[ Search ] [ Legislation ]
[ Home ] [ Back ] [ Bottom ]
91_HB3270 LRB9112128JSpc 1 AN ACT to amend the Public Utilities Act by changing 2 Section 16-125. 3 Be it enacted by the People of the State of Illinois, 4 represented in the General Assembly: 5 Section 5. The Public Utilities Act is amended by 6 changing Section 16-125 as follows: 7 (220 ILCS 5/16-125) 8 Sec. 16-125. Transmission and distribution reliability 9 requirements. 10 (a) To assure the reliable delivery of electricity to 11 all customers in this State and the effective implementation 12 of the provisions of this Article, the Commission shall, 13 within 180 days of the effective date of this Article, adopt 14 rules and regulations for assessing and assuring the 15 reliability of the transmission and distribution systems and 16 facilities that are under the Commission's jurisdiction. 17 (b) These rules and regulations shall require each 18 electric utility or alternative retail electric supplier 19 owning, controlling, or operating transmission and 20 distribution facilities and equipment subject to the 21 Commission's jurisdiction, referred to in this Section as 22 "jurisdictional entities", to adopt and implement procedures 23 for restoring transmission and distribution services to 24 customers after transmission or distribution outages on a 25 nondiscriminatory basis without regard to whether a customer 26 has chosen the electric utility, an affiliate of the electric 27 utility, or another entity as its provider of electric power 28 and energy. These rules and regulations shall also, at a 29 minimum, specifically require each jurisdictional entity to 30 submit annually to the Commission. 31 (1) the number and duration of planned and -2- LRB9112128JSpc 1 unplanned outages during the prior year and their impacts 2 on customers; 3 (2) outages that were controllable and outages that 4 were exacerbated in scope or duration by the condition of 5 facilities, equipment or premises or by the actions or 6 inactions of operating personnel or agents; 7 (3) customer service interruptions that were due 8 solely to the actions or inactions of an alternative 9 retail electric supplier or a public utility in supplying 10 power or energy; 11 (4) a detailed report of the age, current 12 condition, reliability and performance of the 13 jurisdictional entity's existing transmission and 14 distribution facilities, which shall include, without 15 limitation, the following data: 16 (i) a summary of the jurisdictional entity's 17 outages and voltage variances reportable under the 18 Commission's rules; 19 (ii) the jurisdictional entity's expenditures 20 for transmission construction and maintenance, the 21 ratio of those expenditures to the jurisdictional 22 entity's transmission investment, and the average 23 remaining depreciation lives of the entity's 24 transmission facilities, expressed as a percentage 25 of total depreciation lives; 26 (iii) the jurisdictional entity's expenditures 27 for distribution construction and maintenance, the 28 ratio of those expenditures to the jurisdictional 29 entity's distribution investment, and the average 30 remaining depreciation lives of the entity's 31 distribution facilities, expressed as a percentage 32 of total depreciation lives; 33 (iv) a customer satisfaction survey covering, 34 among other areas identified in Commission rules, -3- LRB9112128JSpc 1 reliability, customer service, and understandability 2 of the jurisdictional entity's services and prices; 3 and 4 (v) the corresponding information, in the same 5 format, for the previous 3 years, if available; 6 (5) a plan for future investment and reliability 7 improvements for the jurisdictional entity's transmission 8 and distribution facilities that will ensure continued 9 reliable delivery of energy to customers and provide the 10 delivery reliability needed for fair and open 11 competition; and 12 (6) a report of the jurisdictional entity's 13 implementation of its plan filed pursuant to subparagraph 14 (5) for the previous reporting period. 15 (c) The Commission rules shall set forth the criteria 16 that will be used to assess each jurisdictional entity's 17 annual report and evaluate its reliability performance. Such 18 criteria must take into account, at a minimum: the items 19 required to be reported in subsection (b); the relevant 20 characteristics of the area served; the age and condition of 21 the system's equipment and facilities; good engineering 22 practices; the costs of potential actions; and the benefits 23 of avoiding the risks of service disruption. 24 (d) At least every 3 years, beginning in the year the 25 Commission issues the rules required by subsection (a) or the 26 following year if the rules are issued after June 1, the 27 Commission shall assess the annual report of each 28 jurisdictional entity and evaluate its reliability 29 performance. The Commission's evaluation shall include 30 specific identification of, and recommendations concerning, 31 any potential reliability problems that it has identified as 32 a result of its evaluation. 