[ Search ] [ PDF text ] [ Legislation ]
[ Home ] [ Back ] [ Bottom ]
92_SB0735 LRB9207901SMpkA 1 AN ACT concerning construction contracts. 2 Be it enacted by the People of the State of Illinois, 3 represented in the General Assembly: 4 Section 5. The Illinois Procurement Code is amended by 5 changing Section 30-30 as follows: 6 (30 ILCS 500/30-30) 7 Sec. 30-30. Contracts in excess of $250,000. For 8 building construction contracts in excess of $250,000, 9 separate specifications shall be prepared for all equipment, 10 labor, and materials in connection with the following 6511 subdivisions of the work to be performed: 12 (1) plumbing; 13 (2) heating, piping, refrigeration, and automatic 14 temperature control systems, including the testing and 15 balancing of those systems; 16 (3) ventilating and distribution systems for 17 conditioned air, including the testing and balancing of 18 those systems; 19 (4) electric wiring;and20 (5) general contract work; and 21 (6) masonry. 22 The specifications must be so drawn as to permit separate 23 and independent bidding upon each of the 65subdivisions of 24 work. All contracts awarded for any part thereof shall award 25 the 65subdivisions of work separately to responsible and 26 reliable persons, firms, or corporations engaged in these 27 classes of work. The contracts, at the discretion of the 28 construction agency, may be assigned to the successful bidder 29 on the general contract work or to the successful bidder on 30 the subdivision of work designated by the construction agency 31 before the bidding as the prime subdivision of work, provided -2- LRB9207901SMpkA 1 that all payments will be made directly to the contractors 2 for the 65subdivisions of work upon compliance with the 3 conditions of the contract. A contract may be let for one or 4 more buildings in any project to the same contractor. The 5 specifications shall require, however, that unless the 6 buildings are identical, a separate price shall be submitted 7 for each building. The contract may be awarded to the lowest 8 responsible bidder for each or all of the buildings included 9 in the specifications. 10 (Source: P.A. 90-572, eff. date - See Sec. 99-5.)