State of Illinois
92nd General Assembly
Legislation

   [ Search ]   [ PDF text ]   [ Legislation ]   
[ Home ]   [ Back ]   [ Bottom ]



92_SB0094

 
                                               LRB9204577REdv

 1        AN ACT concerning stormwater.

 2        Be  it  enacted  by  the People of the State of Illinois,
 3    represented in the General Assembly:

 4        Section 5.  The Counties  Code  is  amended  by  changing
 5    Section 5-1062 as follows:

 6        (55 ILCS 5/5-1062) (from Ch. 34, par. 5-1062)
 7        Sec. 5-1062. Stormwater management.
 8        (a)  The  purpose  of this Section is to allow management
 9    and mitigation of the effects of urbanization  on  stormwater
10    drainage  in metropolitan counties located in the area served
11    by  the  Northeastern  Illinois  Planning   Commission,   and
12    references  to  "county"  in this Section shall apply only to
13    those counties.  This Section does shall  not  apply  to  any
14    county  with  a  population in excess of 1,500,000, except as
15    provided in subsection (c). The purpose of this Section shall
16    be achieved by:
17             (1)  consolidating    the    existing     stormwater
18        management framework into a united, countywide structure;
19             (2)  setting  minimum  standards  for floodplain and
20        stormwater management; and
21             (3)  preparing a countywide plan for the  management
22        of stormwater runoff, including the management of natural
23        and  man-made  drainageways.   The  countywide  plan  may
24        incorporate watershed plans.
25        (b)  A  stormwater management planning committee shall be
26    established by county board resolution, with  its  membership
27    consisting  of  equal  numbers  of county board and municipal
28    representatives from each county  board  district,  and  such
29    other  members  as  may  be  determined  by  the  county  and
30    municipal  members.   However,  if the county has more than 6
31    county board districts, the county  board  may  by  ordinance
 
                            -2-                LRB9204577REdv
 1    divide the county into not less than 6 areas of approximately
 2    equal   population,  to  be  used  instead  of  county  board
 3    districts for the purpose of  determining  representation  on
 4    the stormwater management planning committee.
 5        The  county  board  members  shall  be  appointed  by the
 6    chairman of the county board.  Municipal  members  from  each
 7    county  board  district  or  other  represented area shall be
 8    appointed  by  a  majority  vote  of  the  mayors  of   those
 9    municipalities  which  have  the greatest percentage of their
10    respective populations residing in such county board district
11    or other represented area.  All municipal  and  county  board
12    representatives  shall  be  entitled  to  a  vote;  the other
13    members shall be nonvoting members, unless authorized to vote
14    by the unanimous consent of the municipal  and  county  board
15    representatives.  A municipality that is located in more than
16    one county may choose,  at  the  time  of  formation  of  the
17    stormwater   management   planning  committee  and  based  on
18    watershed  boundaries,  to  participate  in  the   stormwater
19    management   planning  program  of  either  or  both  of  the
20    counties. Subcommittees of the stormwater management planning
21    committee may be established to serve a portion of the county
22    or a particular drainage basin that  has  similar  stormwater
23    management   needs.    The   stormwater  management  planning
24    committee shall adopt by-laws, by  a  majority  vote  of  the
25    county  and municipal members, to govern the functions of the
26    committee and its subcommittees. Officers  of  the  committee
27    shall  include a chair and vice chair, one of whom shall be a
28    county representative and one a municipal representative.
29        The principal duties of the committee shall be to develop
30    a stormwater management plan for presentation to and approval
31    by the county board, and to direct the plan's  implementation
32    and revision. The committee may retain engineering, legal and
33    financial  advisors  and inspection personnel.  The committee
34    shall meet at least quarterly and shall  hold  at  least  one
 
