 1                                                        BOB-CDB02

 2        AN ACT making appropriations and reappropriations.

 3        Be  it  enacted  by  the People of the State of Illinois,
 4    represented in the General Assembly:

 5                              ARTICLE 1

 6        Section 1.  The  following  named  amounts,  or  so  much
 7    thereof  as  may  be  necessary,  are  appropriated  from the
 8    Capital Development Fund to the Capital Development Board for
 9    the Department of Agriculture for  the  projects  hereinafter
10    enumerated:

11                ILLINOIS STATE FAIRGROUNDS - DU QUOIN
12    For replacing horse barn roofs ................. $    300,000
13    For upgrading electrical utilities, in
14     addition to funds previously
15      appropriated .................................      700,000
16    For renovating the Hayes House, in addition
17     to funds previously appropriated ..............      600,000
18              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
19    For renovating comfort stations, in addition
20      to funds previously appropriated .............    1,100,000
21    For upgrading the electrical system ............    1,000,000
22    For renovating the grandstand area .............    1,120,000
23        Total, Section 1                               $4,820,000

24        Section  1.1.  The  following  named  amounts, or so much
25    thereof as  may  be  necessary,  are  appropriated  from  the
26    General Revenue Fund to the Capital Development Board for the
27    Department   of  Agriculture  for  the  projects  hereinafter
28    enumerated:

29                ILLINOIS STATE FAIRGROUNDS - DU QUOIN
 
                           -2-                      BOB-CDB02
 1    For upgrading the telecommunications
 2      system ....................................... $    400,000
 3              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
 4    For upgrading the chemistry/seed
 5      laboratory systems ...........................      344,000
 6        Total                                            $744,000

 7        Section 2.  The  following  named  amounts,  or  so  much
 8    thereof  as  may  be  necessary,  are  appropriated  from the
 9    Capital Development Fund to the Capital Development Board for
10    the  Department  of  Central  Management  Services  for   the
11    projects hereinafter enumerated:

12                       CARBONDALE STATE GARAGE
13    For upgrading the drainage system .............. $    110,000
14                         DIXON STATE GARAGE
15    For replacing lighting and roof
16      drainage .....................................      260,000
17          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
18                        (ROOSEVELT) - CHICAGO
19    For replacing the roofing system ...............      305,000
20    For upgrading the kitchen and plumbing .........      565,000
21                 JAMES R. THOMPSON CENTER - CHICAGO
22    For upgrading mechanical systems, in
23      addition to funds previously appropriated..... $  1,400,000
24                         PARIS STATE GARAGE
25    For replacing the roof and improving
26     the exterior ..................................      380,000
27                  ROCKFORD REGIONAL OFFICE BUILDING
28    For upgrading the HVAC system ..................      100,000
29        SUBURBAN NORTH REGIONAL OFFICE BUILDING - DES PLAINES
30    For rehabilitating the exterior and
31      upgrading the atrium .........................      970,000
32        Total, Section 2                               $4,090,000
 
                           -3-                      BOB-CDB02
 1        Section  2.1.  The  following  named  amounts, or so much
 2    thereof as  may  be  necessary,  are  appropriated  from  the
 3    General Revenue Fund to the Capital Development Board for the
 4    Department  of  Central  Management Services for the projects
 5    hereinafter enumerated:

 6          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
 7                        (ROOSEVELT) - CHICAGO
 8    For tuckpointing exterior ...................... $  1,165,000
 9        Total, Section 2.1                             $1,165,000

10        Section 3.  The  following  named  amounts,  or  so  much
11    thereof  as  may  be  necessary,  are  appropriated  from the
12    Capital Development Fund to the Capital Development Board for
13    the Department of Corrections for  the  projects  hereinafter
14    enumerated:

15                              STATEWIDE
16    For construction, equipment and all other
17      necessary costs for a medium security
18      facility, in addition to funds previously
19      appropriated .................................  $73,000,000
20    For planning, construction, equipment
21      and all other necessary costs for a
22      juvenile facility ............................   53,000,000
23    For replacing doors and locks
24      at the following locations at the
25      approximate costs set forth below ............    4,100,000
26       Dixon Correctional Center ..........1,300,000
27       Hill Correctional Center .............500,000
28       Sheridan Correctional Center .......1,300,000
29       Vienna Correctional Center .........1,000,000
30    For replacing roofing systems at
31      the following locations at the
 
                           -4-                      BOB-CDB02
 1      approximate cost set forth below .............      690,000
 2       Illinois Youth Center -
 3        St. Charles .........................100,000
 4       Illinois Youth Center -
 5       Warrenville ..........................330,000
 6       Logan Correctional Center ............260,000
 7    For upgrading showers at the following
 8      locations at the approximate
 9      cost set forth below .........................    3,255,000
10       Hill Correctional
11        Center ............................1,140,000
12       Illinois River Correctional
13        Center ..............................635,000
14       Taylorville Correctional
15        Center ..............................845,000
16       Western Illinois Correctional
17        Center ..............................635,000
18    For upgrading water distribution systems at
19      the following locations at the approximate
20      cost set forth below .........................    2,980,000
21       Dixon Correctional
22        Center ............................2,000,000
23       Joliet Correctional
24        Center ..............................980,000
25    For upgrading water towers at
26      the following locations at the approximate
27      cost set forth below .........................    4,400,000
28       Dixon Correctional
29        Center ............................2,800,000
30       Illinois Youth Center -
31        St. Charles .......................1,300,000
32       Illinois Youth Center -
33        Valley View .........................300,000
34                    CENTRALIA CORRECTIONAL CENTER
 
                           -5-                      BOB-CDB02
 1    For upgrading electrical system ................    1,800,000
 2    For upgrading building automation system .......    1,100,000
 3                    DANVILLE CORRECTIONAL CENTER
 4    For upgrading the boilers ......................    2,500,000
 5                      DIXON CORRECTIONAL CENTER
 6    For planning the upgrade and expansion
 7      of the medical care facility .................    1,200,000
 8                   EAST MOLINE CORRECTIONAL CENTER
 9    For replacing windows ..........................      605,000
10                     GRAHAM CORRECTIONAL CENTER
11    For upgrading building automation system
12      and fire alarm system ........................    1,100,000
13    For upgrading electrical system ................    2,000,000
14                 ILLINOIS YOUTH CENTER - HARRISBURG
15    For constructing a multi-purpose medical,
16      vocational and confinement building ..........   10,250,000
17                   ILLINOIS YOUTH CENTER - JOLIET
18    For replacing rooftop units at
19      Administration Building ......................      195,000
20                 ILLINOIS YOUTH CENTER - WARRENVILLE
21    For upgrading site utilities ...................      345,000
22                     JOLIET CORRECTIONAL CENTER
23    For replacing the transfer switch and
24      emergency generator ..........................      980,000
25                     LINCOLN CORRECTIONAL CENTER
26    For replacing water supply lines ...............    1,145,000
27                     MENARD CORRECTIONAL CENTER
28    For replacing the Administration
29      Building .....................................    8,300,000
30    For replacing the sally port ...................      925,000
31                    SHERIDAN CORRECTIONAL CENTER
32    For upgrading electrical system and
33      installing a generator .......................      905,000
34                  SOUTHWESTERN CORRECTIONAL CENTER
 
                           -6-                      BOB-CDB02
 1    For replacing sewer lines ......................      405,000
 2                   STATEVILLE CORRECTIONAL CENTER
 3    For replacing windows in Cellhouse B,
 4      in addition to funds previously
 5      appropriated .................................    2,500,000
 6                     VIENNA CORRECTIONAL CENTER
 7    For upgrading the HVAC system and replacing
 8      water lines in six housing units .............    1,800,000
 9        Total, Section 3                             $179,480,000

10        Section  4.  The  following  named  amounts,  or  so much
11    thereof as  may  be  necessary,  are  appropriated  from  the
12    Capital Development Fund to the Capital Development Board for
13    the Historic Preservation Agency for the projects hereinafter
14    enumerated:
15          ABRAHAM LINCOLN PRESIDENTIAL LIBRARY, SPRINGFIELD
16    For constructing library and museum, in
17      addition to funds previously appropriated .... $ 50,000,000
18              BISHOP HILL HISTORIC SITE - HENRY COUNTY
19    For restoring interior and exterior ............    1,000,000
20          LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
21    For rehabilitating the saw and grist mill, in
22      addition to funds previously appropriated.....      750,000
23          SHAWNEETOWN BANK HISTORIC SITE - GALLATIN COUNTY
24    For rehabilitating exterior ....................    1,620,000
25        Total, Section 4                              $53,370,000

26        Section  4.1.  The  following  named  amounts, or so much
27    thereof as  may  be  necessary,  are  appropriated  from  the
28    General  Revenue  Fund   to the Capital Development Board for
29    the Historic Preservation Agency for the projects hereinafter
30    enumerated:
31           LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
32    For providing roads, parking areas, lighting
 
                           -7-                      BOB-CDB02
 1      plaza and pedestrian bridges, in addition
 2      to funds previously appropriated  ............ $    400,000
 3                  STATE JOURNAL-REGISTER BUILDING/
 4                   OLD STATE CAPITOL - SPRINGFIELD
 5    For repairing elevators ........................      480,000
 6        Total, Section 4.1                               $880,000

 7        Section 5.  The  following  named  amounts,  or  so  much
 8    thereof  as  may  be  necessary,  are  appropriated  from the
 9    Capital Development Fund to the Capital Development Board for
10    the Illinois Medical District  Commission  for  the  projects
11    hereinafter enumerated:
12           ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
13    For upgrading core utilities ................... $    800,000
14    For upgrading research center ..................      710,000
15        Total, Section 5                               $1,510,000

16        Section  6.  The  following  named  amounts,  or  so much
17    thereof as  may  be  necessary,  are  appropriated  from  the
18    Capital Development Fund to the Capital Development Board for
19    the Department of Human Services for the projects hereinafter
20    enumerated:
21                          STATEWIDE PROGRAM
22    For planning and beginning construction
23      of a facility for the treatment and
24      detention of sexually violent persons, in
25     addition to funds previously appropriated .....    4,000,000
26    For replacing and repairing roofing
27      systems at the following locations, at
28      the approximate cost set forth below ......... $  3,335,000
29       Alton Mental Health Center ...........150,000
30       Chicago-Read Mental Health
31        Center ..............................800,000
32       Howe Developmental Center -
 
                           -8-                      BOB-CDB02
 1        Tinley Park .......................1,300,000
 2       Shapiro Developmental Center -
 3        Kankakee ............................415,000
 4       Illinois School for the
 5        Deaf - Jacksonville .................370,000
 6       Kiley Developmental
 7        Center - Waukegan ...................300,000
 8             ALTON MENTAL HEALTH CENTER - MADISON COUNTY
 9    For renovating the Forensic Complex and
10      constructing two building additions, in
11      addition to funds previously appropriated ....    3,900,000
12                    CHESTER MENTAL HEALTH CENTER
13    For renovating support and residential areas,
14      in addition to funds previously
15      appropriated .................................      996,000
16    For replacing smoke/heat detectors .............      395,000
17                  FOX DEVELOPMENTAL CENTER - DWIGHT
18    For replacing interior doors and flooring
19      and repairing walls in the Main and
20      Administration Buildings .....................    2,205,000
21               HOWE DEVELOPMENTAL CENTER - TINLEY PARK
22    For replacing HVAC and duct work ...............      500,000
23             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
24    For renovating High School Building ............    1,200,000
25    For tuckpointing and replacing windows,
26      sprinklers and door closures .................      730,000
27      ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
28    For renovating the Girls' Dormitory ............      950,000
29                  JACKSONVILLE DEVELOPMENTAL CENTER
30    For planning and beginning the renovation
31      of the power house ...........................      800,000
32                 MABLEY DEVELOPMENTAL CENTER - DIXON
33    For renovating residential buildings ...........    1,930,000
34               MURRAY DEVELOPMENTAL CENTER - CENTRALIA
 
                           -9-                      BOB-CDB02
 1    For planning and beginning boiler house
 2      renovation ...................................      250,000
 3               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
 4    For replacing water mains and valves,
 5      in addition to funds previously
 6      appropriated .................................    1,900,000
 7               SINGER MENTAL HEALTH CENTER - ROCKFORD
 8    For renovating dietary .........................    1,200,000
 9        Total, Section 6                              $24,291,000

10        Section  6.1.  The  following  named  amounts, or so much
11    thereof as  may  be  necessary,  are  appropriated  from  the
12    General Revenue Fund to the Capital Development Board for the
13    Department  of  Human  Services  for the projects hereinafter
14    enumerated:
15                          STATEWIDE PROGRAM
16    For tuckpointing at the following locations
17     at the approximate cost set forth below ....... $    515,000
18      Howe Developmental Center -
19       Tinley Park ..........................115,000
20      Madden Mental Health
21       Center - Hines .......................100,000
22      Tinley Park Mental
23       Health Center ........................300,000
24                ZELLER MENTAL HEALTH CENTER - PEORIA
25    For upgrading the energy management
26      system .......................................      245,000
27        Total, Section 6.1                               $760,000

28        Section 7.  The  following  named  amounts,  or  so  much
29    thereof  as  may  be  necessary,  are  appropriated  from the
30    Capital Development Fund to the Capital Development Board for
31    the  Department  of  Military  Affairs   for   the   projects
32    hereinafter enumerated:
 
                           -10-                     BOB-CDB02
 1                          CHAMPAIGN ARMORY
 2    For upgrading mechanical and electrical
 3      systems and installing a kitchen ............. $  1,196,000
 4                            ELGIN ARMORY
 5    For replacing the roof and upgrading the
 6      interior and exterior ........................      603,000
 7                            GALVA ARMORY
 8    For replacing the roof and upgrading the
 9      interior and exterior ........................      600,000
10                           KEWANEE ARMORY
11    For upgrading electrical and mechanical
12      systems and installing a kitchen .............    2,524,000
13                            MACOMB ARMORY
14    For replacing the mechanical and electrical
15      systems and installing a kitchen .............    2,521,000
16                       NORTH RIVERSIDE ARMORY
17    For rehabilitating the interior and
18      exterior .....................................      618,000
19                          NORTHWEST ARMORY
20    For replacing the mechanical systems ...........    3,045,000
21                          ROCK FALLS ARMORY
22    For replacing the mechanical and
23      electrical systems and upgrading
24      the interior .................................    2,631,000
25        Total, Section 7                              $13,738,000

26        Section  8.  The  following  named  amounts,  or  so much
27    thereof as  may  be  necessary,  are  appropriated  from  the
28    Capital Development Fund to the Capital Development Board for
29    the   Department   of  Natural  Resources  for  the  projects
30    hereinafter enumerated:
31                          STATEWIDE PROGRAM
32    For constructing and renovating lodges ......... $  5,624,000
33    For replacing and renovating concession
 
                           -11-                     BOB-CDB02
 1      buildings ....................................    1,000,000
 2    For replacing roofs at the following locations,
 3     at the approximate cost set forth below .......      525,000
 4      Shabbona Lake State
 5       Park .................................155,000
 6      Hennepin Canal Parkway
 7       State Park ...........................115,000
 8      Randolph Fish &
 9       Wildlife Area .........................65,000
10      Dixon Springs State
11       Park .................................190,000
12               BEAVER DAM STATE PARK - MACOUPIN COUNTY
13    For replacing the sewage system ................      665,000
14                CASTLE ROCK STATE PARK - OGLE COUNTY
15    For rehabilitating the scenic
16      overlook and water system ....................    1,825,000
17               EAGLE CREEK STATE PARK - SHELBY COUNTY
18    For providing lake access and
19      constructing a dock ..........................    1,000,000
20              ELDON HAZLET STATE PARK - CLINTON COUNTY
21    For replacing the main waterline ...............      575,000
22            LASALLE FISH & WILDLIFE AREA - LASALLE COUNTY
23    For renovating the pond and installing
24      a well and treatment system ..................    1,720,000
25               MORAINE VIEW STATE PARK - MCLEAN COUNTY
26    For upgrading the water plant ..................      180,000
27                 NATURAL HISTORY SURVEY - CHAMPAIGN
28    For renovating storage building #1 .............      310,000
29                      PERE MARQUETTE STATE PARK
30    For upgrading youth camp sewer system ..........      140,000
31              SOUTHERN ILLINOIS MINING OFFICE - BENTON
32    For rehabilitating the facility ................      150,000
33         STARVED ROCK STATE PARK AND LODGE - LASALLE COUNTY
34    For upgrading water and sewer systems ..........      600,000
 
                           -12-                     BOB-CDB02
 1        WILLIAM W. POWERS FISH & WILDLIFE AREA - COOK COUNTY
 2    For replacing sanitary sewer lines and
 3      lift station .................................      890,000
 4        Total, Section 8                              $15,204,000

 5        Section 8.1.  The following named  amounts,  or  so  much
 6    thereof  as  may  be  necessary,  are  appropriated  from the
 7    General Revenue Fund to the Capital Development Board for the
 8    Department of Natural Resources for the projects  hereinafter
 9    enumerated:
10                          STATEWIDE PROGRAM
11    For maintaining lodge and concession
12      facilities ................................... $    494,400
13               ILLINOIS BEACH STATE PARK - LAKE COUNTY
14    For stabilizing the shoreline ..................      400,000
15           WAYNE FITZGERRELL STATE PARK - JEFFERSON COUNTY
16    For stabilizing the watershed shoreline ........      675,000
17        Total, Section 8.1                             $1,569,400

18        Section  9.  The  following  named  amounts,  or  so much
19    thereof as  may  be  necessary,  are  appropriated  from  the
20    Capital Development Fund to the Capital Development Board for
21    the  Department  of  Revenue  for  the  projects  hereinafter
22    enumerated:
23                 WILLARD ICE BUILDING - SPRINGFIELD
24    For upgrading the plumbing system .............. $  3,000,000
25    For upgrading parking lot/parking deck
26      structural repair ............................    1,250,000
27    For renovating the interior and
28      upgrading HVAC................................    3,855,000
29      For upgrading fire and voice activated
30      alarm system .................................      960,000
31        Total, Section 9                               $7,815,001
 
                           -13-                     BOB-CDB02
 1        Section  9.1.  The  following  named  amounts, or so much
 2    thereof as  may  be  necessary,  are  appropriated  from  the
 3    General Revenue Fund to the Capital Development Board for the
 4    Department   of   Revenue   for   the   projects  hereinafter
 5    enumerated:
 6                 WILLARD ICE BUILDING - SPRINGFIELD
 7    For completing security system upgrade, in
 8      addition to funds previously appropriated .... $    200,000
 9        Total, Section 9.1                               $200,000

10        Section 10.  The following  named  amounts,  or  so  much
11    thereof  as  may  be  necessary,  are  appropriated  from the
12    Capital Development Fund to the Capital Development Board for
13    the Department of State Police for the  projects  hereinafter
14    enumerated:
15                          STATEWIDE PROGRAM
16    For upgrading firing ranges, range
17      buildings and equipment ...................... $  2,000,000
18                    CAPITOL COMPLEX - SPRINGFIELD
19    For constructing a central administrative
20      office building and purchasing equipment, in
21      addition to funds previously appropriated ....   47,000,000
22        Total, Section 10                             $49,000,000

23        Section  11.  The  following  named  amounts,  or so much
24    thereof as  may  be  necessary,  are  appropriated  from  the
25    Capital Development Fund to the Capital Development Board for
26    the   Department   of  Veterans'  Affairs  for  the  projects
27    hereinafter enumerated:
28                 QUINCY VETERANS HOME - ADAMS COUNTY
29    For replacing roofing systems ..................      185,000
30        Total, Section 11                                $185,000

31        Section 11.1.  The following named amounts,  or  so  much
 
                           -14-                     BOB-CDB02
 1    thereof  as  may  be  necessary,  are  appropriated  from the
 2    General Revenue Fund to the Capital Development Board for the
 3    Department of Veterans' Affairs for the projects  hereinafter
 4    enumerated:
 5               LASALLE VETERANS' HOME - LASALLE COUNTY
 6    For installing wall protection ................. $    120,000
 7    For upgrading tempered water systems ...........       50,000
 8    For replacing lighting .........................       90,000
 9              MANTENO VETERANS' HOME - KANKAKEE COUNTY
10    For installing humidifiers and
11      dehumidifiers ................................    1,515,000
12                QUINCY VETERANS' HOME - ADAMS COUNTY
13    For renovating power plant equipment ...........      715,000
14        Total, Section 11.1                            $2,490,000

15        Section  12.  The  following  named  amounts,  or so much
16    thereof as  may  be  necessary,  are  appropriated  from  the
17    Capital Development Fund to the Capital Development Board for
18    the   Courts   of   Illinois  for  the  projects  hereinafter
19    enumerated:
20               APPELLATE COURT SECOND DISTRICT - ELGIN
21    For miscellaneous improvements ................. $    547,000
22        Total, Section 12                                $547,000

23        Section 12.1.  The following named amounts,  or  so  much
24    thereof  as  may  be  necessary,  are  appropriated  from the
25    General Revenue Fund to the Capital Development Board for the
26    Courts of Illinois for the projects hereinafter enumerated:
27               APPELLATE COURT THIRD DISTRICT - OTTAWA
28    For tuckpointing, repairing the exterior
29      and replacing the roof, in addition to
30      funds previously appropriated ................ $    191,600
31        Total, Section 12.1                              $191,600
 
                           -15-                     BOB-CDB02
 1        Section 13.  The following  named  amounts,  or  so  much
 2    thereof  as  may  be  necessary,  are  appropriated  from the
 3    Capital Development Fund to the Capital Development Board for
 4    the Office  of  the  Secretary  of  State  for  the  projects
 5    hereinafter enumerated:
 6                              STATEWIDE
 7    For replacing windows at the following
 8     locations at the approximate cost set
 9     forth below ................................... $  1,750,000
10      Lexington Avenue Motor
11       Vehicle Facility .....................583,000
12      Martin Luther King, Jr. Dr.
13       Motor Vehicle Facility ...............583,000
14      North Elston Motor
15       Vehicle Facility .....................584,000
16                   CAPITOL BUILDING - SPRINGFIELD
17    For upgrading the HVAC and mechanical
18      systems ......................................    6,950,000
19                    CAPITOL COMPLEX - SPRINGFIELD
20    For completing the stone restoration, in
21      addition to funds previously appropriated ....    3,000,000
22                   STATE POWER PLANT - SPRINGFIELD
23    For installing new water service and
24      repairing power plant systems ................       80,000
25             WILLIAM G. STRATTON BUILDING - SPRINGFIELD
26    For upgrading the electrical system, in
27      addition to funds previously appropriated ....    4,220,000
28        Total, Section 13                             $16,000,000

29        Section  14.  The  following  named  amounts,  or so much
30    thereof as  may  be  necessary,  are  appropriated  from  the
31    Capital Development Fund to the Capital Development Board for
32    the projects hereinafter enumerated:
33                              STATEWIDE
 
                           -16-                     BOB-CDB02
 1    For abating hazardous materials ................ $  2,050,000
 2    For retrofitting or upgrading mechanized
 3      refrigeration equipment (CFCs) ...............    1,650,000
 4    For surveys and modifications to buildings
 5      to meet requirements of the federal
 6      Americans with Disabilitites Act (ADA) .......    4,000,000
 7                   EXECUTIVE MANSION - SPRINGFIELD
 8    For building improvements ......................      600,000
 9        Total, Section 14                              $8,300,000

10        Section  14.1.  The  following  named amounts, or so much
11    thereof as  may  be  necessary,  are  appropriated  from  the
12    General Revenue Fund to the Capital Development Board for the
13    projects hereinafter enumerated:
14                              STATEWIDE
15    Survey for and abate hazardous
16      materials .................................... $  2,000,000
17    For demolition of buildings ....................    1,000,000
18    For repairing minor problems and
19      emergencies ..................................    1,000,000
20        Total, Section 14.1                            $4,000,000

21        Section  15.     The  following named amounts, or so much
22    thereof as  may  be  necessary,  are  appropriated  from  the
23    Capital Development Fund to the Capital Development Board for
24    the   Illinois  Community  College  Board  for  the  projects
25    hereinafter enumerated:
26                              STATEWIDE
27    For miscellaneous capital improvements
28      including construction, capital facilities,
29      cost of planning, supplies, equipment,
30      materials, services and all other expenses
31      required to complete the work at the
32      various community colleges.  This appropriated
 
                           -17-                     BOB-CDB02
 1      amount shall be in addition to any other
 2      appropriated amounts which can be
 3      expended for these purposes ...................$  6,071,700

 4        Section 16.    The following named amounts,  or  so  much
 5    thereof  as  may  be  necessary,  are  appropriated  from the
 6    Capital Development Fund to the Capital Development Board for
 7    the Illinois Board  of  Higher  Education  for  the  projects
 8    hereinafter enumerated:
 9                              STATEWIDE
10    For miscellaneous capital improvements
11      including construction, capital
12      facilities, cost of  planning, supplies,
13      equipment, materials, services and
14      all other expenses required to complete
15      the work at the various universities
16      This appropriated  amount shall be in
17      addition to any other appropriated amounts
18      which can be expended for these purposes...... $ 13,928,300
19       Chicago State University .............322,700
20       Eastern Illinois University ..........515,500
21       Governors State University ...........189,700
22       Illinois State University ..........1,021,300
23       Northeastern Illinois
24        University ..........................383,700
25       Northern Illinois University .......1,159,000
26       Western Illinois University ..........792,200
27       Southern Illinois University -
28        Carbondale ........................1,624,700
29       Southern Illinois University -
30        Edwardsville ........................763,100
31       University of Illinois -
32        Chicago ...........................2,777,300
33       University of Illinois -
 
                           -18-                     BOB-CDB02
 1        Springfield .........................229,100
 2       University of Illinois -
 3        Urbana/Champaign ..................4,150,000
 4                      CHICAGO STATE UNIVERSITY
 5    For constructing a new library facility,
 6      site improvements, utilities, and
 7      purchasing equipment, in addition
 8      to funds previously appropriated .............   16,000,000
 9                     EASTERN ILLINOIS UNIVERSITY
10    For renovating and expanding the
11      Fine Arts Center, in addition to
12      funds previously appropriated ................   40,003,000
13                  NORTHEASTERN ILLINOIS UNIVERSITY
14    For renovating Building "C" and
15      remodeling and expanding Building "E"
16      and Building "F" .............................    9,064,300
17                UNIVERSITY OF ILLINOIS - SPRINGFIELD
18    For constructing a classroom and office
19      building, in addition to funds
20      previously appropriated ......................   30,000,000
21        Total, Section 19                            $108,995,600

22        Section  17.     The  following named amounts, or so much
23    thereof as  may  be  necessary,  are  appropriated  from  the
24    Capital Development Fund to the Capital Development Board for
25    the projects hereinafter enumerated:
26                    SOUTHERN ILLINOIS UNIVERSITY
27    For planning, construction and equipment
28      for a cancer center .......................... $ 14,500,000
29             SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
30    For planning, construction and equipment
31      for an advanced technical worker
32      training facility ............................    1,100,000
33                  UNIVERSITY OF ILLINOIS - CHICAGO
 
                           -19-                     BOB-CDB02
 1    For planning, construction and equipment
 2      for a chemical sciences building .............    6,400,000
 3    For planning, construction and equipment
 4      for a medical imaging research
 5      clinical facility ............................    9,875,000
 6              UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN
 7    For planning, construction and equipment
 8      for a biotechnology genomic facility .........   41,250,000
 9    For planning, construction and equipment
10      for a supercomputing application facility ....   30,000,000
11    For planning, construction and equipment
12      for a technology transfer incubator
13      facility .....................................    3,000,000
14        Total, Section 17                            $106,125,000

15        Section  18.  The  amount  of  $10,000,000,  or  so  much
16    thereof as may be necessary, is appropriated from the Tobacco
17    Settlement Recovery Fund to the Capital Development Board for
18    a grant to Northwestern University for planning, construction
19    and equipment for a biomedical research facility.

