State of Illinois
92nd General Assembly
Legislation

   [ Search ]   [ PDF text ]   [ Legislation ]   
[ Home ]   [ Back ]   [ Bottom ]



92_SB2357

 
 1                                                        BOB-CDB03

 2        AN ACT making appropriations and reappropriations.

 3        Be  it  enacted  by  the People of the State of Illinois,
 4    represented in the General Assembly:

 5                              ARTICLE 1

 6        Section 1.  The  following  named  amounts,  or  so  much
 7    thereof  as  may  be  necessary,  are  appropriated  from the
 8    Capital Development Fund to the Capital Development Board for
 9    the Department of Agriculture for  the  projects  hereinafter
10    enumerated:

11                ILLINOIS STATE FAIRGROUNDS - DU QUOIN
12    For upgrading electrical systems, in
13     addition to funds previously
14      appropriated ................................. $  1,250,000
15    For upgrading the telecommunications
16      system .......................................      400,000
17    For upgrading the HVAC system ..................    1,665,000
18    For replacing judges stand and improving
19      track area ...................................      265,000
20              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
21    For completing the Emerson Building renovation,
22      in addition to funds previously
23      appropriated .................................    1,030,000
24        Total                                          $4,610,000

25        Section  2.  The  following  named  amounts,  or  so much
26    thereof as  may  be  necessary,  are  appropriated  from  the
27    Capital Development Fund to the Capital Development Board for
28    the   Department  of  Central  Management  Services  for  the
29    projects hereinafter enumerated:
 
                           -2-                      BOB-CDB03
 1                 JAMES R. THOMPSON CENTER - CHICAGO
 2    For rehabilitating exterior columns, in
 3      addition to funds previously appropriated .... $  1,000,000
 4                       STATEWIDE
 5    For replacing roofing systems at the
 6      following locations at the approximate
 7     costs set forth below .........................    1,290,000
 8      Suburban North Regional Office ......1,100,000
 9      Effingham State Garage ................190,000
10           SPRINGFIELD COMPUTER FACILITY - SANGAMON COUNTY
11    For upgrading the computer room and the
12      electrical system ............................    1,210,000
13                STATE OF ILLINOIS BUILDING - CHICAGO
14    For upgrading the electrical and
15      mechanical systems ...........................    3,260,000
16    For upgrading building security ................      560,000
17                   DIXON STATE GARAGE - LEE COUNTY
18    For upgrading the lighting and
19      replacing the roof ...........................      260,000
20        Total                                          $7,580,000

21        Section 3.  The  following  named  amounts,  or  so  much
22    thereof  as  may  be  necessary,  are  appropriated  from the
23    Capital Development Fund to the Capital Development Board for
24    the Department of Corrections for  the  projects  hereinafter
25    enumerated:

26                              STATEWIDE
27    For upgrading roofing systems at the
28     following locations at the approximate
29     costs set forth below ......................... $  1,680,000
30      Hardin County Work
31       Camp .................................210,000
32      Illinois Youth Center
 
                           -3-                      BOB-CDB03
 1       Joliet .............................1,030,000
 2      Pontiac Correctional
 3       Center ...............................440,000
 4    For replacing windows at the following
 5     locations at the approximate costs
 6     set forth below, in addition to funds
 7     previously appropriated .......................    7,830,000
 8      Dixon Correctional Center ...........1,850,000
 9     Illinois Youth Ctr Joliet ............1,730,000
10      Shawnee Correctional Ctr ............4,250,000
11    For upgrading roads and parking lots at the
12     following locations at the approximate
13     costs set forth below .........................    2,260,000
14      Illinois Youth Center -
15       St. Charles ........................1,260,000
16      Illinois Youth Center -
17       Sheridan ...........................1,000,000
18                    CENTRALIA CORRECTIONAL CENTER
19    For upgrading the electrical system, in
20      addition to funds previously appropriated ....    1,600,000
21                    DANVILLE CORRECTIONAL CENTER
22    For upgrading the power plant, in
23      addition to funds previously appropriated ....    2,200,000
24                   EAST MOLINE CORRECTIONAL CENTER
25    For replacing the cooling tower, in
26      addition to funds previously appropriated ....      400,000
27    For replacing windows, in addition to
28      funds previously appropriated ................    1,800,000
29                     GRAHAM CORRECTIONAL CENTER
30    For upgrading the building automation
31      system, in addition to funds previously
32      appropriated .................................      900,000
33                   KANKAKEE MSU - KANKAKEE COUNTY
34    For upgrading roads and parking lots ...........      120,000
 
                           -4-                      BOB-CDB03
 1    For fencing improvements .......................      865,000
 2                     MENARD CORRECTIONAL CENTER
 3    For replacing the administration building,
 4      in addition to funds previously
 5      appropriated .................................   12,300,000
 6                      TAMMS CORRECTIONAL CENTER
 7    Construct bar screen ...........................      590,000
 8        Total                                         $32,545,000

 9        Section  4.  The  following  named  amounts,  or  so much
10    thereof as  may  be  necessary,  are  appropriated  from  the
11    Capital Development Fund to the Capital Development Board for
12    the Historic Preservation Agency for the projects hereinafter
13    enumerated:
14          LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
15    For providing electrical at
16      campgrounds .................................. $    120,000
17           LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
18    For replacing the maintenance building,
19      constructing a stable, and relocating
20      sewage system ................................    1,205,000
21                   OLD STATE CAPITOL - SPRINGFIELD
22    For repairing elevators ........................      405,000
23        Total                                          $1,730,000

24        Section  5.  The  following  named  amounts,  or  so much
25    thereof as  may  be  necessary,  are  appropriated  from  the
26    Capital Development Fund to the Capital Development Board for
27    the  Illinois  Medical  District  Commission for the projects
28    hereinafter enumerated:
29           ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
30    For upgrading utility and infrastructure,
31      in addition to funds previously
32      appropriated ................................. $  1,000,000
 
                           -5-                      BOB-CDB03
 1        Total                                          $1,000,000

 2        Section 6.  The  following  named  amounts,  or  so  much
 3    thereof  as  may  be  necessary,  are  appropriated  from the
 4    Capital Development Fund to the Capital Development Board for
 5    the Department of Human Services for the projects hereinafter
 6    enumerated:
 7                              STATEWIDE
 8    For replacing and repairing roads and
 9     parking lots at the following locations,
10     at the approximate costs set forth
11     below ......................................... $  2,700,000
12    Alton Mental Health Center -
13      Madison................................600,000
14    Choate Mental Health Center -
15      Anna ..................................700,000
16    Howe Developmental Center -
17      Tinley Park ...........................800,000
18    Ludeman Developmental Center
19      Park Forest ...........................600,000
20    For replacing and repairing roofing systems
21     at the following locations, at the
22     approximate cost set forth below ..............    5,635,000
23    Alton Mental Health Center -
24      Madison ...............................415,000
25    Shapiro Developmental Center -
26      Kankakee ..............................115,000
27    Ludeman Developmental Center -
28      Park Forest ............................25,000
29    Madden Mental Health Center -
30      Hines ...............................2,515,000
31    Murray Developmental Center -
32      Centralia ...........................1,905,000
33    Kiley Developmental Center -
 
                           -6-                      BOB-CDB03
 1      Waukegan ..............................660,000

 2                  FOX DEVELOPMENTAL CENTER - DWIGHT
 3    For replacing and repairing interior doors,
 4      flooring and walls, in addition to funds
 5      previously appropriated ......................    1,105,000
 6             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
 7    For renovating the High School Building
 8      Phase II .....................................    1,580,000
 9    For renovating the health center ...............      770,000
10    For replacing roof and upgrading the
11      mechanical system at Burns Gym ...............    2,405,000
12    For replacing the visual alert system ..........      800,000
13         ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - MORGAN
14    For renovating the Girls' Dormitory, in
15      addition to funds previously appropriated ....      735,000
16                KILEY DEVELOPMENTAL CENTER - WAUKEGAN
17    For converting the facility to natural
18      gas, in addition to funds previously
19      appropriated .................................    1,135,000
20             LUDEMAN MENTAL HEALTH CENTER - COOK COUNTY
21    For repairing and replacing furnaces and
22      duct work, in addition to funds previously
23      appropriated .................................      500,000
24                 MABLEY DEVELOPMENTAL CENTER - DIXON
25    For replacing mechanicals and upgrading
26      the fire alarm systems .......................      960,000
27               MURRAY DEVELOPMENTAL CENTER - CENTRALIA
28    For renovating the boiler house,
29      in addition to funds previously
30      appropriated .................................    2,450,000
31    For replacing the emergency
32      management system, in
33      addition to funds previously
 
                           -7-                      BOB-CDB03
 1      appropriated .................................      585,000
 2               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
 3    For replacing the sewer system in
 4      south campus .................................    2,150,000
 5    For planning and beginning renovation
 6      of dietary ...................................      500,000
 7    For work necessary to remedy fire
 8      damper deficiencies ..........................    1,515,000
 9    For upgrading roads and parking lots ...........    5,870,000
10               SINGER MENTAL HEALTH CENTER - ROCKFORD
11    For renovating dietary and stores ..............    1,900,000
12        Total                                         $33,295,000

13        Section 7.  The  following  named  amounts,  or  so  much
14    thereof  as  may  be  necessary,  are  appropriated  from the
15    Capital Development Fund to the Capital Development Board for
16    the  Department  of  Military  Affairs   for   the   projects
17    hereinafter enumerated:
18                            CAIRO ARMORY
19    For replacing roof and renovating the
20      interior and exterior ........................ $  1,356,000
21                            ELGIN ARMORY
22    For upgrading the interior and exterior ........      897,000
23                          LITCHFIELD ARMORY
24    For remodeling and installing a
25      kitchen ......................................      517,000
26                           MATTOON ARMORY
27    For replacing the roof and renovating
28      the interior and exterior ....................      992,000
29                           MONMOUTH ARMORY
30    For replacing the roof and renovating
31      the interior and exterior ....................      859,000
32                            SALEM ARMORY
33    For remodeling and installing a
 
                           -8-                      BOB-CDB03
 1      kitchen ......................................      486,000
 2                           SYCAMORE ARMORY
 3    For replacing the electrical system,
 4      renovating the interior and installing
 5      air conditioning .............................    1,707,000
 6        Total                                          $6,814,000

 7        Section  8.  The  following  named  amounts,  or  so much
 8    thereof as  may  be  necessary,  are  appropriated  from  the
 9    Capital Development Fund to the Capital Development Board for
10    the   Department   of  Natural  Resources  for  the  projects
11    hereinafter enumerated:

12                              STATEWIDE
13    For replacing/repairing the roofing systems
14     at the following locations at the approximate
15     costs set forth below ......................... $    240,000
16      Jubilee College State
17       Park-Peoria County ....................45,000
18      Starved Rock State Park &
19       Lodge-LaSalle County ..................60,000
20      Kaskaskia River Fish & Wildlife
21       Area-Randolph County ..................25,000
22      Pyramid State Park-
23       Perry County ..........................55,000
24      Region V Office (Benton)
25       Franklin County .......................55,000
26    For rehabilitating dams and bridges ............    1,000,000
27               EAGLE CREEK STATE PARK - SHELBY COUNTY
28    For constructing lake access boat
29      docks at resort ..............................    2,000,000
30                 FOX RIDGE STATE PARK - COLES COUNTY
31    For replacing spillway .........................      160,000
32                           GOLCONDA MARINA
 
