State of Illinois
90th General Assembly
Legislation

   [ Search ]   [ Legislation ]   [ Bill Summary ]
[ Home ]   [ Back ]   [ Bottom ]



90_HB3164

      510 ILCS 77/15
          Amends the Livestock Management Facilities Act concerning
      livestock waste lagoons.  Makes a technical change.
                                                     LRB9009360PTsb
                                               LRB9009360PTsb
 1        AN ACT to amend the Livestock Management  Facilities  Act
 2    by changing Section 15.
 3        Be  it  enacted  by  the People of the State of Illinois,
 4    represented in the General Assembly:
 5        Section 5.  The Livestock Management  Facilities  Act  is
 6    amended by changing Section 15 as follows:
 7        (510 ILCS 77/15)
 8        (Text of Section before amendment by P.A. 90-565)
 9        Sec. 15. Livestock waste lagoon.
10        (a)  Standards  for  livestock waste lagoon construction.
11    Any earthen livestock waste lagoon  subject  to  registration
12    shall  be  constructed or modified in accordance with "Design
13    of Anaerobic Lagoons for Animal Waste Management" promulgated
14    by  the  American  Society  of  Agricultural  Engineers   and
15    designated  (ASAE  EP403.1)  or  the  national  guidelines as
16    published by the  United  States  Department  of  Agriculture
17    Natural  Resource Conservation Service in Illinois and titled
18    Waste Treatment Lagoon.  The owner or operator of the earthen
19    livestock lagoon may,  with  approval  from  the  Department,
20    modify  or  exceed  these   standards  in  order to meet site
21    specific  objectives.    The   Department   shall   determine
22    compliance  with  these  requirements.   The  Department  may
23    require  changes  in  design  or  additional  requirements to
24    protect groundwater, such as extra liner depth  or  synthetic
25    liners, when it appears groundwater could be impacted.
26        (b)  Registration    and   certification.   Any   earthen
27    livestock waste lagoon newly constructed  or  modified  (does
28    not  include  repairs)  after  the  effective  date  of rules
29    adopted  for  the  implementation  of  this  Act   shall   be
30    registered  by the owner or operator with the Department on a
31    form provided by the Department.  Lagoons  constructed  prior
                            -2-                LRB9009360PTsb
 1    to the effective date of rules adopted for the implementation
 2    of this Act may register with the Department at no charge.
 3        The owner or operator shall register such lagoon with the
 4    Department  during  the  preconstruction phase.  Construction
 5    shall  not  begin  until  30  days  after  submittal   of   a
 6    registration form by certified mail to the Department.
 7        Livestock  waste  lagoon registration forms shall be made
 8    available to  producers  at  offices  of  the  Department  of
 9    Agriculture,  Cooperative  Extension  Service,  and  Soil and
10    Water Conservation Districts.
11        Registration information shall include the following:
12             (1)  Name(s)  and  address(es)  of  the  owner   and
13        operator  who  are  responsible  for  the livestock waste
14        lagoon.
15             (2)  General location of lagoon.
16             (3)  Design construction plans and specifications.
17             (4)  Specific location information:
18                  (A)  Distance to a private  or  public  potable
19             well;
20                  (B)  Distance   to   closest  occupied  private
21             residence (other  than  any  occupied  by  owner  or
22             operator);
23                  (C)  Distance to nearest stream; and
24                  (D)  Distance to nearest populated area.
25             (5)  Anticipated   beginning  and  ending  dates  of
26        construction.
27             (6)  Type of livestock and number of animal units.
28        The Department of Agriculture upon receipt of a livestock
29    waste lagoon registration  form  shall  review  the  form  to
30    determine  that  all  required information has been provided.
31    The person filing the registration shall be  notified  within
32    15  working  days  that  the registration is complete or that
33    clarification of information is needed.   No  later  than  10
34    working  days after receipt of the clarification information,
                            -3-                LRB9009360PTsb
 1    the Department shall notify the owner or  operator  that  the
 2    registration is complete.
 3        The  Department  shall inspect an earthen livestock waste
 4    lagoon  during  at  least  one  of  the   following   phases:
 5    preconstruction,  construction,  and  post-construction.  The
 6    Department shall  require  modifications  when  necessary  to
 7    bring  construction  in  compliance with the standards as set
 8    forth in subsection (a) of Section 15.  The person making the
 9    inspection shall  discuss  with  the  owner  or  operator  an
10    evaluation  of  the  livestock  waste lagoon construction and
11    provide on-site  written  recommendations  to  the  owner  or
12    operator  of  what  modifications  are  necessary or that the
13    lagoon meets the standards set forth  in  subsection  (a)  of
14    Section 15.
15        The  person  making  any  inspection  shall  comply  with
16    reasonable  animal  health protection procedures as requested
17    by the owner or operator.