20        Section  19.  The  amount  of  $32,000,000,  or  so  much
21    thereof as may be necessary, is appropriated from the Capital
22    Development  Fund  to the Board of Trustees of the University
23    of Illinois for planning, construction and  equipment  for  a
24    computer science in engineering facility.

25        Section  20.  The  amount  of  $10,000,000,  or  so  much
26    thereof as may be necessary, is appropriated from the Tobacco
27    Settlement Recovery Fund to the Capital Development Board for
28    a   grant   to   the  University  of  Chicago  for  planning,
29    construction and equipment for an advanced research building.

30        Section 21.  The amount of $1,000,000, or so much thereof
 
                           -20-                     BOB-CDB02
 1    as  may  be  necessary,  is  appropriated  from  the  Tobacco
 2    Settlement Recovery Fund to the Capital Development Board for
 3    a grant to IIT for planning, construction and equipment for a
 4    biomedical research center.

 5        Section 22.  The amount of $4,000,000, or so much thereof
 6    as  may  be  necessary,  is  appropriated  from  the  Tobacco
 7    Settlement Recovery Fund to the Capital Development Board for
 8    a grant to Argonne for planning, construction  and  equipment
 9    for a nanotechnology research institute.

10        Section 23.  The amount of $2,000,000, or so much thereof
11    as  may  be  necessary,  is  appropriated  from  the  Tobacco
12    Settlement Recovery Fund to the Capital Development Board for
13    a grant to Northwestern University for planning, construction
14    and equipment for a nanofabrication and molecular center.

15        Section 24.  The amount of $5,000,000, or so much thereof
16    as  may  be  necessary,  is  appropriated  from  the  Tobacco
17    Settlement Recovery Fund to the Capital Development Board for
18    a  grant  to  Rush Presbyterian St. Luke's Medical Center for
19    planning, construction and equipment for the Cohn Bio-Medical
20    Research Building.

21        Section 25.  The amount of $3,500,000, or so much thereof
22    as  may  be  necessary,  is  appropriated  from  the  Tobacco
23    Settlement Recovery Fund to the Capital Development Board for
24    planning,  construction,  equipment  and   grants   for   the
25    VentureTECH program.

26                      STATE BOARD OF EDUCATION
27        Section  26.  The sum of $500,000,000, or so much thereof
28    as  may  be  necessary,  is  appropriated  from  the   School
29    Construction Fund to the Capital Development Board for school
 
                           -21-                     BOB-CDB02
 1    construction  grants pursuant to the School Construction Law,
 2    in addition  to  amounts  previously  appropriated  for  such
 3    purposes.

 4        Section  95.   No  contract  shall  be  entered  into  or
 5    obligation  incurred for any expenditures from appropriations
 6    made in this Article until after  the  purposes  and  amounts
 7    have been approved by the Governor.

 8                              ARTICLE 2

 9        Section  1.  The  following  named  amounts,  or  so much
10    thereof as may be necessary  and  remain  unexpended  at  the
11    close  of  business on June 30, 2001, from appropriations and
12    reappropriations heretofore made for such purposes in Article
13    1, Section 1, and Article 2, Section 1 of Public Act  91-708,
14    are  reappropriated  from the Capital Development Fund to the
15    Capital Development Board for the Department  of  Agriculture
16    for the projects hereinafter enumerated:

17                ANIMAL DISEASE LABORATORY - CENTRALIA
18    (From Article 2, Section 1 of Public Act 91-708)
19    For upgrading the diagnostic laboratory
20      facility, in addition to funds previously
21      appropriated ................................. $     42,905
22                      DUQUOIN STATE FAIRGROUNDS
23    (From Article 1, Section 1 of Public Act 91-708)
24    For upgrading electrical utilities .............      146,000
25    For constructing a multi-purpose
26      building .....................................    8,000,000
27    (From Article 2, Section 1 of Public Act 91-708)
28    For renovating roundhouses .....................      128,396
29    For constructing livestock
30      facilities ...................................      159,918
 
                           -22-                     BOB-CDB02
 1    For upgrading the racetrack, including the
 2      racetrack walls ..............................      879,177
 3                   GALESBURG DIAGNOSTIC LABORATORY
 4    For purchasing the facility ....................    3,200,000
 5              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
 6    (From Article 1, Section 1 of Public Act 91-708)
 7    For renovating or replacing racehorse
 8      barns - Phase IV .............................    1,648,200
 9    For renovating the Emmerson Building ...........    2,086,150
10    For renovating or replacing #26 Barn ...........      789,673
11    For completing the HVAC system in the
12      Administration Building, in addition to
13      funds previously appropriated ................      340,000
14    For renovating the Junior Home Economics
15      Building .....................................    1,131,000
16    (From Article 2, Section 1 of Public Act 91-708)
17    For completing the HVAC replacement
18      in the Administration Building, in
19      addition to funds previously appropriated ....      405,358
20    For replacing and repairing roofs,
21      Phase II .....................................      196,583
22    For extending the fiber optics system ..........      221,153
23    For installing HVAC system and
24      restrooms in the Orr Building ................      294,828
25    For designing and constructing a complex to
26      accommodate various outdoor events,
27      including site development, utilities,
28      permanent grandstands and portable
29      bleachers, support facilities, vehicle
30      and pedestrian access and related
31      work .........................................      537,570
32    For replacing and renovating
33      racehorse barns (Phase II) ...................      134,561
34    For replacing and rehabilitating roofs .........       25,578
 
                           -23-                     BOB-CDB02
 1    For replacing Series 14 Barns (Phase I) ........       10,653
 2    For replacing the HVAC system in the
 3      Administration Building ......................       73,895
 4    For renovation or replacement of
 5      comfort stations, in addition
 6      to funds previously appropriated .............      122,767
 7    For renovation of the comfort stations-
 8      Phase I ......................................       37,212
 9    For planning and beginning the renovation
10      of the show horse barns ......................       42,284
11        Total, Section 1                              $20,653,861

12        Section  2.  The  following  named  amounts,  or  so much
13    thereof as may be necessary  and  remain  unexpended  at  the
14    close  of  business on June 30, 2001, from appropriations and
15    reappropriations heretofore made for such purposes in Article
16    1, Section 13 and Article 2, Section 2 of Public Act  91-708,
17    as  amended,  are reappropriated from the Capital Development
18    Fund to the Capital  Development  Board  for  the  Courts  of
19    Illinois for the projects hereinafter enumerated:

20                 MT. VERNON APPELLATE COURT BUILDING
21    (From Article 2, Section 2 of Public Act 91-708, as amended)
22    For expanding the courthouse ...................    1,531,730
23    For expanding the courthouse, in
24      addition to funds previously
25      appropriated .................................      792,000
26                SPRINGFIELD - SUPREME COURT BUILDING
27    (From Article 1, Section 13 of Public Act 91-708)
28    For replacing the roof .........................      812,600
29    For renovating the HVAC system on
30      the 3rd Floor ................................      140,000
31    (From Article 2, Section 2 of Public Act 91-708)
32    For installing humidifier and water
 
                           -24-                     BOB-CDB02
 1      filtration systems ...........................    1,570,950
 2    For upgrading the library, in
 3      addition to funds previously appropriated ....      323,721
 4    For replacing plumbing system ..................      363,712
 5    For planning and beginning the
 6      library upgrade ..............................       38,996
 7               THIRD DISTRICT APPELLATE COURT - OTTAWA
 8    For replacing the Annex roof ...................       44,180
 9        Total, Section 2                               $5,617,889

10        Section  2.1.  The  following  named  amounts, or so much
11    thereof as may be necessary  and  remain  unexpended  at  the
12    close  of  business  on  June 30, 2001, from reappropriations
13    heretofore made for such purposes in Article 2,  Section  2.1
14    of  Public  Act  91-708,  are reappropriated from the General
15    Revenue  Fund  to  the  Capital  Development  Board  for  the
16    projects hereinafter enumerated:

17          SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN
18    (From Article 2, Section 2.1 of Public Act 91-708)
19    For upgrading mechanical systems
20      and building exterior ........................ $      9,944
21               THIRD DISTRICT APPELLATE COURT - OTTAWA
22    For tuckpointing and repairing exterior ........       98,888
23             FIFTH DISTRICT APPELLATE COURT - MT. VERNON
24    For repairing plaster and painting .............       81,606
25                SUPREME COURT BUILDING - SPRINGFIELD
26    For tuckpointing and cleaning exterior .........       35,490
27        Total, Section 2.1                               $225,928

28        Section 3.  The  following  named  amounts,  or  so  much
29    thereof  as  may  be  necessary  and remain unexpended at the
30    close of business on June 30, 2001, from  appropriations  and
31    reappropriations heretofore made in Article 1, Section 14 and
 
                           -25-                     BOB-CDB02
 1    Article  2,  Section 3 of Public Act 91-708, approved May 17,
 2    2000, are reappropriated from the Capital Development Fund to
 3    the Capital Development Board for the Office of the Secretary
 4    of State for the projects hereinafter enumerated:

 5             WILLIAM G. STRATTON BUILDING - SPRINGFIELD
 6    (From Article 1, Section 14 of Public Act 91-708)
 7    For replacing windows and tuckpointing ......... $  5,925,000
 8                    CAPITOL COMPLEX - SPRINGFIELD
 9    (From Article 2, Section 3 of Public Act 91-708)
10    For upgrading electrical lighting and replacing
11      ceilings - Stratton Office Building ..........    5,416,239
12    For replacing mechanical piping - Klein
13      and Mason Warehouse...........................      278,100
14    For renovating the exterior of the Capitol
15      and Howlett Buildings ........................    1,337,174
16    For demolition of 222 S. College,
17      and landscaping of Capitol Complex
18      in addition to funds previously
19      appropriated .................................    1,200,000
20    For demolition of 222 South College
21      Building and landscaping of
22      Capitol Complex ..............................    2,387,894
23        Total, Section 3                              $16,544,407

24        Section 3.1.  The sum of $825,000, or so much thereof  as
25    may  be  necessary  and  remains unexpended on June 30, 2001,
26    from a reappropriation heretofore made for such  purposes  in
27    Article 2, Section 17 of Public Act 91-708, is reappropriated
28    from  the Capital Development Fund to the Capital Development
29    Board for the Secretary of State for a grant to the Edgebrook
30    Library for all costs associated with the miscellaneous costs
31    incurred for construction or other purposes.
32        Section 3.2.  The sum of $8,300,000, or so  much  thereof
 
                           -26-                     BOB-CDB02
 1    as  may  be necessary, and remains unexpended at the close of
 2    business on June 30, 2001, from an  appropriation  heretofore
 3    made  in  Article  1,  Section  14.1 of Public Act 91-708, as
 4    amended, is reappropriated from the Capital Development  Fund
 5    to  the  Capital  Development  Board  for  the  Office of the
 6    Secretary of State to construct a parking garage.

 7        Section 4.  The  following  named  amounts,  or  so  much
 8    thereof  as  may  be  necessary  and remain unexpended at the
 9    close of business on June 30, 2001, from  appropriations  and
10    reappropriations heretofore made for such purposes in Article
11    1,  Section  2 and Article 2, Section 4 of Public Act 91-708,
12    are reappropriated from the Capital Development Fund  to  the
13    Capital  Development  Board  for  the  Department  of Central
14    Management Services for the projects hereinafter enumerated:

15                 JAMES R. THOMPSON CENTER - CHICAGO
16    (From Article 1, Section 2 of Public Act 91-708)
17    For upgrading mechanical systems ............... $  1,466,396
18           MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO
19    For replacing roof and upgrading
20      mechanical and electrical systems ............    1,249,680
21           PEORIA REGIONAL OFFICE BUILDING - PEORIA COUNTY
22    For rehabilitating the HVAC system .............      135,000
23                  ROCKFORD REGIONAL OFFICE BUILDING
24    For upgrading utilities ........................       80,000
25                      SPRINGFIELD STATE GARAGE
26    For renovating the interior of the
27      central garage ...............................      653,360
28            RESEARCH AND COLLECTION CENTER - SPRINGFIELD
29    For expanding surplus warehouse ................    3,184,803
30                   ELGIN REGIONAL OFFICE BUILDING
31    (From Article 2, Section 4 of Public Act 91-708)
32    For replacing the utility system ...............      854,356
 
                           -27-                     BOB-CDB02
 1          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
 2                      ROOSEVELT ROAD - CHICAGO
 3    (From Article 1, Section 2 of Public Act 91-708)
 4    For upgrading electrical systems ...............      940,000
 5    (From Article 2, Section 4 of Public Act 91-708)
 6    For converting and renovating tub rooms ........      409,500
 7    For upgrading the HVAC system ..................      367,798
 8               ILLINOIS CENTER FOR REHABILITATION AND
 9                     EDUCATION (WOOD) - CHICAGO
10    (From Article 1, Section 2 of Public Act 91-708)
11    For upgrading fire and safety systems ..........      335,000
12                STATE OF ILLINOIS BUILDING - CHICAGO
13    (From Article 1, Section 2 of Public Act 91-708)
14    For restoring exterior and rebuilding
15      foundation ...................................    1,580,000
16                 CHICAGO - STATE OF ILLINOIS CENTER
17    (From Article 2, Section 4 of Public Act 91-708)
18    For replacing roofing system and
19      insulation, in addition to funds
20      previously appropriated ......................       17,779
21    For the correction of design/construction
22      deficiencies, including remedial work in
23      the heating, refrigeration, temperature
24      control and ventilation systems at the
25      State of Illinois Center at Chicago ..........       26,478
26           OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER
27    For planning and beginning the renovation
28      of the facility ..............................    2,166,020
29              SUBURBAN NORTH REGIONAL OFFICE BUILDING -
30                             DES PLAINES
31    For renovating offices for Environmental
32      Protection Agency, in addition to funds
33      previously appropriated ......................      750,895
34    For renovation of Suburban North Regional
 
                           -28-                     BOB-CDB02
 1      Office Building (formerly Maine Township
 2      North High School building), in addition
 3      to funds previously appropriated for such
 4      purpose, Phase III ...........................      328,299
 5                         OTTAWA STATE GARAGE
 6    For replacing state garage .....................    1,334,504
 7                    SPRINGFIELD - CAPITOL COMPLEX
 8    For construction of a day care center, in
 9      addition to funds previously appropriated
10      for such purpose .............................      950,000
11    For construction of a day care center in the
12      Capitol Complex in Springfield ...............      244,348
13                   COMPUTER FACILITY - SPRINGFIELD
14    For installing a cooling tower and fire alarm
15      system and various other improvements ........      550,354
16    For replacement of the halon fire
17      suppression system ...........................      130,990
18                        ASH STREET COMPLEX -
19                   MUSEUM AND COLLECTION CENTER -
20                             SPRINGFIELD
21    For replacement of the roofing system ..........      438,346
22                   MARION REGIONAL OFFICE BUILDING
23    For replacing HVAC system and interior
24      lighting .....................................      582,369
25    For construction of a Regional Office
26      Building Addition ............................      282,513
27                SPRINGFIELD REGIONAL OFFICE BUILDING
28    For replacing the potable water system .........      747,059
29    For upgrading the parking lot ..................      160,864
30        Total, Section 4                              $19,966,711

31        Section 4.1.  The following named  amounts,  or  so  much
32    thereof  as  may  be  necessary  and remain unexpended at the
33    close of business on June  30,  2001,  from  reappropriations
 
                           -29-                     BOB-CDB02
 1    heretofore  made  for such purposes in Article 2, Section 4.1
 2    of Public Act 91-708, are  reappropriated  from  the  General
 3    Revenue  Fund  to  the  Capital  Development  Board  for  the
 4    Department  of  Central  Management Services for the projects
 5    hereinafter enumerated:

 6                 JAMES R. THOMPSON CENTER - CHICAGO
 7    (From Article 2, Section 4.1 of Public Act 91-708)
 8    For restoring the exterior plaza ...............       78,933
 9           CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY
10    For rehabilitating exterior ....................      214,884
11                       CHICAGO MEDICAL CENTER
12          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
13    For rehabilitating the pool area ...............      143,950
14                STATE OF ILLINOIS BUILDING - CHICAGO
15    For restoring exterior limestone and
16      masonry ......................................      505,991
17                         PARIS STATE GARAGE
18    For replacing overhead lighting and
19      pneumatic system .............................      192,532
20        Total, Section 4.1                             $1,136,290

21        Section 5.  The  following  named  amounts,  or  so  much
22    thereof  as  may  be  necessary  and remain unexpended at the
23    close of business on June 30, 2001, from  appropriations  and
24    reappropriations heretofore made for such purposes in Article
25    1,  Section 7, and Article 2, Section 5 of Public Act 91-708,
26    are reappropriated from the Capital Development Fund  to  the
27    Capital  Development  Board  for  the  Department  of Natural
28    Resources for the projects hereinafter enumerated:

29                 BABE WOODYARD STATE NATURAL AREA -
30                          VERMILION COUNTY
31    (From Article 2, Section 5 of Public Act 91-708)
 
                           -30-                     BOB-CDB02
 1    For developing the site and associated
 2      land acquisition ............................. $  2,828,451
 3                BEALL WOODS STATE CONSERVATION AREA -
 4                            WABASH COUNTY
 5    For replacing a visitors center ................      228,012
 6               BEAVER DAM STATE PARK - MACOUPIN COUNTY
 7    For rehabilitating dams, spillway, and
 8      boat access facilities .......................      402,632
 9                      CARLYLE LAKE STATE PARKS
10    For cabin construction and site
11      improvements at Eldon
12      Hazlet State Park, Phase II ..................    1,463,185
13    For road and site improvements at
14      Carlyle Lake .................................    1,500,000
15    For infrastructure and site
16      improvements at Carlyle Lake .................    2,776,997
17                CASTLE ROCK STATE PARK - OGLE COUNTY
18    (From Article 1, Section 7 of Public Act 91-708)
19    For replacing maintenance building .............      413,803
20               CAVE-IN-ROCK STATE PARK - HARDIN COUNTY
21    (From Article 2, Section 5 of Public Act 91-708)
22    For constructing a shower building
23      and upgrading the campground .................       51,259
24             CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
25    For upgrading sewage treatment system ..........    1,049,219
26    For construction of a concession building
27      and upgrading the horse concession, in
28      addition to funds previously appropriated ....       25,954
29    For planning and beginning the replacement
30      of concession buildings ......................       10,180
31               EAGLE CREEK STATE PARK - SHELBY COUNTY
32    For rehabilitation of the sewage treatment
33      system, in addition to funds previously
34      appropriated .................................      175,281
 
                           -31-                     BOB-CDB02
 1               FORT MASSAC STATE PARK - MASSAC COUNTY
 2    (From Article 1, Section 7 of Public Act 91-708)
 3    For reconstructing the fort ....................    4,300,000
 4    (From Article 2, Section 5 of Public Act 91-708)
 5    For planning and beginning the
 6      reconstruction of the fort ...................       35,314
 7                     GEOLOGICAL SURVEY-CHAMPAIGN
 8    (From Article 1, Section 7 of Public Act 91-708)
 9    For constructing two pole
10      storage buildings ............................      312,500
11          HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
12    For rehabilitating aqueducts
13      #3, #4 and #8 ................................      750,000
14    (From Article 2, Section 5 of Public Act 91-708)
15    For stabilizing the feeder canal bank ..........       44,484
16    For replacement and rehabilitation
17      of arch culverts and canal ...................      261,190
18         HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
19    For dam rehabilitation and the State's share
20      to implement the ecological restoration
21      plan in cooperation with the U.S.
22      Army Corps of Engineers, and
23      land acquisition .............................      858,655
24    For construction of a pole building
25      and hunter check station .....................       41,284
26                 ILLINOIS-MICHIGAN CANAL STATE TRAIL
27    For stabilization of the aqueduct ..............      173,139
28               ILLINOIS BEACH STATE PARK - LAKE COUNTY
29    (From Article 1, Section 7 of Public Act 91-708)
30    For replacing sanitary sewer line ..............      545,300
31    (From Article 2, Section 5 of Public Act 91-708)
32    For rehabilitating lodge entrance ..............       73,463
33    For constructing an office building ............       45,626
34    For replacing sanitary sewer lines .............      474,347
 
                           -32-                     BOB-CDB02
 1            JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
 2    For upgrading campground electrical ............      209,574
 3    For rehabilitation of the concession
 4      building, in addition to funds
 5      previously appropriated ......................       85,499
 6    For rehabilitation of the concession building ..       40,558
 7         KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES
 8    For constructing sanitary sewer system, in
 9      addition to funds previously appropriated ....    5,000,000
10                KANKAKEE STATE PARK - KANKAKEE COUNTY
11    For planning and constructing a
12      sanitary sewer system ........................       80,854
13                KASKASKIA RIVER FISH & WILDLIFE AREA
14    (From Article 1, Section 7 of Public Act 91-708)
15    For providing electrical service ...............      106,000
16               KICKAPOO STATE PARK - VERMILION COUNTY
17    For rehabilitating the water
18      system and day-use areas .....................    1,041,000
19           LAKE LE-AQUA-NA STATE PARK - STEPHENSON COUNTY
20    (From Article 2, Section 5 of Public Act 91-708)
21    For replacing sewage treatment plant ...........      539,270
22            LAKE MURPHYSBORO STATE PARK - JACKSON COUNTY
23    (From Article 1, Section 7 of Public Act 91-708)
24    For replacing the district office
25      building .....................................      485,299
26         LINCOLN TRAIL STATE RECREATION AREA - CLARK COUNTY
27    For renovating the concession
28      building .....................................      815,000
29    For upgrading campground electrical
30      and drainage .................................      460,000
31    (From Article 2, Section 5 of Public Act 91-708)
32    For rehabilitating the day use area
33      and site .....................................    1,183,776
34           LITTLE GRASSY FISH HATCHERY - WILLIAMSON COUNTY
 
                           -33-                     BOB-CDB02
 1    (From Article 1, Section 7 of Public Act 91-708)
 2    For improving drainage discharge ...............      250,000
 3                   MASON STATE FOREST TREE NURSERY
 4    For expanding the cold storage facility ........      638,000
 5    For expanding the seed cleaning facility .......      662,000
 6            MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
 7    (From Article 2, Section 5 of Public Act 91-708)
 8    For rehabilitating levee and well, in
 9      addition to funds previously appropriated ....    2,404,021
10              MORAINE HILLS STATE PARK - MCHENRY COUNTY
11    For renovation of the trail ....................       89,337
12    For replacement of restrooms and upgrading
13      the water system .............................      139,731
14                    MORRISON-ROCKWOOD STATE PARK
15    (From Article 1, Section 7 of Public Act 91-708)
16    For improving the water system and
17      rehabilitating the campground water ..........      418,000
18                   NATURAL HISTORY SURVEY - HAVANA
19    For renovating Forbes Biological Station .......      683,000
20                  NORTH POINT MARINA - LAKE COUNTY
21    (From Article 2, Section 5 of Public Act 91-708)
22    For construction of a breakwater structure .....    1,012,492
23    For modifying the marina's docking system ......    1,471,710
24                 NAUVOO STATE PARK - HANCOCK COUNTY
25    For replacing water distribution
26      system .......................................      128,990
27              PERE MARQUETTE STATE PARK - JERSEY COUNTY
28    For replacing the lodge HVAC condensing unit, in
29      addition to funds previously appropriated ....      158,475
30                PRAIRIE RIDGE SANCTUARY NATURAL AREA
31    (From Article 1, Section 7 of Public Act 91-708)
32    For replacing the Service & Hazardous
33      Materials buildings and installing a fuel
34      tank .........................................      366,000
 
                           -34-                     BOB-CDB02
 1             RESEARCH & COLLECTIONS CENTER - SPRINGFIELD
 2    (From Article 1, Section 7 of Public Act 91-708)
 3    For renovating the interior ....................      991,000
 4               ROCK CUT STATE PARK - WINNEBAGO COUNTY
 5    For upgrading the sewage system ................    2,365,300
 6                  NEW OFFICE BUILDING - SPRINGFIELD
 7    For completing construction of an
 8      office building, in addition to funds
 9      previously appropriated ......................    2,000,000
10                    SANGANOIS CONSERVATION AREA -
11                  CASS, MASON AND SCHUYLER COUNTIES
12    (From Article 2, Section 5 of Public Act 91-708)
13    For rehabilitating the levee system ............      197,895
14               SANGCHRIS STATE PARK - SANGAMON COUNTY
15    For upgrading campground electrical
16      system .......................................      180,111
17           SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY
18    For planning and beginning renovation
19      of hatchery ..................................      442,608
20                             SPRINGFIELD
21    For constructing an office building and
22      interpretive center ..........................   12,332,481
23              STARVED ROCK STATE PARK - LASALLE COUNTY
24    For construction of a visitors center, in
25      addition to funds previously appropriated ....    3,978,987
26    For rehabilitating the sewer system ............    1,038,833
27    For rehabilitating trails, in addition
28      to funds previously appropriated .............      500,000
29    For upgrading the HVAC system ..................       93,704
30    For construction of a Visitors'
31      Center, in addition to funds
32      previously appropriated ......................      365,000
33    For rehabilitation of trails, in addition
34      to funds previously appropriated .............      175,769
 