                            -3-                LRB9204577REdv
 1    public  meeting  during the preparation of the plan and prior
 2    to its submittal to the county board.
 3        (c)  In the preparation of a stormwater management  plan,
 4    a  county  stormwater  management  planning  committee  shall
 5    coordinate the planning process with each adjoining county to
 6    ensure  that  recommended  stormwater  projects  will have no
 7    significant impact on the levels or flows of  stormwaters  in
 8    inter-county  watersheds  or  on the capacity of existing and
 9    planned  stormwater   retention   facilities.    An   adopted
10    stormwater  management plan shall identify steps taken by the
11    county to coordinate the development of plan  recommendations
12    with adjoining counties.
13        (d)  Before  the stormwater management planning committee
14    recommends to the county board a stormwater  management  plan
15    for the county or a portion thereof, it shall submit the plan
16    to the Office of Water Resources of the Department of Natural
17    Resources   and   to   the   Northeastern  Illinois  Planning
18    Commission for review and recommendations.   The  Office  and
19    the  Commission,  in  reviewing the plan, shall consider such
20    factors as impacts on the  levels  or  flows  in  rivers  and
21    streams  and  the cumulative effects of stormwater discharges
22    on  flood  levels.   The  Office  of  Water  Resources  shall
23    determine whether the plan or ordinances enacted to implement
24    the plan complies with the requirements  of  subsection  (f).
25    Within  a  period  not to exceed 60 days, the review comments
26    and recommendations shall  be  submitted  to  the  stormwater
27    management   planning   committee   for  consideration.   Any
28    amendments to the plan shall be submitted to the  Office  and
29    the Commission for review.
30        (e)  Prior  to recommending the plan to the county board,
31    the stormwater management planning committee  shall  hold  at
32    least  one public hearing thereon and shall afford interested
33    persons an opportunity to be heard.   The  hearing  shall  be
34    held  in  the  county  seat.   Notice of the hearing shall be
 
                            -4-                LRB9204577REdv
 1    published at least once no  less  than  15  days  in  advance
 2    thereof  in  a  newspaper of general circulation published in
 3    the county.  The notice shall state the time and place of the
 4    hearing and the place where copies of the proposed plan  will
 5    be  accessible  for examination by interested parties.  If an
 6    affected municipality having  a  stormwater  management  plan
 7    adopted  by  ordinance  wishes to protest the proposed county
 8    plan provisions, it shall appear at the hearing and submit in
 9    writing  specific  proposals  to  the  stormwater  management
10    planning committee.    After  consideration  of  the  matters
11    raised at the hearing, the committee may amend or approve the
12    plan and recommend it to the county board for adoption.
13        The   county   board  may  enact  the  proposed  plan  by
14    ordinance.  If the proposals for  modification  of  the  plan
15    made   by   an  affected  municipality  having  a  stormwater
16    management plan are not included in the proposed county plan,
17    and the municipality affected by the plan opposes adoption of
18    the county plan by resolution of its  corporate  authorities,
19    approval of the county plan shall require an affirmative vote
20    of  at  least  two-thirds of the county board members present
21    and voting.  If the county board wishes to amend  the  county
22    plan,  it  shall  submit in writing specific proposals to the
23    stormwater management planning committee.  If  the  proposals
24    are  not  approved  by  the  committee,  or  are  opposed  by
25    resolution  of  the  corporate  authorities  of  an  affected
26    municipality  having  a municipal stormwater management plan,
27    amendment of the plan shall require an affirmative vote of at
28    least two-thirds of the  county  board  members  present  and
29    voting.
30        (f)  The   county   board   may  prescribe  by  ordinance
31    reasonable rules and regulations  for  floodplain  management
32    and  for  governing  the  location, width, course and release
33    rate of all stormwater runoff channels, streams and basins in
34    the  county,  in  accordance  with  the  adopted   stormwater
 