18        Upon completion of the construction or modification,  but
19    prior to placing the lagoon in service, the owner or operator
20    of  the  livestock  waste  lagoon  shall  certify  on  a form
21    provided  by  the  Department  that  the  lagoon   has   been
22    constructed  or modified in accordance with the standards set
23    forth  in  subsection  (a)  of  Section  15  and   that   the
24    information provided on the registration form is correct.
25             (1)  The  certification  notice  to  the  Department
26        shall include a  certification statement and signature.
27             (2)  The   certification   shall  state:  "I  hereby
28        certify that the information provided  on  this  form  is
29        correct  and  that  the  lagoon  has  been constructed in
30        accordance  with  the  standards  as  required   by   the
31        Livestock Management Facilities Act."
32        The  owner or operator of the lagoon may proceed to place
33    the lagoon in service no earlier than 10 working  days  after
34    submitting  to  the  Department a certification of compliance
                            -4-                LRB9009360PTsb
 1    statement.
 2        (c)  Complaint procedure. Any person having  a  complaint
 3    concerning  an  earthen  livestock  waste  lagoon  may file a
 4    complaint  with  the  Agency.   If  the  Agency  finds   that
 5    groundwater   has   been   negatively   impacted  because  of
 6    structural problems with the earthen lagoon, the Agency shall
 7    notify the Department that  modification  of  the  lagoon  is
 8    necessary.  The livestock owner or operator or the Department
 9    may request guidance from the  United  States  Department  of
10    Agriculture  Natural  Resource  Conservation  Service  or the
11    University of Illinois Cooperative Extension Service.
12        The person making any inspection shall comply with animal
13    health protection procedures as requested  by  the  owner  or
14    operator.
15        Any  earthen  livestock  waste lagoon in service prior to
16    the effective date of the rules for  implementation  of  this
17    Act is not subject to registration but is only subject to the
18    complaint  procedure.   However,  any  such  livestock  waste
19    lagoon  found  impacting  groundwater shall be required to be
20    repaired,  modified,  or  have   procedures   instituted   so
21    groundwater is not negatively impacted.
22        If   an   investigation   reveals  groundwater  has  been
23    negatively  impacted,  the  Department   and   Agency   shall
24    cooperate   with  the  owner  or  operator  of  the  affected
25    livestock waste lagoon to provide a  reasonable  solution  to
26    protect the groundwater.
27        Nothing   in   this  Section  shall  limit  the  Agency's
28    authority  under  the   Environmental   Protection   Act   to
29    investigate  and  respond  to violations of the Environmental
30    Protection Act or rules adopted under that Act.
31        (d)  Livestock  waste  lagoon  registration   fee.    The
32    livestock waste lagoon registration fee is $50.
33        (e)  Closure of livestock waste lagoons. When any earthen
34    livestock  waste  lagoon is removed from service, it shall be
                            -5-                LRB9009360PTsb
 1    completely emptied.  Appropriate closure procedures shall  be
 2    followed  as  determined by rule.  The remaining hole must be
 3    filled.  The closure requirements shall be  completed  within
 4    two  years from the date of cessation of operation unless the
 5    lagoon is maintained or serviced.  The Department may grant a
 6    waiver to the before-stated closure  requirements  that  will
 7    permit the lagoon to be used for an alternative purpose.
 8        Upon  a  change  in  ownership  of  a  registered earthen
 9    livestock waste lagoon, the owner shall notify the Department
10    of the change within 30 working days of the  closing  of  the
11    transaction.
12        (f)  Administrative   authority.   All   actions  of  the
13    Department  of  Agriculture  are  subject  to  the   Illinois
14    Administrative Procedure Act.
15        Any   earthen   livestock   waste   lagoon   subject   to
16    registration  shall  not  begin  operation until the owner or
17    operator of the lagoon has met the requirements of this Act.
18        The owner or operator  of  any  earthen  livestock  waste
19    lagoon  subject  to registration that has not been registered
20    or constructed in accordance  with  standards  set  forth  in
21    subsection  (a) of Section 15 shall, upon being identified as
22    such by the  Department,  be  given  written  notice  by  the
23    Department  to  register  and  certify  the  lagoon within 10
24    working days of receipt of the notice.   The  Department  may
25    inspect such lagoon and require compliance in accordance with
26    subsections  (a)  and  (b)  of  this Section. If the owner or
27    operator of the livestock waste lagoon  that  is  subject  to
28    registration  fails to comply with the notice, the Department
29    may issue a  cease  and  desist  order  until  such  time  as
30    compliance  is  obtained  with  the requirements of this Act.