                           -9-                      BOB-CDB03
 1    For planning and construction of
 2      marina expansion .............................    1,915,000
 3           GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY
 4    For replacing floating boardwalk ...............      485,000
 5                  HENNEPIN CANAL PARKWAY STATE PARK
 6    For rehabilitating/repairing railroad
 7      bridges, in addition to funds
 8      previously appropriated ......................      900,000
 9               ILLIANA HEIGHTS SWAMP - KANKAKEE COUNTY
10    For improving DuPage River Spillway ............      110,000
11               ILLINOIS BEACH STATE PARK - LAKE COUNTY
12    For redeveloping North Unit Service
13      Area .........................................    4,860,000
14                  IROQUOIS COUNTY CONSERVATION AREA
15    For improving check station/concession
16      building .....................................      680,000
17        KANKAKEE WILDLIFE CONSERVATION AREA - KANKAKEE COUNTY
18    For planning and constructing new
19      lodge, in addition to funds
20      previously appropriated ......................    3,500,000
21               KICKAPOO STATE PARK - VERMILLION COUNTY
22    For replacing stairway to Long Pond ............      230,000
23                  MINE RESCUE STATION - SPRINGFIELD
24    For replacing HVAC system ......................      125,000
25               RED HILLS STATE PARK - LAWRENCE COUNTY
26    For miscellaneous improvements .................      850,000
27                 SAM PARR STATE PARK - JASPER COUNTY
28    For renovating recreational facilities .........    1,915,000
29              SILOAM SPRINGS STATE PARK - ADAMS COUNTY
30    For rehabilitating office/service
31      area .........................................    1,200,000
32        SNAKEDEN HOLLOW FISH AND WILDLIFE AREA - KNOX COUNTY
33    For rehabilitating the Spillway, in
34      addition to funds previously
 
                           -10-                     BOB-CDB03
 1      appropriated .................................      100,000
 2           SPRING LAKE CONSERVATION AREA - TAZEWELL COUNTY
 3    For stabilizing levee and
 4      shoreline ....................................      500,000
 5                 VOLO BOG NATURAL AREA - LAKE COUNTY
 6    For replacing floating boardwalk and
 7      deck .........................................    1,765,000
 8             WELDON SPRINGS STATE PARK - DE WITT COUNTY
 9    For upgrading residence utilities ..............       40,000
10    For improving campgrounds, in addition to
11      funds previously appropriated ................      695,000
12             WHITE PINES FOREST STATE PARK - OGLE COUNTY
13    For planning and beginning sewer system
14      replacement ..................................      100,000
15        Total                                         $23,370,000

16        Section 9.  The  following  named  amounts,  or  so  much
17    thereof  as  may  be  necessary,  are  appropriated  from the
18    Capital Development Fund to the Capital Development Board for
19    the  Department  of  Revenue  for  the  projects  hereinafter
20    enumerated:
21                 WILLARD ICE BUILDING - SPRINGFIELD
22    For replacing and repairing concrete
23      stairway and completing of parking
24      deck, in addition to funds
25      previously appropriated ...................... $    285,000
26    For upgrading fire and voice activated
27      alarm system .................................    1,010,000
28    For replacing dock exhaust system ..............      560,000
29    For upgrading building management
30      controls .....................................    3,545,000
31        Total                                          $5,400,000

32        Section 10.  The following  named  amounts,  or  so  much
 
                           -11-                     BOB-CDB03
 1    thereof  as  may  be  necessary,  are  appropriated  from the
 2    Capital Development Fund to the Capital Development Board for
 3    the Department of State Police for the  projects  hereinafter
 4    enumerated:
 5                        PESOTUM - DISTRICT 10
 6    For replacing the sewer and septic
 7      systems ...................................... $    125,000
 8                      SPRINGFIELD - DISTRICT 9
 9    For replacing the HVAC systems and
10      upgrading the electrical system ..............      733,000
11        Total                                            $858,000

12        Section  11.  The  following  named  amounts,  or so much
13    thereof as  may  be  necessary,  are  appropriated  from  the
14    Capital Development Fund to the Capital Development Board for
15    the   Department   of  Veterans'  Affairs  for  the  projects
16    hereinafter enumerated:
17                        MANTENO VETERANS HOME
18    For replacing condensing units ................. $    375,000
19    For upgrading or constructing
20      roads and parking lots .......................      635,000
21    For planning and constructing
22      additional storage and support areas .........    1,365,000
23                         ANNA VETERANS HOME
24    For constructing a garage ......................      325,000
25                 QUINCY VETERANS HOME - ADAMS COUNTY
26    For constructing a bus and ambulance
27      garage .......................................      900,000
28        Total                                          $3,600,000

29        Section 12.  The following  named  amounts,  or  so  much
30    thereof  as  may  be  necessary,  are  appropriated  from the
31    Capital Development Fund to the Capital Development Board for
32    the  Courts  of  Illinois  for   the   projects   hereinafter
 
                           -12-                     BOB-CDB03
 1    enumerated:
 2                SUPREME COURT BUILDING - SPRINGFIELD
 3    For replacing the roofing system, in addition
 4      to funds previously appropriated ............. $    170,000
 5    For upgrading the air conditioning and
 6      heating systems ..............................      350,000
 7               APPELLATE COURT THIRD DISTRICT - OTTAWA
 8    For renovating the annex interior ..............      315,000
 9        Total                                            $835,000

10        Section  13.  The  following  named  amounts,  or so much
11    thereof as  may  be  necessary,  are  appropriated  from  the
12    Capital Development Fund to the Capital Development Board for
13    the  Office  of  the  Secretary  of  State  for  the projects
14    hereinafter enumerated:
15                   CAPITOL BUILDING - SPRINGFIELD
16    For upgrading the HVAC systems, in
17      addition to funds previously
18      appropriated ................................. $  6,440,000
19                    CAPITOL COMPLEX - SPRINGFIELD
20    For asbestos abatement .........................    1,000,000
21             WILLIAM G. STRATTON BUILDING - SPRINGFIELD
22    For renovating the Stratton Office
23      Building, in addition to funds
24      previously appropriated ......................    5,970,000
25                  DRIVER'S FACILITY WEST - CHICAGO
26    For renovating the building ....................      855,000
27        Total                                         $14,265,000

28        Section 14.    The following named amounts,  or  so  much
29    thereof  as  may  be  necessary,  are  appropriated  from the
30    Capital Development Fund to the Capital Development Board for
31    the Illinois Board  of  Higher  Education  for  the  projects
32    hereinafter enumerated:
 
                           -13-                     BOB-CDB03
 1                              STATEWIDE
 2    For miscellaneous capital improvements
 3      including construction, capital
 4      facilities, cost of  planning, supplies,
 5      equipment, materials, services and
 6      all other expenses required to complete
 7      the work at the various universities
 8      This appropriated  amount shall be in
 9      addition to any other appropriated amounts
10      which can be expended for these purposes...... $ 20,000,000
11       Chicago State University .............322,100
12       Eastern Illinois University ..........515,500
13       Governors State University ...........189,700
14       Illinois State University ..........1,021,300
15       Northeastern Illinois
16        University ..........................383,700
17       Northern Illinois University .......1,159,000
18       Western Illinois University ..........792,200
19       Southern Illinois University -
20        Carbondale ........................1,625,000
21       Southern Illinois University -
22        Edwardsville ........................763,100
23       University of Illinois -
24        Chicago ...........................2,777,300
25       University of Illinois -
26        Springfield .........................229,100
27       University of Illinois -
28        Urbana/Champaign ..................4,150,300
29       Illinois Community
30        College Board .....................6,071,700

31                  UNIVERSITY CENTER OF LAKE COUNTY
32    For constructing a university center and
33      purchasing equipment, in addition to
 
                           -14-                     BOB-CDB03
 1      funds previously appropriated ................    8,000,000
 2                          LAKELAND COLLEGE
 3    Student Services Building addition .............    6,721,600
 4                  ILLINOIS MATH AND SCIENCE ACADEMY
 5    For constructing a mezzanine level in
 6      east gymnasium and purchasing equipment,
 7      in addition to funds previously
 8      appropriated .................................    5,943,800
 9             UNIVERSITY OF ILLINOIS AT CHAMPAIGN-URBANA
10    Expansion of Microelectronics Lab ..............   18,000,000
11                  UNIVERSITY OF ILLINOIS AT CHICAGO
12    Plan, construct, and equip the Chemical
13      Sciences Building ............................   57,600,000
14                     WESTERN ILLINOIS UNIVERSITY
15    Plan and construct Convocation Center ..........    4,000,000
16              SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
17    For renovating and constructing an
18      addition to the Morris Library, in
19      addition to funds previously
20      appropriated .................................   25,690,000
21        Total                                        $145,955,400

22                      STATE BOARD OF EDUCATION
23        Section  15.  The  sum of $70,000,000, or so much thereof
24    as  may  be  necessary,  is  appropriated  from  the   School
25    Construction Fund to the Capital Development Board for school
26    construction  grants pursuant to the School Construction Law,
27    in addition  to  amounts  previously  appropriated  for  such
28    purposes.

29        Section  16.  The  sum of $25,000,000, or so much thereof
30    as  may  be  necessary,  is  appropriated  from  the  Capital
31    Development Fund to the Board of Trustees of  the  University
32    of  Illinois  to plan and construct an Education and Research
 
                           -15-                     BOB-CDB03
 1    facility for the College of Medicine  in  Chicago,  including
 2    planning,   land   acquisition,   demolition,   construction,
 3    remodeling,   landscaping,   site   improvements,  equipment,
 4    extension  or  modification  of   campus   utility   systems,
 5    relocation of programs, and such expenses as may be necessary
 6    to  complete the facility.  This appropriation is in addition
 7    to funds previously appropriated.

 8        Section 17.  The sum of $55,000,000, or so  much  thereof
 9    as  may  be  necessary,  is  appropriated  from  the  Capital
10    Development Fund to the Capital Development Board for the use
11    by  the  Department  of  Central  Management Services for the
12    acquisition of real property  and  related  expenses  in  and
13    around  the  Capitol  Complex,  in Springfield, Illinois, the
14    purchase price to be set at fair market value, as  determined
15    by  independent  appraisal,  pre-existing option, exercise of
16    right  of  first  refusal  or  other  appropriate  means   of
17    determining  fair  market  value when the acquisition of such
18    property is deemed by  the  Director  of  the  Department  of
19    Central Management Services to be in the best interest of the
20    state.

21        Section 18.  The sum of $2,992,000, or so much thereof as
22    may   be   necessary,   is   appropriated  from  the  Capital
23    Development Fund to the Board  of  Trustees  of  Northeastern
24    Illinois   University   to  purchase  equipment  and  remodel
25    buildings A, B and E.  This appropriation is in  addition  to
26    any funds previously appropriated.

27        Section 19.  The sum of $6,000,000, or so much thereof as
28    may   be   necessary,   is   appropriated  from  the  Capital
29    Development Fund to the Board of Trustees of Eastern Illinois
30    University to purchase equipment, renovate  and  expand  Fine
31    Arts  Center.  This appropriation is in addition to any funds
 
                           -16-                     BOB-CDB03
 1    previously appropriated.

 2        Section 20.  The sum of $2,400,000, or so much thereof as
 3    may  be  necessary,  is   appropriated   from   the   Capital
 4    Development  Fund  to  the Board of Trustees of Chicago State
 5    University to purchase equipment to complete the construction
 6    the  the  Convocation  Center.   This  appropriation  is   in
 7    addition to any funds previously appropriated.

 8        Section 21.  The sum of $3,944,000, or so much thereof as
 9    may   be   necessary,   is   appropriated  from  the  Capital
10    Development  Fund  to  the  Board  of  Trustees  of  Northern
11    Illinois University to purchase equipment for the College  of
12    Business  Building  (Barsema Hall).  This appropriation is in
13    addition to any funds previously appropriated.

14        Section 22.  The sum of $800,000, or so much  thereof  as
15    may   be   necessary,   is   appropriated  from  the  Capital
16    Development  Fund  to  the  Board  of  Trustees  of  Southern
17    Illinois University at Carbondale to purchase  equipment  for
18    Altgeld  Hall  and the Old Baptist Foundation Building.  This
19    appropriation  is  in  addition  to  any   funds   previously
20    appropriated.

21        Section  23.  The  sum of $15,000,000, or so much thereof
22    as  may  be  necessary,  is  appropriated  from  the  Capital
23    Development Fund to the Board of Trustees of  the  University
24    of  Illinois  to  plan  and  construct a Classroom and Office
25    Building  at  the  Springfield  Campus  and  related  utility
26    systems, including planning,  land  acquisition,  demolition,
27    construction,  remodeling,  landscaping,  site  improvements,
28    equipment,   extension  or  modification  of  campus  utility
29    systems, and such expenses as may be  necessary  to  complete
30    the  facility.   This  appropriation  is in addition to funds
 
                           -17-                     BOB-CDB03
 1    previously appropriated.