                           -35-                     BOB-CDB02
 1    For rehabilitation of the sewer
 2      system - Phase I .............................       79,636
 3             TRI-COUNTY PARK - COOK/KANE/DUPAGE COUNTIES
 4    For planning and beginning
 5      construction of a park .......................       48,602
 6                 WASTE MANAGEMENT & RESEARCH CENTER
 7    (From Article 1, Section 7 of Public Act 91-708)
 8    For constructing a garage and
 9      storage area .................................      394,000
10           WAYNE FITZGERRELL STATE PARK - FRANKLIN COUNTY
11    (From Article 2, Section 5 of Public Act 91-708)
12    For rehabilitation of the sewage
13      treatment plant ..............................      149,908
14             WHITE PINES FOREST STATE PARK - OGLE COUNTY
15    For planning and beginning lodge and cabin
16      restoration ..................................      150,000
17                        WILDLIFE PRAIRIE PARK
18    (From Article 1, Section 7 of Public Act 91-708)
19    For planning and beginning the upgrade
20      of the park ..................................    1,000,000
21             TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
22    (From Article 2, Section 5 of Public Act 91-708)
23    For constructing a visitor center and
24      purchasing land ..............................    3,119,323
25      NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
26                     (FORMERLY BURNHAM HOSPITAL)
27    For construction of a Natural History
28      Research Center for the space needs of
29      the Illinois Natural History Survey on
30      the campus of the University of Illinois......    6,000,000
31    For planning and construction of the
32      Natural History Research Center
33      for the space needs of the
34      Illinois Natural History Survey
 
                           -36-                     BOB-CDB02
 1      on the campus of the University
 2      of Illinois in Champaign .....................    2,103,800
 3                   STATE WATER SURVEY - CHAMPAIGN
 4    (From Article 1, Section 7 of Public Act 91-708)
 5    For constructing a vehicle maintenance
 6      and shop building ............................    3,568,000
 7    (From Article 2, Section 5 of Public Act 91-708)
 8    For upgrading and replacing the mechanical
 9      system, in addition to funds
10      previously appropriated ......................    2,090,148
11    For planning and replacement of vehicle
12      storage/shop facilities ......................       21,150
13                     DICKSON MOUNDS - LEWISTOWN
14    For renovating Canton Liverpool
15      Toll Booth ...................................       28,902
16      STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
17    For the completion of site improvements ........      190,582
18                     STATE MUSEUM - SPRINGFIELD
19    For renovating or replacing exhibits, in
20      addition to funds previously appropriated ....    5,500,000
21    For planning and beginning replacement
22      of the state museum ..........................      469,146
23    For planning and replacement of the main
24      museum exhibits, in addition to funds
25      previously appropriated ......................      351,000
26    For planning renovation of main museum
27      exhibits and for renovation of basement
28      galleries ....................................       24,350
29                              STATEWIDE
30    (From Article 1, Section 7 of Public Act 91-708)
31    For fabrication of visitors centers
32      exhibit ......................................      700,000
33    For replacing and constructing vault
34      toilets at the following locations,
 
                           -37-                     BOB-CDB02
 1      at the approximate cost set forth
 2      below ........................................    1,805,000
 3       Wayne Fitzgerrell State Park .........414,000
 4       Goose Lake Prairie State Park .........71,000
 5       Wolf Creek State Park ................805,000
 6       Hennepin Canal Parkway
 7       State Trail ..........................435,000
 8       Kaskaskia River Fish &
 9       Wildlife Area .........................80,000
10       For providing dump stations..................      200,000
11    For rehabilitating bridges at the
12      following locations, at the approximate
13      cost set forth below .........................    1,056,060
14       Rock Island Trail ....................661,060
15       Frank Holten State Park ..............300,000
16       Horseshoe Lake State Park .............70,000
17       Castle Rock State Park ................25,000
18    For rehabilitating dams at the
19      following locations, at the
20      approximate cost set forth below .............    1,421,887
21       Ramsey Lake State Park ...............521,887
22       Rock Cut State Park ..................450,000
23       Snakeden Hollow State Park ...........450,000
24    For replacing roofs at the following
25      locations, at the approximate
26      cost set forth below .........................    1,384,000
27       Southern IL Arts &
28        Crafts Center .......................290,000
29       Frank Holten State Park ...............28,000
30       DNR Geological Survey-
31        Champaign ...........................124,000
32       Sangchris Lake State
33        Park .................................50,000
34       Illini State Park ....................125,000
 
                           -38-                     BOB-CDB02
 1       Shelbyville Fish &
 2        Wildlife Area .......................100,000
 3       Trail of Tears State
 4        Forest ..............................219,000
 5       Sanganois Conservation Area ...........48,000
 6       Rice Lake State Park .................125,000
 7       Hidden Spring State Park ..............67,000
 8       Siloam Springs State Park .............48,000
 9       Mississippi Palisades
10        State Park ..........................160,000
11    (From Article 2, Section 5 of Public Act 91-708)
12    For replacing roofing systems at the
13      following locations, at the approximate
14      cost set forth below .........................    1,684,260
15        Beall Woods Conservation Area -
16         Wabash County .......................30,000
17        Eagle Creek State Park -
18         Shelby County ..........................100
19        Eldon Hazlet State Park -
20         Clinton County ......................61,296
21        Fox Ridge State Park -
22         Coles County ........................34,000
23        Giant City State Park -
24         Jackson/Union Counties ..............89,969
25        Goose Lake Prairie State Park -
26         Grundy County ......................109,519
27        Hennepin Canal Parkway State Trail ...97,485
28        Illinois Beach State Park -
29         Lake County ........................478,008
30        Illinois Caverns Natural Area -
31         Monroe County .......................74,000
32        Kankakee River State Park -
33         Kankakee/Will Counties ..............74,000
34        Kickapoo State Park -
 
                           -39-                     BOB-CDB02
 1         Vermilion County ....................36,320
 2        Middle Fork State Fish & Wildlife
 3         Area - Vermilion County .............12,900
 4        Moraine Hills State Park -
 5         McHenry County ......................52,456
 6        Moraine View State Park -
 7         McLean County.......................148,415
 8        Ramsey Lake State Park -
 9         Fayette County ......................63,203
10        Randolph County Conservation Area ....53,236
11        Red Hills State Park -
12         Lawrence County ........................100
13        Saline County Conservation Area ......20,000
14        Sam Dale Lake Conservation Area -
15         Wayne County ...........................100
16        Spitler Woods State Natural Area -
17         Macon County ...........................425
18        Stephen A. Forbes State Park -
19         Marion County .......................36,547
20        Ten Mile Creek State Fish &
21         Wildlife Area - Jefferson/
22         Hamilton Counties....................76,000
23        Union County Conservation Area ........6,694
24        Washington County Conservation Area ..45,546
25        Waste Management & Research Center -
26         Champaign ..............................100
27        William W. Powers Conservation Area -
28         Cook County .........................37,841
29        Wolf Creek State Park -
30         Shelby County .......................46,000
31    For replacing vault toilets at the following
32      locations, at the approximate cost set forth
33      below ........................................      613,343
34        Anderson Lake Conservation Area -
 
                           -40-                     BOB-CDB02
 1         Fulton/Schuyler Counties ...........156,000
 2        Giant City State Park -
 3         Jackson/Union Counties .............294,498
 4        Randolph County Conservation Area ...150,630
 5        Silver Springs State Park -
 6          Kendall County .....................12,215
 7    For replacing roofing systems at the
 8      following locations at the approximate
 9      costs set forth below ........................       91,146
10        Silver Springs State Park, Three
11         Buildings .......................... 76,146
12        Weldon Springs State Park, Nine
13         Buildings .......................... 15,000
14    For constructing vault toilets at the following
15      locations at the approximate costs set forth
16      below ........................................      443,507
17        Cave-In-Rock State Park ............ 156,072
18        Golconda/Rauchfuss Hill ............ 122,998
19        I&M Canal - Gebhard Woods State
20         Park ................................ 5,000
21        Prophetstown State Park ............. 53,437
22        William W. Powers State Park ....... 106,000
23    For constructing hazardous material storage
24      buildings ....................................      262,324
25    For replacing concession buildings and
26      upgrading support facilities at the following
27      locations at the approximate costs set
28      forth below: .................................    1,261,749
29       Kickapoo State Park ..................387,818
30       Rock Cut State Park ..................521,525
31       Stephen A. Forbes State Park .........352,406
32    For constructing vault toilets at the
33      following locations at the approximate
34      cost set forth below: ........................      519,925
 
                           -41-                     BOB-CDB02
 1       Apple River Canyon State Park ........228,145
 2       Des Plaines Conservation Area .........66,000
 3       Kankakee River State Park .............31,780
 4       Lake Le-Aqua-Na State Park ...........115,000
 5       Marshall County Conservation Area .....30,000
 6       Morrison-Rockwood State Park ..........12,000
 7       Rice Lake Conservation Area ...........37,000
 8    For replacing roofing systems and structural
 9      repairs at the following locations at the
10      approximate costs set forth below: ...........       40,452
11       Mine Rescue Station, One building .....13,858
12       Castle Rock State Park,
13        One building ..........................2,120
14       Dixon Springs State Park,
15        Three buildings .......................1,060
16       Cave-In-Rock State Park,
17        One building ..........................1,060
18       Ferne Clyffe State Park,
19        One building ..........................1,060
20       Hamilton County Conservation
21        Area, One building ...................15,370
22       Lake Murphysboro State Park
23        Two buildings .........................1,060
24       Red Hills State Park, Two
25        buildings .............................1,060
26       Fox Ridge State Park, Six
27        buildings .............................1,060
28       Shelbyville Fish and Wildlife
29        Area, Two buildings ...................1,060
30       Newton Lake Fish and Wildlife
31        Area, One building ....................1,684
32    For repair or replacement of roofs and
33      parapet walls and reconstruction of
34      chimneys at the following locations
 
                           -42-                     BOB-CDB02
 1      at the approximate costs set forth below .....      517,905
 2       Geological Survey - Applied Lab ......186,375
 3       Water Survey - Eight Buildings ........46,000
 4       Natural History Survey - Natural
 5        Resources Studies Annex ..............67,000
 6       Geological Survey - Natural
 7        Resources Building ...................64,000
 8       Water Survey - Parapet walls at
 9        Buildings No. 4, 5 and 6 .............10,000
10       Dickson Mounds - Exterior restroom
11        and picnic shelter ...................14,530
12       Jake Wolf Fish Hatchery ..............130,000
13    For land acquisition ...........................      490,648
14    For maintaining the lodge and concession
15      facilities ...................................       12,106
16    For construction of hazardous material
17      storage buildings ............................       67,557
18    For abating hazards caused by the presence
19      of asbestos-containing materials .............       51,622
20    For planning, construction, reconstruction,
21      land acquisition and related costs,
22      utilities, site improvements, and all other
23      expenses necessary for various capital
24      improvements at parks, conservation areas,
25      and other facilities under the jurisdiction
26      of the Department of Natural Resources .......    3,408,548
27        Total, Section 5                             $103,291,135

28        Section 5.1.  The sum of $3,000,000, or so  much  thereof
29    as  may  be necessary, and remains unexpended at the close of
30    business on June 30, 2001, from an  appropriation  heretofore
31    made  in  Article  1,  Section  7.3  of Public Act 91-708, as
32    amended, is reappropriated from the Capital Development  Fund
33    to  the  Capital Development Board for a grant to the City of
 
                           -43-                     BOB-CDB02
 1    Chicago  for   acquiring   land,   planning   and   beginning
 2    construction of a visitor center at Lake Calumet.

 3        Section  5.2.  The  following  named  amounts, or so much
 4    thereof as  may  be  necessary  and  remain  unexpended  from
 5    reappropriations heretofore made for such purposes in Article
 6    2,  Section 5.1 of Public Act 91-708, are reappropriated from
 7    the General Revenue Fund to the Capital Development Board for
 8    the  Department  of  Natural  Resources  for   the   projects
 9    hereinafter enumerated:

10    (From Article 2, Section 5.1 of Public Act 91-708)
11                  DICKSON MOUNDS MUSEUM - LEWISTOWN
12    For planning and beginning repair of
13      exterior walls ............................... $     78,245
14                 FOX RIDGE STATE PARK - COLES COUNTY
15    For rehabilitating historic structures .........      210,000
16             HENNEPIN CANAL PARKWAY - ROCK ISLAND COUNTY
17    For rehabilitating Aqueduct #6 .................      572,625
18               ILLINOIS BEACH STATE PARK - LAKE COUNTY
19    For stabilizing shoreline ......................      200,727
20               SPRING GROVE HATCHERY - MCHENRY COUNTY
21    For upgrading the septic system ................       30,000
22                              STATEWIDE
23    For maintaining lodge/concession program .......       58,640
24    For rehabilitating or replacing
25      playground equipment .........................      160,757
26    For maintaining lodge and concession
27      facilities ...................................      158,874
28    For rehabilitating or replacing playground
29      equipment ....................................       84,068
30    For maintaining lodge and concession
31      facilities at various DNR locations ..........       28,230
32    For rehabilitating or replacing
 
                           -44-                     BOB-CDB02
 1      playground equipment, in addition
 2      to funds previously appropriated .............      172,430
 3    For rehabilitation or replacement
 4      of playground equipment ......................       12,457
 5    For rehabilitation of trail systems ............       73,019
 6    For rehabilitation and replacement of
 7      playground equipment .........................       17,473
 8        Total, Section 5.2                             $1,857,545

 9        Section  5.3.  The sum of $200,000, or so much thereof as
10    may be necessary and  remains  unexpended  at  the  close  of
11    business  on  June 30, 2001, from an appropriation heretofore
12    made in Article 1, Section  7.2  of  Public  Act  91-708,  is
13    reappropriated  from  the  Capital  Development  Fund  to the
14    Capital Development Board for a grant to the City of  Carlyle
15    for development of a health center in association with resort
16    development at Carlyle Lake.

17        Section  6.  The  following  named  amounts,  or  so much
18    thereof as may be necessary  and  remain  unexpended  at  the
19    close  of  business on June 30, 2001, from appropriations and
20    reappropriations heretofore made for such purposes in Article
21    1, Section 3, and Article 2, Section 6 of Public Act  91-708,
22    as  amended,  are reappropriated from the Capital Development
23    Fund to the Capital Development Board for the  Department  of
24    Corrections for the projects hereinafter enumerated:

25    (From Article 2, Section 6 of Public Act 91-708)
26                 DECATUR WOMEN'S CORRECTIONAL CENTER
27    For the planning and conversion of
28      Meyer Mental Health Center into a
29      correctional facility ........................ $    221,445
30                      DIXON CORRECTIONAL CENTER
31    (From Article 1, Section 3 of Public Act 91-708)
 
                           -45-                     BOB-CDB02
 1    For constructing a gun range and
 2      classroom building ...........................      500,000
 3                     DWIGHT CORRECTIONAL CENTER
 4    (From Article 1, Section 3 of Public Act 91-708)
 5    For renovating C9 and Old Hospital .............    3,810,000
 6    For renovating Housing Unit C8, in
 7      addition to funds previously
 8      appropriated .................................      270,000
 9    (From Article 2, Section 6 of Public Act 91-708)
10    For upgrading the water treatment plant ........    1,000,000
11    For upgrading water and sewer systems ..........       23,790
12    For renovating buildings, in addition
13      to funds previously appropriated .............      274,847
14    For constructing a gatehouse and
15      sally port and upgrading the
16      security system ..............................      674,223
17    For completion of medical unit,
18      in addition to funds previously
19      appropriated .................................       38,694
20    For renovation of buildings ....................       68,161
21                   EAST MOLINE CORRECTIONAL CENTER
22    (From Article 1, Section 3 of Public Act 91-708)
23    For replacing the chiller/absorber .............      400,000
24    (From Article 2, Section 6 of Public Act 91-708)
25    For upgrading fire alarm and building
26      automation systems ...........................      852,805
27    For upgrading the electrical
28      system .......................................    1,012,651
29                        HANNA CITY WORK CAMP
30    For upgrading electrical system ................      563,742
31                HILL CORRECTIONAL CENTER - GALESBURG
32    (From Article 1, Section 3 of Public Act 91-708)
33    For upgrading electrical system ................      185,000
34    (From Article 2, Section 6 of Public Act 91-708)
 
                           -46-                     BOB-CDB02
 1    For replacing domestic water lines .............      126,264
 2                            HOPKINS PARK
 3    (From Article 1, Section 3 of Public Act 91-708)
 4    For infrastructure improvements
 5      in connection with the Hopkins Park
 6      Correctional Center ..........................    8,300,000
 7             ILLINOIS RIVER CORRECTIONAL CENTER - CANTON
 8    For replacing warehouse freezers ...............      150,000
 9           ILLINOIS YOUTH CENTER - KEWANEE - HENRY COUNTY
10    For constructing a 60-bed inmate
11      housing addition .............................    4,000,000
12                 ILLINOIS YOUTH CENTER - ST. CHARLES
13    For constructing an R & C building
14      and other improvements .......................   34,000,000
15    For upgrading plumbing system and replacing
16      toilets and sinks ............................      651,115
17    (From Article 2, Section 6 of Public Act 91-708)
18    For planning and beginning the upgrade
19      of existing facility .........................      328,875
20                 ILLINOIS YOUTH CENTER - HARRISBURG
21    For upgrading mechanical control system ........      478,078
22                   ILLINOIS YOUTH CENTER - JOLIET
23    For planning, site improvements,
24      utility upgrade, equipment and all
25      costs necessary to construct a
26      housing unit and dietary facility ............       29,274
27                  ILLINOIS YOUTH CENTER - RUSHVILLE
28    (From Article 1, Section 3 of Public Act 91-708)
29    For planning, design, construction, equipment
30      and all other necessary costs to add
31      a cellhouse ..................................   14,000,000
32                 ILLINOIS YOUTH CENTER - VALLEY VIEW
33    (From Article 2, Section 6 of Public Act 91-708)
34    For replacing boilers, controls, hot
 
                           -47-                     BOB-CDB02
 1      water heaters and softeners in
 2      residential units and administration
 3      building .....................................      447,917
 4                 ILLINOIS YOUTH CENTER - WARRENVILLE
 5    For rehabilitation of the administration
 6      building .....................................      744,432
 7                     JOLIET CORRECTIONAL CENTER
 8    For correcting erosion and
 9      stabilizing the masonry wall .................    1,689,240
10    For completing the west cellhouse renovation,
11      including asbestos abatement, in addition
12      to funds previously appropriated .............       19,565
13         LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE
14    For constructing two cellhouses, in
15      addition to funds previously appropriated ....    7,570,627
16                     LINCOLN CORRECTIONAL CENTER
17    For renovation of the Dietary, construction
18      of a cooler addition and installation
19      of blast chillers ............................       33,843
20                      LOGAN CORRECTIONAL CENTER
21    (From Article 1, Section 3 of Public Act 91-708)
22    For constructing a medical building
23      and dietary building .........................   11,000,000
24    (From Article 2, Section 6 of Public Act 91-708)
25    For planning and beginning replacement
26      of the Dietary and Medical Buildings .........      240,331
27    For renovation of sewer system .................       57,982
28                MENARD CORRECTIONAL CENTER - CHESTER
29    (From Article 1, Section 3 of Public Act 91-708)
30    For stabilizing dam, in addition to funds
31      previously appropriated ......................      510,000
32    For correcting slope failure & MSU
33      improvements .................................      875,000
34    For upgrading electrical distribution
 
                           -48-                     BOB-CDB02
 1      system .......................................    2,424,959
 2    For replacing the HVAC system ..................      550,000
 3    (From Article 2, Section 6 of Public Act 91-708)
 4    For improving ventilation and dehumidification
 5      systems in the kitchen and dining rooms ......      482,282
 6    For replacing shower room and guard tower ......      481,397
 7    For upgrading mechanical bar screen and storm
 8      and sanitary sewer system ....................    1,206,548
 9    For completing upgrade of North Cellhouse
10      plumbing system, in addition to funds
11      previously appropriated ......................      207,248
12    For replacing toilets and waste lines
13      at E/W Cellhouse and upgrade
14      North Cellhouse plumbing .....................    1,584,078
15    For renovation or replacement of the
16      Old Hospital Building, in addition to
17      funds previously appropriated ................    4,530,372
18    For replacing and installing
19      water storage tank ...........................      367,333
20    For replacing Boiler #2, in addition
21      to funds previously appropriated .............      199,199
22    For replacement of the chimney stack and
23      boilers, in addition to funds previously
24      appropriated .................................       87,501
25    For replacement of hot water heaters and
26      deairing tanks ...............................       21,945
27    For planning and construction of the
28      Administration Building ......................    1,200,000
29                     PONTIAC CORRECTIONAL CENTER
30    (From Article 1, Section 3 of Public Act 91-708)
31    For expanding the main sally port ..............      400,000
32    For renovating the exterior of North/
33      South Cellhouses .............................      600,000
34    (From Article 2, Section 6 of Public Act 91-708)
 
                           -49-                     BOB-CDB02
 1    For completing replacement of hot water
 2      lines, in addition to funds previously
 3      appropriated .................................      612,300
 4    For renovation of main sally port ..............      270,405
 5                    SHERIDAN CORRECTIONAL CENTER
 6    (From Article 1, Section 3 of Public Act 91-708)
 7    For upgrading the storm sewers .................      115,000
 8    (From Article 2, Section 6 of Public Act 91-708)
 9    For replacing doors and locks ..................      145,936
10               STATEVILLE CORRECTIONAL CENTER - JOLIET
11    (From Article 1, Section 3 of Public Act 91-708)
12    For planning and beginning renovation of
13      H & I houses .................................      500,000
14    For replacing the water line ...................    3,320,000
15    For upgrading electrical system in
16      "B" House ....................................    1,500,000
17    (From Article 2, Section 6 of Public Act 91-708)
18    For constructing a housing unit, cellhouse,
19      vehicle maintenance building and
20      warehouse for the reception and
21      classification center, in addition to
22      funds previously appropriated ................   24,065,628
23    For replacing windows in B House ...............    2,876,644
24    For replacing cell fronts in F House ...........      957,924
25    For upgrading plumbing system in F House,
26      in addition to funds previously
27      appropriated .................................    3,497,820
28    For replacing power plant and
29      utility distribution system ..................    9,580,135
30    For planning, design, construction,
31      equipment and all other necessary costs
32      for an Adult Reception and Classification
33      Center .......................................   34,345,768
34    For upgrading storm drainage and
 
                           -50-                     BOB-CDB02
 1      wastewater systems ...........................    1,100,503
 2    For upgrading electrical system and elevator
 3      and installing HVAC system ...................    1,179,600
 4    For replacement of the MSU .....................    4,339,281
 5                   TAYLORVILLE CORRECTIONAL CENTER
 6    For upgrading shower ventilation system ........      234,944
 7                     THOMSON CORRECTIONAL CENTER
 8    For constructing three cellhouses and
 9      expanding educational and vocational
10      space, in addition to funds previously
11      appropriated .................................   24,591,248
12                    VANDALIA CORRECTIONAL CENTER
13    (From Article 1, Section 3 of Public Act 91-708)
14    For constructing a multi-purpose program
15      building .....................................    1,300,000
16    For converting Administration Building and
17      planning construction of an Administration/
18      Health Care Unit .............................      800,000
19    For upgrading the primary water
20      distribution system ..........................    1,268,198
21    (From Article 2, Section 6 of Public Act 91-708)
22    For planning and beginning construction
23      for a slaughter house and meat plant .........      466,456
24    For repairing exterior masonry, in addition
25      to funds previously appropriated .............      723,392
26                     VIENNA CORRECTIONAL CENTER
27    For replacing windows, in addition to
28      funds previously appropriated ................      779,030
29    For completing upgrade of the steam
30      distribution system, in addition to
31      funds previously appropriated ................      254,131
32    For upgrading electrical system and
33      installing emergency generator ...............      179,828
34    For renovating the kitchen .....................    1,808,596
 
                           -51-                     BOB-CDB02
 1    For upgrading the steam distribution system
 2      and renovation of Powerhouse, in addition
 3      to funds previously appropriated .............      131,139
 4    For upgrading air conditioning system
 5      and replacement of cooling tower .............      227,878
 6    For completing the rehabilitation of duct
 7      systems and walls, in addition to funds
 8      previously appropriated ......................      196,628
 9         WESTERN ILLINOIS CORRECTIONAL CENTER - MT. STERLING
10    (From Article 1, Section 3 of Public Act 91-708)
11    For replacing warehouse freezers ...............      150,000
12                              STATEWIDE
13    For planning, design, construction, equipment
14      and all other necessary costs for a
15      maximum security facility ....................  129,000,000
16    For planning a medium security facility
17      and land acquisition .........................    6,000,000
18    For replacing locks and control panels
19      at the following locations at the
20      approximate costs set forth below ............    2,700,000
21       Illinois River
22        Correctional Center .................850,000
23       Western Illinois
24        Correctional Center .................850,000
25       Danville Correctional
26        Center ............................1,000,000
27    For replacing roofing systems at
28      the following locations at the
29      approximate cost set forth below .............    1,720,022
30       Menard Correctional Center ...........170,000
31       Vienna Correctional Center ...........155,000
32       Illinois Youth Center -
33        Harrisburg ...........................95,000
34       Dixon Correctional Center ............500,000
 