31    Failure to  construct  the  lagoon  in  accordance  with  the
32    construction   plan   and  Department  recommendations  is  a
33    business offense punishable  by  a  fine  of  not  more  than
34    $5,000.
                            -6-                LRB9009360PTsb
 1    (Source: P.A. 89-456, eff. 5-21-96.)
 2        (Text of Section after amendment by P.A. 90-565)
 3        Sec. 15. Livestock waste lagoon.
 4        (a)  Standards  for  livestock waste lagoon construction;
 5    compliance; and changes. Any earthen livestock  waste  lagoon
 6    subject  to  registration shall be constructed or modified in
 7    accordance with "Design of Anaerobic Lagoons for Animal Waste
 8    Management"  promulgated   by   the   American   Society   of
 9    Agricultural   Engineers   or   the  national  guidelines  as
10    published by the  United  States  Department  of  Agriculture
11    Natural  Resource Conservation Service in Illinois and titled
12    Waste Treatment Lagoon.  The owner or operator of the earthen
13    livestock lagoon may,  with  approval  from  the  Department,
14    modify  or  exceed  these   standards  in  order to meet site
15    specific objectives.   Notwithstanding any other  requirement
16    of  this  subsection,  every  earthen  livestock waste lagoon
17    shall include the construction of a  secondary  berm,  filter
18    strip,  grass  waterway,  or  terrace,  or any combination of
19    those, outside the  perimeter  of  the  primary  berm  if  an
20    engineer licensed under the Professional Engineering Practice
21    Act  of  1989 and retained by the registrant determines, with
22    the concurrence of the Department, that construction of  such
23    a secondary berm or other feature or features is necessary in
24    order to ensure against a release of livestock waste from the
25    lagoon  (i)  that  encroaches  or  is  reasonably expected to
26    encroach upon land other   than  the  land  occupied  by  the
27    livestock  waste  handling facility of which the  lagoon is a
28    part or (ii) that enters or is  reasonably expected to  enter
29    the  waters  of  this  State.  The Department shall determine
30    compliance  with  these  requirements.   The  Department  may
31    require changes  in  design  or  additional  requirements  to
32    protect  groundwater,  such as extra liner depth or synthetic
33    liners, when it appears groundwater could be impacted.
34        (b)  Registration   and   certification.   Any    earthen
                            -7-                LRB9009360PTsb
 1    livestock  waste  lagoon  newly constructed or modified (does
 2    not include  repairs)  after  the  effective  date  of  rules
 3    adopted   for   the  implementation  of  this  Act  shall  be
 4    registered by the owner or operator with the Department on  a
 5    form  provided  by the Department.  Lagoons constructed prior
 6    to the effective date of rules adopted for the implementation
 7    of this Act may register with the Department at no charge.
 8        In order to give the Department notice of the owner's  or
 9    operator's intent to construct or modify an earthen livestock
10    waste  lagoon,  the  owner  or  operator  shall register such
11    lagoon with the Department during the preconstruction  phase.
12    Construction shall not begin until 30 days after submittal of
13    a  registration  form  by  certified  mail to the Department.
14    When an informational meeting is  requested  by  the  county,
15    construction  shall  not  begin until after the informational
16    meeting has been held.
17        Livestock waste lagoon registration forms shall  be  made
18    available  to  producers  at  offices  of  the  Department of
19    Agriculture, Cooperative  Extension  Service,  and  Soil  and
20    Water Conservation Districts.
21        Registration information shall include the following:
22             (1)  Name(s)   and  address(es)  of  the  owner  and
23        operator who are  responsible  for  the  livestock  waste
24        lagoon.
25             (2)  General location of lagoon.
26             (3)  Design construction plans and specifications.
27             (4)  Specific location information:
28                  (A)  Distance  to  a  private or public potable
29             well;
30                  (B)  Distance  to  closest   occupied   private
31             residence  (other  than  any  occupied  by  owner or
32             operator);
33                  (C)  Distance to nearest stream; and
34                  (D)  Distance to nearest populated area.
                            -8-                LRB9009360PTsb
 1             (5)  Anticipated  beginning  and  ending  dates   of
 2        construction.
 3             (6)  Type of livestock and number of animal units.
 4        The Department of Agriculture upon receipt of a livestock
 5    waste  lagoon  registration  form  shall  review  the form to
 6    determine that all required information  has  been  provided.