 2        Section 24.  The sum of $3,600,000, or so much thereof as
 3    may  be  necessary,  is   appropriated   from   the   Capital
 4    Development   Fund  to  the  Capital  Development  Board  for
 5    miscellaneous capital  improvements  at  various  educational
 6    facilities   statewide,   in  addition  to  funds  previously
 7    appropriated.

 8                             ARTICLE 1a

 9        Section 1.  The  following  named  amounts,  or  so  much
10    thereof  as  may  be  necessary  and remain unexpended at the
11    close of business on June 30, 2002, from  appropriations  and
12    reappropriations heretofore made for such purposes in Article
13    56, Section 1, and Article 56a, Section 1 of Public Act 92-8,
14    are  reappropriated  from the Capital Development Fund to the
15    Capital Development Board for the Department  of  Agriculture
16    for the projects hereinafter enumerated:

17                      DUQUOIN STATE FAIRGROUNDS
18    (From Article 56, Section 1 of Public Act 92-8)
19    For replacing horse barn roofs .................      293,137
20    For upgrading electrical utilities, in
21     addition to funds previously
22      appropriated .................................      700,000
23    (From Article 56a, Section 1 of Public Act 92-8)
24    For upgrading electrical utilities .............      105,800
25    For constructing a multi-purpose
26      building .....................................    7,914,200
27    For constructing livestock
28      facilities ...................................       15,544
29    For upgrading the racetrack, including the
30      racetrack walls ..............................       59,767
 
                           -18-                     BOB-CDB03
 1                   GALESBURG DIAGNOSTIC LABORATORY
 2    For purchasing the facility ....................    3,200,000
 3              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
 4    (From Article 56, Section 1 of Public Act 92-8)
 5    For renovating comfort stations, in addition
 6      to funds previously appropriated .............    1,100,000
 7    For upgrading the electrical system ............      966,300
 8    For renovating the grandstand area .............    1,114,363
 9    (From Article 56a, Section 1 of Public Act 92-8)
10    For renovating or replacing racehorse
11      barns - Phase IV .............................    1,646,366
12    For renovating the Emmerson Building ...........    1,704,240
13    For renovating or replacing #26 Barn ...........      775,773
14    For completing the HVAC system in the
15      Administration Building, in addition to
16      funds previously appropriated ................      119,129
17    For renovating the Junior Home Economics
18      Building .....................................    1,020,702
19    For replacing and repairing roofs,
20      Phase II .....................................       37,964
21    For installing HVAC system and
22      restrooms in the Orr Building ................      228,211
23    For designing and constructing a complex to
24      accommodate various outdoor events,
25      including site development, utilities,
26      permanent grandstands and portable
27      bleachers, support facilities, vehicle
28      and pedestrian access and related
29      work .........................................      136,075
30    For replacing and renovating
31      racehorse barns (Phase II) ...................       79,840
32    For replacing and rehabilitating roofs .........        9,070
33        Total, Section 1                              $21,226,481
 
                           -19-                     BOB-CDB03
 1        Section  1a.  The  following  named  amount,  or  so much
 2    thereof as may be necessary and  remains  unexpended  at  the
 3    close  of  business  on  June 30, 2002, from an appropriation
 4    heretofore made for such purposes in Article 56, Section  1.1
 5    of  Public  Act  92-8, as amended, is reappropriated from the
 6    Tobacco Settlement Recovery Fund to the  Capital  Development
 7    Board  for  the  Department  of  Agriculture  for the project
 8    hereinafter enumerated:

 9              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
10    (From Article 56, Section 1.1 of Public Act 92-8)
11    For upgrading the chemistry/seed
12      laboratory systems ........................... $    344,000
13        Total                                            $344,000

14        Section 2.  The  following  named  amounts,  or  so  much
15    thereof  as  may  be  necessary  and remain unexpended at the
16    close of business on June 30, 2002, from  appropriations  and
17    reappropriations heretofore made for such purposes in Article
18    56, Section 12 and Article 56a, Section 2 of Public Act 92-8,
19    as  amended,  are reappropriated from the Capital Development
20    Fund to the Capital  Development  Board  for  the  Courts  of
21    Illinois for the projects hereinafter enumerated:

22                 MT. VERNON APPELLATE COURT BUILDING
23    (From Article 56a, Section 2 of Public Act 92-8, as amended)
24    For expanding the courthouse ................... $  1,531,730
25    For expanding the courthouse, in
26      addition to funds previously
27      appropriated .................................      792,000
28                SPRINGFIELD - SUPREME COURT BUILDING
29    For replacing the roof .........................      605,149
30    For renovating the HVAC system on
31      the 3rd Floor ................................      140,000
 
                           -20-                     BOB-CDB03
 1    For installing humidifier and water
 2      filtration systems ...........................    1,570,950
 3    For upgrading the library, in
 4      addition to funds previously appropriated ....       61,815
 5    For replacing plumbing system ..................      159,638
 6               APPELLATE COURT SECOND DISTRICT - ELGIN
 7    (From Article 56, Section 12 of Public Act 92-8)
 8    For miscellaneous improvements .................      539,784
 9        Total, Section 2                               $5,401,066

10        Section  2.1.  The  following  named  amounts, or so much
11    thereof as may be necessary  and  remain  unexpended  at  the
12    close  of  business  on  June 30, 2002, from reappropriations
13    heretofore made for such purposes in Article 56a, Section 2.1
14    of Public Act  92-8,  are  reappropriated  from  the  General
15    Revenue  Fund  to  the  Capital  Development  Board  for  the
16    projects hereinafter enumerated:

17                SUPREME COURT BUILDING - SPRINGFIELD
18    (From Article 56a, Section 2.1 of Public Act 92-8)
19    For tuckpointing and cleaning exterior .........       34,698
20        Total, Section 2.1                                $34,698

21        Section  2a.  The  following  named  amounts,  or so much
22    thereof as may be necessary  and  remain  unexpended  at  the
23    close  of  business on June 30, 2002, from appropriations and
24    reappropriations heretofore made in Article 56, Section  12.1
25    and   Article  56a,  Section  2a  of  Public  Act  92-8,  are
26    reappropriated from the Tobacco Settlement Recovery  Fund  to
27    the  Capital Development Board for the Courts of Illinois for
28    the projects hereinafter enumerated:

29                  APPELLATE COURT BUILDING - ELGIN
30    (From Article 56a, Section 2a of Public Act 92-8)
 
                           -21-                     BOB-CDB03
 1    For various improvements, in addition
 2      to funds previously appropriated ............. $     42,430
 3    For replacing S-2 air conditioning unit ........      159,386
 4               APPELLATE COURT THIRD DISTRICT - OTTAWA
 5    (From Article 56, Section 12.1 of Public Act 92-8)
 6    For tuckpointing, repairing the exterior
 7      and replacing the roof, in addition to
 8      funds previously appropriated ................      191,600
 9        Total, Section 2a                                $393,416

10        Section 3.  The  following  named  amounts,  or  so  much
11    thereof  as  may  be  necessary  and remain unexpended at the
12    close of business on June 30, 2002, from  appropriations  and
13    reappropriations  heretofore  made  in Article 56, Section 13
14    and Article 56a, Section 3 of Public Act 92-8,  approved  May
15    17,  2000,  are  reappropriated  from the Capital Development
16    Fund to the Capital Development Board for the Office  of  the
17    Secretary of State for the projects hereinafter enumerated:

18             WILLIAM G. STRATTON BUILDING - SPRINGFIELD
19    (From Article 56a, Section 3 of Public Act 92-8)
20    For replacing windows and tuckpointing ......... $  5,862,943
21                    CAPITOL COMPLEX - SPRINGFIELD
22    (From Article 56, Section 13 of Public Act 92-8)
23    For completing the stone restoration, in
24      addition to funds previously appropriated ....    3,000,000
25    (From Article 56a, Section 3 of Public Act 92-8)
26    For upgrading electrical lighting and replacing
27      ceilings - Stratton Office Building ..........    5,354,508
28    For replacing mechanical piping - Klein
29      and Mason Warehouse...........................       58,850
30    For renovating the exterior of the Capitol
31      and Howlett Buildings ........................      741,484
32    For demolition of 222 S. College,
 
                           -22-                     BOB-CDB03
 1      and landscaping of Capitol Complex
 2      in addition to funds previously
 3      appropriated .................................    1,200,000
 4    For demolition of 222 South College
 5      Building and landscaping of
 6      Capitol Complex ..............................    2,387,894
 7                   STATE POWER PLANT - SPRINGFIELD
 8    (From Article 56, Section 13 of Public Act 92-8)
 9    For installing new water service and
10      repairing power plant systems ................       80,000
11                              STATEWIDE
12    (From Article 56, Section 13 of Public Act 92-8)
13    For replacing windows at the following
14     locations at the approximate cost set
15     forth below ...................................    1,705,969
16      Lexington Avenue Motor
17       Vehicle Facility .....................583,000
18      Martin Luther King, Jr. Dr.
19       Motor Vehicle Facility ...............583,000
20      North Elston Motor
21       Vehicle Facility .....................584,000 ____________
22        Total, Section 3                              $20,391,648

23        Section  3.2.   The sum of $8,300,000, or so much thereof
24    as may be necessary, and remains unexpended at the  close  of
25    business  on June 30, 2002, from a reappropriation heretofore
26    made  in  Public  Act  92-8,  Article  56a,  Section  3.2  is
27    reappropriated from  the  Capital  Development  Fund  to  the
28    Capital  Development Board for the Office of the Secretary of
29    State to construct a parking garage.

30        Section 4.  The  following  named  amounts,  or  so  much
31    thereof  as  may  be  necessary  and remain unexpended at the
32    close of business on June 30, 2002, from  appropriations  and
 
                           -23-                     BOB-CDB03
 1    reappropriations heretofore made for such purposes in Article
 2    56,  Section 2 and Article 56a, Section 4 of Public Act 92-8,
 3    are reappropriated from the Capital Development Fund  to  the
 4    Capital  Development  Board  for  the  Department  of Central
 5    Management Services for the projects hereinafter enumerated:

 6                 JAMES R. THOMPSON CENTER - CHICAGO
 7    (From Article 56, Section 2 of Public Act 92-8)
 8    For upgrading mechanical systems, in
 9      addition to funds previously appropriated..... $  1,400,000
10    (From Article 56a, Section 4 of Public Act 92-8)
11    For upgrading mechanical systems ...............    1,403,062
12           MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO
13    For replacing roof and upgrading
14      mechanical and electrical systems ............    1,174,589
15                         PARIS STATE GARAGE
16    (From Article 56, Section 2 of Public Act 92-8)
17    For replacing the roof and improving
18     the exterior ..................................      380,000
19           PEORIA REGIONAL OFFICE BUILDING - PEORIA COUNTY
20    (From Article 56a, Section 4 of Public Act 92-8)
21    For rehabilitating the HVAC system .............      123,841
22                  ROCKFORD REGIONAL OFFICE BUILDING
23    For upgrading utilities ........................       80,000
24                      SPRINGFIELD STATE GARAGE
25    For renovating the interior of the
26      central garage ...............................      553,953
27            RESEARCH AND COLLECTION CENTER - SPRINGFIELD
28    For expanding surplus warehouse ................    3,043,289
29                   ELGIN REGIONAL OFFICE BUILDING
30    For replacing the utility system ...............      684,281
31          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
32                      ROOSEVELT ROAD - CHICAGO
33    For upgrading electrical systems ...............      898,048
 