                           -52-                     BOB-CDB02
 1       Pontiac Correctional Center ..........440,000
 2       Illinois Youth Center - Joliet .......360,022
 3    For replacing or upgrading security and
 4      monitoring systems at the following
 5      locations at the approximate cost set
 6      forth below ..................................      755,000
 7       Vienna Correctional
 8        Center ..............................250,000
 9       Pontiac Correctional
10        Center ..............................200,000
11       Joliet Correctional
12        Center ..............................305,000
13    For planning and replacing windows at the
14      following locations at the approximate cost
15      set forth below ..............................    3,278,791
16       Vienna Correctional
17        Center ............................1,780,000
18       Sheridan Correctional
19        Center ..............................418,791
20       Illinois Youth Center -
21        Valley View .........................500,000
22       Illinois Youth Center -
23        Joliet ..............................165,000
24       Dixon Correctional
25        Center ..............................235,000
26       Shawnee Correctional
27        Center ..............................180,000
28    For upgrading and renovating showers at
29      the following locations at the approximate
30      cost set forth below .........................    1,975,000
31       Shawnee Correctional
32        Center ..............................800,000
33       Danville Correctional
34        Center ..............................800,000
 
                           -53-                     BOB-CDB02
 1       Graham Correctional
 2        Center ..............................200,000
 3       Centralia Correctional
 4        Center ..............................175,000
 5    For replacing security fencing at the
 6      following locations at the approximate
 7      cost set forth below .........................    1,498,165
 8       Hill Correctional
 9        Center ..............................398,165
10       Western IL Correctional
11        Center ..............................300,000
12       Joliet Correctional
13        Center ..............................186,922
14       Logan Correctional
15        Center ..............................200,000
16       Dixon Correctional
17        Center ..............................100,000
18       Shawnee Correctional
19        Center ..............................100,000
20       Graham Correctional
21        Center ..............................100,000
22       Danville Correctional
23        Center ..............................100,000
24    For upgrading roads and parking lots at
25      the following locations at the approximate
26      cost set forth below .........................      978,100
27       Dwight Correctional
28        Center ..............................483,840
29       Illinois Youth Center -
30        Valley View .........................494,260
31    (From Article 2, Section 6 of Public Act 91-708)
32    For planning, design, construction, equipment
33      and all other necessary costs for a
34      female multi-security level
 
                           -54-                     BOB-CDB02
 1      correctional center ..........................   78,702,968
 2    For replacing roofing systems at the
 3      following locations at the approximate
 4      cost set forth below .........................      637,986
 5        Vienna Correctional Center ..........469,664
 6        Sheridan Correctional Center ........168,322
 7    For replacing or installing mechanical bar
 8      screens at the following locations at the
 9      approximate cost set forth below .............      605,823
10        Graham Correctional Center -
11         Hillsboro ..........................317,545
12        Western Illinois Correctional
13         Center - Mt. Sterling ..............288,278
14    For upgrading security control systems and
15      panels in housing units at the following
16      locations at the approximate cost set
17      forth below ..................................    4,620,014
18        Danville Correctional Center ........500,000
19        Hill Correctional Center -
20         Galesburg ........................1,500,000
21        Western Illinois Correctional
22         Center - Mt. Sterling ..............675,000
23        Illinois River Correctional
24         Center - Canton ....................675,000
25        Shawnee Correctional Center -
26         Vienna ...........................1,270,014
27    For planning, design, construction,
28      equipment and all other necessary costs
29      for a juvenile facility ......................   19,016,529
30    For replacing locks and doors at the
31      following locations at the approximate
32      cost set forth below .........................      766,403
33        Dwight Correctional Center ......... 103,239
34        Illinois River Correctional
 
                           -55-                     BOB-CDB02
 1         Center - Canton ..................... 3,610
 2        IYC - Joliet ....................... 646,568
 3        IYC - Pere Marquette - Grafton ...... 12,986
 4    For replacing roofing systems at the following
 5      locations at the approximate cost set forth
 6      below ........................................      675,103
 7        Dixon Correctional Center,
 8         four buildings .................... 270,813
 9        IYC - St. Charles, two buildings ... 197,498
10        Joliet Correctional Center,
11         six buildings ..................... 142,779
12        Logan Correctional Center - Lincoln
13         three buildings ..................... 8,086
14        Menard Correctional Center - Chester
15         six buildings ...................... 24,738
16        Pontiac Correctional Center,
17         one building ....................... 31,189
18    For inspecting and upgrading water towers
19      at the following locations at the approximate
20      costs set forth below ........................    1,556,313
21        Dixon Correctional Center,
22         Upgrade Water Tower ............... 369,928
23        Graham Correctional Center - Hillsboro
24         Upgrade Water Tower  ............... 62,524
25        Joliet Correctional Center,
26         Upgrade Water Tower ............... 130,328
27        Logan Correctional Center - Lincoln
28         Complete Water Tower Upgrade  ..... 103,536
29        Menard Correctional Center - Chester
30         Upgrade Water Tower  ............... 22,443
31        Stateville Correctional Center - Joliet
32         Upgrade Water Tower  .............. 663,578
33        Statewide, Inspect and Upgrade
34         Water Towers ...................... 117,099
 
                           -56-                     BOB-CDB02
 1    For upgrading fire and safety systems at
 2      the following locations at the approximate
 3      costs set forth below, in addition to
 4      funds previously appropriated ................    3,025,696
 5        Menard Correctional Center -
 6         Chester ......................... 1,884,584
 7        Sheridan Correctional Center ....... 312,246
 8        Vienna Correctional Center ......... 828,866
 9    For replacing roofing systems at the
10      following locations at the approximate
11      costs set forth below: .......................      215,071
12       East Moline Correctional Center,
13        Three buildings ..................... 79,929
14       Graham Correctional Center, Hillsboro
15        Seven buildings .................... 117,699
16       Sheridan Correctional Center, LaSalle
17        Three buildings ..................... 17,443
18    For replacing doors and locks at the
19      following locations at the approximate
20      costs set forth below: .......................      585,101
21       IYC - St. Charles ................... 221,452
22       Lincoln Correctional Center ......... 272,473
23       Jacksonville Correctional Center ..... 12,473
24       Sheridan Correctional Center ......... 78,703
25    For upgrading fire safety systems at the
26      following locations at the approximate
27      costs set forth below, in addition to
28      funds previously appropriated: ...............    4,454,272
29       Menard Correctional Center ........... 63,476
30       Pontiac Correctional Center ....... 2,960,453
31       Stateville Correctional Center .... 1,430,343
32    For upgrading water and wastewater
33      systems at the following locations
34      at the approximate costs set forth below: ....      692,276
 
                           -57-                     BOB-CDB02
 1       Big Muddy Correctional Center
 2        for installing mechanical
 3        bar screen ........................... 7,347
 4       Centralia Correctional Center
 5        for upgrading water
 6        treatment plant .................... 183,702
 7       East Moline Correctional Center
 8        for upgrading sewer system ........... 4,310
 9       Ed Jenison Work Camp (Paris)
10        for installing mechanical
11        bar screen ........................... 2,530
12       IYC - Harrisburg for upgrading
13        water distribution system ........... 59,198
14       Kankakee MSU for constructing
15        well #2 ............................ 288,550
16       IYC - St. Charles for upgrading
17        sewage/storm system ................ 134,865
18       IYC - Valley View for installing
19        mechanical bar screen ............... 11,774
20    For correction of deficiencies in
21      water systems at three correctional
22      facilities ...................................       81,228
23    For replacement of locks, windows and
24      doors at the following locations
25      as set forth below: ..........................      368,672
26       IYC Harrisburg ....................... 44,053
27       IYC Joliet ........................... 14,426
28       Menard .............................. 213,471
29       IYC Valley View ...................... 95,722
30       Vienna ................................ 1,000
31    For planning, design, construction,
32      equipment and other necessary costs
33      for a Maximum Security Correctional
34      Center, in addition to funds previously
 
                           -58-                     BOB-CDB02
 1      appropriated .................................   16,488,520
 2    For planning, design, construction,
 3      equipment and other necessary costs
 4      for a Correctional Facility for
 5      juveniles ....................................    4,770,240
 6    For planning, design, construction,
 7      equipment and other necessary costs
 8      for a Medium Security Correctional
 9      Facility .....................................    6,423,155
10    For correcting defects in the food preparation
11      areas, including roofs .......................      108,588
12    For replacement of roofs at various Department of
13      Corrections locations ........................       70,407
14    For roof replacement at the following
15      locations at the approximate costs
16      set forth below: .............................      179,437
17       Graham Correctional Center
18        Five buildings ........................6,543
19       Graham Correctional Center
20        Thirty-two buildings ..................6,000
21       Menard Correctional Center
22        Warehouse Building ...................26,000
23       Menard Correctional Center
24        Five buildings .......................55,068
25       Pontiac Correctional Center
26        Eight buildings .......................6,500
27       Illinois Youth Center-St. Charles
28        Three buildings ......................15,326
29       Sheridan Correctional Center
30        Six buildings ........................16,000
31       Stateville Correctional Center
32        Seven buildings ......................24,000
33       Ill Youth Center-Valley View
34        Administration Building and
 
                           -59-                     BOB-CDB02
 1         Kitchen Addition ....................24,000 ____________
 2        Total, Section 6                             $522,958,055

 3        Section  6.1.  The  following  named  amounts, or so much
 4    thereof as may be necessary  and  remain  unexpended  at  the
 5    close  of  business  on  June 30, 2001, from reappropriations
 6    heretofore made for such purposes in Article 2,  Section  6.1
 7    of  Public  Act  91-708,  are reappropriated from the General
 8    Revenue  Fund  to  the  Capital  Development  Board  for  the
 9    Department  of  Corrections  for  the  projects   hereinafter
10    enumerated:

11    (From Article 2, Section 6.1 of Public Act 91-708)
12               STATEVILLE CORRECTIONAL CENTER - JOLIET
13    For tuckpointing buildings .....................       65,086
14                    VANDALIA CORRECTIONAL CENTER
15    For replacing showers in six buildings, in
16      addition to funds previously appropriated ....      473,426
17                              STATEWIDE
18    For energy conservation improvements at the
19      following locations at the approximate
20      costs set forth below: .......................       39,718
21       Dwight Correctional Center ............ 7,000
22       Joliet Correctional Center
23        School Building ...................... 1,000
24       Menard Psychiatric Center
25        Randolph Hall ........................ 7,500
26       Stateville Correctional Center
27        Law Library .......................... 7,400
28       Pontiac Correctional Center .......... 15,093
29       Vienna Correctional Center ............ 1,725
30    For upgrading doors and locking systems at
31      the following locations at the approximate
32      costs set forth below: .......................      577,182
 
                           -60-                     BOB-CDB02
 1       Illinois Youth Center-Warrenville
 2        For replacement of doors
 3         and locking systems ............... 577,182 ____________
 4        Total, Section 6.1                             $1,155,412

 5        Section  6.2.  The amount of $586,423, or so much thereof
 6    as may be necessary and remains unexpended at  the  close  of
 7    business  on June 30, 2001, from a reappropriation heretofore
 8    made for such purposes in Article 2, Section  6.3  of  Public
 9    Act  91-708,  is reappropriated from the General Revenue Fund
10    to the  Capital  Development  Board  for  the  Department  of
11    Corrections  for  the  projects hereinafter enumerated at the
12    approximate costs set forth below:

13    Danville Correctional Center -
14      For upgrading the hot water
15       distribution system ...................$1,000
16    Stateville Correctional Center-
17      For upgrading the plumbing systems in
18       four buildings .......................509,555
19    Menard Correctional Center -
20      For planning and to begin upgrading
21       the plumbing systems in two
22       buildings .............................37,934
23    Pontiac Correctional Center -
24      For upgrading the mechanical systems
25       and renovation of shower rooms ........37,934

26        Section 7.  The  following  named  amounts,  or  so  much
27    thereof  as  may  be  necessary  and remain unexpended at the
28    close of business on June 30, 2001, from  appropriations  and
29    reappropriations heretofore made for such purposes in Article
30    1,  Section 4, and Article 2, Section 7 of Public Act 91-708,
31    are reappropriated from the Capital Development Fund  to  the
 
                           -61-                     BOB-CDB02
 1    Capital  Development  Board  for  the  Historic  Preservation
 2    Agency for the projects hereinafter enumerated:

 3              BISHOP HILL HISTORIC SITE - HENRY COUNTY
 4    (From Article 2, Section 7 of Public Act 91-708)
 5    For rehabilitating Bjorkland Hotel ............. $    939,819
 6                    BLACKHAWK STATE HISTORIC SITE
 7    (From Article 1, Section 4 of Public Act 91-708)
 8    For rehabilitating lodge .......................    1,166,000
 9    (From Article 2, Section 7 of Public Act 91-708)
10    For a grant to the City of Rock Island
11      to relocate the existing sewer line ..........      660,000
12               BRYANT COTTAGE STATE MEMORIAL - BEMENT
13    (From Article 1, Section 4 of Public Act 91-708)
14    For rehabilitating interior and exterior .......      217,000
15             CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
16    For providing structural stabilization .........      308,000
17    (From Article 2, Section 7 of Public Act 91-708)
18    For renovation of the Cahokia Courthouse
19      and the Jarrot House .........................       72,953
20             CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
21    For replacement of Monk's Mounds stairs ........      339,695
22    For restoration of Monk's Mound ................    1,045,251
23    For purchasing private land within historic
24      site boundary ................................      209,314
25    For replacement of Monk's Mounds stairs ........       22,006
26                          DAVID DAVIS HOME
27    To acquire a residence to be
28      converted to a Visitors Center ...............      249,400
29          FORT DE CHARTRES HISTORIC SITE - RANDOLPH COUNTY
30    (From Article 1, Section 4 of Public Act 91-708)
31    For rehabilitating the stone gatehouse
32      wall and foundation ..........................      763,000
33    (From Article 2, Section 7 of Public Act 91-708)
 
                           -62-                     BOB-CDB02
 1    For restoring the powder magazine ..............      294,840
 2    For replacing Maintenance Building .............        1,566
 3                        GALENA HISTORIC SITE
 4    For structural stabilization and
 5      rehabilitation of five historic
 6      structures in the Grant Home District
 7      including the Biesman, Nolan, Gill,
 8      Coville, and Donegan houses ..................      400,300
 9                JARROT MANSION STATE HISTORICAL SITE
10    (From Article 1, Section 4 of Public Act 91-708)
11    For restoring the mansion, in addition
12      to funds previously appropriated .............    1,650,000
13                  LEWIS AND CLARK STATE MEMORIAL -
14                           MADISON COUNTY
15    (From Article 2, Section 7 of Public Act 91-708)
16    For constructing interpretive center,
17      and development of the historic site
18      in addition to funds previously
19      appropriated .................................    1,138,931
20            LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
21    For rehabilitating site and providing
22      irrigation system ............................      413,332
23              LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
24    For rehabilitating interior and exterior .......      738,096
25                  LINCOLN LOG CABIN HISTORIC SITE -
26                            COLES COUNTY
27    For constructing visitors center, Phase II,
28      and developing day use area ..................    1,225,174
29            LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG
30    For renovating village entrance and
31      completing visitors center ...................      313,628
32              LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
33    (From Article 1, Section 4 of Public Act 91-708)
34    For constructing a Lincoln Presidential
 
                           -63-                     BOB-CDB02
 1      Library ......................................   40,000,000
 2    (From Article 2, Section 7 of Public Act 91-708)
 3    For planning and beginning the Lincoln
 4      Presidential Center, in addition to
 5      funds previously appropriated ................    4,200,208
 6                POSTVILLE COURTHOUSE HISTORIC SITE -
 7                               LINCOLN
 8    For rehabilitating Courthouse and site .........      103,095
 9               PULLMAN FACTORY HISTORIC SITE - CHICAGO
10    For stabilization of the structure and for planning
11      and beginning restoration ....................       46,963
12                   OLD STATE CAPITOL - SPRINGFIELD
13    For providing structural stabilization .........    1,439,821
14    For rehabilitating Old State Capitol ...........      477,073
15                     UNION STATION - SPRINGFIELD
16    For purchasing and rehabilitating ..............    2,531,218
17                         VACHEL LINDSAY HOME
18    For rehabilitating home ........................      689,333
19                        VANDALIA STATE HOUSE
20    For replacing roof and rehabilitating
21      exterior .....................................      163,138
22    For rehabilitating HVAC and electrical
23      systems and interior .........................      351,240
24                              STATEWIDE
25    (From Article 1, Section 4 of Public Act 91-708)
26    For statewide ISTEA 21 Match ...................      637,000
27    (From Article 2, Section 7 of Public Act 91-708)
28    For replacing roofing systems at the
29      following locations at the approximate
30      costs set forth below: .......................      158,819
31       Fort De Chartres, Randolph County .... 43,198
32       Washburne House, Galena ............... 5,378
33       David Davis Mansion, Bloomington ..... 22,051
34       Bishop Hill House, Henry County ...... 88,192
 
                           -64-                     BOB-CDB02
 1    For matching ISTEA federal grant funds .........      470,176
 2        Total, Section 7                              $63,436,389

 3        Section  7.1.  The  amount of $52,326, or so much thereof
 4    as may be necessary and remains unexpended at  the  close  of
 5    business  on June 30, 2001, from a reappropriation heretofore
 6    made for such purpose in Article 2, Section 7.1 of Public Act
 7    91-708, is reappropriated from the Capital  Development  Fund
 8    to   the   Capital   Development   Board   for  the  Historic
 9    Preservation   Agency    for    acquiring    the    Zimmerman
10    archaeological  site  in  LaSalle  County  and for associated
11    costs, planning, stabilization,  restoration  and  all  other
12    expenses   necessary  to  comply  with  the  intent  of  this
13    appropriation.

14        Section 7.2.  The sum of $800,000, or so much thereof  as
15    may  be  necessary  and as remains unexpended at the close of
16    business on June 30, 2001, from a reappropriation  heretofore
17    made  in  Article  2,  Section  7.3  of Public Act 91-708, is
18    reappropriated from  the  Capital  Development  Fund  to  the
19    Capital  Development  Board  for  the  Historic  Preservation
20    Agency  for  the  construction  of an interpretive center and
21    development of the historic  site  at  the  Lewis  and  Clark
22    National Trail Site No. 1 in Madison County.

23        Section  7.3.  The  following  named  amounts, or so much
24    thereof as may be necessary  and  remain  unexpended  at  the
25    close  of  business  on  June 30, 2001, from reappropriations
26    heretofore made for such purposes in Article 2,  Section  7.4
27    of  Public  Act  91-708,  are reappropriated from the General
28    Revenue  Fund  to  the  Capital  Development  Board  for  the
29    Historic Preservation Agency  for  the  projects  hereinafter
30    enumerated:
 
                           -65-                     BOB-CDB02
 1                   DANA THOMAS HOUSE - SPRINGFIELD
 2    (From Article 2, Section 7.4 of Public Act 91-708)
 3    For restoring exterior and interior ............ $    357,274
 4                        GALENA HISTORIC SITE
 5    For rehabilitating Washburne House .............      564,000
 6                 LINCOLN'S NEW SALEM HISTORIC SITE -
 7                             PETERSBURG
 8    For resurfacing village and service roads ......      115,740
 9    For rehabilitating lift stations ...............      336,637
10    For rehabilitating saw mill and grist
11      mill .........................................      208,075
12                  METAMORA COURTHOUSE HISTORIC SITE
13    For rehabilitating courthouse ..................      436,370
14               JOURNAL REGISTER BUILDING - SPRINGFIELD
15    For renovating building ........................       41,962
16                   OLD STATE CAPITOL - SPRINGFIELD
17    For replacing the bottom cylinder of
18      the hydraulic elevator .......................       50,000
19        Total, Section 7.3                             $2,110,058

20        Section  9.  The  following  named  amounts,  or  so much
21    thereof as may be necessary  and  remain  unexpended  at  the
22    close  of  business on June 30, 2001, from appropriations and
23    reappropriations heretofore made for such purposes in Article
24    1, Section 5, and Article 2, Section 9 of Public Act  91-708,
25    as  amended,  are reappropriated from the Capital Development
26    Fund to the Capital Development Board for the  Department  of
27    Human Services for the projects hereinafter enumerated:

28             ALTON MENTAL HEALTH CENTER - MADISON COUNTY
29    (From Article 1, Section 5 of Public Act 91-708)
30    For renovating the central dietary,
31      Phase II, in addition to funds previously
32      appropriated ................................. $  1,485,000
 
                           -66-                     BOB-CDB02
 1    (From Article 2, Section 9 of Public Act 91-708)
 2    For constructing two building additions
 3      at the Forensic Complex ......................   11,343,698
 4    For rehabilitation of the central dietary ......    1,666,574
 5                    CHESTER MENTAL HEALTH CENTER
 6    (From Article 1, Section 5 of Public Act 91-708)
 7    For upgrading energy management system .........      489,500
 8    For replacing sewer lines ......................      686,347
 9    (From Article 2, Section 9 of Public Act 91-708)
10    For upgrading access control/duress system .....    1,471,165
11    For renovating kitchen area ....................      911,784
12    For replacing fencing and upgrading
13      recreational yard ............................      249,355
14    For renovating support and residential
15      area .........................................    2,247,947
16    For construction of a storage building  ........       14,080
17          SCHOOL OF PUBLIC HEALTH AND PSYCHIATRIC INSTITUTE
18    For planning and renovation of residential
19      and program units for children and
20      adolescent services ..........................      794,770
21             CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
22    For upgrading fire/life safety systems, in
23      addition to funds previously appropriated ....      162,271
24    For renovating residential units, in
25      addition to funds previously
26      appropriated .................................    2,171,000
27    For renovation of utility rooms and installation
28      of drinking fountains ........................       36,975
29    For renovation of the West Campus Nurses'
30      Stations .....................................      260,825
31    For renovation of Henry Horner Children's
32      Center and West Campus for fire and
33      life safety codes ............................       95,231
34    For renovation of the West Campus shower
 
                           -67-                     BOB-CDB02
 1      and toilet rooms .............................      253,620
 2        CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
 3    (From Article 1, Section 5 of Public Act 91-708)
 4    For replacing cooling towers ...................      470,000
 5    For planning and beginning the
 6      renovation of Life Skills Building  ..........      900,000
 7    (From Article 2, Section 9 of Public Act 91-708)
 8    For completing HVAC system upgrade,
 9      in addition to funds previously
10      appropriated .................................       61,535
11              ELGIN MENTAL HEALTH CENTER - KANE COUNTY
12    For replacing power plant and engineering
13      building .....................................    7,991,825
14    For renovating the central dietary
15      and kitchen ..................................    3,933,400
16    For construction of an Adult Psychiatric
17      Building, in addition to funds previously
18      appropriated .................................    3,681,000
19    For construction of roads, parking lots
20      and street lights ............................    1,976,721
21    For upgrading and expanding the mechanical
22      infrastructure, in addition to funds
23      previously appropriated ......................    3,145,033
24    For construction of a forensic services complex
25      at Elgin Mental Health Center, in addition
26      to funds previously appropriated .............    3,411,734
27    For construction of a forensic services
28      complex, in addition to funds previously
29      appropriated .................................       56,256
30    For renovation of the HVAC systems,
31      replacement of windows and installation
32      of security screens, in addition
33      to funds previously appropriated .............    2,062,047
34    For construction of a Forensic Services
 
                           -68-                     BOB-CDB02
 1      Facility, in addition to funds
 2      previously appropriated  .....................      242,710
 3    For upgrading for fire and life safety .........       73,298
 4    For planning the renovation of the Forensic
 5      Building and abating asbestos ................      237,723
 6    For renovation of the Central Stores
 7      Building .....................................       85,679
 8    For the demolition of the Old Main Building
 9      and construction of an Adult
10      Psychiatric Center ...........................       75,736
11                  FOX DEVELOPMENTAL CENTER - DWIGHT
12    (From Article 1, Section 5 of Public Act 91-708)
13    For replacing sewer lines ......................      173,748
14    (From Article 2, Section 9 of Public Act 91-708)
15    For upgrading electrical system and installing
16      an emergency generator .......................      795,375
17    For replacement of absorbers and
18      upgrading HVAC system ........................       81,571
19    For renovation of Building #8 and
20      window replacement of Building
21      #1, in addition to funds
22      previously appropriated ......................       21,305
23               HOWE DEVELOPMENTAL CENTER - TINLEY PARK
24    (From Article 1, Section 5 of Public Act 91-708)
25    For completing upgrade of tunnels,
26      Phase II, in addition to funds previously
27      appropriated .................................    2,970,000
28    For renovating the kitchen .....................      150,000
29    (From Article 2, Section 9 of Public Act 91-708)
30    For renovating residences, in addition to
31      funds previously appropriated ................    2,720,122
32    For replacing roofs ............................       21,272
33    For planning and beginning access
34      to water supply from village .................       45,370
 
                           -69-                     BOB-CDB02
 1    For planning and rehabilitation of
 2      utility tunnels ..............................       68,825
 3    For renovation of residential buildings ........    1,900,278
 4    For replacement of steam and
 5      condensate lines .............................       50,553
 6    For renovation of the boilers in the power
 7      plant ........................................       29,856
 8             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
 9    (From Article 1, Section 5 of Public Act 91-708)
10    For replacing HVAC, upgrading electrical
11      and replacing doors, in addition to
12      funds previously appropriated ................    1,700,000
13    (From Article 2, Section 9 of Public Act 91-708)
14    For renovating the fire alarm systems, in
15      addition to funds previously appropriated ....      115,029
16      ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
17    For installation of individual
18      package boilers, in addition
19      to funds previously appropriated .............      400,000
20          JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
21    For rehabilitating cooling towers at
22      the power plant ..............................      258,650
23    For extending chilled water line ...............      134,282
24    For rehabilitation of bathrooms and
25      replacing doors ..............................      282,080
26                KILEY DEVELOPMENTAL CENTER - WAUKEGAN
27    (From Article 1, Section 5 of Public Act 91-708)
28    For renovating homes, Phase II, in
29      addition to funds previously
30      appropriated .................................    1,135,000
31    For planning and beginning installation
32      of gas distribution system ...................      100,000
33    (From Article 2, Section 9 of Public Act 91-708)
34    For renovating homes ...........................       60,229
 