 7    The  person  filing the registration shall be notified within
 8    15 working days that the registration  is  complete  or  that
 9    clarification  of  information  is  needed.  No later than 10
10    working days after receipt of the clarification  information,
11    the  Department  shall  notify the owner or operator that the
12    registration is complete.
13        The Department shall inspect an earthen  livestock  waste
14    lagoon     during    preconstruction,    construction,    and
15    post-construction.     The    Department    shall     require
16    modifications   when   necessary  to  bring  construction  in
17    compliance with the standards as set forth in subsection  (a)
18    of  Section  15.     The  person  making the inspection shall
19    discuss with the  owner,  operator,  or  certified  livestock
20    manager   an   evaluation   of  the  livestock  waste  lagoon
21    construction  and   shall   (i)   provide   on-site   written
22    recommendations   to   the   owner,  operator,  or  certified
23    livestock manager of what modifications are necessary or (ii)
24    inform the owner, operator, or  certified  livestock  manager
25    that  the  lagoon meets the standards set forth in subsection
26    (a) of Section 15. On the day of the inspection,  the  person
27    making  the  inspection  shall  give  the owner, operator, or
28    certified livestock manager a written report of  his  or  her
29    findings   based   on   the   inspection,  together  with  an
30    explanation of any remedial measures necessary to enable  the
31    lagoon to meet the standards set forth in subsection (a).
32        The  person  making  any  inspection  shall  comply  with
33    reasonable  animal  health protection procedures as requested
34    by the owner, operator, or certified livestock manager.
                            -9-                LRB9009360PTsb
 1        Upon completion of the construction or modification,  but
 2    prior to placing the lagoon in service, the owner or operator
 3    of  the  livestock  waste  lagoon  shall  certify  on  a form
 4    provided  by  the  Department  that  the  lagoon   has   been
 5    constructed  or modified in accordance with the standards set
 6    forth  in  subsection  (a)  of  Section  15  and   that   the
 7    information provided on the registration form is correct.
 8             (1)  The  certification  notice  to  the  Department
 9        shall include a  certification statement and signature.
10             (2)  The   certification   shall  state:  "I  hereby
11        certify that the information provided  on  this  form  is
12        correct  and  that  the  lagoon  has  been constructed in
13        accordance  with  the  standards  as  required   by   the
14        Livestock Management Facilities Act."
15        The  owner or operator of the lagoon may proceed to place
16    the lagoon in service no earlier than 10 working  days  after
17    submitting  to  the  Department a certification of compliance
18    statement.
19        (b-5) Public informational meeting.  Within 7 days  after
20    receiving  a  registration form giving notice of an intent to
21    construct or modify an  earthen livestock waste lagoon  after
22    the    effective  date  of  this  amendatory Act of 1997, the
23    Department shall send a  copy of the registration form to the
24    county board of the county in which the  lagoon is or  is  to
25    be  located.  After receiving a copy of a lagoon registration
26    form from the Department under  this  subsection,  within  30
27    days  the county board may at its discretion request that the
28    Department conduct a public informational meeting  within  15
29    days  of the request concerning the proposed  construction or
30    modification of the lagoon.  If the Department conducts  such
31    a  meeting,  then  at  least 10 days before the  meeting, the
32    Department shall cause notice of the meeting to be  published
33    in  a  newspaper  of general circulation in the county or the
34    State newspaper.  The owner or  operator  who  submitted  the
                            -10-               LRB9009360PTsb
 1    registration  form  to  the  Department  shall  appear at the
 2    meeting.  At the meeting, the Department shall afford members
 3    of  the public an opportunity to ask  questions  and  present
 4    oral   or   written   testimony   concerning   the   proposed
 5    construction or modification of the lagoon.
 6        (c)  Complaint  procedure.  Any person having a complaint
 7    concerning an earthen  livestock  waste  lagoon  may  file  a
 8    complaint   with  the  Agency.   If  the  Agency  finds  that
 9    groundwater  has  been   negatively   impacted   because   of
10    structural problems with the earthen lagoon, the Agency shall
11    notify  the  Department  that  modification  of the lagoon is
12    necessary. The livestock owner or operator or the  Department
13    may  request  guidance  from  the United States Department of
14    Agriculture Natural  Resource  Conservation  Service  or  the
15    University of Illinois Cooperative Extension Service.
16        The person making any inspection shall comply with animal
17    health  protection  procedures  as  requested by the owner or
18    operator.
19        Any earthen livestock waste lagoon in  service  prior  to
20    the  effective  date  of the rules for implementation of this
21    Act is not subject to registration but is only subject to the
22    complaint  procedure.   However,  any  such  livestock  waste
23    lagoon found impacting groundwater shall be  required  to  be
24    repaired,   modified,   or   have  procedures  instituted  so
25    groundwater is not negatively impacted.