                           -24-                     BOB-CDB03
 1    For converting and renovating tub rooms ........      221,816
 2    For upgrading the HVAC system ..................      152,189
 3               ILLINOIS CENTER FOR REHABILITATION AND
 4                     EDUCATION (WOOD) - CHICAGO
 5    For upgrading fire and safety systems ..........      320,350
 6                STATE OF ILLINOIS BUILDING - CHICAGO
 7    For restoring exterior and rebuilding
 8      foundation ...................................    1,540,901
 9           OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER
10    For planning and beginning the renovation
11      of the facility ..............................    1,952,304
12              SUBURBAN NORTH REGIONAL OFFICE BUILDING -
13                             DES PLAINES
14    (From Article 56, Section 2 of Public Act 92-8)
15    For planning and beginning
16      rehabilitation of the exterior and
17      upgrading the atrium .........................      400,000
18    (From Article 56a, Section 4 of Public Act 92-8)
19    For renovating offices for Environmental
20      Protection Agency, in addition to funds
21      previously appropriated ......................      428,471
22    For renovation of Suburban North Regional
23      Office Building (formerly Maine Township
24      North High School building), in addition
25      to funds previously appropriated for such
26      purpose, Phase III ...........................      102,803
27                         OTTAWA STATE GARAGE
28    For replacing state garage .....................    1,334,504
29                   COMPUTER FACILITY - SPRINGFIELD
30    For installing a cooling tower and fire alarm
31      system and various other improvements ........      397,846
32    For replacement of the halon fire
33      suppression system ...........................       18,598
34                        ASH STREET COMPLEX -
 
                           -25-                     BOB-CDB03
 1                   MUSEUM AND COLLECTION CENTER -
 2                             SPRINGFIELD
 3    For replacement of the roofing system ..........      167,781
 4                   MARION REGIONAL OFFICE BUILDING
 5    For replacing HVAC system and interior
 6      lighting .....................................      149,513
 7    For construction of a Regional Office
 8      Building Addition ............................      282,513
 9                SPRINGFIELD REGIONAL OFFICE BUILDING
10    For replacing the potable water system .........      483,924
11    For upgrading the parking lot ..................       56,063
12        Total, Section 4                              $17,750,639

13        Section 4.1.  The following named  amounts,  or  so  much
14    thereof  as  may  be  necessary  and remain unexpended at the
15    close of business on June  30,  2002,  from  reappropriations
16    heretofore made for such purposes in Article 56a, Section 4.1
17    of  Public  Act  91-8,  are  reappropriated  from the General
18    Revenue  Fund  to  the  Capital  Development  Board  for  the
19    Department of Central Management Services  for  the  projects
20    hereinafter enumerated:

21                 JAMES R. THOMPSON CENTER - CHICAGO
22    (From Article 56a, Section 4.1 of Public Act 92-8)
23    For restoring the exterior plaza ............... $     78,933
24           CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY
25    For rehabilitating exterior ....................      214,884
26                       CHICAGO MEDICAL CENTER
27          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
28    For rehabilitating the pool area ...............       98,956
29                STATE OF ILLINOIS BUILDING - CHICAGO
30    For restoring exterior limestone and
31      masonry ......................................      145,985
32        Total, Section 4.1                               $538,758
 
                           -26-                     BOB-CDB03
 1        Section  4a.  The  following  named  amounts,  or so much
 2    thereof as may be necessary  and  remain  unexpended  at  the
 3    close  of  business  on  June  30,  2002, from appropriations
 4    heretofore made for such purposes in Article 56, Section  2.1
 5    and  Article  56a,  Section  4a  of  Public  Act  92-8,   are
 6    reappropriated  from  the Tobacco Settlement Recovery Fund to
 7    the Capital Development Board for the Department  of  Central
 8    Management Services for the projects hereinafter enumerated:

 9                  CHICAGO-READ - MEMORIAL CEMETERY
10    (From Article 56a, Section 4a of Public Act 92-8)
11    For upgrading site ............................. $     92,177
12          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
13                     (ROOSEVELT ROAD) - CHICAGO
14    (From Article 56, Section 2.1 of Public Act 92-8)
15    For tuckpointing exterior ......................    1,027,900
16    (From Article 56a, Section 4a of Public Act 92-8)
17    For upgrading lighting & paging systems ........      125,000
18    For constructing a parking lot .................      457,846
19        Total, Section 4a                              $1,702,923

20        Section  5.  The  following  named  amounts,  or  so much
21    thereof as may be necessary  and  remain  unexpended  at  the
22    close  of  business on June 30, 2002, from appropriations and
23    reappropriations heretofore made for such purposes in Article
24    56, Section 8, and Article 56a, Section 5 of Public Act 92-8,
25    are reappropriated from the Capital Development Fund  to  the
26    Capital  Development  Board  for  the  Department  of Natural
27    Resources for the projects hereinafter enumerated:

28                 BABE WOODYARD STATE NATURAL AREA -
29                          VERMILION COUNTY
30    (From Article 56a, Section 5 of Public Act 92-8)
31    For developing the site and associated
 
                           -27-                     BOB-CDB03
 1      land acquisition ............................. $  2,820,959
 2               BEAVER DAM STATE PARK - MACOUPIN COUNTY
 3    (From Article 56, Section 8 of Public Act 92-8)
 4    For replacing the sewage system ................      665,000
 5    (From Article 56a, Section 5 of Public Act 92-8)
 6    For rehabilitating dams, spillway, and
 7      boat access facilities .......................      369,611
 8                      CARLYLE LAKE STATE PARKS
 9    For cabin construction and site
10      improvements at Eldon
11      Hazlet State Park, Phase II ..................    1,395,470
12    For road and site improvements at
13      Carlyle Lake .................................    1,500,000
14    For infrastructure and site
15      improvements at Carlyle Lake .................    2,617,312
16                CASTLE ROCK STATE PARK - OGLE COUNTY
17    (From Article 56, Section 8 of Public Act 92-8)
18    For rehabilitating the scenic
19      overlook and water system ....................    1,776,901
20    (From Article 56a, Section 5 of Public Act 92-8)
21    For replacing maintenance building .............      279,011
22             CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
23    For upgrading sewage treatment system ..........      990,847
24    For construction of a concession building
25      and upgrading the horse concession, in
26      addition to funds previously appropriated ....       18,554
27              ELDON HAZLET STATE PARK - CLINTON COUNTY
28    (From Article 56, Section 8 of Public Act 92-8)
29    For replacing the main waterline ...............      536,231
30               FORT MASSAC STATE PARK - MASSAC COUNTY
31    (From Article 56a, Section 5 of Public Act 92-8)
32    For reconstructing the fort ....................    4,116,053
33                     GEOLOGICAL SURVEY-CHAMPAIGN
34    For constructing two pole
 
                           -28-                     BOB-CDB03
 1      storage buildings ............................      290,961
 2          HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
 3    For rehabilitating aqueducts
 4      #3, #4 and #8 ................................      713,581
 5    For stabilizing the feeder canal bank ..........       44,484
 6    For replacement and rehabilitation
 7      of arch culverts and canal ...................       62,483
 8         HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
 9    For dam rehabilitation and the State's share
10      to implement the ecological restoration
11      plan in cooperation with the U.S.
12      Army Corps of Engineers, and
13      land acquisition .............................      858,655
14    For construction of a pole building
15      and hunter check station .....................       41,284
16               ILLINOIS BEACH STATE PARK - LAKE COUNTY
17    For replacing sanitary sewer line ..............      545,300
18    For rehabilitating lodge entrance ..............       18,422
19    For constructing an office building ............       20,966
20    For replacing sanitary sewer lines .............      457,978
21            JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
22    For upgrading campground electrical ............       35,380
23    For rehabilitation of the concession
24      building, in addition to funds
25      previously appropriated ......................       62,818
26    For rehabilitation of the concession building ..       23,314
27         KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES
28    For constructing sanitary sewer system, in
29      addition to funds previously appropriated ....    5,000,000
30                KANKAKEE STATE PARK - KANKAKEE COUNTY
31    For planning and constructing a
32      sanitary sewer system ........................       80,854
33                KASKASKIA RIVER FISH & WILDLIFE AREA
34    For providing electrical service ...............       44,123
 
                           -29-                     BOB-CDB03
 1               KICKAPOO STATE PARK - VERMILION COUNTY
 2    For rehabilitating the water
 3      system and day-use areas .....................      978,520
 4           LAKE LE-AQUA-NA STATE PARK - STEPHENSON COUNTY
 5    For replacing sewage treatment plant ...........      359,672
 6            LAKE MURPHYSBORO STATE PARK - JACKSON COUNTY
 7    For replacing the district office
 8      building .....................................      471,352
 9         LINCOLN TRAIL STATE RECREATION AREA - CLARK COUNTY
10    For renovating the concession
11      building .....................................      765,125
12    For upgrading campground electrical
13      and drainage .................................      460,000
14    For rehabilitating the day use area
15      and site .....................................    1,163,909
16           LITTLE GRASSY FISH HATCHERY - WILLIAMSON COUNTY
17    For improving drainage discharge ...............       98,702
18                   MASON STATE FOREST TREE NURSERY
19    For expanding the cold storage facility ........      579,424
20    For expanding the seed cleaning facility .......      662,000
21            MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
22    For rehabilitating levee and well, in
23      addition to funds previously appropriated ....      266,028
24              MORAINE HILLS STATE PARK - MCHENRY COUNTY
25    For renovation of the trail ....................       86,975
26    For replacement of restrooms and upgrading
27      the water system .............................       82,922
28               MORAINE VIEW STATE PARK - MCLEAN COUNTY
29    (From Article 56, Section 8 of Public Act 92-8)
30    For upgrading the water plant ..................      180,000
31                    MORRISON-ROCKWOOD STATE PARK
32    (From Article 56a, Section 5 of Public Act 92-8)
33    For improving the water system and
34      rehabilitating the campground water ..........      406,998
 
                           -30-                     BOB-CDB03
 1                   NATURAL HISTORY SURVEY - HAVANA
 2    For renovating Forbes Biological Station .......      451,366
 3                  NORTH POINT MARINA - LAKE COUNTY
 4    For construction of a breakwater structure .....    1,012,492
 5              PERE MARQUETTE STATE PARK - JERSEY COUNTY
 6    (From Article 56, Section 8 of Public Act 92-8)
 7    For upgrading youth camp sewer system ..........      140,000
 8    (From Article 56a, Section 5 of Public Act 92-8)
 9                PRAIRIE RIDGE SANCTUARY NATURAL AREA
10    For replacing the Service & Hazardous
11      Materials buildings and installing a fuel
12      tank .........................................      304,944
13             RESEARCH & COLLECTIONS CENTER - SPRINGFIELD
14    For renovating the interior ....................      991,000
15               ROCK CUT STATE PARK - WINNEBAGO COUNTY
16    For upgrading the sewage system ................    2,039,178
17                  NEW OFFICE BUILDING - SPRINGFIELD
18    For completing construction of an
19      office building, in addition to funds
20      previously appropriated ......................    1,339,287
21           SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY
22    For planning and beginning renovation
23      of hatchery ..................................      341,468
24                             SPRINGFIELD
25    For constructing an office building and
26      interpretive center ..........................    4,120,470
27              STARVED ROCK STATE PARK - LASALLE COUNTY
28    For construction of a visitors center, in
29      addition to funds previously appropriated ....      607,975
30    For rehabilitating the sewer system ............      357,431
31    For rehabilitating trails, in addition
32      to funds previously appropriated .............       30,205
33    For upgrading the HVAC system ..................       45,831
34              SOUTHERN ILLINOIS MINING OFFICE - BENTON
 
                           -31-                     BOB-CDB03
 1    (From Article 56, Section 8 of Public Act 92-8)
 2    For rehabilitating the facility ................      150,000
 3         STARVED ROCK STATE PARK AND LODGE - LASALLE COUNTY
 4    For upgrading water and sewer systems ..........      600,000
 5                 WASTE MANAGEMENT & RESEARCH CENTER
 6    (From Article 56a, Section 5 of Public Act 92-8)
 7    For constructing a garage and
 8      storage area .................................      385,838
 9             WHITE PINES FOREST STATE PARK - OGLE COUNTY
10    For planning and beginning lodge and cabin
11      restoration ..................................      109,108
12                        WILDLIFE PRAIRIE PARK
13    For planning and beginning the upgrade
14      of the park ..................................      403,803
15        WILLIAM W. POWERS FISH & WILDLIFE AREA - COOK COUNTY
16    (From Article 56, Section 8 of Public Act 92-8)
17    For replacing sanitary sewer lines and
18      lift station .................................      870,550
19             TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
20    (From Article 56a, Section 5 of Public Act 92-8)
21    For constructing a visitor center and
22      purchasing land ..............................      982,217
23      NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
24                     (FORMERLY BURNHAM HOSPITAL)
25    For construction of a Natural History
26      Research Center for the space needs of
27      the Illinois Natural History Survey on
28      the campus of the University of Illinois......    6,000,000
29    For planning and construction of the
30      Natural History Research Center
31      for the space needs of the
32      Illinois Natural History Survey
33      on the campus of the University
34      of Illinois in Champaign .....................    2,103,800
 