                           -70-                     BOB-CDB02
 1             LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
 2    (From Article 1, Section 5 of Public Act 91-708)
 3    For completing installation of
 4      rethermalization, in addition to funds
 5      previously appropriated ......................      700,000
 6    (From Article 2, Section 9 of Public Act 91-708)
 7    For upgrading power plant and installing
 8      EMS, in addition to funds previously
 9      appropriated .................................    1,502,364
10    For renovating or replacing
11      Elmhurst Cottage .............................    1,691,458
12    For renovating or replacing Elmhurst
13      Cottage, in addition to funds
14      previously appropriated ......................    1,351,795
15    For upgrading the architectural and mechanical
16      systems, in addition to funds
17      previously appropriated ......................      149,198
18    For upgrading the HVAC systems, including
19      chillers .....................................       25,157
20             LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
21    For renovating residential and neighborhood
22      homes, in addition to funds previously
23      appropriated .................................    1,850,000
24    For replacing plumbing, HVAC and
25      boiler systems ...............................      788,685
26    For renovation of residential buildings,
27      in addition to funds previously
28      appropriated .................................    1,781,093
29    For renovation of residences ...................       35,293
30                 MADDEN MENTAL HEALTH CENTER - HINES
31    For renovating pavilions for safety/
32      security, in addition to
33      funds previously appropriated ................    1,200,000
34    For renovating dietary .........................      903,500
 
                           -71-                     BOB-CDB02
 1    For renovation of pavilions, in addition
 2      to funds previously appropriated .............      596,000
 3    For upgrading residences for safety and
 4      security .....................................       29,739
 5            MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
 6    For renovating Kennedy Hall ....................    2,398,911
 7    For renovating Stevenson Hall ..................      869,702
 8    For rehabilitation of the dietary facility .....       13,156
 9               MURRAY DEVELOPMENTAL CENTER - CENTRALIA
10    For replacing energy management system .........      759,936
11    For renovating Elm Cottage .....................      180,572
12               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
13    (From Article 1, Section 5 of Public Act 91-708)
14    For replacing steam & condensate
15      lines, in addition to funds previously
16      appropriated .................................    2,800,000
17    (From Article 2, Section 9 of Public Act 91-708)
18    For upgrading HVAC systems in four
19      residential buildings ........................    1,147,000
20    For planning and beginning the upgrade
21      of steam and condensate lines ................      310,083
22    For rehabilitating HVAC system .................    1,142,650
23    For replacing cooling towers and
24      rehabilitating absorbers .....................      464,349
25    For completion of the HVAC system, in
26      addition to funds previously
27      appropriated .................................       87,283
28    For replacement of boiler, in
29      addition to funds previously
30      appropriated .................................       90,346
31    For replacement of water mains
32      and valves ...................................      330,197
33    For planning and beginning sewer and
34      manhole renovation ...........................       12,911
 
                           -72-                     BOB-CDB02
 1    For rehabilitation of the boilers ..............       59,086
 2    For planning and replacement of windows ........       51,774
 3    For upgrading fire safety systems in the
 4      support buildings ............................       36,877
 5    For installation of air conditioning in
 6      Building #704, in addition to funds
 7      previously appropriated ......................       75,695
 8    For replacement of cooling towers in
 9      Buildings #100A and #100B ....................       26,402
10    For installation of air conditioning in
11      Buildings #502 and #514 ......................       37,554
12               SINGER MENTAL HEALTH CENTER - ROCKFORD
13    (From Article 1, Section 5 of Public Act 91-708)
14    For renovating patient units, Phase II,
15      in addition to funds previously
16      appropriated  ................................    3,100,000
17    (From Article 2, Section 9 of Public Act 91-708)
18    For replacing roofs ............................       12,534
19    For renovating mechanicals and
20      residential areas ............................    1,405,236
21    For replacement of absorbers ...................      110,891
22                  TINLEY PARK MENTAL HEALTH CENTER
23    For upgrading fire/life safety systems
24      and bedroom lighting, in addition to
25      funds previously appropriated ................      224,300
26                  TINLEY PARK MENTAL HEALTH CENTER/
27                      HOWE DEVELOPMENTAL CENTER
28    For replacement of the bar screen and
29      renovating the sewer system, in
30      addition to funds previously appropriated ....      115,126
31    For rehabilitation of the electrical
32      distribution system, in addition to
33      funds previously appropriated ................      488,105
34    For renovation for accessibility in four
 
                           -73-                     BOB-CDB02
 1      buildings ....................................      121,149
 2    For renovation for fire and life safety in
 3      three residences .............................      152,206
 4                ZELLER MENTAL HEALTH CENTER  - PEORIA
 5    For upgrading HVAC and mechanical
 6      systems ......................................      649,407
 7                              STATEWIDE
 8    (From Article 1, Section 5 of Public Act 91-708)
 9    For repairing or replacing roofs
10      at the following locations, at
11      the approximate cost set forth below .........    3,669,771
12       Choate Mental Health and
13        Developmental Center - Anna .........241,125
14       Illinois School for the
15        Visually Impaired -
16        Jacksonville ........................100,000
17       Jacksonville Developmental
18        Center - Morgan County ...............60,000
19       Lincoln Developmental Center -
20        Logan County ........................483,312
21       Murray Developmental Center -
22        Centralia .........................1,485,333
23       Shapiro Developmental Center -
24        Kankakee ..........................1,300,000
25    For planning and beginning construction
26      of a facility for sexually violent
27      persons ......................................    2,884,250
28    (From Article 2, Section 9 of Public Act 91-708)
29    For replacing and repairing roofing systems
30      at the following locations at the approximate
31      cost set forth below .........................    1,631,422
32        Choate Developmental Center -
33         Anna ................................46,129
34        Chicago-Read Mental Health Center ....74,425
 
                           -74-                     BOB-CDB02
 1        Tinley Park Mental Health Center.....167,648
 2        Illinois School for the Visually
 3         Impaired - Jacksonville .............60,125
 4        Shapiro Developmental Center -
 5         Kankakee ...........................505,187
 6        Kiley Developmental Center -
 7         Waukegan ...........................281,300
 8        Ludeman Developmental Center -
 9         Park Forest ........................427,000
10    For upgrading roads at the following
11      locations at the approximate
12      cost set forth below .........................      566,114
13        Howe Developmental Center -
14         Tinley Park ........................133,417
15        Shapiro Developmental Center -
16         Kankakee ...........................432,697
17    For replacing roofing systems at the
18      following locations at the approximate
19      costs set forth below: .......................      102,417
20       Elgin Mental Health Center,
21         five buildings ......................59,071
22       Jacksonville Mental Health and
23         Developmental Center,
24         two buildings........................43,346
25    For replacement of roofing systems at the
26      following locations at the approximate costs
27      set forth below: .............................      308,781
28        Lincoln Development Center ...........77,195
29        Murray Developmental Center ..........77,195
30        Elgin Developmental Center ...........77,195
31        Shapiro Developmental Center .........77,195
32    For upgrading roads and parking lots at
33      the following locations at the
34      approximate costs set forth below: ...........       17,451
 
                           -75-                     BOB-CDB02
 1        McFarland Mental Health Center ........1,000
 2        Shapiro Developmental Center .........16,451
 3    For rehabilitation of water towers -
 4      Murray and Chester ...........................      228,838
 5    For replacement of roofs at the following
 6      locations at the approximate costs set
 7      forth below: .................................      185,763
 8        Elgin Mental Health Center -
 9          Three buildings .....................3,284
10        Lincoln Developmental Center -
11          Three buildings .....................4,088
12        Ludeman Developmental Center -
13          Support buildings ..................17,192
14        Madden Mental Health Center -
15          Buildings and covered walkways ......5,000
16        McFarland Mental Health Center -
17          Three buildings .....................4,570
18        Meyer Mental Health Center -
19          One building ........................1,450
20        Shapiro Developmental Center -
21          Three buildings ...................138,409
22        Tinley Park Mental Health Center -
23          Oak Hall ...........................11,770 ____________
24        Total, Section 9                             $105,430,911

25        Section  9A.  The  following  named  amounts,  or so much
26    thereof as may be necessary  and  remain  unexpended  at  the
27    close  of  business  on  June 30, 2001, from reappropriations
28    heretofore made for such purposes in Article 2, Section 9A of
29    Public  Act  91-708,  are  reappropriated  from  the  Capital
30    Development Fund to the Capital  Development  Board  for  the
31    Department  of  Human  Services  for the projects hereinafter
32    enumerated:
 
                           -76-                     BOB-CDB02
 1             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
 2    (From Article 2, Section 9A of Public Act 91-708)
 3    For installing HVAC and upgrading electrical
 4      and replacing doors .......................... $    706,335
 5    For completing the HVAC system upgrade,
 6      in addition to funds previously
 7      appropriated .................................      144,036
 8    For renovating Unit 5 ..........................       54,900
 9    For the renovation of Cullom Hall ..............      613,574
10    For rehabilitation of the domestic hot and
11      cold water piping in six buildings ...........      185,728
12      ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
13    For installing sewers ..........................      386,594
14    For constructing a new building to
15      replace buildings 2, 3 and 4,
16      in addition to funds previously
17      appropriated .................................    1,119,902
18    For installation of individual
19      package boilers ..............................      268,995
20    For the replacement of Buildings
21      #2, #3, and #4 ...............................       70,287
22        Total, Section 9A                              $3,550,351

23        Section 9B.  The amount of $329,449, or so  much  thereof
24    as  may  be  necessary and remains unexpended at the close of
25    business on June 30, 2001, from an  appropriation  heretofore
26    made  in Article 2, Section 9B of Public Act 91-708, approved
27    May 17, 2000, is reappropriated from the Capital  Development
28    Fund  to  the Capital Development Board for the Department of
29    Human Services to convert and expand the Joliet  Annex  to  a
30    treatment   and   detention  facility  for  sexually  violent
31    persons, including moveable equipment and telecommunications.

32        Section 9C.  The following  named  amounts,  or  so  much
 
                           -77-                     BOB-CDB02
 1    thereof  as  may  be  necessary  and remain unexpended at the
 2    close of business on June  30,  2001,  from  reappropriations
 3    heretofore  made for such purposes in  Article 2, Section 9.1
 4    of Public Act 91-708, are  reappropriated  from  the  General
 5    Revenue  Fund  to  the  Capital  Development  Board  for  the
 6    Department  of  Human  Services  for the projects hereinafter
 7    enumerated:

 8                     ALTON MENTAL HEALTH CENTER
 9    (From Article 2, Section 9.1 of Public Act 91-708)
10    For replacing windows in four buildings ........     $713,537
11                    CHESTER MENTAL HEALTH CENTER
12    For replacing backflow prevention
13      devices ......................................       68,925
14            CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
15    For life/safety improvements ...................      163,612
16                  FOX DEVELOPMENTAL CENTER - DWIGHT
17    For replacing windows ..........................      217,525
18             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
19    For upgrading kitchen equipment ................      719,822
20                  JACKSONVILLE DEVELOPMENTAL CENTER
21    For upgrading HVAC systems in the Drake and
22      Gillespie buildings ..........................      234,012
23    For replacing stoker and controls ..............       45,322
24    For planning and beginning the rehabilitation
25      of the water tower and smokestack ............       21,777
26                    LINCOLN DEVELOPMENTAL CENTER
27    For replacing windows ..........................      292,081
28               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
29    For replacing windows in complex
30      buildings ....................................      326,469
31                              STATEWIDE
32    For resurfacing roads at Chicago-Read,
33      Tinley Park and Murray .......................      384,116
 
                           -78-                     BOB-CDB02
 1    For repair of the exterior masonry walls
 2      at Fox, Shapiro and Tinley Park/Howe .........       10,209
 3        Total, Section 9C                              $3,197,407

 4        Section 9D.  The following  named  amounts,  or  so  much
 5    thereof  as  may  be  necessary  and remain unexpended at the
 6    close of business on June  30,  2001,  from  reappropriations
 7    heretofore  made  for such purposes in Article 2, Section 9.2
 8    of Public Act 91-708, are  reappropriated  from  the  General
 9    Revenue  Fund  to  the  Capital  Development  Board  for  the
10    Department  of  Human  Services  for the projects hereinafter
11    enumerated:

12             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
13    (From Article 2, Section 9.2 of Public Act 91-708)
14    For installing an all-weather
15      running track ................................      183,605
16    For renovation of buildings and lead
17      paint abatement ..............................       67,556
18        Total, Section 9D                                $251,161

19        Section 10.  The  following  named  amount,  or  so  much
20    thereof  as  may  be  necessary and remains unexpended at the
21    close of business on June 30,  2001,  from  an  appropriation
22    heretofore  made  in  Article  1,  Section  12  of Public Act
23    91-708, is reappropriated from the Capital  Development  Fund
24    to  the  Capital  Development  Board for the Illinois Medical
25    District Commission for the projects hereinafter enumerated:

26           ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
27    (From Article 1, Section 12 of Public Act 91-708)
28    For constructing a Lab and Research
29      Biotech Grad Facility ........................ $  3,469,418
30        Total, Section 10                              $3,469,418
 
                           -79-                     BOB-CDB02
 1        Section 10.1  The following named  amounts,  or  so  much
 2    thereof  as  may  be  necessary  and remain unexpended at the
 3    close of business on June  30,  2001,  from  reappropriations
 4    heretofore  made  in  Article  2,  Section  10  of Public Act
 5    91-708, approved May 17, 2000, are  reappropriated  from  the
 6    General Revenue Fund to the Capital Development Board for the
 7    Medical  District  Commission  for  the  projects hereinafter
 8    enumerated:

 9               CHICAGO TECHNOLOGY PARK RESEARCH CENTER
10    (From Article 2, Section 10 of Public Act 91-708)
11    For renovating the Research Center ............. $    746,360
12    For upgrading centrifugal chillers .............      220,600
13        Total, Section 10.1                              $966,960

14        Section 11.  The following  named  amounts,  or  so  much
15    thereof  as  may  be  necessary  and remain unexpended at the
16    close of business on June 30, 2001, from  appropriations  and
17    reappropriations   heretofore   made  for  such  purposes  in
18    Article 1, Section 6, and Article 2, Section 11 of Public Act
19    91-708, as  amended,  are  reappropriated  from  the  Capital
20    Development  Fund  to  the  Capital Development Board for the
21    Department of Military Affairs for the  projects  hereinafter
22    enumerated:

23                            AURORA ARMORY
24    (From Article 2, Section 11 of Public Act 91-708)
25    For planning and beginning construction of
26      an armory .................................... $     10,820
27                     CAMP LINCOLN - SPRINGFIELD
28    (From Article 1, Section 6 of Public Act 91-708)
29    For converting commissary to a military
30      museum, in addition to funds
31      previously appropriated ......................      715,000
 
                           -80-                     BOB-CDB02
 1    (From Article 2, Section 11 of Public Act 91-708)
 2    For renovating heating system and
 3      replacing windows ............................      539,697
 4    For construction of a military academy
 5      facility .....................................      638,820
 6    For site improvements and construction for
 7      a military academy facility, including
 8      repair and reconstruction of access
 9      roads and drives at Camp Lincoln .............       24,062
10    For planning, design, site improvements, and
11      other costs associated with the conversion
12      of the old "Castle" or Commissary Building
13      for use as a military museum .................       61,052
14                          CHAMPAIGN ARMORY
15    For replacing roofing systems and
16      rehabilitating exterior walls ................      299,180
17                           DANVILLE ARMORY
18    For planning and construction of a new armory ..    1,070,000
19                           DELAVAN ARMORY
20    For rehabilitating the exterior and
21      replacing roofing system .....................      556,778
22                      DIXON ARMORY - LEE COUNTY
23    For upgrading mechanical and
24      electrical systems ...........................      442,231
25                         DONNELLEY BUILDING
26    For the rehabilitation and renovation of
27      the Donnelley Building and purchase of
28      land for parking .............................       98,840
29              EAST ST. LOUIS ARMORY - ST. CLAIR COUNTY
30    (From Article 1, Section 6 of Public Act 91-708)
31    For upgrading mechanical systems
32      and rest rooms ...............................    1,465,502
33                     ELGIN ARMORY - KANE COUNTY
34    For upgrading heating and mechanical
 
                           -81-                     BOB-CDB02
 1      systems ......................................    2,664,030
 2                     GALVA ARMORY - HENRY COUNTY
 3    For relocating kitchen .........................      773,000
 4                        GENERAL JONES ARMORY
 5    For rehabilitating the armory building,
 6      in addition to funds previously
 7      appropriated .................................    4,000,000
 8    (From Article 2, Section 11 of Public Act 91-708)
 9    For renovation of the exterior and interior,
10      mechanical areas and expansion of the
11      parking lot, in addition to amounts
12      previously appropriated ......................      393,790
13    For replacement of the Assembly Hall
14      roofing system including its structural
15      system .......................................       62,492
16                     JOLIET ARMORY - WILL COUNTY
17    (From Article 1, Section 6 of Public Act 91-708)
18    For renovating mechanical and electrical
19      systems and exterior .........................    2,650,475
20    (From Article 2, Section 11 of Public Act 91-708)
21                  MACHESNEY PARK ARMORY (ROCKFORD)
22    For the state's share for additional planning
23      and construction of an armory and
24      Organizational Maintenance Shop ..............      218,047
25                       MIDWAY ARMORY - CHICAGO
26    (From Article 1, Section 6 of Public Act 91-708)
27    For replacing the roof and
28      upgrading the interior .......................    1,198,590
29                     NORTHWEST ARMORY - CHICAGO
30    (From Article 2, Section 11 of Public Act 91-708)
31    For renovation of interior and exterior,
32      in addition to funds previously
33      appropriated for such purposes ...............    1,109,656
34                 PONTIAC ARMORY - LIVINGSTON COUNTY
 
                           -82-                     BOB-CDB02
 1    (From Article 1, Section 6 of Public Act 91-708)
 2    For upgrading mechanical systems
 3      and rest rooms ...............................    1,352,516
 4    (From Article 2, Section 11 of Public Act 91-708)
 5    For rehabilitating the exterior and
 6      replacing the roofing system .................      547,950
 7                         ROCK ISLAND ARMORY
 8    For construction of an armory and
 9      maintenance shop .............................       64,292
10                    SALEM ARMORY - MARION COUNTY
11    For replacement of the boiler and all
12      domestic plumbing, piping and fixtures,
13      and upgrading of the kitchen,
14      including equipment ..........................       71,670
15                 SAUK AREA CAREER SCHOOL - CRESTWOOD
16    For the purchase and renovation of the
17      former Sauk Area Career School, converting
18      to an armory and upgrading the parking
19      lot ..........................................       82,303
20                  STREATOR ARMORY - LASALLE COUNTY
21    For replacing the roofing system and
22      tuckpointing walls ...........................      271,639
23                            URBANA ARMORY
24    (From Article 1, Section 6 of Public Act 91-708)
25    For renovating the interior and
26      replacing the upper roof .....................      620,090
27                           WAUKEGAN ARMORY
28    (From Article 2, Section 11 of Public Act 91-708)
29    For replacing roofing system ...................       15,707
30               WEST FRANKFORT ARMORY - FRANKLIN COUNTY
31    (From Article 1, Section 6 of Public Act 91-708)
32    For replacing the HVAC and
33      water distribution systems ...................    1,241,832
34    (From Article 2, Section 11 of Public Act 91-708)
 
                           -83-                     BOB-CDB02
 1    For replacing roofs and rehabilitating
 2      exterior .....................................      548,879
 3                      WILLIAMSON COUNTY ARMORY
 4    For providing the State's share for planning
 5      and construction of a new armory, in
 6      addition to amounts previously
 7      appropriated .................................       14,316
 8                              STATEWIDE
 9    (From Article 1, Section 6 of Public Act 91-708)
10    For replacing roofing systems, windows
11      and doors, and rehabilitating the
12      exterior walls at the following
13      locations, at the approximate cost
14      set forth below ..............................    2,782,925
15       Bloomington Armory ...................169,000
16       Dixon Armory .........................801,000
17       Kewanee Armory .......................399,000
18       Macomb Armory ........................242,000
19       Rock Falls Armory ....................475,925
20       Sycamore Armory ......................696,000
21    (From Article 2, Section 11 of Public Act 91-708)
22    For replacement of roofs at the following
23      locations at the approximate costs set
24      forth below ..................................      115,420
25          Camp Lincoln - AGO Building .......115,420 ____________
26        Total, Section 11                             $26,721,601

27        Section  11.1.  The  following  named amounts, or so much
28    thereof as may be necessary  and  remain  unexpended  at  the
29    close  of  business  on  June 30, 2001, from reappropriations
30    heretofore made for such purposes in Article 2, Section  11.1
31    of  Public  Act  91-708,  are reappropriated from the General
32    Revenue  Fund  to  the  Capital  Development  Board  for  the
33    Department of Military Affairs for the  projects  hereinafter
 
                           -84-                     BOB-CDB02
 1    enumerated:

 2                          CARBONDALE ARMORY
 3    (From Article 2, Section 11.1 of Public Act 91-708)
 4    For rehabilitating the exterior and interior ... $    571,113
 5                          LITCHFIELD ARMORY
 6    For renovating the interior and exterior .......      580,325
 7        Total, Section 11.1                            $1,151,438

 8        Section  12.  The  following  named  amount,  or  so much
 9    thereof as may be necessary and  remains  unexpended  at  the
10    close  of  business  on  June 30, 2001, from an appropriation
11    heretofore made in  Article  1,  Section  8   of  Public  Act
12    91-708,  is  reappropriated from the Capital Development Fund
13    to the Capital Development Board for the Department of Public
14    Health for the projects hereinafter enumerated:

15               OAKLAND STREET LABORATORY - CARBONDALE
16    (From Article 1, Section 8 of Public Act 91-708)
17    For upgrading electrical and plumbing
18      systems ...................................... $    215,000
19        Total, Section 8                                 $215,000

20        Section 13.  The following  named  amounts,  or  so  much
21    thereof  as  may  be  necessary  and remain unexpended at the
22    close of business on June 30, 2001, from  appropriations  and
23    reappropriations heretofore made for such purposes in Article
24    1,  Section 9 and Article 2, Section 12 of Public Act 91-708,
25    are reappropriated from the Capital Development Fund  to  the
26    Capital  Development  Board for the Department of Revenue for
27    the projects hereinafter enumerated:

28                 WILLARD ICE BUILDING - SPRINGFIELD
29    (From Article 1, Section 9 of Public Act 91-708)
 
                           -85-                     BOB-CDB02
 1    For upgrading security system, in
 2      addition to funds previously appropriated .... $    500,000
 3    (From Article 2, Section 12 of Public Act 91-708)
 4    For resealing and replacing
 5      atrium windows ...............................      295,000
 6    For replacing the roof .........................    1,292,309
 7    For upgrading the uninterruptible power
 8      system, in addition to funds previously
 9      appropriated .................................      714,473
10    For replacing the halon fire suppression
11      system .......................................       62,956
12    For completion of the replacement of the
13      fire alarm and security system ...............       70,000
14        Total, Section 13                              $2,934,738

15        Section 13.1.  The following named amounts,  or  so  much
16    thereof  as  may  be  necessary  and remain unexpended at the
17    close of business on June 30, 2001, from  appropriations  and
18    reappropriations heretofore made for such purposes in Article
19    2, Section 12.1 of Public Act 91-708, are reappropriated from
20    the General Revenue Fund to the Capital Development Board for
21    the  Department  of  Revenue  for  the  projects  hereinafter
22    enumerated:

23                 WILLARD ICE BUILDING - SPRINGFIELD
24    (From Article 2, Section 12.1 of Public Act 91-708)
25    For repairing the exterior of the building ..... $    425,000
26    For planning and rehabilitating the
27      plumbing system ..............................       45,800
28    For planning and beginning the upgrade of
29      the security and surveillance system .........       32,800
30    For resealing and replacing atrium windows .....      500,000
31    For resealing and replacing atrium windows .....    1,077,944
32        Total, Section 13.1                            $2,081,544
 
                           -86-                     BOB-CDB02
 1        Section  14.  The  following  named  amounts,  or so much
 2    thereof as may be necessary  and  remain  unexpended  at  the
 3    close  of  business on June 30, 2001, from appropriations and
 4    reappropriations heretofore made for such purposes in Article
 5    1, Section 10, and  Article  2,  Section  13  of  Public  Act
 6    91-708,  are reappropriated from the Capital Development Fund
 7    to the Capital Development Board for the Department of  State
 8    Police for the projects hereinafter enumerated:

 9                     CAIRO (ULLIN) - DISTRICT 22
10    (From Article 2, Section 13 of Public Act 91-708)
11    For construction of a firing range and radio
12      tower ........................................ $    467,480
13                    CHICAGO FORENSIC LABORATORY
14    For construction of a laboratory and
15      parking facilities ...........................       84,737
16                 DISTRICT 13 HEADQUARTERS - DuQUOIN
17    (From Article 1, Section 10 of Public Act 91-708)
18    For constructing a district 13
19      headquarters .................................    5,000,000
20    (From Article 2, Section 13 of Public Act 91-708)
21    For planning the replacement of the
22      district headquarters facilities .............      482,007
23                  DISTRICT 6 HEADQUARTERS - PONTIAC
24    For planning, construction, reconstruction,
25      demolition of existing buildings, and
26      all costs related to replacing
27      the facilities ...............................    4,519,630
28                         SPRINGFIELD ARMORY
29    For planning and design of the rehabilitation
30      and site improvements of the Springfield
31      Armory, in addition to funds previously
32      appropriated .................................    1,485,581
33             SPRINGFIELD - STATE POLICE TRAINING ACADEMY
 
                           -87-                     BOB-CDB02
 1    For replacing portable classroom building ......      978,252
 2                        STERLING - DISTRICT 1
 3    For planning, construction, reconstruction,
 4      demolition of existing buildings, and
 5      all costs related to the relocation of
 6      the headquarters, in addition to funds
 7      previously appropriated ......................      234,645
 8                              STATEWIDE
 9    (From Article 1, Section 10 of Public Act 91-708)
10    For replacing communications towers
11      equipment and tower buildings ................    4,208,000
12    For upgrading generators and UPS systems .......      200,000
13    (From Article 2, Section 13 of Public Act 91-708)
14    For replacing roofing system at the
15      following locations at the approximate
16      cost set forth below .........................      443,600
17       District 13 Headquarters,
18         DuQuoin ............................$72,000
19       Joliet Laboratory .....................60,000
20       District 6 Headquarters,
21         Pontiac .............................58,900
22       District 9 Headquarters,
23         Springfield ........................141,700
24       State Police Training Center,
25         Pawnee ..............................30,000
26       District 18 Headquarters,
27         Litchfield ..........................45,000
28       District 19 Headquarters,
29         Carmi ...............................45,000
30    For replacing radio communication towers,
31      equipment buildings and installing emergency
32      power generators at the following locations:
33      Pecatonica, Elwood, Kingston, Mason
34      City .........................................    1,700,513
 