26        If  an  investigation  reveals   groundwater   has   been
27    negatively   impacted,   the   Department  and  Agency  shall
28    cooperate  with  the  owner  or  operator  of  the   affected
29    livestock  waste  lagoon  to provide a reasonable solution to
30    protect the groundwater.
31        Nothing  in  this  Section  shall  limit   the   Agency's
32    authority   under   the   Environmental   Protection  Act  to
33    investigate and respond to violations  of  the  Environmental
34    Protection Act or rules adopted under that Act.
                            -11-               LRB9009360PTsb
 1        (d)  Livestock   waste   lagoon  registration  fee.   The
 2    livestock waste lagoon registration fee is $50.
 3        (d-5)  Reporting release of waste.  An owner or  operator
 4    of  a  lagoon    shall  report  to  the Agency any release of
 5    livestock waste from a  lagoon  within  24  hours  after  the
 6    discovery  of  the  release.   The  procedure  for  reporting
 7    releases shall be adopted by the Agency by rule.
 8        For  a  first  violation  of this subsection (d-5) by the
 9    owner or operator  of  a  livestock  management  facility  or
10    livestock  waste handling facility, the Department shall send
11    the owner or operator a written notice of  the  violation  by
12    certified mail, return receipt requested.
13        If  after  an administrative hearing the Department finds
14    that the owner or operator of a livestock management facility
15    or livestock waste handling facility has committed  a  second
16    violation  of  this  subsection  (d-5),  the Department shall
17    impose on  the  owner  or  operator  a  civil  administrative
18    penalty  in  an  amount  not  exceeding $1,000.  The Attorney
19    General may bring an action in the circuit court  to  enforce
20    the  collection  of  a  penalty imposed under this subsection
21    (d-5).
22        If after an administrative hearing the  Department  finds
23    that the owner or operator of a livestock management facility
24    or  livestock  waste  handling facility has committed a third
25    violation of this  subsection  (d-5),  the  Department  shall
26    enter  an  administrative  order  directing that the owner or
27    operator cease operation of the facility until the  violation
28    is corrected.
29        If  a  livestock  management  facility or livestock waste
30    handling facility has  not  committed  a  violation  of  this
31    subsection  (d-5)  within the 5 years immediately preceding a
32    violation, the violation shall be construed and treated as  a
33    first violation.
34        (e)  Closure of livestock waste lagoons. When any earthen
                            -12-               LRB9009360PTsb
 1    livestock  waste  lagoon is removed from service, it shall be
 2    completely emptied.  Appropriate closure procedures shall  be
 3    followed  as  determined by rule.  The remaining hole must be
 4    filled.  The closure requirements shall be  completed  within
 5    two  years from the date of cessation of operation unless the
 6    lagoon is maintained or serviced.  The Department may grant a
 7    waiver to the before-stated closure  requirements  that  will
 8    permit the lagoon to be used for an alternative purpose.
 9        Upon  a  change  in  ownership  of  a  registered earthen
10    livestock waste lagoon, the owner shall notify the Department
11    of the change within 30 working days of the  closing  of  the
12    transaction.
13        (f)  Administrative   authority.   All   actions  of  the
14    Department  of  Agriculture  are  subject  to  the   Illinois
15    Administrative Procedure Act.
16        Any   earthen   livestock   waste   lagoon   subject   to
17    registration  shall  not  begin  operation until the owner or
18    operator of the lagoon has met the requirements of this Act.
19        The owner or operator  of  any  earthen  livestock  waste
20    lagoon  subject  to registration that has not been registered
21    or constructed in accordance  with  standards  set  forth  in
22    subsection  (a) of Section 15 shall, upon being identified as
23    such by the  Department,  be  given  written  notice  by  the
24    Department  to  register  and  certify  the  lagoon within 10
25    working days of receipt of the notice.   The  Department  may
26    inspect such lagoon and require compliance in accordance with
27    subsections  (a)  and  (b)  of  this Section. If the owner or
28    operator of the livestock waste lagoon  that  is  subject  to
29    registration  fails to comply with the notice, the Department
30    may issue a  cease  and  desist  order  until  such  time  as
31    compliance  is  obtained  with  the requirements of this Act.
32    Failure to  construct  the  lagoon  in  accordance  with  the
33    construction   plan   and  Department  recommendations  is  a
34    business offense punishable  by  a  fine  of  not  more  than
                            -13-               LRB9009360PTsb
 1    $5,000.
 2    (Source: P.A. 89-456, eff. 5-21-96; 90-565, eff. 6-1-98.)

[ Top ]