                           -32-                     BOB-CDB03
 1                   STATE WATER SURVEY - CHAMPAIGN
 2    For constructing a vehicle maintenance
 3      and shop building ............................    3,532,499
 4    For upgrading and replacing the mechanical
 5      system, in addition to funds
 6      previously appropriated ......................    2,081,198
 7      STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
 8    For the completion of site improvements ........      190,582
 9                     STATE MUSEUM - SPRINGFIELD
10    (From Article 56, Section 8 of Public Act 92-8)
11    Plan, begin construction of Illinois
12      State Museum .................................    3,600,000
13    (From Article 56a, Section 5 of Public Act 92-8)
14    For renovating or replacing exhibits, in
15      addition to funds previously appropriated ....    4,733,794
16    For planning and replacement of the main
17      museum exhibits, in addition to funds
18      previously appropriated ......................       99,729
19                              STATEWIDE
20    (From Article 56, Section 8 of Public Act 92-8)
21    For constructing, replacing and
22      renovating lodges and concession
23      buildings ....................................    6,624,000
24    For replacing roofs at the following locations,
25     at the approximate cost set forth below .......      525,000
26      Shabbona Lake State
27       Park .................................155,000
28      Hennepin Canal Parkway
29       State Park ...........................115,000
30      Randolph Fish &
31       Wildlife Area .........................65,000
32      Dixon Springs State
33       Park .................................190,000
34    (From Article 56a, Section 5 of Public Act 92-8)
 
                           -33-                     BOB-CDB03
 1    For fabrication of visitors centers
 2      exhibit ......................................      427,060
 3    For replacing and constructing vault
 4      toilets at the following locations,
 5      at the approximate cost set forth
 6      below ........................................    1,749,122
 7       Wayne Fitzgerrell State Park .........410,000
 8       Goose Lake Prairie State Park .........64,122
 9       Wolf Creek State Park ................800,000
10       Hennepin Canal Parkway
11       State Trail ..........................425,000
12       Kaskaskia River Fish &
13       Wildlife Area .........................50,000
14       For providing dump stations..................      200,000
15    For rehabilitating bridges at the
16      following locations, at the approximate
17      cost set forth below .........................      693,806
18       Rock Island Trail ....................341,806
19       Frank Holten State Park ..............260,000
20       Horseshoe Lake State Park .............67,000
21       Castle Rock State Park ................25,000
22    For rehabilitating dams at the
23      following locations, at the
24      approximate cost set forth below .............    1,032,662
25       Ramsey Lake State Park ...............176,662
26       Rock Cut State Park ..................450,000
27       Snakeden Hollow State Park ...........406,000
28    For replacing roofs at the following
29      locations, at the approximate
30      cost set forth below .........................    1,129,384
31       Southern IL Arts &
32        Crafts Center .......................272,384
33       Frank Holten State Park ...............45,000
34       DNR Geological Survey-
 
                           -34-                     BOB-CDB03
 1        Champaign ...........................124,000
 2       Sangchris Lake State
 3        Park ..................................5,000
 4       Illini State Park ....................125,000
 5       Shelbyville Fish &
 6        Wildlife Area .......................100,000
 7       Trail of Tears State
 8        Forest ..............................130,000
 9       Sanganois Conservation Area ...........35,000
10       Rice Lake State Park ..................75,000
11       Hidden Spring State Park ..............60,000
12       Siloam Springs State Park .............10,000
13       Mississippi Palisades
14        State Park ..........................148,000
15    For replacing roofing systems at the
16      following locations, at the approximate
17      cost set forth below .........................      433,532
18        Beall Woods Conservation Area -
19         Wabash County ........................3,000
20        Eldon Hazlet State Park -
21         Clinton County ......................14,000
22        Fox Ridge State Park -
23         Coles County ........................21,532
24        Giant City State Park -
25         Jackson/Union Counties ..............14,000
26        Goose Lake Prairie State Park -
27         Grundy County .......................10,000
28        Hennepin Canal Parkway State Trail ...45,000
29        Illinois Beach State Park -
30         Lake County ........................150,000
31        Illinois Caverns Natural Area -
32         Monroe County .......................21,000
33        Kankakee River State Park -
34         Kankakee/Will Counties ..............40,000
 
                           -35-                     BOB-CDB03
 1        Moraine Hills State Park -
 2         McHenry County ......................23,000
 3        Moraine View State Park -
 4         McLean County.........................4,000
 5        Ramsey Lake State Park -
 6         Fayette County .......................1,000
 7        Randolph County Conservation Area ....10,000
 8        Stephen A. Forbes State Park -
 9         Marion County ........................7,000
10        Ten Mile Creek State Fish &
11         Wildlife Area - Jefferson/
12         Hamilton Counties....................21,000
13        Union County Conservation Area ........4,000
14        Washington County Conservation Area ..10,000
15        William W. Powers Conservation Area -
16         Cook County .........................34,000
17        Wolf Creek State Park -
18         Shelby County ........................1,000
19    For replacing vault toilets at the following
20      locations, at the approximate cost set forth
21      below ........................................      446,441
22        Anderson Lake Conservation Area -
23         Fulton/Schuyler Counties ...........156,000
24        Giant City State Park -
25         Jackson/Union Counties .............196,068
26        Randolph County Conservation Area ....82,158
27        Silver Springs State Park -
28          Kendall County .....................12,215
29    For replacing roofing systems at the
30      following locations at the approximate
31      costs set forth below ........................       38,824
32        Silver Springs State Park, Three
33         Buildings .......................... 33,679
34        Weldon Springs State Park, Nine
 
                           -36-                     BOB-CDB03
 1         Buildings ........................... 5,145
 2    For constructing vault toilets at the following
 3      locations at the approximate costs set forth
 4      below ........................................      229,441
 5        Cave-In-Rock State Park ............. 94,265
 6        Golconda/Rauchfuss Hill ............. 72,360
 7        Prophetstown State Park ............. 53,437
 8        William W. Powers State Park ......... 9,379
 9    For constructing hazardous material storage
10      buildings ....................................      200,964
11    For replacing concession buildings and
12      upgrading support facilities at the following
13      locations at the approximate costs set
14      forth below: .................................      456,612
15       Kickapoo State Park ..................319,890
16       Rock Cut State Park ..................114,900
17       Stephen A. Forbes State Park ..........21,822
18    For constructing vault toilets at the
19      following locations at the approximate
20      cost set forth below: ........................      501,126
21       Apple River Canyon State Park ........221,246
22       Des Plaines Conservation Area .........66,000
23       Kankakee River State Park .............31,780
24       Lake Le-Aqua-Na State Park ...........115,000
25       Marshall County Conservation Area .....30,000
26       Morrison-Rockwood State Park .............100
27       Rice Lake Conservation Area ...........37,000
28    For replacing roofing systems and structural
29      repairs at the following locations at the
30      approximate costs set forth below: ...........       33,338
31       Mine Rescue Station, One building ......7,234
32       Castle Rock State Park,
33        One building ..........................2,000
34       Dixon Springs State Park,
 
                           -37-                     BOB-CDB03
 1        Three buildings .......................1,060
 2       Cave-In-Rock State Park,
 3        One building ..........................1,060
 4       Ferne Clyffe State Park,
 5        One building ..........................1,060
 6       Hamilton County Conservation
 7        Area, One building ...................15,000
 8       Lake Murphysboro State Park
 9        Two buildings .........................1,060
10       Red Hills State Park, Two
11        buildings .............................1,060
12       Fox Ridge State Park, Six
13        buildings .............................1,060
14       Shelbyville Fish and Wildlife
15        Area, Two buildings ...................1,060
16       Newton Lake Fish and Wildlife
17        Area, One building ....................1,684
18    For repair or replacement of roofs and
19      parapet walls and reconstruction of
20      chimneys at the following locations
21      at the approximate costs set forth below .....      509,923
22       Geological Survey - Applied Lab ......186,375
23       Water Survey - Eight Buildings ........46,000
24       Natural History Survey - Natural
25        Resources Studies Annex ..............67,000
26       Geological Survey - Natural
27        Resources Building ...................64,000
28       Water Survey - Parapet walls at
29        Buildings No. 4, 5 and 6 .............10,000
30       Dickson Mounds - Exterior restroom
31        and picnic shelter ...................14,530
32       Jake Wolf Fish Hatchery ..............122,018
33    For land acquisition ...........................      280,169
34    For construction of hazardous material
 
                           -38-                     BOB-CDB03
 1      storage buildings ............................       66,293
 2    For planning, construction, reconstruction,
 3      land acquisition and related costs,
 4      utilities, site improvements, and all other
 5      expenses necessary for various capital
 6      improvements at parks, conservation areas,
 7      and other facilities under the jurisdiction
 8      of the Department of Natural Resources .......    2,122,014
 9        Total, Section 5                              $87,272,655

10        Section 5.1.  The sum of $3,000,000, or so  much  thereof
11    as  may  be necessary, and remains unexpended at the close of
12    business on June 30, 2002, from a reappropriation  heretofore
13    made  in  Article  56a,  Section  5.1  of Public Act 92-8, as
14    amended, is reappropriated from the Capital Development  Fund
15    to  the  Capital Development Board for a grant to the City of
16    Chicago  for   acquiring   land,   planning   and   beginning
17    construction of a visitor center at Lake Calumet.

18        Section  5.2.  The  following  named  amounts, or so much
19    thereof as  may  be  necessary  and  remain  unexpended  from
20    reappropriations heretofore made for such purposes in Article
21    56a,  Section 5.2 of Public Act 92-8, are reappropriated from
22    the General Revenue Fund to the Capital Development Board for
23    the  Department  of  Natural  Resources  for   the   projects
24    hereinafter enumerated:

25    (From Article 56a, Section 5.2 of Public Act 92-8)
26                  DICKSON MOUNDS MUSEUM - LEWISTOWN
27    For planning and beginning repair of
28      exterior walls ............................... $     25,098
29                 FOX RIDGE STATE PARK - COLES COUNTY
30    For rehabilitating historic structures .........      194,865
31             HENNEPIN CANAL PARKWAY - ROCK ISLAND COUNTY
 
                           -39-                     BOB-CDB03
 1    For rehabilitating Aqueduct #6 .................       80,011
 2               SPRING GROVE HATCHERY - MCHENRY COUNTY
 3    For upgrading the septic system ................       30,000
 4                              STATEWIDE
 5    For rehabilitating or replacing
 6      playground equipment .........................      139,232
 7    For rehabilitating or replacing playground
 8      equipment ....................................       69,624
 9    For rehabilitation of trail systems ............       73,019
10        Total, Section 5.2                               $611,849

11        Section  5.3.  The sum of $200,000, or so much thereof as
12    may be necessary and  remains  unexpended  at  the  close  of
13    business  on June 30, 2002, from a reappropriation heretofore
14    made in Article 56a, Section  5.3  of  Public  Act  92-8,  is
15    reappropriated  from  the  Capital  Development  Fund  to the
16    Capital Development Board for a grant to the City of  Carlyle
17    for development of a health center in association with resort
18    development at Carlyle Lake.