33 (e) In the event that more than 50030,000customers of 34 an electric utility are subjected to a continuous power -4- LRB9112128JSpc 1 interruption of 4 hours or more that results in the 2 transmission of power at less than 50% of the standard 3 voltage, or that results in the total loss of power 4 transmission, the utility shall be responsible for 5 compensating customers affected by that interruption for 4 6 hours or more for all actual damages, which shall not include 7 consequential damages, suffered as a result of the power 8 interruption. The utility shall also reimburse the affected 9 municipality, county, or other unit of local government in 10 which the power interruption has taken place for all 11 emergency and contingency expenses incurred by the unit of 12 local government as a result of the interruption. A waiver 13 of the requirements of this subsection may be granted by the 14 Commission in instances in which the utility can show that 15 the power interruption was a result of any one or more of the 16 following causes: 17 (1) Unpreventable damage due to weather events or 18 conditions. 19 (2) Customer tampering. 20 (3) Unpreventable damage due to civil or 21 international unrest or animals. 22 (4) Damage to utility equipment or other actions by 23 a party other than the utility, its employees, agents, or 24 contractors. 25 Loss of revenue and expenses incurred in complying with this 26 subsection may not be recovered from ratepayers. 27 (f) In the event of a power surge or other fluctuation 28 that causes damage and affects more than 50030,00029 customers, the electric utility shall pay to affected 30 customers the replacement value of all goods damaged as a 31 result of the power surge or other fluctuation unless the 32 utility can show that the power surge or other fluctuation 33 was due to one or more of the following causes: 34 (1) Unpreventable damage due to weather events or -5- LRB9112128JSpc 1 conditions. 2 (2) Customer tampering. 3 (3) Unpreventable damage due to civil or 4 international unrest or animals. 5 (4) Damage to utility equipment or other actions by 6 a party other than the utility, its employees, agents, or 7 contractors. 8 Loss of revenue and expenses incurred in complying with this 9 subsection may not be recovered from ratepayers. Customers 10 with respect to whom a waiver has been granted by the 11 Commission pursuant to subparagraphs (1)-(4) of subsections 12 (e) and (f) shall not count toward the 50030,000customers 13 required therein. 14 (g) Whenever an electric utility must perform planned or 15 routine maintenance or repairs on its equipment that will 16 result in transmission of power at less than 50% of the 17 standard voltage, loss of power, or power fluctuation (as 18 defined in subsection (f)), the utility shall make reasonable 19 efforts to notify potentially affected customers no less than 20 24 hours in advance of performance of the repairs or 21 maintenance. 22 (h) Remedies provided for under this Section may be 23 sought exclusively through the Illinois Commerce Commission 24 as provided under Section 10-109 of this Act. Damages 25 awarded under this Section for a power interruption shall be 26 limited to actual damages, which shall not include 27 consequential damages, and litigation costs. Damage awards 28 may not be paid out of utility rate funds. 29 (i) The provisions of this Section shall not in any way 30 diminish or replace other civil or administrative remedies 31 available to a customer or a class of customers. 32 (j) The Commission shall by rule require an electric 33 utility to maintain service records detailing information on 34 each instance of transmission of power at less than 50% of -6- LRB9112128JSpc 1 the standard voltage, loss of power, or power fluctuation (as 2 defined in subsection (f)), that affects 10 or more 3 customers. Occurrences that are momentary shall not be 4 required to be recorded or reported. The service record 5 shall include, for each occurrence, the following 6 information: 7 (1) The date. 8 (2) The time of occurrence. 9 (3) The duration of the incident. 10 (4) The number of customers affected. 11 (5) A description of the cause. 12 (6) The geographic area affected. 13 (7) The specific equipment involved in the 14 fluctuation or interruption. 15 (8) A description of measures taken to restore 16 service. 17 (9) A description of measures taken to remedy the 18 cause of the power interruption or fluctuation. 19 (10) A description of measures taken to prevent 20 future occurrence. 21 (11) The amount of remuneration, if any, paid to 22 affected customers. 23 (12) A statement of whether the fixed charge was 24 waived for affected customers. 25 Copies of the records containing this information shall 26 be available for public inspection at the utility's offices, 27 and copies thereof may be obtained upon payment of a fee not 28 exceeding the reasonable cost of reproduction. A copy of 29 each record shall be filed with the Commission and shall be 30 available for public inspection. Copies of the records may 31 be obtained upon payment of a fee not exceeding the 32 reasonable cost of reproduction. 33 (k) The requirements of subsections (e) through (j) of 34 this Section shall apply only to an electric public utility -7- LRB9112128JSpc 1 having 1,000,000 or more customers. 2 (Source: P.A. 90-561, eff. 12-16-97.) 3 Section 99. Effective date. This Act takes effect upon 4 becoming law.