 331.3
          Amends the Metropolitan Water Reclamation  District  Act.
      Allows  a  sanitary district to use competitive selection and
      the prequalification of bidders in  connection  with  2-phase
      design/build selection procedures.  Sets the requirements for
      2-phase design/build selection procedures.
                                                     LRB9005151MWpc
                                               LRB9005151MWpc
 1        AN  ACT  to  amend  the  Metropolitan  Water  Reclamation
 2    District Act by changing Section 11.3.
 3        Be  it  enacted  by  the People of the State of Illinois,
 4    represented in the General Assembly:
 5        Section 5.  The Metropolitan Water  Reclamation  District
 6    Act is amended by changing Section 11.3 as follows:
 7        (70 ILCS 2605/11.3) (from Ch. 42, par. 331.3)
 8        Sec.  11.3.   Competitive bidding; competitive selection;
 9    prequalification of bidders.
10        (a)  Except as provided in Sections 11.4  and  11.5,  all
11    purchase  orders  or contracts involving amounts in excess of
12    $10,000 and made by or on behalf of the sanitary district for
13    labor, services or work,  the  purchase,  lease  or  sale  of
14    personal  property,  materials, equipment or supplies, or the
15    granting of any concession, shall be let  by  free  and  open
16    competitive   bidding  after  advertisement,  to  the  lowest
17    responsible bidder or to the highest responsible  bidder,  as
18    the case may be, depending upon whether the sanitary district
19    is to expend or receive money.
20        All such purchase orders or contracts which shall involve
21    amounts  of  $10,000 or less, shall also be let in the manner
22    prescribed above  whenever  practicable,  except  that  after
23    solicitation  of  bids, such purchase orders or contracts may
24    be let in the open market, in a manner calculated  to  insure
25    the  best  interests  of  the  public. The provisions of this
26    section are subject to any contrary provisions  contained  in
27    "An  Act concerning the use of Illinois mined coal in certain
28    plants and institutions", filed July 13, 1937, as  heretofore
29    and hereafter amended.
30        Notwithstanding  the  provisions  of  this  Section,  the
31    sanitary  district  is expressly authorized to establish such
                            -2-                LRB9005151MWpc
 1    procedures as it deems appropriate to comply  with  state  or
 2    federal   regulations   as  to  affirmative  action  and  the
 3    utilization of small and minority businesses in  construction
 4    and procurement contracts.
 5        (b) (1)  In    connection   with   2-phase   design/build
 6    selection procedures authorized in this Section, the Board of
 7    Commissioners may authorize the  General  Superintendent,  by
 8    the affirmative vote of two-thirds of the then members of the
 9    Board  of Commissioners, to use competitive selection and the
10    prequalification  of  responsible  bidders  consistent   with
11    applicable federal regulations and this subsection (b).
12        (2)  Two-phase  design/build  selection  procedures shall
13    consist of the following:
14             (i)  The  General  Superintendent   shall   develop,
15        through  licensed  architects  or  licensed  engineers, a
16        scope of work statement for inclusion in the solicitation
17        for phase-one proposals  that  defines  the  project  and
18        provides prospective offerors with sufficient information
19        regarding  the project requirements.  The statement shall
20        include  criteria,  preliminary  design,  general  budget
21        parameters, and general schedule or delivery requirements
22        to enable the offerors to submit proposals that meet  the
23        District's need.  When the 2-phase design/build selection
24        procedure   is   used  and  the  District  contracts  for
25        development of the scope of work statement, the  District
26        shall  contract for architectural or engineering services
27        as defined by and in accordance with  the  Architectural,
28        Engineering,  and  Land  Surveying  Qualifications  Based
29        Selection Act and all applicable licensing statutes.
30             (ii)  The   evaluation   factors   to   be  used  in
31        evaluating phase-one proposals shall  be  stated  in  the
32        solicitation and shall include specialized experience and
33        technical   competence,   capability   to  perform,  past
34        performance  of  the  offeror's   team   (including   the
                            -3-                LRB9005151MWpc
 1        architect,  engineer  and  construction  members  of  the
 2        team), and other appropriate technical and qualifications
 3        factors.   Each solicitation shall establish the relative
 4        importance assigned to the  evaluation  factors  and  the
 5        subfactors  that  must be considered in the evaluation of
 6        phase-one  proposals  on  the  basis  of  the  evaluation
 7        factors set forth in the solicitation.  Each design/build
 8        team  shall  include  a  licensed   design   professional
 9        independent  from  the  District's  licensed architect or
10        engineer and a licensed design professional must be named
11        in the phase-one proposals submitted to the District.
12             (iii)  On the basis of the  phase-one  proposal  the
13        District  shall  select  as the most highly qualified the
14        number of offerors  specified  in  the  solicitation  and
15        request   the   selected   offerors   to  submit  phase-2
16        competitive proposals  and  cost  or  price  information.
17        Each solicitation shall establish the relative importance
18        assigned  to  the  evaluation  factors and the subfactors
19        that shall be considered in  the  evaluation  of  phase-2
20        proposals  on  the  basis  of  the evaluation factors set
21        forth in the solicitation.  The  District  may  negotiate
22        with the selected design/build team after award but prior
23        to  contract execution for the purpose of securing better
24        terms than  originally  proposed,  provided  the  salient
25        features   of   the  design/build  solicitation  are  not
26        diminished.    Each   phase-2   solicitation    evaluates
27        separately (A) the technical submission for the proposal,
28        including   design  concepts  or  proposed  solutions  to
29        requirements addressed within the scope of work  and  (B)
30        the  evaluation factors and subfactors, including cost or
31        price, that must be  considered  in  the  evaluations  of
32        proposals.
33             (iv)  A  design/build  solicitation issued under the
34        procedures in this subsection (b) shall state the maximum
                            -4-                LRB9005151MWpc
 1        number of offerors that are  to  be  selected  to  submit
 2        competitive   phase-2   proposals.   The  maximum  number
 3        specified in the solicitation shall not exceed  5  unless
 4        the  District  with respect to an individual solicitation
 5        determines that a specified number greater than 5  is  in
 6        the  best interest of the District and is consistent with
 7        the purposes and objective of  the  2-phase  design/build
 8        selection process.
 9             (v)  All  designs  submitted  as part of the 2-phase
10        selection process and not selected shall  be  proprietory
11        to the preparers.
12    (Source: P.A. 83-835.)

[ Top ]