19        Section  5a.  The  following  named  amounts,  or so much
20    thereof as may be necessary  and  remain  unexpended  at  the
21    close  of  business  on  June  30,  2002, from appropriations
22    heretofore made for such purposes in Article 56, Section  8.1
23    and  Article  56a,  Section  5a  of  Public  Act  92-8,   are
24    reappropriated  from  the Tobacco Settlement Recovery Fund to
25    the Capital Development Board for the Department  of  Natural
26    Resources for the projects hereinafter enumerated:

27                          STATEWIDE PROGRAM
28    (From Article 56, Section 8.1 of Public Act 92-8)
29    For maintaining lodge and concession
30      facilities ................................... $    450,022
31    (From Article 56a, Section 5a of Public Act 92-8)
 
                           -40-                     BOB-CDB03
 1    For maintaining lodge
 2      and concession facilities ....................       79,486
 3    For rehabilitating or
 4      replacing playground equipment ...............    1,120,000
 5    For land acquisition
 6      relocation costs .............................      100,000
 7    For nature preserve
 8      boundary fence and survey ....................      405,000
 9                  DICKSON MOUNDS MUSEUM - LEWISTOWN
10    For renovating  E. Waterford School ............      562,520
11                 GRUBB HOLLOW PRAIRIE - PIKE COUNTY
12    For constructing a parking lot &
13      kiosk and developing trails ..................       10,000
14               ILLINOIS BEACH STATE PARK - LAKE COUNTY
15    (From Article 56, Section 8.1 of Public Act 92-8)
16    For stabilizing the shoreline ..................      400,000
17    (From Article 56a, Section 5a of Public Act 92-8)
18    For stabilizing the shoreline ..................       60,931
19                KASKASKIA BIO STATION-MOULTRIE COUNTY
20    For renovating buildings .......................      684,600
21       KASKASKIA RIVER FISH & WILDLIFE AREA - RANDOLPH COUNTY
22    For providing boat access
23      safety improvements ..........................      210,000
24            LASALLE FISH & WILDLIFE AREA - LASALLE COUNTY
25    For upgrading fish-holding
26      and water systems ............................      262,157
27           LITTLE GRASSY FISH HATCHERY - WILLIAMSON COUNTY
28    For replacing fish collection kettles ..........      107,066
29                 NAUVOO STATE PARK - HANCOCK COUNTY
30    For renovating the Reinberger Museum ...........      205,300
31                PRAIRIE RIDGE SANCTUARY NATURAL AREA
32    For upgrading electrical
33      and providing insulation .....................      112,346
34               RAMSEY LAKE STATE PARK - FAYETTE COUNTY
 
                           -41-                     BOB-CDB03
 1    For replacing fjords ...........................      150,000
 2      REAVIS SPRING HILL PRAIRIE NATURE PRESERVE - MASON COUNTY
 3    For developing natural resources
 4      protection ...................................       50,000
 5                 JAMES R. THOMPSON CENTER - CHICAGO
 6    For renovating the art gallery .................      416,017
 7           WAYNE FITZGERRELL STATE PARK - JEFFERSON COUNTY
 8    (From Article 56, Section 8.1 of Public Act 92-8)
 9    For stabilizing the watershed shoreline ........      671,945
10        Total, Section 5a                              $6,057,390

11        Section  6.  The  following  named  amounts,  or  so much
12    thereof as may be necessary  and  remain  unexpended  at  the
13    close  of  business on June 30, 2002, from appropriations and
14    reappropriations heretofore made for such purposes in Article
15    56, Section 3, and Article 56a, Section 6 of Public Act 92-8,
16    as amended, are reappropriated from the  Capital  Development
17    Fund  to  the Capital Development Board for the Department of
18    Corrections for the projects hereinafter enumerated:

19                    CENTRALIA CORRECTIONAL CENTER
20    (From Article 56, Section 3 of Public Act 92-8)
21    For planning upgrade of electrical system ...... $    200,000
22    For upgrading building automation system .......    1,100,000
23                    DANVILLE CORRECTIONAL CENTER
24    For planning upgrade of the boilers ............      244,800
25                 DECATUR WOMEN'S CORRECTIONAL CENTER
26    (From Article 56a, Section 6 of Public Act 92-8)
27    For the planning and conversion of
28      Meyer Mental Health Center into a
29      correctional facility ........................       67,403
30                      DIXON CORRECTIONAL CENTER
31    (From Article 56, Section 3 of Public Act 92-8)
32    For planning the upgrade and expansion
 
                           -42-                     BOB-CDB03
 1      of the medical care facility .................    1,200,000
 2    (From Article 56a, Section 6 of Public Act 92-8)
 3    For constructing a gun range and
 4      classroom building ...........................      426,687
 5                     DWIGHT CORRECTIONAL CENTER
 6    For renovating C9 and Old Hospital .............    3,701,200
 7    For renovating Housing Unit C8, in
 8      addition to funds previously
 9      appropriated .................................      270,000
10    For upgrading the water treatment plant ........      279,806
11    For renovating buildings, in addition
12      to funds previously appropriated .............      274,847
13    For constructing a gatehouse and
14      sally port and upgrading the
15      security system ..............................      218,523
16    For renovation of buildings ....................       32,161
17                   EAST MOLINE CORRECTIONAL CENTER
18    (From Article 56, Section 3 of Public Act 92-8)
19    For replacing windows ..........................      605,000
20    (From Article 56a, Section 6 of Public Act 92-8)
21    For replacing the chiller/absorber .............      387,700
22    For upgrading fire alarm and building
23      automation systems ...........................      477,795
24    For upgrading the electrical
25      system .......................................      778,354
26                        HANNA CITY WORK CAMP
27    For upgrading electrical system ................       70,719
28                     GRAHAM CORRECTIONAL CENTER
29    (From Article 56, Section 3 of Public Act 92-8)
30    For planning upgrade of building automation
31      system and fire alarm system .................      200,000
32    For upgrading electrical system ................    1,974,296
33                HILL CORRECTIONAL CENTER - GALESBURG
34    (From Article 56a, Section 6 of Public Act 92-8)
 
                           -43-                     BOB-CDB03
 1    For upgrading electrical system ................      121,791
 2                            HOPKINS PARK
 3    For infrastructure improvements
 4      in connection with the Hopkins Park
 5      Correctional Center ..........................    8,176,670
 6             ILLINOIS RIVER CORRECTIONAL CENTER - CANTON
 7    For replacing warehouse freezers ...............      139,969
 8           ILLINOIS YOUTH CENTER - KEWANEE - HENRY COUNTY
 9    For constructing a 60-bed inmate
10      housing addition .............................    3,939,770
11                 ILLINOIS YOUTH CENTER - ST. CHARLES
12    For constructing an R & C building
13      and other improvements .......................   33,642,017
14    For upgrading plumbing system and replacing
15      toilets and sinks ............................      403,117
16    For planning and beginning the upgrade
17      of existing facility .........................      268,643
18                 ILLINOIS YOUTH CENTER - HARRISBURG
19    (From Article 56, Section 3 of Public Act 92-8)
20    For constructing a multi-purpose medical,
21      vocational and confinement building ..........   10,250,000
22    (From Article 56a, Section 6 of Public Act 92-8)
23    For upgrading mechanical control system ........      161,127
24                   ILLINOIS YOUTH CENTER - JOLIET
25    (From Article 56, Section 3 of Public Act 92-8)
26    For replacing rooftop units at
27      Administration Building ......................      195,000
28                  ILLINOIS YOUTH CENTER - RUSHVILLE
29    (From Article 56a, Section 6 of Public Act 92-8)
30    For planning, design, construction, equipment
31      and all other necessary costs to add
32      a cellhouse ..................................   12,077,980
33                 ILLINOIS YOUTH CENTER - VALLEY VIEW
34    For replacing boilers, controls, hot
 
                           -44-                     BOB-CDB03
 1      water heaters and softeners in
 2      residential units and administration
 3      building .....................................      203,038
 4                 ILLINOIS YOUTH CENTER - WARRENVILLE
 5    (From Article 56, Section 3 of Public Act 92-8)
 6    For upgrading site utilities ...................      345,000
 7    (From Article 56a, Section 6 of Public Act 92-8)
 8    For rehabilitation of the administration
 9      building .....................................      742,084
10                     JOLIET CORRECTIONAL CENTER
11    (From Article 56, Section 3 of Public Act 92-8)
12    For replacing the transfer switch and
13      emergency generator ..........................      980,000
14    (From Article 56a, Section 6 of Public Act 92-8)
15    For correcting erosion and
16      stabilizing the masonry wall .................      398,354
17         LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE
18    For constructing two cellhouses, in
19      addition to funds previously appropriated ....      760,820
20                     LINCOLN CORRECTIONAL CENTER
21    (From Article 56, Section 3 of Public Act 92-8)
22    For replacing water supply lines ...............    1,121,300
23                      LOGAN CORRECTIONAL CENTER
24    (From Article 56a, Section 6 of Public Act 92-8)
25    For constructing a medical building
26      and dietary building .........................   10,989,246
27                MENARD CORRECTIONAL CENTER - CHESTER
28    (From Article 56, Section 3 of Public Act 92-8)
29    For replacing the Administration
30      Building .....................................    1,000,000
31    For replacing the sally port ...................      925,000
32    (From Article 56a, Section 6 of Public Act 92-8)
33    For stabilizing dam, in addition to funds
34      previously appropriated ......................      462,231
 
                           -45-                     BOB-CDB03
 1    For correcting slope failure & MSU
 2      improvements .................................      446,365
 3    For upgrading electrical distribution
 4      system .......................................    1,869,755
 5    For replacing the HVAC system ..................      457,493
 6    For improving ventilation and dehumidification
 7      systems in the kitchen and dining rooms ......       95,303
 8    For replacing shower room and guard tower ......      102,641
 9    For upgrading mechanical bar screen and storm
10      and sanitary sewer system ....................      215,550
11    For completing upgrade of North Cellhouse
12      plumbing system, in addition to funds
13      previously appropriated ......................      207,248
14    For replacing toilets and waste lines
15      at E/W Cellhouse and upgrade
16      North Cellhouse plumbing .....................      442,832
17    For renovation or replacement of the
18      Old Hospital Building, in addition to
19      funds previously appropriated ................    2,819,184
20    For replacing Boiler #2, in addition
21      to funds previously appropriated .............       19,450
22    For replacement of the chimney stack and
23      boilers, in addition to funds previously
24      appropriated .................................       87,501
25    For planning and construction of the
26      Administration Building ......................    1,200,000
27                     PONTIAC CORRECTIONAL CENTER
28    For expanding the main sally port ..............      400,000
29    For renovating the exterior of North/
30      South Cellhouses .............................      552,172
31    For completing replacement of hot water
32      lines, in addition to funds previously
33      appropriated .................................      565,233
34    For renovation of main sally port ..............      270,405
 
                           -46-                     BOB-CDB03
 1                    SHERIDAN CORRECTIONAL CENTER
 2    (From Article 56, Section 3 of Public Act 92-8)
 3    For upgrading electrical system and
 4      installing a generator .......................      905,000
 5    (From Article 56a, Section 6 of Public Act 92-8)
 6    For upgrading the storm sewers .................      103,661
 7    For replacing doors and locks ..................      145,936
 8                  SOUTHWESTERN CORRECTIONAL CENTER
 9    (From Article 56, Section 3 of Public Act 92-8)
10    For replacing sewer lines ......................      398,084
11               STATEVILLE CORRECTIONAL CENTER - JOLIET
12    For replacing windows in Cellhouse B,
13      in addition to funds previously
14      appropriated .................................    2,500,000
15    (From Article 56a, Section 6 of Public Act 92-8)
16    For planning and beginning renovation of
17      H & I houses .................................      402,088
18    For replacing the water line ...................    3,220,795
19    For upgrading electrical system in
20      "B" House ....................................    1,428,300
21    For constructing a housing unit, cellhouse,
22      vehicle maintenance building and
23      warehouse for the reception and
24      classification center, in addition to
25      funds previously appropriated ................    4,873,743
26    For replacing windows in B House ...............    2,876,644
27    For replacing cell fronts in F House ...........      941,480
28    For upgrading plumbing system in F House,
29      in addition to funds previously
30      appropriated .................................    3,497,820
31    For replacing power plant and
32      utility distribution system ..................    4,739,578
33    For planning, design, construction,
34      equipment and all other necessary costs
 