                           -88-                     BOB-CDB02
 1    For replacing radio communication
 2      towers and equipment buildings and
 3      installing emergency power
 4      generators at Andover, Eaton,
 5      Pecatonica, and Cypress ......................      407,500
 6    For replacing radio communication
 7      towers, equipment, buildings and
 8      installing emergency power
 9      generators at various locations ..............       25,321
10       District #22, Effingham (Mason site)
11       District #10, Pesotum
12       District #21, Askum
13       District #6, Pontiac                          ____________
14        Total, Section 14                             $20,237,266

15        Section  14.1.  The  following  named amounts, or so much
16    thereof as may be necessary  and  remain  unexpended  at  the
17    close  of  business  on  June 30, 2001, from reappropriations
18    heretofore made in Article 2,  Section  13.1  of  Public  Act
19    91-708,  are  reappropriated from the General Revenue Fund to
20    the Capital Development Board for  the  Department  of  State
21    Police for the project hereinafter enumerated:

22    (From Article 2, Section 13.1 of Public Act 91-708)
23                   FORENSIC SCIENCE LAB - CHICAGO
24    For upgrading exterior penthouse louvers ....... $    190,462
25        Total, Section 14.1                              $190,462

26        Section  15.  The  following  named  amounts,  or so much
27    thereof as may be necessary  and  remain  unexpended  at  the
28    close  of  business on June 30, 2001, from appropriations and
29    reappropriations  heretofore  made  for  such   purposes   in
30    Article  1,  Section  11, and Article 2, Section 14 of Public
31    Act 91-708, are reappropriated from the  Capital  Development
 
                           -89-                     BOB-CDB02
 1    Fund  to  the Capital Development Board for the Department of
 2    Veterans' Affairs for the projects hereinafter enumerated:

 3                  ILLINOIS VETERANS' HOME - LASALLE
 4    (From Article 2, Section 14 of Public Act 91-708)
 5    For constructing additional parking areas ...... $    350,000
 6    For construction of a storage building  ........      178,380
 7              MANTENO VETERANS' HOME - KANKAKEE COUNTY
 8    (From Article 1, Section 11 of Public Act 91-708)
 9    For upgrading courtyard program spaces .........    3,840,000
10    (From Article 2, Section 14 of Public Act 91-708)
11    For upgrading the electrical system ............    1,360,900
12    For upgrading storm sewer ......................      150,000
13    For constructing a multi-purpose
14      building .....................................      412,962
15    For construction of a special care facility ....      974,427
16                QUINCY VETERANS' HOME - ADAMS COUNTY
17    (From Article 1, Section 11 of Public Act 91-708)
18    For installing rethermalization system .........    1,100,000
19    (From Article 2, Section 14 of Public Act 91-708)
20    For improvements to various buildings
21      and replacement of Fletcher Building
22      to meet licensure standards ..................    8,513,551
23        Total, Section 15                             $16,880,220

24        Section 15.1.  The following named amounts,  or  so  much
25    thereof  as  may  be  necessary  and remain unexpended at the
26    close of business on June  30,  2001,  from  reappropriations
27    heretofore  made for such purposes in Article 2, Section 14.1
28    of Public Act 91-708, as amended, are reappropriated from the
29    General Revenue Fund to the Capital Development Board for the
30    Department of Veterans' Affairs for the projects  hereinafter
31    enumerated:
 
                           -90-                     BOB-CDB02
 1                   ILLINOIS VETERANS' HOME - ANNA
 2    (From Article 2, Section 14.1 of Public Act 91-708)
 3    For repairing, upgrading and maintaining
 4      various systems .............................. $    340,783
 5    For installing lighting, benches,
 6      landscaping and ADA improvements .............      798,088
 7                  ILLINOIS VETERANS' HOME - LASALLE
 8    For replacing lighting .........................       75,000
 9    For installing wall protection .................       99,174
10                  ILLINOIS VETERANS' HOME - MANTENO
11    For upgrading generators for emergency power ...      100,000
12    For tuckpointing and repairing masonry .........      206,090
13    For replacing exterior doors and frames ........       39,216
14        Total, Section 15.1                            $1,658,351

15        Section  16.  The  following  named  amounts,  or so much
16    thereof as may be necessary  and  remain  unexpended  at  the
17    close  of  business on June 30, 2001, from appropriations and
18    reappropriations heretofore made for such purposes in Article
19    1, Section 15, and  Article  2,  Section  15  of  Public  Act
20    91-708,  are reappropriated from the Capital Development Fund
21    to the Capital Development Board for the projects hereinafter
22    enumerated:

23              ATTORNEY GENERAL BUILDING - SPRINGFIELD
24    (From Article 2, Section 15 of Public Act 91-708)
25    For planning an annex or addition and
26      beginning construction of
27      parking facilities ........................... $     35,932
28                    SPRINGFIELD - CAPITOL COMPLEX
29    For upgrading HVAC system at the Archives
30      Building, in addition to funds previously
31      appropriated .................................      155,380
32    For installing fire/security alarm
 
                           -91-                     BOB-CDB02
 1      system .......................................      149,841
 2    For upgrading environmental equipment
 3      and HVAC, in addition to funds previously
 4      appropriated - Archives Building .............    1,465,755
 5    For planning and beginning the rehabilitation
 6      of the Power Plant ...........................      309,009
 7    For upgrading sewer system - Capitol Complex,
 8      in addition to funds previously
 9      appropriated .................................      234,869
10    For upgrading the life/safety and security
11      systems - Capitol Building ...................    1,854,816
12    For upgrading the refrigeration equipment -
13      Capitol Complex ..............................      149,540
14    For renovating mechanical system -
15      Capitol Complex, in addition to funds
16      previously appropriated ......................       81,315
17    For providing a parking facility for the
18      Bloom and Harris Buildings, including
19      land acquisition .............................       98,175
20    For all costs associated with the design
21      and planning for asbestos abatement,
22      window replacement, energy conservation
23      improvements, replacement of carpeting and
24      ceiling tiles, handicap accessibility
25      improvements, and rehabilitation of the
26      water and air distribution systems in the
27      Stratton Office Building .....................       91,892
28    For renovation of the Waterways Building for
29      the Fourth District of the Appellate Court ...    1,088,200
30             SPRINGFIELD - SIU CONSOLIDATED LABORATORIES
31    For construction of an addition to the
32      laboratory facility for Southern Illinois
33      University, Environmental Protection Agency
34      and Department of Public Health ..............       21,690
 
                           -92-                     BOB-CDB02
 1                       STATE CAPITOL BUILDING
 2    For upgrading the life/safety and
 3      security systems, in addition to
 4      funds previously appropriated ................    2,600,000
 5               STRATTON OFFICE BUILDING - SPRINGFIELD
 6    For installing fire alarm system ...............      149,500
 7                              STATEWIDE
 8    (From Article 1, Section 15 of Public Act 91-708)
 9    For surveys and modifications to buildings
10      to meet requirements of the federal
11      Americans with Disabilities Act (ADA) ........    4,000,000
12    For upgrading and remediating aboveground
13      and underground storage tanks ................    1,000,000
14    For abating hazardous materials ................    1,000,000
15    For retrofitting or upgrading mechanized
16      refrigeration equipment (CFCs) ...............    4,000,000
17    (From Article 2, Section 15 of Public Act 91-708)
18    For surveys and modifications to buildings
19      to meet requirements of the federal
20      Americans with Disabilities Act ..............    9,000,000
21    For abating hazardous materials ................    4,763,216
22    For retrofitting or upgrading mechanized
23      refrigeration equipment (CFCs) ...............    7,000,000
24    For upgrading and remediating aboveground
25      and underground storage tanks ................    3,500,000
26    For surveys and modifications to buildings
27      to meets requirements of the federal
28      Americans With Disabilities Act ..............    3,536,848
29    For retrofitting or upgrading mechanized
30      refrigeration equipment (CFCs) ...............    6,641,045
31    For abating hazardous materials ................    3,558,384
32    For upgrading and remediating underground
33      storage tanks ................................    7,429,552
34    For surveys and modifications to
 
                           -93-                     BOB-CDB02
 1      buildings to meet requirements of the
 2      federal Americans with Disabilities Act ......    1,748,241
 3    For abatement of hazardous materials ...........      950,052
 4    For upgrading/retrofitting mechanized
 5      refrigeration equipment (CFC's) ..............      229,956
 6    For upgrade and remediation of underground
 7      storage tanks ................................      686,324
 8    For renovation to meet the requirements
 9      of the Americans with Disabilities Act .......      303,263
10    For abatement of hazardous materials ...........      622,607
11    For upgrade and remediation of
12      underground storage tanks ....................      505,804
13    For survey for and abatement of
14      asbestos-containing materials ................      234,485
15    For upgrade/retrofit of mechanized
16      refrigeration equipment (CFC's) ..............      324,514
17    For abatement of hazardous conditions,
18      including underground storage tanks,
19      in addition to funds previously
20      appropriated .................................      337,181
21    For surveys and modifications to buildings
22      to meet requirements of the federal
23      Americans with Disabilities Act ..............    8,168,045
24    For demolition of buildings ....................      283,579
25    For retrofitting/upgrading mechanical
26      refrigeration equipment ......................      110,991
27    For planning and beginning construction of
28      quick chill food factories ...................       51,211
29    For abating hazardous conditions, including
30      underground storage tanks, in addition to
31      funds previously appropriated ................       47,897
32    For the planning, upgrade and replacement of
33      potentially hazardous underground storage
34      tanks ........................................      172,657
 
                           -94-                     BOB-CDB02
 1    For surveys and abatement of asbestos-
 2      containing materials .........................      222,090
 3    For asbestos abatement located during
 4      Asbestos Abatement Authority and other
 5      surveys to eliminate significant health
 6      hazards ......................................       97,506
 7    For planning and abatement of asbestos,
 8      and replenishment of initial project
 9      construction costs in bondable projects
10      at various state owned facilities ............       47,003
11        Total, Section 16                             $79,058,365

12        Section 16.2.  The  amount  of  $1,893,782,  or  so  much
13    thereof  as  may  be  necessary and remains unexpended at the
14    close of business on June 30,  2001,  from  an  appropriation
15    heretofore  made  in  Article  1,  Section 15.2 of Public Act
16    91-708, is reappropriated from the Asbestos Abatement Fund to
17    the Capital  Development  Board  for  surveying  and  abating
18    asbestos-containing materials statewide.

19        Section 16.3.  The sum of $485,897,364 or so much thereof
20    as  may  be  necessary and remains unexpended at the close of
21    business on June 30, 2001, from an  appropriation  heretofore
22    made  in  Article  1,  Section  15.3 of Public Act 91-708, is
23    reappropriated from  the  School  Construction  Fund  to  the
24    Capital  Development  Board  for  school  construction grants
25    pursuant to the  School  Construction  Law,  in  addition  to
26    amounts previously appropriated for such purposes.

27        Section  16.4.  The sum of $2,230,000, or so much thereof
28    as may be necessary and remains unexpended at  the  close  of
29    business  on  June 30, 2001, from an appropriation heretofore
30    made in Article 1, Section 15.4  of  Public  Act  91-708,  is
31    reappropriated  from  the General Revenue Fund for a grant to
 
                           -95-                     BOB-CDB02
 1    the City of Normal for demolition of a  power  plant  at  the
 2    former Department of Human Services facility.

 3        Section  17.  The  following  named  amounts,  or so much
 4    thereof as may be necessary  and  remain  unexpended  at  the
 5    close  of  business  on  June 30, 2001, from reappropriations
 6    heretofore made for such purposes in Article 2, Section 18 of
 7    Public  Act  91-708,  are  reappropriated  from  the  General
 8    Revenue  Fund  to  the  Capital  Development  Board  for  the
 9    projects hereinafter enumerated:

10    (From Article 2, Section 18 of Public Act 91-708)
11                              STATEWIDE
12    For remediating minor problems and
13      emergencies .................................. $  3,474,200
14    For conducting construction site
15      archeological studies ........................      245,000
16    For demolition of buildings ....................    2,500,000
17    For surveying and abating asbestos-
18      containing materials .........................    1,000,000
19    For surveying and abating asbestos-
20      containing materials .........................      684,968
21    For remediating minor problems
22      and emergencies ..............................    1,281,882
23    For conducting construction site
24      archeological studies ........................      216,888
25    For demolishing buildings ......................    4,800,000
26    For repair of minor problems and
27      emergencies ..................................      855,125
28    For construction site archeological
29      studies ......................................       40,559
30    For surveys for and abatement of
31      asbestos-containing material .................      367,312
32    For demolition of buildings ....................    2,491,266
 
                           -96-                     BOB-CDB02
 1    For repair of minor problems and
 2      emergencies ..................................       84,490
 3    For surveys for asbestos containing
 4      material .....................................       25,943
 5    For survey of asbestos-containing
 6      materials ....................................       63,478
 7    For the planning and abatement of asbestos
 8      hazards, and replenishment of initial
 9      project construction costs in
10      non-bondable projects at various
11      state owned facilities .......................       99,334
12        Total, Section 17                             $18,230,445

13        Section 18.  The amount of $1,473,857, or so much thereof
14    as may be necessary and remains unexpended at  the  close  of
15    business  on June 30, 2001, from a reappropriation heretofore
16    made in Article 2, Section 19 of Public Act 91-708,  approved
17    May  17,  2000, is reappropriated from the Asbestos Abatement
18    Fund to the Capital Development Board  for  asbestos  surveys
19    and  emergency abatement in relation to asbestos abatement in
20    state governmental buildings or higher education  residential
21    and auxiliary enterprise buildings.

22        Section  19.  The  sum  of $37,013, or so much thereof as
23    may be necessary and  remains  unexpended  at  the  close  of
24    business  on June 30, 2001, from a reappropriation heretofore
25    made for such purposes in Article 2, Section 20 of Public Act
26    91-708, is reappropriated from the General  Revenue  Fund  to
27    the  Capital  Development  Board  for a grant to Lincoln Land
28    Community  College  for  all  costs   associated   with   the
29    construction of a new Rural Education and Technology Center.

30        Section 19.1.  The sum of $267,636, or so much thereof as
31    may  be  necessary  and  remains unexpended on June 30, 2001,
 
                           -97-                     BOB-CDB02
 1    from a reappropriation heretofore made in Article 2,  Section
 2    22  of  Public Act 91-708, is reappropriated from the General
 3    Revenue Fund to the Capital Development  Board  for  planning
 4    and  renovation  of  Founders  Memorial  Library  at Northern
 5    Illinois University.

 6        Section 20.  The amount of $2,007,232, or so much thereof
 7    as may be necessary and remains unexpended at  the  close  of
 8    business  on June 30, 2001, from a reappropriation heretofore
 9    made for such purposes in Article 2, Section 23 of Public Act
10    91-708, is reappropriated from the School Infrastructure Fund
11    to the Capital  Development  Board  for  school  construction
12    project grants pursuant to the School Construction Law.

13        Section  21.  The  sum of $27,555,207, or so much thereof
14    as may be necessary and remains unexpended at  the  close  of
15    business  on June 30, 2001, from a reappropriation heretofore
16    made for such purposes in Article 2, Section 24 of Public Act
17    91-708, is reappropriated from the School Infrastructure Fund
18    to the Capital  Development  Board  for  school  construction
19    grants pursuant to the School Construction Law.

20        Section  22.  The  sum of $28,321,460, or so much thereof
21    as may be necessary and remains unexpended at  the  close  of
22    business  on June 30, 2001, from a reappropriation heretofore
23    made for such purposes in Article 2, Section 25 of Public Act
24    91-708, is reappropriated from the School  Construction  Fund
25    to  the  Capital  Development  Board  for school construction
26    grants pursuant to the School Construction Law.

27        Section 23.  The sum of $33,658, or so  much  thereof  as
28    may  be  necessary  and  remains  unexpended  at the close of
29    business on June 30, 2001, from a reappropriation  heretofore
30    made for such purposes in Article 2, Section 26 of Public Act
 
                           -98-                     BOB-CDB02
 1    91-708, is reappropriated from the Asbestos Abatement Fund to
 2    the   Capital  Development  Board  for  asbestos  surveys  in
 3    relation to the  asbestos  abatement  of  State  Governmental
 4    Buildings.

 5        Section  24.     The  following  named amount, or so much
 6    thereof as may be necessary and  remains  unexpended  at  the
 7    close  of  business  on  June 30, 2001, from an appropriation
 8    heretofore made in  Article  1,  Section  17  of  Public  Act
 9    91-708,  is  reappropriated from the Capital Development Fund
10    to the Capital Development Board  for  the  Board  of  Higher
11    Education for the projects hereinafter enumerated:

12                SIU SCHOOL OF MEDICINE - SPRINGFIELD
13    (From Article 1, Section 17 of Public Act 91-708)
14    For constructing and for equipment for
15      an addition to the combined laboratory,
16      in addition to funds previously
17      appropriated ................................. $ 27,000,000
18        Total, Section 24                             $27,000,000

19        Section  25.  The  following  named  amounts,  or so much
20    thereof as may be necessary  and  remain  unexpended  at  the
21    close  of  business on June 30, 2001, from appropriations and
22    reappropriations heretofore made for such purposes in Article
23    1, Section 16 and Article 2, Section 27 of Public Act 91-708,
24    are reappropriated from the Capital Development Fund  to  the
25    Capital  Development  Board for the Board of Higher Education
26    for the projects hereinafter enumerated:

27          ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA
28    (From Article 1, Section 16 of Public Act 91-708)
29    For replacing the roof on the
30      Academic Building ............................ $    415,000
 
                           -99-                     BOB-CDB02
 1    (From Article 2, Section 27 of Public Act 91-708)
 2    For replacing carpeting, constructing storage
 3      building and various site improvements,
 4      including extending communications
 5      conduit system ...............................      391,877
 6    For replacing air conditioning units,
 7      controls and upgrading the energy
 8      management system ............................      122,757
 9    For remodeling the Information Resource
10      Technology Center ............................       50,665
11    For renovation of the laboratory areas,
12      including a greenhouse .......................       41,504
13    For the purchase, renovation and improvement
14      of the North Campus High School site of
15      the Aurora West School District 129,
16      including construction of four dormitories,
17      equipment purchases and other expenses for
18      use by the Illinois Mathematics and Science
19      Academy ......................................      314,284
20        Total, Section 25                              $1,336,087

21        Section 26.  The sum of $8,382,000, or so much thereof as
22    may be necessary and remains unexpended from an appropriation
23    heretofore made in Article 2,  Section  15.1  of  Public  Act
24    91-708,  approved  May  17,  2000, is reappropriated from the
25    Capital Development Fund to the Capital Development Board for
26    the  Illinois   Community   College   Board   for   planning,
27    construction,  utilities,  site  improvements,  equipment and
28    other costs necessary for a  new  Workforce  Development  and
29    Community  Education  Facility at John A. Logan College.  The
30    provisions of Article V of the Public Community  College  Act
31    are not applicable to this appropriation.

32        Section  27.  The  following  named  amounts,  or so much
 
                           -100-                    BOB-CDB02
 1    thereof as may be necessary  and  remain  unexpended  at  the
 2    close  of  business on June 30, 2001, from appropriations and
 3    reappropriations heretofore made for such purposes in Article
 4    1, Section 18, and Article 2, Section 28  of  of  Public  Act
 5    91-708,  are reappropriated from the Capital Development Fund
 6    to the Capital Development Board for the  Illinois  Community
 7    College Board for the projects hereinafter enumerated:

 8                        CARL SANDBURG COLLEGE
 9    (From Article 1, Section 18 of Public Act 91-708)
10    For constructing a computer/
11      student center ............................... $  3,595,300
12                CITY COLLEGES OF CHICAGO/KENNEDY KING
13    (From Article 2, Section 28 of Public Act 91-708)
14    For remodeling for Workforce Preparation
15      Centers ......................................    3,862,000
16    For remodeling for a culinary arts
17      educational facility .........................   10,875,000
18            CITY COLLEGES OF CHICAGO - MALCOLM X COLLEGE
19    (From Article 1, Section 18 of Public Act 91-708)
20    For remodeling the Allied Health
21      program facilities ...........................    4,539,000
22         DANVILLE AREA COMMUNITY COLLEGE - VERMILION COUNTY
23    For renovating campus buildings ................    9,571,000
24    (From Article 2, Section 28 of Public Act 91-708)
25    To rehabilitate infrastructure,
26      construct a classroom facility
27      and a day care center, in addition
28      to funds previously appropriated .............       38,612
29    For rehabilitation of the infrastructure and
30      planning campus buildings ....................      259,864
31                          COLLEGE OF DUPAGE
32    For upgrading the Instructional Center
33      heating, ventilating and air
 
                           -101-                    BOB-CDB02
 1      conditioning systems .........................    2,228,000
 2                       ELGIN COMMUNITY COLLEGE
 3    For construction of addition, site improvements,
 4      remodeling and purchasing equipment ..........      152,930
 5              HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON
 6    For constructing buildings and making
 7      site improvements, including equipment .......       43,100
 8           IL EASTERN COMMUNITY COLLEGE - FRONTIER COLLEGE
 9    (From Article 1, Section 18 of Public Act 91-708)
10    For constructing a learning resource
11      center .......................................    1,758,079
12            JOHN A. LOGAN COMMUNITY COLLEGE - CARTERVILLE
13    (From Article 2, Section 28 of Public Act 91-708)
14    For constructing additions and site
15      improvements, in addition to funds
16      previously appropriated ......................    2,208,000
17                JOHN WOOD COMMUNITY COLLEGE - QUINCY
18    For constructing campus buildings and site
19      improvements, in addition to funds
20      previously appropriated ......................    9,779,640
21    For planning campus buildings and site
22      improvements .................................    1,067,958
23                     KANKAKEE COMMUNITY COLLEGE
24    (From Article 1, Section 18 of Public Act 91-708)
25    For constructing a laboratory/classroom
26      facility .....................................    7,000,000
27                          KASKASKIA COLLEGE
28    For renovating the learning
29      resource center ..............................      729,014
30                         KISHWAUKEE COLLEGE
31    For constructing a parking lot addition ........      506,000
32                       COLLEGE OF LAKE COUNTY
33    For planning and beginning construction
34      of a technology building -
 
                           -102-                    BOB-CDB02
 1      Phase 1 ......................................    3,483,000
 2    (From Article 2, Section 28 of Public Act 91-708)
 3                     LAKE LAND COLLEGE - MATTOON
 4    For constructing a Technology Building, a
 5      parking area and for site improvements .......    2,874,788
 6    For constructing a classroom/administration
 7      building and purchasing equipment, in addition
 8      to funds previously appropriated .............      434,960
 9             LEWIS AND CLARK COMMUNITY COLLEGE - GODFREY
10    For constructing classroom
11      and office building and additions,
12      and remodeling of Haskell Hall ...............    5,561,520
13    For construction of health, mathematics and
14      science laboratory facilities and
15      remodeling Fobes Hall ........................       52,601
16            LINCOLN LAND COMMUNITY COLLEGE - SPRINGFIELD
17    (From Article 1, Section 18 of Public Act 91-708)
18    For constructing a conference &
19      training facility addition to the
20      Millenium Center, in addition
21      to funds previously appropriated .............      939,000
22    (From Article 2, Section 28 of Public Act 91-708)
23    For constructing an addition and remodeling
24      Sangamon and Menard Halls ....................    2,447,695
25           MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS
26    For constructing a classroom/administration
27      building, providing site improvements and
28      purchasing equipment, in addition to
29      funds previously appropriated ................    1,705,076
30                       MCHENRY COUNTY COLLEGE
31    (From Article 1, Section 18 of Public Act 91-708)
32    For constructing classrooms and a
33      student services building and remodeling
34      space, in addition to funds previously
 
                           -103-                    BOB-CDB02
 1      appropriated .................................    8,544,000
 2                      OAKTON COMMUNITY COLLEGE
 3    For planning an addition to Ray
 4      Harstein campus - Phase 1 ....................      392,000
 5                    PARKLAND COLLEGE - CHAMPAIGN
 6    (From Article 2, Section 28 of Public Act 91-708)
 7    For constructing a classroom/instructional
 8      support building, in addition to
 9      funds previously appropriated ................    7,593,777
10               PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS
11    For constructing an addition to the Adult
12      Training/Outreach Center, in addition to
13      funds previously appropriated ................   10,961,000
14                       REND LAKE COLLEGE - INA
15    (From Article 1, Section 18 of Public Act 91-708)
16    For site development, design and
17      construction of an Industrial &
18      Community Training Center at Pinckneyville
19      Industrial Park ..............................      368,695
20    (From Article 2, Section 28 of Public Act 91-708)
21    For replacing utility piping ...................      383,791
22                RICHLAND COMMUNITY COLLEGE - DECATUR
23    For remodeling and constructing additions ......    6,646,085
24                  SHAWNEE COMMUNITY COLLEGE - ULLIN
25    For constructing additions, parking
26      facilities, and renovating buildings,
27      including equipment ..........................    1,764,352
28                    SOUTHWESTERN ILLINOIS COLLEGE
29                 (Formerly BELLEVILLE AREA COLLEGE)
30    For renovating campus buildings and site
31      improvements at the Belleville and Red
32      Bud campuses .................................    2,216,000
33    For constructing a building, additions
34      and site improvements at the
 