                            -5-                LRB9204577REdv
 1    management  plan.   These  rules  and regulations shall, at a
 2    minimum,  meet  the  standards  for   floodplain   management
 3    established   by  the  Office  of  Water  Resources  and  the
 4    requirements of the Federal Emergency Management  Agency  for
 5    participation in the National Flood Insurance Program.
 6        (g)  In  accordance  with,  and  if  recommended  in, the
 7    adopted stormwater management  plan,  the  county  board  may
 8    adopt  a schedule of fees as may be necessary to mitigate the
 9    effects of increased stormwater  runoff  resulting  from  new
10    development.    The   fees  shall  not  exceed  the  cost  of
11    satisfying  the  onsite  stormwater  retention  or  detention
12    requirements of the adopted stormwater management plan.   The
13    fees  shall  be  used to finance activities undertaken by the
14    county or its included municipalities to mitigate the effects
15    of urban stormwater runoff by providing  regional  stormwater
16    retention  or  detention  facilities,  as  identified  in the
17    county plan.  All such fees collected by the county shall  be
18    held  in  a  separate fund, and shall be expended only in the
19    watershed within which they were collected.
20        (h)  For the purpose of implementing this Section and for
21    the development, design,  planning,  construction,  operation
22    and  maintenance of stormwater facilities provided for in the
23    stormwater  management  plan,  a  county   board   that   has
24    established   a   stormwater  management  planning  committee
25    pursuant to this Section may cause an annual tax  of  not  to
26    exceed  0.20%  of  the value, as equalized or assessed by the
27    Department of Revenue, of all taxable property in the  county
28    to  be  levied  upon  all the taxable property in the county.
29    The tax shall be in addition to all other taxes authorized by
30    law to be levied and collected in the county and shall be  in
31    addition  to  the  maximum  tax  rate  authorized  by law for
32    general county purposes.  The 0.20%  limitation  provided  in
33    this  Section  may be increased or decreased by referendum in
34    accordance with the provisions of  Sections  18-120,  18-125,
 
                            -6-                LRB9204577REdv
 1    and 18-130 of the Property Tax Code.
 2        Any  revenues  generated  as  a  result  of  ownership or
 3    operation of facilities or land acquired with the  tax  funds
 4    collected  pursuant to this subsection (h) shall be held in a
 5    separate fund and be used either to abate such  property  tax
 6    or for implementing this Section.
 7        However,  unless  at  least  part  of the county has been
 8    declared after July 1, 1986 by presidential  proclamation  to
 9    be  a  disaster  area  as  a  result  of  flooding,  the  tax
10    authorized  by  this subsection (h) shall not be levied until
11    the question of its adoption, either for a  specified  period
12    or  indefinitely,  has been submitted to the electors thereof
13    and approved by a majority of those voting on  the  question.
14    This  question  may  be submitted at any election held in the
15    county after the adoption of a resolution by the county board
16    providing for the submission of the question to the  electors
17    of the county.  The county board shall certify the resolution
18    and  proposition  to the proper election officials, who shall
19    submit the proposition at an election in accordance with  the
20    general election law.  If a majority of the votes cast on the
21    question  is  in  favor  of  the  levy  of  the  tax,  it may
22    thereafter be levied in the county for the  specified  period
23    or indefinitely, as provided in the proposition. The question
24    shall be put in substantially the following form:
25    -------------------------------------------------------------
26        Shall an annual tax be levied
27    for stormwater management purposes            YES
28    (for a period of not more than
29    ...... years) at a rate not exceeding      ------------------
30    .....% of the equalized assessed
31    value of the taxable property of              NO
32    ........ County?
33    -------------------------------------------------------------
34        (i)  Upon  the  creation  and  implementation of a county
 
                            -7-                LRB9204577REdv
 1    stormwater management  plan,  the  county  may  petition  the
 2    circuit  court  to  dissolve  any  or  all drainage districts
 3    created pursuant to the Illinois Drainage Code or predecessor
 4    Acts which are located entirely within the area of the county
 5    covered by the plan.
 6        However, any active drainage district implementing a plan
 7    that is consistent with and at  least  as  stringent  as  the
 8    county stormwater management plan may petition the stormwater
 9    management planning committee for exception from dissolution.
10    Upon  filing  of the petition, the committee shall set a date
11    for hearing not less than 2 weeks, nor  more  than  4  weeks,
12    from  the  filing  thereof,  and  the committee shall give at
13    least one week's  notice  of  the  hearing  in  one  or  more
14    newspapers of general circulation within the district, and in
15    addition  shall  cause  a copy of the notice to be personally
16    served upon each of the trustees of  the  district.   At  the
17    hearing, the committee shall hear the district's petition and
18    allow  the  district  trustees  and any interested parties an
19    opportunity  to  present  oral  and  written  evidence.   The
20    committee shall render its decision  upon  the  petition  for
21    exception  from  dissolution based upon the best interests of
22    the residents  of  the  district.   In  the  event  that  the
23    exception  is  not  allowed, the district may file a petition
24    within 30 days of the decision with the  circuit  court.   In
25    that  case, the notice and hearing requirements for the court
26    shall be the same as herein provided for the  committee.  The
27    court  shall  likewise  render  its  decision  of  whether to
28    dissolve the  district  based  upon  the  best  interests  of
29    residents of the district.
30        The dissolution of any drainage district shall not affect
31    the  obligation of any bonds issued or contracts entered into
32    by  the  district  nor  invalidate  the  levy,  extension  or
33    collection of any  taxes  or  special  assessments  upon  the
34    property  in  the former drainage district.  All property and
 