                           -47-                     BOB-CDB03
 1      for an Adult Reception and Classification
 2      Center .......................................   16,817,412
 3    For upgrading storm drainage and
 4      wastewater systems ...........................    1,088,016
 5    For upgrading electrical system and elevator
 6      and installing HVAC system ...................    1,179,600
 7                   TAYLORVILLE CORRECTIONAL CENTER
 8    For upgrading shower ventilation system ........       20,085
 9                     THOMSON CORRECTIONAL CENTER
10    For constructing three cellhouses and
11      expanding educational and vocational
12      space, in addition to funds previously
13      appropriated .................................   10,786,381
14                    VANDALIA CORRECTIONAL CENTER
15    For constructing a multi-purpose program
16      building .....................................      358,528
17    For converting Administration Building and
18      planning construction of an Administration/
19      Health Care Unit .............................      455,520
20    For upgrading the primary water
21      distribution system ..........................      383,142
22    For planning and beginning construction
23      for a slaughter house and meat plant .........      253,995
24    For repairing exterior masonry, in addition
25      to funds previously appropriated .............      229,502
26                     VIENNA CORRECTIONAL CENTER
27    (From Article 56, Section 3 of Public Act 92-8)
28    For upgrading the HVAC system and replacing
29      water lines in six housing units .............    1,770,018
30    (From Article 56a, Section 6 of Public Act 92-8)
31    For replacing windows, in addition to
32      funds previously appropriated ................      236,201
33    For completing upgrade of the steam
34      distribution system, in addition to
 
                           -48-                     BOB-CDB03
 1      funds previously appropriated ................      216,179
 2    For upgrading electrical system and
 3      installing emergency generator ...............       51,270
 4    For renovating the kitchen .....................      350,157
 5    For upgrading the steam distribution system
 6      and renovation of Powerhouse, in addition
 7      to funds previously appropriated .............      131,139
 8    For upgrading air conditioning system
 9      and replacement of cooling tower .............      109,384
10         WESTERN ILLINOIS CORRECTIONAL CENTER - MT. STERLING
11    For replacing warehouse freezers ...............      146,900
12                              STATEWIDE
13    (From Article 56, Section 3 of Public Act 92-8)
14    For replacing doors and locks
15      at the following locations at the
16      approximate costs set forth below ............    4,091,162
17       Dixon Correctional Center ..........1,300,000
18       Hill Correctional Center .............500,000
19       Sheridan Correctional Center .......1,300,000
20       Vienna Correctional Center ...........991,162
21    For replacing roofing systems at
22      the following locations at the
23      approximate cost set forth below .............      690,000
24       Illinois Youth Center -
25        St. Charles .........................100,000
26       Illinois Youth Center -
27       Warrenville ..........................330,000
28       Logan Correctional Center ............260,000
29    For upgrading showers at the following
30      locations at the approximate
31      cost set forth below .........................    3,233,800
32       Hill Correctional
33        Center ............................1,140,000
34       Illinois River Correctional
 
                           -49-                     BOB-CDB03
 1        Center ..............................635,000
 2       Taylorville Correctional
 3        Center ..............................823,800
 4       Western Illinois Correctional
 5        Center ..............................635,000
 6    For upgrading water distribution systems at
 7      the following locations at the approximate
 8      cost set forth below .........................    2,950,503
 9       Dixon Correctional
10        Center ............................1,500,000
11       Joliet Correctional
12        Center ............................1,450,503
13    For upgrading water towers at the following
14      locations at the approximate
15      cost set forth below .........................    4,400,000
16       Dixon Correctional
17        Center ............................2,800,000
18       Illinois Youth Center -
19        St. Charles .......................1,300,000
20       Illinois Youth Center -
21        Valley View .........................300,000
22    (From Article 56a, Section 6 of Public Act 92-8)
23    For planning, design, construction, equipment
24      and all other necessary costs for a
25      maximum security facility ....................  126,120,700
26    For planning a medium security facility
27      and land acquisition .........................    4,583,534
28    For replacing locks and control panels
29      at the following locations at the
30      approximate costs set forth below ............    2,509,381
31       Illinois River
32        Correctional Center .................850,000
33       Western Illinois
34        Correctional Center .................850,000
 
                           -50-                     BOB-CDB03
 1       Danville Correctional
 2        Center ..............................809,381
 3    For replacing roofing systems at
 4      the following locations at the
 5      approximate cost set forth below .............    1,453,783
 6       Menard Correctional Center ...........157,883
 7       Vienna Correctional Center ............81,100
 8       Illinois Youth Center -
 9        Harrisburg ...........................43,800
10       Dixon Correctional Center ............500,000
11       Pontiac Correctional Center ..........440,000
12       Illinois Youth Center - Joliet .......231,000
13    For replacing or upgrading security and
14      monitoring systems at the following
15      locations at the approximate cost set
16      forth below ..................................      478,706
17       Vienna Correctional
18        Center ..............................250,000
19       Pontiac Correctional
20        Center ..............................200,000
21       Joliet Correctional
22        Center ...............................28,706
23    For planning and replacing windows at the
24      following locations at the approximate cost
25      set forth below ..............................    2,993,234
26       Vienna Correctional
27        Center ............................1,780,000
28       Sheridan Correctional
29        Center ..............................399,959
30       Illinois Youth Center -
31        Valley View .........................500,000
32       Illinois Youth Center -
33        Joliet ...............................81,499
34       Dixon Correctional
 
                           -51-                     BOB-CDB03
 1        Center ..............................206,292
 2       Shawnee Correctional
 3        Center ...............................25,484
 4    For upgrading and renovating showers at
 5      the following locations at the approximate
 6      cost set forth below .........................    1,894,962
 7       Shawnee Correctional
 8        Center ..............................785,847
 9       Danville Correctional
10        Center ..............................734,115
11       Graham Correctional
12        Center ..............................200,000
13       Centralia Correctional
14        Center ..............................175,000
15    For replacing security fencing at the
16      following locations at the approximate
17      cost set forth below .........................    1,147,101
18       Hill Correctional
19        Center ..............................379,153
20       Western IL Correctional
21        Center ..............................129,829
22       Joliet Correctional
23        Center ...............................49,119
24       Logan Correctional
25        Center ..............................200,000
26       Dixon Correctional
27        Center ..............................100,000
28       Shawnee Correctional
29        Center ..............................100,000
30       Graham Correctional
31        Center ...............................89,000
32       Danville Correctional
33        Center ..............................100,000
34    For upgrading roads and parking lots at
 
                           -52-                     BOB-CDB03
 1      the following locations at the approximate
 2      cost set forth below .........................      660,647
 3       Dwight Correctional
 4        Center ..............................443,773
 5       Illinois Youth Center -
 6        Valley View .........................216,874
 7    For planning, design, construction, equipment
 8      and all other necessary costs for a
 9      female multi-security level
10      correctional center ..........................   78,054,054
11    For replacing roofing systems at the
12      following locations at the approximate
13      cost set forth below .........................      259,016
14        Vienna Correctional Center ..........241,231
15        Sheridan Correctional Center .........17,785
16    For replacing or installing mechanical bar
17      screens at the following locations at the
18      approximate cost set forth below .............      117,976
19        Graham Correctional Center -
20         Hillsboro ...........................84,976
21        Western Illinois Correctional
22         Center - Mt. Sterling ...............33,000
23    For upgrading security control systems and
24      panels in housing units at the following
25      locations at the approximate cost set
26      forth below ..................................    3,753,580
27        Danville Correctional Center ........500,000
28        Hill Correctional Center -
29         Galesburg ..........................903,580
30        Western Illinois Correctional
31         Center - Mt. Sterling ..............675,000
32        Illinois River Correctional
33         Center - Canton ....................675,000
34        Shawnee Correctional Center -
 
                           -53-                     BOB-CDB03
 1         Vienna ...........................1,000,000
 2    For planning, design, construction,
 3      equipment and all other necessary costs
 4      for a juvenile facility ......................   14,778,129
 5    For replacing locks and doors at the
 6      following locations at the approximate
 7      cost set forth below .........................      118,621
 8        Dwight Correctional Center ......... 103,239
 9        Illinois River Correctional
10         Center - Canton ..................... 3,610
11        IYC - Joliet ......................... 3,785
12        IYC - Pere Marquette - Grafton ....... 7,987
13    For replacing roofing systems at the following
14      locations at the approximate cost set forth
15      below ........................................      493,218
16        Dixon Correctional Center,
17         four buildings .................... 173,370
18        IYC - St. Charles, two buildings ... 193,500
19        Joliet Correctional Center,
20         six buildings ...................... 62,335
21        Logan Correctional Center - Lincoln
22         three buildings ..................... 8,086
23        Menard Correctional Center - Chester
24         six buildings ...................... 24,738
25        Pontiac Correctional Center,
26         one building ....................... 31,189
27    For inspecting and upgrading water towers
28      at the following locations at the approximate
29      costs set forth below ........................      675,230
30        Dixon Correctional Center,
31         Upgrade Water Tower ............... 369,928
32        Graham Correctional Center - Hillsboro
33         Upgrade Water Tower  ............... 62,524
34        Joliet Correctional Center,
 
                           -54-                     BOB-CDB03
 1         Upgrade Water Tower ................ 76,108
 2        Logan Correctional Center - Lincoln
 3         Complete Water Tower Upgrade  ...... 13,000
 4        Menard Correctional Center - Chester
 5         Upgrade Water Tower  ............... 22,443
 6        Stateville Correctional Center - Joliet
 7         Upgrade Water Tower  ............... 36,112
 8        Statewide, Inspect and Upgrade
 9         Water Towers ....................... 95,115
10    For upgrading fire and safety systems at
11      the following locations at the approximate
12      costs set forth below, in addition to
13      funds previously appropriated ................    2,619,002
14        Menard Correctional Center -
15         Chester ......................... 1,854,559
16        Sheridan Correctional Center ....... 295,481
17        Vienna Correctional Center ......... 468,962
18    For replacing roofing systems at the
19      following locations at the approximate
20      costs set forth below: .......................       29,338
21       East Moline Correctional Center,
22        Three buildings ..................... 25,238
23       Graham Correctional Center, Hillsboro
24        Seven buildings ...................... 4,000
25       Sheridan Correctional Center, LaSalle
26        Three buildings ........................ 100
27    For replacing doors and locks at the
28      following locations at the approximate
29      costs set forth below: .......................      349,738
30       IYC - St. Charles ................... 160,081
31       Lincoln Correctional Center .......... 98,481
32       Jacksonville Correctional Center ..... 12,473
33       Sheridan Correctional Center ......... 78,703
34    For upgrading fire safety systems at the
 
                           -55-                     BOB-CDB03
 1      following locations at the approximate
 2      costs set forth below, in addition to
 3      funds previously appropriated: ...............    4,219,722
 4       Menard Correctional Center ........... 27,000
 5       Pontiac Correctional Center ....... 2,766,722
 6       Stateville Correctional Center .... 1,426,000
 7    For upgrading water and wastewater
 8      systems at the following locations
 9      at the approximate costs set forth below: ....      535,525
10       Big Muddy Correctional Center
11        for installing mechanical
12        bar screen ........................... 7,347
13       Centralia Correctional Center
14        for upgrading water
15        treatment plant ..................... 81,816
16       East Moline Correctional Center
17        for upgrading sewer system ........... 4,310
18       Ed Jenison Work Camp (Paris)
19        for installing mechanical
20        bar screen ........................... 2,530
21       IYC - Harrisburg for upgrading
22        water distribution system ........... 59,198
23       Kankakee MSU for constructing
24        well #2 ............................ 288,550
25       IYC - St. Charles for upgrading
26        sewage/storm system ................. 80,000
27       IYC - Valley View for installing
28        mechanical bar screen ............... 11,774
29    For correction of deficiencies in
30      water systems at three correctional
31      facilities ...................................       76,555
32    For replacement of locks, windows and
33      doors at the following locations
34      as set forth below: ..........................      211,416
 