                           -104-                    BOB-CDB02
 1      Belleville and Red Bud campuses,
 2      in addition to funds previously
 3      appropriated .................................      107,816
 4                       SOUTH SUBURBAN COLLEGE
 5    (From Article 1, Section 18 of Public Act 91-708)
 6    For improving flood retention ..................      437,000
 7                         SPOON RIVER COLLEGE
 8    For remodeling Engle Hall and
 9      constructing a maintenance building ..........    2,643,720
10               TRITON COMMUNITY COLLEGE - RIVER GROVE
11    (From Article 2, Section 28 of Public Act 91-708)
12    For rehabilitating the Liberal Arts
13      Building .....................................    3,687,000
14    For rehabilitating the potable water
15      distribution system ..........................      659,000
16         WILLIAM RAINEY HARPER COMMUNITY COLLEGE - PALATINE
17    For constructing a Multi-purpose
18      Instructional Center and renovating
19      Building A Cafeteria .........................    3,869,549
20                              STATEWIDE
21    (From Article 1, Section 18 of Public Act 91-708)
22    For miscellaneous capital improvements
23      including construction, capital facilities,
24      cost of planning, supplies, equipment,
25      materials, services and all other expenses
26      required to complete the work at the
27      various community colleges.  This appropriated
28      amount shall be in addition to any other
29      appropriated amounts which can be
30      expended for these purposes ..................    5,791,600
31                  STATEWIDE - CONSTRUCTION DEFECTS
32    (From Article 2, Section 28 of Public Act 91-708)
33    For planning, construction and renovation
34      to correct defectively designed or
 
                           -105-                    BOB-CDB02
 1      constructed community college facilities,
 2      provided that monies recovered based upon
 3      claims arising out of such defective design
 4      or construction shall be paid to the state
 5      as required by Section 105.12 of the Public
 6      Community College Act as reimbursement for
 7      monies expended pursuant to this
 8      appropriation ................................      645,522
 9        Total, Section 27                            $132,423,044

10        Section  28.     The  following named amounts, or so much
11    thereof as may be necessary  and  remain  unexpended  at  the
12    close  of  business  on  June  30,  2001, from appropriations
13    heretofore made in  Article  1,  Section  19  of  Public  Act
14    91-708,  are reappropriated from the Capital Development Fund
15    to the Capital Development Board for the  Illinois  Board  of
16    Higher Education for the projects hereinafter enumerated:

17                              STATEWIDE
18    (From Article 1, Section 19 of Public Act 91-708)
19    For miscellaneous capital improvements,
20      including construction, capital
21      facilities, cost of  planning,
22      supplies, equipment, materials, services
23      and all other expenses required to
24      complete the work at the various universities.
25      This appropriated  amount shall be in
26      addition to any other appropriated
27      amounts which can be expended
28      for these purposes............................ $ 14,208,400
29       Chicago State University .............336,100
30       Eastern Illinois University ..........526,700
31       Governors State University ...........212,000
32       Illinois State University ..........1,209,800
 
                           -106-                    BOB-CDB02
 1       Northeastern Illinois
 2        University ..........................375,400
 3       Northern Illinois University .......1,249,300
 4       Western Illinois University ..........851,000
 5       Southern Illinois University -
 6        Carbondale ........................1,646,700
 7       Southern Illinois University -
 8        Edwardsville ........................663,000
 9       University of Illinois -
10        Chicago ...........................2,798,400
11       University of Illinois -
12        Springfield .........................243,100
13       University of Illinois -
14        Urbana/Champaign ..................4,096,900
15                      CHICAGO STATE UNIVERSITY
16    For remodeling Building K, in addition
17      to funds previously appropriated .............    9,517,300
18                     EASTERN ILLINOIS UNIVERSITY
19    For planning and beginning to renovate
20      and expand the Fine Arts Center -
21      Phase 1, in addition to funds
22      previously appropriated ......................    4,330,600
23                     GOVERNORS STATE UNIVERSITY
24    For constructing addition and
25      remodeling the teaching & learning
26      complex, in addition to funds
27      previously appropriated ......................   21,985,700
28                    NORTHERN ILLINOIS UNIVERSITY
29    For renovating the Founders Library
30      basement, in addition to funds previously
31      appropriated .................................    4,443,100
32              SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
33    For renovating Altgeld Hall and Old
34      Baptist Foundation, in addition to funds
 
                           -107-                    BOB-CDB02
 1      previously appropriated ......................   10,480,300
 2        Total, Section 28                             $64,965,400

 3        Section 29.  The sum of $3,449,361, or so much thereof as
 4    may  be  necessary  and  remains  unexpended  at the close of
 5    business on June 30, 2001, from a reappropriation  heretofore
 6    made for such purposes in Article 2, Section 29 of Public Act
 7    91-708,  is  reappropriated from the Capital Development Fund
 8    to the Capital Development Board for the  Illinois  Community
 9    College   Board   for   miscellaneous   capital  improvements
10    including    construction,    reconstruction,     remodeling,
11    improvement,  repair  and installation of capital facilities,
12    cost of planning, supplies,  equipment,  materials,  services
13    and  all  other expenses required to complete the work at the
14    various community colleges.  This appropriation shall  be  in
15    addition  to  any  other  appropriated  amounts  which can be
16    expended for these purposes.

17        Section 30.  The sum of $4,008,595, or so much thereof as
18    may be necessary and  remains  unexpended  at  the  close  of
19    business  on June 30, 2001, from a reappropriation heretofore
20    made for such purposes in Article 2, Section 30 of Public Act
21    91-708, is reappropriated from the Capital  Development  Fund
22    to  the  Capital Development Board for the Illinois Community
23    College  Board   for   miscellaneous   capital   improvements
24    including     construction,    reconstruction,    remodeling,
25    improvement, repair and installation of  capital  facilities,
26    cost  of  planning,  supplies, equipment, materials, services
27    and all other expenses required to complete the work  at  the
28    various  community  colleges.  This appropriation shall be in
29    addition to any  other  appropriated  amounts  which  can  be
30    expended for these purposes.

31        Section 31.  The sum of $2,128,283, or so much thereof as
 
                           -108-                    BOB-CDB02
 1    may  be  necessary  and  remains  unexpended  at the close of
 2    business on June 30, 2001, from a reappropriation  heretofore
 3    made for such purposes in Article 2, Section 31 of Public Act
 4    91-708,  is  reappropriated from the Capital Development Fund
 5    to the Capital Development Board for the  Illinois  Community
 6    College   Board   for   grants   to  community  colleges  for
 7    miscellaneous capital  improvements  including  construction,
 8    reconstruction,    remodeling,   improvements,   repair   and
 9    installation  of  capital  facilities,  cost   of   planning,
10    supplies,  equipment,  materials,  services,  and  all  other
11    expenses  required  to  complete the work. This appropriation
12    shall be in addition to any other appropriated amounts  which
13    can be expended for these purposes.

14        Section 32.  The sum of $3,190,033, or so much thereof as
15    may  be  necessary  and  remains  unexpended  at the close of
16    business on June 30, 2001, from a reappropriation  heretofore
17    made  for such purpose in Article 2, Section 32 of Public Act
18    91-708 is reappropriated from the Capital Development Fund to
19    the Capital Development  Board  for  the  Illinois  Community
20    College   Board   for   miscellaneous   capital  improvements
21    including construction, capital facilities, cost of planning,
22    supplies,  equipment,  materials,  services  and  all   other
23    expenses  required  to  complete  the  work  at  the  various
24    community  colleges.  This appropriation shall be in addition
25    to any other appropriated amounts which can be  expended  for
26    these purposes.

27        Section  33.  The  following  named  amounts,  or so much
28    thereof as may be necessary  and  remain  unexpended  at  the
29    close  of  business  on  June 30, 2001, from reappropriations
30    heretofore made for such purposes in Article 2, Section 33 of
31    Public  Act  91-708,  are  reappropriated  from  the  Capital
32    Development Fund to the Capital  Development  Board  for  the
 
                           -109-                    BOB-CDB02
 1    Board  of  Higher  Education  for  the  projects  hereinafter
 2    enumerated:

 3                      CHICAGO STATE UNIVERSITY
 4    (From Article 2, Section 33 of Public Act 91-708)
 5    For planning and beginning to remodel
 6      Building K and improving site ................ $  1,100,000
 7    For planning, site improvements, utilities,
 8      construction, equipment and other costs
 9      necessary for a new library facility .........   18,813,571
10    For upgrading campus infrastructure,
11      in addition to the funds
12      previously appropriated ......................    2,700,000
13    For renovating buildings and upgrading
14      mechanical systems ...........................    3,097,957
15    For renovating campus buildings and
16      upgrading mechanical systems .................      305,008
17    For providing campus health and safety
18      improvements .................................       40,221
19              EASTERN ILLINOIS UNIVERSITY - CHARLESTON
20    For planning and beginning to renovate
21      and expand the Fine Arts Center ..............    2,000,000
22    For upgrading campus buildings for health,
23      safety and environmental improvements ........    1,267,646
24    For constructing an addition and
25      renovating Booth Library .....................   13,060,082
26    For planning an addition and renovation
27      of Booth Library .............................      172,373
28    For construction of an addition and
29      remodeling Buzzard Building ..................      117,260
30              GOVERNORS STATE UNIVERSITY - PARK FOREST
31    For constructing a child development center
32      and an addition to the main building
33      and remodeling Wings E and F .................   13,403,900
 
                           -110-                    BOB-CDB02
 1    For planning and beginning the
 2      main building renovations,
 3      a child development center, and
 4      faculty offices ..............................      989,562
 5    For upgrading and replacing cooling
 6      and refrigeration systems and
 7      equipment ....................................      308,775
 8    For renovation of the main building ............       23,362
 9    For remodeling the main building ...............      171,802
10                 ILLINOIS STATE UNIVERSITY - NORMAL
11    For planning and beginning to rehabilitate
12      Schroeder Hall ...............................    1,043,632
13    For planning, site improvements, utilities,
14      construction, equipment and other costs
15      necessary for a new facility for the
16      College of Business ..........................   18,033,157
17    For remodeling Julian and Moulton Halls ........    6,455,654
18             NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
19    For planning and beginning to remodel
20      Buildings A, B and E .........................    7,795,054
21    For remodeling in the Science Building
22      to upgrade heating, ventilating and air
23      conditioning systems .........................    2,021,400
24    For replacing fire alarm systems, lighting
25      and ceilings .................................    2,496,900
26    For renovating the auditorium in
27      Building E ...................................    5,959,874
28    For fire safety modifications at the
29      facility .....................................      123,458
30    For renovation of Buildings E, F, and
31      the auditorium, and demolition and
32      replacement of Buildings G, J and M,
33      in addition to amounts previously
34      appropriated .................................      219,790
 
                           -111-                    BOB-CDB02
 1    For remodeling the library .....................      160,697
 2                NORTHERN ILLINOIS UNIVERSITY - DEKALB
 3    For planning a classroom building and
 4      developing site in Hoffman Estates ...........    1,314,500
 5    For completing the construction of the
 6      Engineering Building, in addition to
 7      amounts previously appropriated for
 8      such purpose .................................    4,452,489
 9    For renovating Altgeld Hall and
10      purchasing equipment .........................   11,299,390
11    For upgrading storm waterway controls in
12      addition to funds previously appropriated ....    6,716,000
13              SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
14    For upgrading and remodeling Anthony Hall ......    2,953,454
15    For site improvements and purchasing
16      equipment for the Engineering and
17      Technology Building ..........................      210,808
18    For planning addition, remodeling and
19      upgrading the HVAC system in Altgeld Hall ....      448,712
20             SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
21    For construction of the Engineering Facility
22      building and related site improvements .......      706,191
23    For planning and beginning construction
24      or renovation for a classroom/administration
25      facility at East St. Louis in addition
26      to funds previously appropriated .............      616,157
27                  UNIVERSITY CENTER OF LAKE COUNTY
28    For land, planning, remodeling, construction
29      and all costs necessary to construct a
30      facility .....................................   11,000,000
31                  UNIVERSITY OF ILLINOIS - CHICAGO
32    For remodeling the Clinical
33      Sciences Building ............................   10,962,502
34    For the renovation of the court area and
 
                           -112-                    BOB-CDB02
 1      Lecture Center, in addition to funds
 2      previously appropriated ......................    2,580,825
 3              UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN
 4    For planning and beginning to construct
 5      a central chiller plant ......................    3,651,680
 6    For completion of campus flood control .........    6,000,000
 7    For remodeling the Mechanical Engineering
 8      Laboratory Building ..........................    4,504,786
 9                UNIVERSITY OF ILLINOIS - SPRINGFIELD
10    For constructing and improving campus
11      roadways, in addition to funds previously
12      appropriated .................................      121,440
13                WESTERN ILLINOIS UNIVERSITY - MACOMB
14    For constructing a utility tunnel system, in
15      addition to funds previously appropriated ....    3,707,900
16    For remodeling Horrabin Hall and
17      beginning to convert Simpkins Hall
18      gymnasium and adjacent areas into
19      a performing arts facility ...................      929,380
20    For construction of a steam and electrical
21      utility tunnel ...............................       31,903
22    For constructing a utility tunnel and
23      installing piping, lines and cables ..........    5,310,941
24    For remodeling Horrabin and Simpkins
25      Halls, in addition to funds
26      previously appropriated.......................    1,496,183
27        Total, Section 33                            $180,896,376

28        Section  34.  The  sum  of $44,609, or so much thereof as
29    may be necessary and  remains  unexpended  at  the  close  of
30    business  on June 30, 2001, from a reappropriation heretofore
31    made for such purposes in Article 2, Section 34 of Public Act
32    91-708, is reappropriated from the Capital  Development  Fund
33    to  the  Capital  Development  Board  for the Board of Higher
 
                           -113-                    BOB-CDB02
 1    Education for miscellaneous  capital  improvements  including
 2    construction, reconstruction, remodeling, improvement, repair
 3    and  installation  of  capital  facilities, cost of planning,
 4    supplies,  equipment,  materials,  services  and  all   other
 5    expenses required for completing the the work at the colleges
 6    and universities.  This appropriation shall be in addition to
 7    any  other  appropriated  amounts  which  can be expended for
 8    these purposes.

 9        Section 35.  The  following  named  amount,  or  so  much
10    thereof  as  may  be  necessary and remains unexpended at the
11    close of business on June 30, 2001,  from  a  reappropriation
12    heretofore made for such purposes in Article 2, Section 35 of
13    Public   Act  91-708,  is  reappropriated  from  the  Capital
14    Development Fund to the Capital  Development  Board  for  the
15    Board   of   Higher   Education   for  miscellaneous  capital
16    improvements    including    construction,    reconstruction,
17    remodeling, improvement, repair and installation  of  capital
18    facilities, cost of planning, supplies, equipment, materials,
19    services and all other expenses required to complete the work
20    at the colleges and universities hereinafter enumerated. This
21    appropriation  shall be in addition to any other appropriated
22    amounts which can be expended for these purposes:
23      Western Illinois University .................. $     19,577
24        Total, Section 35                                 $19,577

25        Section 36.  The sum of $8,109,679, or so much thereof as
26    may be necessary and  remains  unexpended  at  the  close  of
27    business  on June 30, 2001, from a reappropriation heretofore
28    made for such purposes in Article 2, Section 36 of Public Act
29    91-708, is reappropriated from the Capital  Development  Fund
30    to  the  Capital  Development  Board  for the Board of Higher
31    Education for miscellaneous  capital improvements,  including
32    construction, reconstruction, remodeling, improvement, repair
 
                           -114-                    BOB-CDB02
 1    and  installation  of  capital  facilities, cost of planning,
 2    supplies,  equipment,  materials,  services  and  all   other
 3    expenses  required  to  complete  the  work  at  the  various
 4    universities set forth below.  This appropriation shall be in
 5    addition  to  any  other  appropriated  amounts  which can be
 6    expended for these purposes.
 7      For Chicago State University ...... $  271,528
 8      For Eastern Illinois University ...... 308,852
 9      For Governors State University ....... 122,972
10      For Illinois State University ......... 18,562
11      For Northeastern Illinois University . 423,700
12      For Northern Illinois University ... 1,206,900
13      For Western Illinois University ...... 239,021
14      For Southern Illinois University -
15       Carbondale ........................ 1,079,679
16      For Southern Illinois University -
17       Edwardsville ........................ 557,970
18      For University of Illinois -
19       Chicago ........................... 2,316,938
20      For University of Illinois -
21       Urbana-Champaign .................. 1,563,557

22        Section 37.  The sum of $8,083,767, or so much thereof as
23    may be necessary and  remains  unexpended  at  the  close  of
24    business  on June 30, 2001, from a reappropriation heretofore
25    made for such purposes in Article 2, Section 37 of Public Act
26    91-708, is reappropriated from the Capital  Development  Fund
27    to  the  Capital  Development  Board  for the Board of Higher
28    Education for miscellaneous  capital  improvements  including
29    construction, capital facilities, cost of planning, supplies,
30    equipment,   materials,   services  and  all  other  expenses
31    required to complete the work at the various universities set
32    forth below.  This appropriation shall be in addition to  any
33    other  appropriated  amounts  which can be expended for these
 
                           -115-                    BOB-CDB02
 1    purposes.
 2    For Chicago State University ........ $  219,230
 3    For Eastern Illinois University ........ 421,820
 4    For Governors State University ......... 136,200
 5    For Illinois State University .......... 188,355
 6    For Northeastern Illinois University ... 317,800
 7    For Northern Illinois University ....... 813,497
 8    For Western Illinois University ........ 605,245
 9    For Southern Illinois University -
10      Carbondale ........................... 497,741
11    For Southern Illinois University -
12      Edwardsville ......................... 552,590
13    For University of Illinois - Chicago . 2,199,443
14    For University of Illinois -
15      Urbana-Champaign ................... 2,131,846

16        Section 38.  The following  named  amounts,  or  so  much
17    thereof  as  may  be  necessary  and remain unexpended at the
18    close of business on June  30,  2001,  from  reappropriations
19    heretofore made for such purposes in Article 2, Section 38 of
20    Public  Act  91-708,  are  reappropriated  from  the  Capital
21    Development  Fund  to  the  Capital Development Board for the
22    Board  of  Higher  Education  for  the  projects  hereinafter
23    enumerated:

24                    NORTHERN ILLINOIS UNIVERSITY
25    (From Article 2, Section 38 of Public Act 91-708)
26    For upgrading the storm waterway controls
27      and campus drives ............................ $    948,993
28    For renovation of heating plants and the
29      HVAC system ..................................       25,733
30        Total, Section 38                                $974,726

31        Section 39.  The sum of $506,144, or so much  thereof  as
 
                           -116-                    BOB-CDB02
 1    may  be  necessary  and  remains  unexpended  at the close of
 2    business on June 30, 2001, from a reappropriation  heretofore
 3    made for such purposes in Article 2, Section 39 of Public Act
 4    91-708,  is  reappropriated from the Capital Development Fund
 5    to the Capital Development Board  for  the  Board  of  Higher
 6    Education  for  miscellaneous capital improvements, including
 7    construction, reconstruction, remodeling, improvement, repair
 8    and installation of capital  facilities,  cost  of  planning,
 9    supplies,   equipment,  materials,  services  and  all  other
10    expenses required for completing the the work at the colleges
11    and universities.  This appropriation shall be in addition to
12    any other appropriated amounts  which  can  be  expended  for
13    these purposes.

14        Section  40.  The  following  named  amount,  or  so much
15    thereof as may be necessary and  remains  unexpended  at  the
16    close  of  business  on June 30, 2001, from a reappropriation
17    heretofore made for such purposes in Article 2, Section 40 of
18    Public  Act  91-708,  is  reappropriated  from  the   Capital
19    Development  Fund  to  the  Capital Development Board for the
20    Board  of  Higher   Education   for   miscellaneous   capital
21    improvements,    including    construction,   reconstruction,
22    remodeling, improvements, repair and installation of  capital
23    facilities, cost of planning, supplies, equipment, materials,
24    services,  and  all  other  expenses required to complete the
25    work at the colleges and universities hereinafter enumerated.
26    This  appropriation  shall  be  in  addition  to  any   other
27    appropriated   amounts   which  can  be  expended  for  these
28    purposes:
29    Northern Illinois University ................... $    798,656
30        Total, Section 40                                $798,656

31        Section 41.  The sum of $11,628, or so  much  thereof  as
32    may  be  necessary  and  remains  unexpended  at the close of
 
                           -117-                    BOB-CDB02
 1    business on June 30, 2001, from a reappropriation  heretofore
 2    made for such purposes in Article 2, Section 41 of Public Act
 3    91-708,  is  reappropriated from the Capital Development Fund
 4    to the Capital Development Board  for  the  Board  of  Higher
 5    Education for Northern Illinois University, for the planning,
 6    architectural  engineering,  purchase,  site improvements and
 7    construction or remodeling of a site in Rockford for use as a
 8    campus.

 9        Section 42.  The following  named  amounts,  or  so  much
10    thereof  as  may  be  necessary  and remain unexpended at the
11    close of business on June  30,  2001,  from  reappropriations
12    heretofore made for such purposes in Article 2, Section 42 of
13    Public  Act  91-708,  are  reappropriated  from  the  Capital
14    Development  Fund  to  the  Capital Development Board for the
15    Board  of  Higher   Education   for   miscellaneous   capital
16    improvements    including    construction,    reconstruction,
17    remodeling,  improvement,  repair and installation of capital
18    facilities, cost of planning, supplies, equipment, materials,
19    services and all other expenses required to complete the work
20    at  the  various  universities  set  forth   below.      This
21    appropriation  shall be in addition to any other appropriated
22    amounts which can be expended for these purposes.
23      For Chicago State University ................. $    323,491
24      For Eastern Illinois University ..............      477,375
25      For Governors State University ...............       71,798
26      For Illinois State University ................      311,898
27      For Northeastern Illinois University .........      645,072
28      For Northern Illinois University .............      404,039
29      For Southern Illinois University .............      229,526
30      For University of Illinois ...................    1,935,281
31      For Western Illinois University ..............      161,904
32        Total, Section 42                              $4,560,384
 
                           -118-                    BOB-CDB02
 1        Section 43.  The following  named  amounts,  or  so  much
 2    thereof  as  may  be  necessary  and remain unexpended at the
 3    close of business on June  30,  2001,  from  reappropriations
 4    heretofore made for such purposes in Article 2, Section 43 of
 5    Public  Act  91-708,  are  reappropriated  from  the  Capital
 6    Development  Fund  to  the  Capital Development Board for the
 7    Board of Trustees of Southern  Illinois  University  for  the
 8    projects hereinafter enumerated:

 9                          CARBONDALE CAMPUS
10    (From Article 2, Section 43 of Public Act 91-708)
11    For construction of an engineering building
12      annex ........................................ $     63,948
13                         EDWARDSVILLE CAMPUS
14    For replacement of the high temperature water
15      distribution system ..........................      188,842
16    For infrastructure, site development, and
17      other necessary costs associated with
18      the development of University Park ...........        7,501
19    For costs associated with the consolidation
20      of the music facilities ......................       24,136
21    For planning and construction of an Art and
22      Design Facility ..............................       24,089
23        Total, Section 43                                $308,516

24        Section  44.  The  sum of $179,911, or so much thereof as
25    may be necessary and  remains  unexpended  at  the  close  of
26    business  on June 30, 2001, from a reappropriation heretofore
27    made for such purposes in Article 2, Section 44 of Public Act
28    91-708, is reappropriated from the Capital  Development  Fund
29    to  the  Capital  Development  Board  for  Southern  Illinois
30    University  for  miscellaneous capital improvements including
31    construction,   reconstruction,   remodeling,   improvements,
32    repair  and  installation  of  capital  facilities,  cost  of
 
                           -119-                    BOB-CDB02
 1    planning, supplies, equipment, materials, services,  and  all
 2    other   expenses   required   to  complete  the  work.   This
 3    appropriation shall be in addition to any other  appropriated
 4    amounts which can be expended for these purposes.

 5        Section  45.  The  following  named  amounts,  or so much
 6    thereof as may be necessary  and  remain  unexpended  at  the
 7    close  of  business  on  June 30, 2001, from reappropriations
 8    heretofore made for such purposes in Article 2, Section 45 of
 9    Public  Act  91-708,  are  reappropriated  from  the  Capital
10    Development Fund to the Capital  Development  Board  for  the
11    Board  of  Trustees  of  the  University  of Illinois for the
12    projects hereinafter enumerated:

13                    UNIVERSITY CENTER - CHICAGO
14    (From Article 2, Section 45 of Public Act 91-708)
15    For remodeling Alumni Hall, Phase II,
16      including utilities .......................... $     53,982
17                        HEALTH SCIENCE CENTER
18    For remodeling the Neuropsychiatric
19      Institute ....................................       75,202
20                       URBANA-CHAMPAIGN CAMPUS
21    For initiating a campus flood
22      control project ..............................    1,070,717
23        Total, Section 45                              $1,199,901

24        Section 46.  The sum of $550,194, or so much  thereof  as
25    may  be  necessary  and  remains  unexpended  at the close of
26    business on June 30, 2001, from a reappropriation  heretofore
27    made for such purposes in Article 2, Section 46 of Public Act
28    91-708,  is  reappropriated from the Capital Development Fund
29    to the Capital Development Board for the Board of Trustees of
30    the  University  of  Illinois   for   miscellaneous   capital
31    improvements    including    construction,    reconstruction,
 
                           -120-                    BOB-CDB02
 1    remodeling,  improvement,  repair and installation of capital
 2    facilities, cost of planning, supplies, equipment, materials,
 3    services and all other expenses required for  completing  the
 4    work  at  the  colleges and universities.  This appropriation
 5    shall be in addition to any other appropriated amounts  which
 6    can be expended for these purposes.

 7        Section  47.  The  sum of $374,714, or so much thereof as
 8    may be necessary and  remains  unexpended  at  the  close  of
 9    business  on June 30, 2001, from a reappropriation heretofore
10    made for such purposes in Article 2, Section 47 of Public Act
11    91-708, is reappropriated from the Capital  Development  Fund
12    to the Capital Development Board for the Board of Trustees of
13    the  University  of  Illinois (formerly for the Department of
14    Human Services) for renovation of the School of Public Health
15    and Psychiatric Institute (formerly the ISPI building).

16        Section 48.  The sum of $10,338, or so  much  thereof  as
17    may  be  necessary  and  remains  unexpended  at the close of
18    business on June 30, 2001, from a reappropriation  heretofore
19    made for such purposes in Article 2, Section 50 of Public Act
20    91-708,  is  reappropriated from the Capital Development Fund
21    to the Capital Development Board for a grant to  the  College
22    of  Lake  County for all costs associated with the renovation
23    of the Southlake Education Center.