                            -8-                LRB9204577REdv
 1    obligations of the former drainage district shall be  assumed
 2    and  managed  by  the  county,  and  the  debts of the former
 3    drainage district shall be discharged as soon as practicable.
 4        If a drainage district lies only partly within  a  county
 5    that  adopts  a county stormwater management plan, the county
 6    may  petition  the  circuit  court  to  disconnect  from  the
 7    drainage district that portion  of  the  district  that  lies
 8    within  that  county.   The property of the drainage district
 9    within the disconnected area shall be assumed and managed  by
10    the  county.   The  county shall also assume a portion of the
11    drainage district's debt at the time of disconnection,  based
12    on  the  portion  of the value of the taxable property of the
13    drainage district which is  located  within  the  area  being
14    disconnected.
15        The operations of any drainage district that continues to
16    exist  in  a  county that has adopted a stormwater management
17    plan in accordance with this Section shall be  in  accordance
18    with the adopted plan.
19        (j)  Any  county  that  has  adopted  a county stormwater
20    management plan under this Section may, after 10 days written
21    notice to the owner or occupant,  enter  upon  any  lands  or
22    waters  within  the  county  for  the  purpose  of inspecting
23    stormwater  facilities  or  causing  the   removal   of   any
24    obstruction  to an affected watercourse.  The county shall be
25    responsible for any damages occasioned thereby.
26        (k)  Upon petition of the municipality, and  based  on  a
27    finding  of the stormwater management planning committee, the
28    county shall not enforce rules and regulations adopted by the
29    county in any municipality located wholly  or  partly  within
30    the   county  that  has  a  municipal  stormwater  management
31    ordinance that is consistent with and at least  as  stringent
32    as  the  county  plan and ordinance, and is being enforced by
33    the municipal authorities.
34        (l)  A county may  issue  general  obligation  bonds  for
 
                            -9-                LRB9204577REdv
 1    implementing  any  stormwater plan adopted under this Section
 2    in the manner prescribed in Section 5-1012; except  that  the
 3    referendum  requirement  of Section 5-1012 shall not apply to
 4    bonds issued pursuant to this Section on which the  principal
 5    and  interest  are to be paid entirely out of funds generated
 6    by the taxes and fees authorized by this Section.
 7        (m)  The  powers  authorized  by  this  Section  may   be
 8    implemented  by  the county board for a portion of the county
 9    subject to similar stormwater management needs.
10        (n)  The powers and taxes authorized by this Section  are
11    in  addition  to  the powers and taxes authorized by Division
12    5-15; in exercising its powers under this Section,  a  county
13    shall  not be subject to the restrictions and requirements of
14    that Division.
15        (o)  Pursuant to paragraphs (g) and (i) of Section  6  of
16    Article  VII  of  the  Illinois  Constitution,  this  Section
17    specifically  denies  and  limits  the  exercise of any power
18    which is inconsistent herewith by  home  rule  units  in  any
19    county  with  a population of less than 1,500,000 in the area
20    served by  the  Northeastern  Illinois  Planning  Commission.
21    This  Section  does  not  prohibit the concurrent exercise of
22    powers consistent herewith.
23    (Source: P.A. 88-670, eff. 12-2-94; 89-445, eff. 2-7-96.)

[ Top ]