24        Section 50.  The amount of $1,500,000, or so much thereof
25    as may be necessary and remains unexpended at  the  close  of
26    business  on  June 30, 2001, from an appropriation heretofore
27    made in Article 1,  Section  21  of  Public  Act  91-708,  is
28    reappropriated  from  the  Capital  Development  Fund  to the
29    Capital Development Board for a  grant  to  Lewis  and  Clark
30    Community College for all costs associated with construction,
31    redevelopment,  infrastructure  and  engineering costs at the
 
                           -121-                    BOB-CDB02
 1    N.O. Nelson property in Edwardsville.

 2        Section 51.  The amount of $1,300,000, or so much thereof
 3    as may be necessary and remains unexpended at  the  close  of
 4    business  on  June 30, 2001, from an appropriation heretofore
 5    made in Article 1,  Section  22  of  Public  Act  91-708,  is
 6    reappropriated  from  the  Capital  Development  Fund  to the
 7    Capital Development Board for the Board of  Higher  Education
 8    for  the  University  of Illinois at Springfield for planning
 9    and  beginning  construction  of  a  classroom   and   office
10    building.

11        Section  52.  The  amount of $100,000, or so much thereof
12    as may be necessary and remains unexpended at  the  close  of
13    business  on  June 30, 2001, from an appropriation heretofore
14    made in Article 1,  Section  23  of  Public  Act  91-708,  is
15    reappropriated  from  the  Capital  Development  Fund  to the
16    Capital Development  Board  for  the  Department  of  Natural
17    Resources to begin planning and construction for the Kankakee
18    River State Park Lodge.

19        Section  53.  The  amount of $500,000, or so much thereof
20    as may be necessary and remains unexpended at  the  close  of
21    business  on  June 30, 2001, from an appropriation heretofore
22    made in Article 1,  Section  25  of  Public  Act  91-708,  is
23    reappropriated  from  the Tobacco Settlement Recovery Fund to
24    the Capital Development Board for a  grant  to  the  Illinois
25    Institute  of  Technology for development and improvements at
26    the Food Safety Center.

27        Section  54.  The  amount  of  $10,000,000,  or  so  much
28    thereof as may be necessary and  remains  unexpended  at  the
29    close  of  business  on  June 30, 2001, from an appropriation
30    heretofore made in  Article  1,  Section  26  of  Public  Act
 
                           -122-                    BOB-CDB02
 1    91-708,   is   reappropriated  from  the  Tobacco  Settlement
 2    Recovery Fund to the Capital Development Board for a grant to
 3    Northwestern University for the planning and construction  of
 4    a biomedical research facility.

 5        Section 55.  The amount of $7,000,000, or so much thereof
 6    as  may  be  necessary and remains unexpended at the close of
 7    business on June 30, 2001, from an  appropriation  heretofore
 8    made  in  Article  1,  Section  28  of  Public Act 91-708, is
 9    reappropriated from  the  Capital  Development  Fund  to  the
10    Capital Development Board to construct an industrial training
11    center at Illinois Central College.

12        Section 56.  The amount of $5,000,000, or so much thereof
13    as  may  be  necessary and remains unexpended at the close of
14    business on June 30, 2001, from an  appropriation  heretofore
15    made  in  Article  1,  Section  29  of  Public Act 91-708, is
16    reappropriated from  the  Capital  Development  Fund  to  the
17    Department  of Natural Resources for a grant to the Fox River
18    Water  Reclamation  District   for   skyline   sewer   system
19    renovations and improvements.

20        Section 57.  The amount of $1,000,000, or so much thereof
21    as  may  be  necessary and remains unexpended at the close of
22    business on June 30, 2001, from an  appropriation  heretofore
23    made  in  Article  1,  Section  30  of  Public Act 91-708, is
24    reappropriated from  the  Capital  Development  Fund  to  the
25    Capital  Development  Board  for  a grant for development and
26    improvements to the Newberry Library.

27        Section  59.  The  amount  of  $20,000,000,  or  so  much
28    thereof as may be necessary and  remains  unexpended  at  the
29    close  of  business  on  June 30, 2001, from an appropriation
30    heretofore made in  Article  1,  Section  31  of  Public  Act
 
                           -123-                    BOB-CDB02
 1    91-708,  is  reappropriated from the Capital Development Fund
 2    to the Capital Development Board for grants to units of local
 3    government  and  other  eligible  entities  for   all   costs
 4    associated    with   land   acquisition,   construction   and
 5    rehabilitation projects.

 6        Section 59.  The amount of $800,000, or so  much  thereof
 7    as  may  be  necessary and remains unexpended at the close of
 8    business on June 30, 2001, from an  appropriation  heretofore
 9    made  in  Article  1,  Section  32  of  Public Act 91-708, is
10    reappropriated from  the  Capital  Development  Fund  to  the
11    Capital  Development  Board  for  a  grant  to  the  City  of
12    Centreville for infrastructure improvements.

13        Section  60.  The  amount of $250,000, or so much thereof
14    as may be necessary and remains unexpended at  the  close  of
15    business  on  June 30, 2001, from an appropriation heretofore
16    made in Article 1,  Section  33  of  Public  Act  91-708,  is
17    reappropriated  from  the  Capital  Development  Fund  to the
18    Capital Development Board for construction of a fire house in
19    the City of Madison.

20        Section 61.  The amount of $150,000, or so  much  thereof
21    as  may  be  necessary and remains unexpended at the close of
22    business on June 30, 2001, from an  appropriation  heretofore
23    made  in  Article  1,  Section  34  of  Public Act 91-708, is
24    reappropriated from  the  Capital  Development  Fund  to  the
25    Capital  Development Board for renovations and rehabilitation
26    of the old Rosemont Fire Station in the Village of Washington
27    Park.

28        Section 62.  The amount of $500,000, or so  much  thereof
29    as  may  be  necessary and remains unexpended at the close of
30    business on June 30, 2001, from an  appropriation  heretofore
 
                           -124-                    BOB-CDB02
 1    made  in  Article  1,  Section  35  of  Public Act 91-708, is
 2    reappropriated from  the  Capital  Development  Fund  to  the
 3    Capital  Development  Board  for  the  Historic  Preservation
 4    Agency   for  land  acquisition  costs  associated  with  the
 5    purchase of the Crenshaw property.

 6        Section 63.  The amount of $7,935,000, or so much thereof
 7    as may be necessary and remains unexpended at  the  close  of
 8    business  on  June 30, 2001, from an appropriation heretofore
 9    made in Article 1,  Section  36  of  Public  Act  91-708,  is
10    reappropriated  from  the  Fund  for  Illinois' Future to the
11    Capital Development  Board  for  grants  to  units  of  local
12    government,   educational   facilities,   and  not-for-profit
13    organizations for expenses  and  infrastructure  improvements
14    including,   but   not  limited  to  planning,  construction,
15    reconstruction, renovation, utilities and equipment.

16        Section 64.  The amount of $100,000, or so  much  thereof
17    as  may  be  necessary and remains unexpended at the close of
18    business on June 30, 2001, from an  appropriation  heretofore
19    made  in  Article  1,  Section  37  of  Public Act 91-708, is
20    reappropriated from  the  Capital  Development  Fund  to  the
21    Capital  Development  Board  for  all  costs  associated with
22    infrastructure improvements in the Village of Fairmont City.

23        Section 65.  The sum of $100,000, or so much  thereof  as
24    may  be  necessary, is and remains unexpended at the close of
25    business on June 30, 2001, from an  appropriation  heretofore
26    made  in  Article  1,  Section  38  of  Public Act 91-708, as
27    amended, is reappropriated from the Capital Development  Fund
28    to  the  Capital  Development  Board for the repaving of 23rd
29    Street from Nameoki Road to Route 162 in Granite City.

30        Section 66.  The sum of $100,000, or so much  thereof  as
 
                           -125-                    BOB-CDB02
 1    may  be  necessary, is and remains unexpended at the close of
 2    business on June 30, 2001, from an  appropriation  heretofore
 3    made  in  Article  1,  Section  39  of  Public Act 91-708, as
 4    amended, is reappropriated from the Capital Development  Fund
 5    to  the  Capital  Development  Board  for  the resurfacing of
 6    Arlington Drive in Nameoki Township.

 7        Section 67.  The sum of $334,347, or so much  thereof  as
 8    may  be  necessary  and  remains  unexpended  at the close of
 9    business on June 30, 2001, from a reappropriation  heretofore
10    made for such purposes in Article 2, Section 51 of Public Act
11    91-708,  is  reappropriated from the Capital Development Fund
12    to the Capital Development Board  for  a  grant  to  Parkland
13    College for capital improvements.

14        Section  68.  The  sum  of $32,563, or so much thereof as
15    may be necessary and  remains  unexpended  at  the  close  of
16    business  on June 30, 2001, from a reappropriation heretofore
17    made for such purposes in Article 2, Section 52 of Public Act
18    91-708, is reappropriated from the General  Revenue  Fund  to
19    the  Capital  Development  Board for a grant to Prairie State
20    College for planning for Outreach/Adult Training Center.

21        Section 69.  The sum of $540,555, or so much  thereof  as
22    may  be  necessary  and  remains  unexpended  at the close of
23    business on June 30, 2001, from a reappropriation  heretofore
24    made for such purposes in Article 2, Section 53 of Public Act
25    91-708,  is  reappropriated from the Capital Development Fund
26    to the Capital Development Board for planning  for  expansion
27    at McHenry County College at Crystal Lake.

28        Section  70.  The  sum of $112,716, or so much thereof as
29    may be necessary and  remains  unexpended  at  the  close  of
30    business  on June 30, 2001, from a reappropriation heretofore
 
                           -126-                    BOB-CDB02
 1    made for such purposes in Article 2, Section 54 of Public Act
 2    91-708, is reappropriated from the General  Revenue  Fund  to
 3    the  Capital  Development  Board  for  a grant to Spoon River
 4    College  for   Macomb   Campus   renovation   and   classroom
 5    enhancements.

 6        Section 71.  The sum of $7,100, or so much thereof as may
 7    be  necessary and remains unexpended at the close of business
 8    on June 30, 2001, from a reappropriation heretofore made  for
 9    such  purposes in Article 2, Section 55 of Public Act 91-708,
10    is reappropriated from the Capital Development  Fund  to  the
11    Capital  Development Board for a grant to Rock Valley College
12    for planning for a new instructional building.

13        Section 72.  The  following  named  amount,  or  so  much
14    thereof  as  may  be  necessary and remains unexpended at the
15    close of business on June 30, 2001,  from  a  reappropriation
16    heretofore  made  in  Article  2,  Section  56  of Public Act
17    91-708, approved May 17, 2000,  is  reappropriated  from  the
18    Capital Development Fund to the Capital Development Board for
19    the project hereinafter enumerated:
20                    EAST ST. LOUIS COLLEGE CENTER
21    (From Article 2, Section 56 of Public Act 91-708)
22    For construction of facilities, remodeling,
23      site improvements, utilities and other
24      costs necessary for adapting the former
25      campus of Metropolitan Community College
26      for a Community College Center and Southern
27      Illinois University, in addition to funds
28      previously appropriated ........................$25,473,000

29        Section  73.  The  sum of $10,423,575, or so much thereof
30    as may be necessary and remains unexpended at  the  close  of
31    business  on June 30, 2001, from a reappropriation heretofore
 
                           -127-                    BOB-CDB02
 1    made in Article 2, Section 57 of Public Act 91-708,  approved
 2    May  17, 2000, is reappropriated from the Capital Development
 3    Fund to the Capital Development Board for the Board of Higher
 4    Education for miscellaneous  capital  improvements  including
 5    construction,   reconstruction,   remodeling,   improvements,
 6    repair  and  installation  of  capital  facilities,  cost  of
 7    planning,  supplies,  equipment,  materials, services and all
 8    other expenses required to complete the work at  the  various
 9    universities set forth below.  This appropriated amount shall
10    be in addition to any other appropriated amounts which can be
11    expended for these purposes.

12      Chicago State University ..............218,500
13      Eastern Illinois University ...........330,413
14      Governors State University ............131,700
15      Illinois State University .............810,750
16      Northeastern Illinois University ......307,200
17      Northern Illinois University ..........933,600
18      Western Illinois University ...........625,200
19      Southern Illinois University -
20       Carbondale .........................1,433,800
21      Southern Illinois University -
22       Edwardsville .........................544,800
23      University of Illinois -
24       Chicago Campus .....................2,378,300
25      University of Illinois -
26       Springfield Campus ...................157,200
27      University of Illinois -
28       Champaign/Urbana Campus ............2,552,112

29        Section 74.  The sum of $3,372,224, or so much thereof as
30    may  be  necessary  and  remains  unexpended  at the close of
31    business on June 30, 2001, from a reappropriation  heretofore
32    made  in Article 2, Section 58 of Public Act 91-708, approved
 
                           -128-                    BOB-CDB02
 1    May 17, 2000, is reappropriated from the Capital  Development
 2    Fund  to  the  Capital  Development  Board  for  the Illinois
 3    Community   College   Board   for    miscellaneous    capital
 4    improvements including construction, capital facilities, cost
 5    of planning, supplies, equipment, materials, services and all
 6    other  expenses  required to complete the work at the various
 7    community colleges.  This appropriated  amount  shall  be  in
 8    addition  to  any  other  appropriated  amounts  which can be
 9    expended for these purposes.

10        Section 75.  The sum of $207,842,147, or so much  thereof
11    as  may  be  necessary and remains unexpended at the close of
12    business on June 30, 2001, from a reappropriation  heretofore
13    made  in Article 2, Section 59 of Public Act 91-708, approved
14    May 17, 2000, is reappropriated from the School  Construction
15    Fund to the Capital Development Board for school construction
16    grants  pursuant  to the School Construction Law, in addition
17    to amounts previously appropriated for such purposes.

18        Section 76.  The sum of $5,211,629, or so much thereof as
19    may be necessary and  remains  unexpended  at  the  close  of
20    business  on June 30, 2001, from a reappropriation heretofore
21    made in Article 2, Section 60 of Public Act 91-708,  approved
22    May   17,   2000,   is   reappropriated   from   the   School
23    Infrastructure  Fund  to  the  Capital  Development Board for
24    school   construction   grants   pursuant   to   the   School
25    Construction  Law,  in   addition   to   amounts   previously
26    appropriated for such purposes.

27        Section  79.  The  sum of $550,000, or so much thereof as
28    may be necessary and  remains  unexpended  at  the  close  of
29    business  on June 30, 2001, from a reappropriation heretofore
30    made for such purposes in Article 2, Section 65 of Public Act
31    91-708, approved May 17, 2000,  is  reappropriated  from  the
 
                           -129-                    BOB-CDB02
 1    Capital Development Fund to the Capital Development Board for
 2    a  grant to the Village of Arlington Heights for construction
 3    projects.

 4        Section 80.  The sum of $230,000, or so much  thereof  as
 5    may  be  necessary  and  remains  unexpended  at the close of
 6    business on June 30, 2001, from a reappropriation  heretofore
 7    made for such purposes in Article 2, Section 67 of Public Act
 8    91-708,  approved  May  17,  2000, is reappropriated from the
 9    Capital Development Fund to the Capital Development Board for
10    a grant to the City of Princeton for a new police facility.

11        Section 81.  The sum of $125,000, or so much  thereof  as
12    may  be  necessary  and  remains  unexpended  at the close of
13    business on June 30, 2001, from a reappropriation  heretofore
14    made for such purposes in Article 2, Section 68 of Public Act
15    91-708,  approved  May  17,  2000, is reappropriated from the
16    Capital Development Fund to the Capital Development Board for
17    a grant to the City of Toulon for a new community center.

18        Section 82.  The sum of $805,845, or so much  thereof  as
19    may  be  necessary  and  remains  unexpended  at the close of
20    business on June 30, 2001, from a reappropriation  heretofore
21    made for such purposes in Article 2, Section 69 of Public Act
22    91-708,  approved  May  17,  2000, is reappropriated from the
23    Capital Development Fund to the Capital Development Board for
24    a grant to Waubonsee  Community  College  for  infrastructure
25    improvements (IT).

26        Section  83.  The  sum of $550,000, or so much thereof as
27    may be necessary and  remains  unexpended  at  the  close  of
28    business  on June 30, 2001, from a reappropriation heretofore
29    made for such purposes in Article 2, Section 70 of Public Act
30    91-708, approved May 17, 2000,  is  reappropriated  from  the
 
                           -130-                    BOB-CDB02
 1    Capital Development Fund to the Capital Development Board for
 2    a  grant to the Village of Stickney for village hall & public
 3    safety facility (1/2).

 4        Section 84.  The sum of $105,000, or so much  thereof  as
 5    may  be  necessary  and  remains  unexpended  at the close of
 6    business on June 30, 2001, from a reappropriation  heretofore
 7    made for such purposes in Article 2, Section 78 of Public Act
 8    91-708,  approved  May  17,  2000, is reappropriated from the
 9    Capital Development Fund to the Capital Development Board for
10    a grant to the Town of Cicero for a police  station/community
11    center.

12        Section  85.  The  sum of $150,000, or so much thereof as
13    may be necessary and  remains  unexpended  at  the  close  of
14    business  on June 30, 2001, from a reappropriation heretofore
15    made for such purposes in Article 2, Section 82 of Public Act
16    91-708, approved May 17, 2000,  is  reappropriated  from  the
17    Capital Development Fund to the Capital Development Board for
18    a grant to the Village of Illiopolis for a new village hall.

19        Section 86.  The sum of $2,000,000, or so much thereof as
20    may  be  necessary  and  remains  unexpended  at the close of
21    business on June 30, 2001, from a reappropriation  heretofore
22    made for such purposes in Article 2, Section 86 of Public Act
23    91-708,  approved  May  17,  2000, is reappropriated from the
24    Capital Development Fund to the Capital Development Board for
25    a grant to the Lewis & Clark Community College for  buildings
26    and/or building improvements.  The provisions of Article V of
27    the  Public  Community College Act are not applicable to this
28    appropriation.

29        Section 87.  The sum of $125,000, or so much  thereof  as
30    may  be  necessary  and  remains  unexpended  at the close of
 
                           -131-                    BOB-CDB02
 1    business on June 30, 2001, from a reappropriation  heretofore
 2    made for such purposes in Article 2, Section 87 of Public Act
 3    91-708,  approved  May  17,  2000, is reappropriated from the
 4    Capital Development Fund to the Capital Development Board for
 5    a grant to Triton College Library renovation.

 6        Section 88.  The sum of $125,000, or so much  thereof  as
 7    may  be  necessary  and  remains  unexpended  at the close of
 8    business on June 30, 2001, from a reappropriation  heretofore
 9    made for such purposes in Article 2, Section 94 of Public Act
10    91-708,  approved  May  17,  2000, is reappropriated from the
11    Capital Development Fund to the Capital Development Board for
12    a grant to the Village of Willow Springs for a public  safety
13    building.

14        Section  89.  The  amount of $400,000, or so much thereof
15    as may be necessary and remains unexpended at  the  close  of
16    business  on June 30, 2001, from a reappropriation heretofore
17    made for such purposes in Article 2, Section 96 of Public Act
18    91-708, approved May 17, 2000, as amended, is  reappropriated
19    from  the Capital Development Fund to the Capital Development
20    Board for a grant to  the  Winnetka  Park  District  for  the
21    purpose  of  all  costs associated with the construction of a
22    recreational center/ice arena.

23        Section 90.  The amount of $100,000, or so  much  thereof
24    as  may  be necessary, and remains unexpended at the close of
25    business on June 30, 2001, from an  appropriation  heretofore
26    made  in  Article  2,  Section  97  of  Public Act 91-708, as
27    amended, is reappropriated to the Capital  Development  Board
28    from  the  Capital  Development  Fund  to  the North Suburban
29    Special Recreation Association for the purpose of  all  costs
30    associated with the recreation center, offices, ice arena and
31    for acquiring and developing an office.
 
                           -132-                    BOB-CDB02
 1        Section  91.  The  amount of $100,000, or so much thereof
 2    as may be necessary and remains unexpended at  the  close  of
 3    business  on June 30, 2001, from a reappropriation heretofore
 4    made in Article 2, Section 102 of Public Act 91-708, approved
 5    May 17, 2000, is reappropriated from the Fund  for  Illinois'
 6    Future  to  the  Capital Development Board for a grant to the
 7    Clinton County Project for  Older  Americans  for  all  costs
 8    associated with building acquisition and improvements.

 9        Section  92.  The  amount of $166,830, or so much thereof
10    as may be necessary and remains unexpended at  the  close  of
11    business  on June 30, 2001, from a reappropriation heretofore
12    made for such purposes in Article 2, Section  106  of  Public
13    Act 91-708, approved May 17, 2000, is reappropriated from the
14    Capital Development Fund to the Capital Development Board for
15    a grant to the LaSalle Veterans Home for all costs associated
16    with architectural and engineering designs.

17        Section  93.   The sum of $750,913, or so much thereof as
18    may be necessary and  remains  unexpended  at  the  close  of
19    business  on June 30, 2001, from a reappropriation heretofore
20    made for such purposes in Article 2, Section  107  of  Public
21    Act 91-708, approved May 17, 2000, is reappropriated from the
22    Capital Development Fund to the Capital Development Board for
23    a  grant  to  Blackhawk East College for all costs associated
24    with  a  multi-purpose  agriculture  education  instructional
25    center.

26        Section 94.  The sum of $1,320,000, or so much thereof as
27    may be necessary and  remains  unexpended  at  the  close  of
28    business  on June 30, 2001, from a reappropriation heretofore
29    made in Article 2, Section 108 of Public Act 91-708, approved
30    May 17, 2000, is reappropriated from the General Revenue Fund
31    to the Capital Development Board for a grant to  the  Village
 
                           -133-                    BOB-CDB02
 1    of  Bridgeview  for  all costs associated with infrastructure
 2    improvements.

 3        Section 95.  The sum of $40,000, or so  much  thereof  as
 4    may  be  necessary  and  remains  unexpended  at the close of
 5    business on June 30, 2001, from a reappropriation  heretofore
 6    made in Article 2, Section 118 of Public Act 91-708, approved
 7    May  17,  2000, is reappropriated from the Fund for Illinois'
 8    Future to the Capital Development Board to the Chicago Public
 9    Schools for a grant to West  Pullman  School  for  playground
10    equipment.

11        Section 96.  The sum of $9,899,375, or so much thereof as
12    may  be  necessary  and  remains  unexpended  at the close of
13    business on June 30, 2001, from a reappropriation  heretofore
14    made  for  such  purposes in Article 2, Section 123 of Public
15    Act 91-708, approved May 17, 2000, is reappropriated from the
16    Capital Development Fund to the Capital Development Board for
17    a grant to Chicago State University for all costs  associated
18    with construction of a Convocation Center.

19        Section  97.  The  sum of $900,000, or so much thereof as
20    may be necessary and  remains  unexpended  at  the  close  of
21    business  on June 30, 2001, from a reappropriation heretofore
22    made for such purposes in Article 2, Section  124  of  Public
23    Act 91-708, approved May 17, 2000, is reappropriated from the
24    Capital Development Fund to the Capital Development Board for
25    costs  associated  with establishing a campus-wide fire alarm
26    system at Governor's State University.

27        Section 98.  The sum of $100,000, or so much  thereof  as
28    may  be  necessary  and  remains  unexpended  at the close of
29    business on June 30, 2001, from a reappropriation  heretofore
30    made in Article 2, Section 125 of Public Act 91-708, approved
 
                           -134-                    BOB-CDB02
 1    May  17,  2000, is reappropriated from the Fund for Illinois'
 2    Future to the  Capital  Development  Board  for  a  grant  to
 3    National Latinos with Disabilities for capital developments.

 4        Section  99.  The  sum of $404,298, or so much thereof as
 5    may be necessary and  remains  unexpended  at  the  close  of
 6    business  on June 30, 2001, from a reappropriation heretofore
 7    made for such purposes in Article 2, Section  126  of  Public
 8    Act 91-708, approved May 17, 2000, is reappropriated from the
 9    Capital Development Fund to the Capital Development Board for
10    a  grant  to  Southwestern  Area College (formerly Belleville
11    Area College) for funding the construction of the  Automotive
12    Collision Repair Technology Training Facility.

13        Section  100.  The sum of $522,500, or so much thereof as
14    may be necessary and  remains  unexpended  at  the  close  of
15    business  on June 30, 2001, from a reappropriation heretofore
16    made for such purposes in Article 2, Section  131  of  Public
17    Act 91-708, approved May 17, 2000, is reappropriated from the
18    Capital Development Fund to the Capital Development Board for
19    a  grant  to  Kendall  County  for  all costs associated with
20    courthouse   renovation,   in   addition   to   other   funds
21    appropriated for such purpose.

22        Section 101.  The sum of $1,100,000, or so  much  thereof
23    as  may  be  necessary and remains unexpended at the close of
24    business on June 30, 2001, from a reappropriation  heretofore
25    made  for  such  purposes in Article 2, Section 132 of Public
26    Act 91-708, approved May 17, 2000, is reappropriated from the
27    Capital Development Fund to the Capital Development Board for
28    a grant to the Italian  American  Sports  Hall  of  Fame  for
29    various improvements.

30        Section  102.  The  amount  of  $3,952,265,  or  so  much
 
                           -135-                    BOB-CDB02
 1    thereof  as  may  be  necessary and remains unexpended at the
 2    close of business on June 30, 2001,  from  a  reappropriation
 3    made  in  Article  2,  Section  134  of Public Act 91-708, is
 4    reappropriated from  the  Capital  Development  Fund  to  the
 5    Capital   Development  Board  for  the  Department  of  Human
 6    Services to construct a detention and treatment facility.

 7        Section 103.   No  contract  shall  be  entered  into  or
 8    obligation  incurred for any expenditures from appropriations
 9    made in this Article until after  the  purposes  and  amounts
10    have been approved by the Governor.


11                             ARTICLE 999

12        Section  999.   Effective  date. This Act takes effect on
13    July 1, 2001.