                           -56-                     BOB-CDB03
 1       IYC Harrisburg ........................ 9,684
 2       IYC Joliet ............................ 1,000
 3       Menard .............................. 177,562
 4       IYC Valley View ...................... 22,170
 5       Vienna ................................ 1,000
 6    For planning, design, construction,
 7      equipment and other necessary costs
 8      for a Maximum Security Correctional
 9      Center, in addition to funds previously
10      appropriated .................................      125,851
11    For planning, design, construction,
12      equipment and other necessary costs
13      for a Correctional Facility for
14      juveniles ....................................      437,994
15    For planning, design, construction,
16      equipment and other necessary costs
17      for a Medium Security Correctional
18      Facility .....................................      481,161
19    For correcting defects in the food preparation
20      areas, including roofs .......................      108,588
21    For replacement of roofs at various Department of
22      Corrections locations ........................       31,724
23    For roof replacement at the following
24      locations at the approximate costs
25      set forth below: .............................      179,437
26       Graham Correctional Center
27        Five buildings ........................6,543
28       Graham Correctional Center
29        Thirty-two buildings ..................6,000
30       Menard Correctional Center
31        Warehouse Building ...................26,000
32       Menard Correctional Center
33        Five buildings .......................70,394
34       Pontiac Correctional Center
 
                           -57-                     BOB-CDB03
 1        Eight buildings .......................6,500
 2       Sheridan Correctional Center
 3        Six buildings ........................16,000
 4       Stateville Correctional Center
 5        Seven buildings ......................24,000
 6       Ill Youth Center-Valley View
 7        Administration Building and
 8         Kitchen Addition ....................24,000 ____________
 9        Total, Section 6                             $435,043,526

10        Section 6.1.  The following named  amounts,  or  so  much
11    thereof  as  may  be  necessary  and remain unexpended at the
12    close of business on June  30,  2002,  from  reappropriations
13    heretofore  made  for  such purposes in  Article 56a, Section
14    6.1 of Public Act 92-8, are reappropriated from  the  General
15    Revenue  Fund  to  the  Capital  Development  Board  for  the
16    Department   of  Corrections  for  the  projects  hereinafter
17    enumerated:

18    (From Article 56a, Section 6.1 of Public Act 92-8)
19                              STATEWIDE
20    For energy conservation improvements at the
21      following locations at the approximate
22      costs set forth below: ....................... $     32,218
23       Dwight Correctional Center ............ 6,000
24       Joliet Correctional Center
25        School Building ...................... 1,000
26       Menard Psychiatric Center
27        Randolph Hall ........................ 1,000
28       Stateville Correctional Center
29        Law Library .......................... 7,400
30       Pontiac Correctional Center .......... 15,093
31       Vienna Correctional Center ............ 1,725
32    For upgrading doors and locking systems at
 
                           -58-                     BOB-CDB03
 1      the following locations at the approximate
 2      costs set forth below: .......................      547,588
 3       Illinois Youth Center-Warrenville
 4        For replacement of doors
 5         and locking systems ............... 547,588 ____________
 6        Total, Section 6.1                               $579,806

 7        Section 6.2.  The amount of $435,987, or so much  thereof
 8    as  may  be  necessary and remains unexpended at the close of
 9    business on June 30, 2002, from a reappropriation  heretofore
10    made  for such purposes in Article 56a, Section 6.2 of Public
11    Act 92-8, is reappropriated from the General Revenue Fund  to
12    the   Capital   Development   Board  for  the  Department  of
13    Corrections for the projects hereinafter  enumerated  at  the
14    approximate costs set forth below:

15      Danville Correctional Center -
16        For upgrading the hot water
17        distribution system ..................$1,000
18      Stateville Correctional Center-
19        For upgrading the plumbing systems in
20        four buildings ......................384,659
21      Menard Correctional Center -
22        For planning and to begin upgrading
23        the plumbing systems in two
24        buildings ............................12,394
25      Pontiac Correctional Center -
26        For upgrading the mechanical systems
27        and renovation of shower rooms .......37,934

28        Section  7.  The  following  named  amounts,  or  so much
29    thereof as may be necessary  and  remain  unexpended  at  the
30    close  of  business on June 30, 2002, from appropriations and
31    reappropriations heretofore made for such purposes in Article
 
                           -59-                     BOB-CDB03
 1    56, Section 4, and Article 56a, Section 7 of Public Act 92-8,
 2    are reappropriated from the Capital Development Fund  to  the
 3    Capital  Development  Board  for  the  Historic  Preservation
 4    Agency for the projects hereinafter enumerated:

 5              BISHOP HILL HISTORIC SITE - HENRY COUNTY
 6    (From Article 56, Section 4 of Public Act 92-8)
 7    For restoring interior and exterior ............ $    500,000
 8    (From Article 56a, Section 7 of Public Act 92-8)
 9    For rehabilitating Bjorkland Hotel .............      904,535
10                    BLACKHAWK STATE HISTORIC SITE
11    For rehabilitating lodge .......................    1,097,426
12    For a grant to the City of Rock Island
13      to relocate the existing sewer line ..........      120,000
14               BRYANT COTTAGE STATE MEMORIAL - BEMENT
15    For rehabilitating interior and exterior .......      209,030
16             CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
17    For providing structural stabilization .........      274,683
18    For renovation of the Cahokia Courthouse
19      and the Jarrot House .........................       59,600
20             CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
21    For replacement of Monk's Mounds stairs ........      339,695
22    For restoration of Monk's Mound ................    1,009,932
23    For purchasing private land within historic
24      site boundary ................................      189,979
25                          DAVID DAVIS HOME
26    To acquire a residence to be
27      converted to a Visitors Center ...............      249,400
28          FORT DE CHARTRES HISTORIC SITE - RANDOLPH COUNTY
29    For rehabilitating the stone gatehouse
30      wall and foundation ..........................      729,655
31                        GALENA HISTORIC SITE
32    For structural stabilization and
33      rehabilitation of five historic
 
                           -60-                     BOB-CDB03
 1      structures in the Grant Home District
 2      including the Biesman, Nolan, Gill,
 3      Coville, and Donegan houses ..................      377,131
 4                JARROT MANSION STATE HISTORICAL SITE
 5    For restoring the mansion, in addition
 6      to funds previously appropriated .............    1,644,865
 7                  LEWIS AND CLARK STATE MEMORIAL -
 8                           MADISON COUNTY
 9    For constructing interpretive center,
10      and development of the historic site
11      in addition to funds previously
12      appropriated .................................       97,861
13            LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
14    For rehabilitating site and providing
15      irrigation system ............................      246,247
16              LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
17    For rehabilitating interior and exterior .......      710,003
18                  LINCOLN LOG CABIN HISTORIC SITE -
19                            COLES COUNTY
20    For constructing visitors center, Phase II,
21      and developing day use area ..................      428,803
22          LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
23    (From Article 56, Section 4 of Public Act 92-8)
24    For rehabilitating the saw and grist mill, in
25      addition to funds previously appropriated.....      750,000
26    (From Article 56a, Section 7 of Public Act 92-8)
27    For renovating village entrance and
28      completing visitors center ...................       50,639
29              LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
30    (From Article 56, Section 4 of Public Act 92-8)
31    For constructing library and museum, in
32      addition to funds previously appropriated ....   49,993,476
33    (From Article 56a, Section 7 of Public Act 92-8)
34    For constructing a Lincoln Presidential
 
                           -61-                     BOB-CDB03
 1      Library ......................................   26,758,158
 2    For planning and beginning the Lincoln
 3      Presidential Center, in addition to
 4      funds previously appropriated ................      714,989
 5                   OLD STATE CAPITOL - SPRINGFIELD
 6    For providing structural stabilization .........      130,277
 7    For rehabilitating Old State Capitol ...........      282,190
 8          SHAWNEETOWN BANK HISTORIC SITE - GALLATIN COUNTY
 9    (From Article 56, Section 4 of Public Act 92-8)
10    For rehabilitating exterior ....................    1,620,000
11                     UNION STATION - SPRINGFIELD
12    (From Article 56a, Section 7 of Public Act 92-8)
13    For purchasing and rehabilitating ..............    2,523,319
14                         VACHEL LINDSAY HOME
15    For rehabilitating home ........................      152,395
16    For rehabilitating HVAC and electrical
17      systems and interior .........................       49,351
18                              STATEWIDE
19    For statewide ISTEA 21 Match ...................      637,000
20    For replacing roofing systems at the
21      following locations at the approximate
22      costs set forth below: .......................      115,622
23       Fort De Chartres, Randolph County ....... 100
24       Washburne House, Galena ............... 5,378
25       David Davis Mansion, Bloomington ..... 22,051
26       Bishop Hill House, Henry County ...... 88,093
27    For matching ISTEA federal grant funds .........      390,385
28        Total, Section 7                              $93,356,646

29        Section  7.2.  The sum of $800,000, or so much thereof as
30    may be necessary and as remains unexpended at  the  close  of
31    business  on June 30, 2002, from a reappropriation heretofore
32    made in Article 56a, Section  7.2  of  Public  Act  92-8,  is
33    reappropriated  from  the  Capital  Development  Fund  to the
 
                           -62-                     BOB-CDB03
 1    Capital  Development  Board  for  the  Historic  Preservation
 2    Agency for the construction of  an  interpretive  center  and
 3    development  of  the  historic  site  at  the Lewis and Clark
 4    National Trail Site No. 1 in Madison County.

 5        Section 7.3.  The following named  amounts,  or  so  much
 6    thereof  as  may  be  necessary  and remain unexpended at the
 7    close of business on June  30,  2002,  from  reappropriations
 8    heretofore made for such purposes in Article 56a, Section 7.3
 9    of  Public  Act  92-8,  are  reappropriated  from the General
10    Revenue  Fund  to  the  Capital  Development  Board  for  the
11    Historic Preservation Agency  for  the  projects  hereinafter
12    enumerated:

13                   DANA THOMAS HOUSE - SPRINGFIELD
14    (From Article 56a, Section 7.3 of Public Act 92-8)
15    For restoring exterior and interior ............ $    229,143
16                        GALENA HISTORIC SITE
17    For rehabilitating Washburne House .............      388,265
18                 LINCOLN'S NEW SALEM HISTORIC SITE -
19                             PETERSBURG
20    For resurfacing village and service roads ......       18,225
21    For rehabilitating saw mill and grist
22      mill .........................................      208,075
23                  METAMORA COURTHOUSE HISTORIC SITE
24    For rehabilitating courthouse ..................      436,370
25                   OLD STATE CAPITOL - SPRINGFIELD
26    For replacing the bottom cylinder of
27      the hydraulic elevator .......................       50,000
28        Total, Section 7.3                             $1,330,078

29        Section  7a.  The  following  named  amounts,  or so much
30    thereof as may be necessary  and  remain  unexpended  at  the
31    close  of  business on June 30, 2002, from appropriations and
 
                           -63-                     BOB-CDB03
 1    reappropriations  made  for  such  purposes  in  Article  56,
 2    Section 4.1 and Article 56a, Section 7a of Public  Act  92-8,
 3    are  reappropriated from the Tobacco Settlement Recovery Fund
 4    to  the  Capital   Development   Board   for   the   Historic
 5    Preservation Agency for the projects hereinafter enumerated:

 6           CAHOKIA MOUNDS HISTORIC SITE - ST. CLAIR COUNTY
 7    (From Article 56a, Section 7a of Public Act 92-8)
 8    For replacing Orientation Theater
 9      screen and film .............................. $    615,360
10           LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
11    (From Article 56, Section 4.1 of Public Act 92-8)
12    For providing roads, parking areas, lighting
13      plaza and pedestrian bridges, in addition
14      to funds previously appropriated .............      400,000
15    (From Article 56a, Section 7a of Public Act 92-8)
16    For providing roads, parking areas and
17      pedestrian bridges ...........................      125,000
18                   OLD STATE CAPITOL - SPRINGFIELD
19    For providing back-up generator ................      210,902
20        Total, Section 7a                              $1,351,262

21        Section  8.  The  following  named  amounts,  or  so much
22    thereof as may be necessary  and  remain  unexpended  at  the
23    close  of  business on June 30, 2002, from appropriations and
24    reappropriations heretofore made for such purposes in Article
25    56, Section 6, and Article 56a, Section 9 of Public Act 92-8,
26    as amended, are reappropriated from the  Capital  Development
27    Fund  to  the Capital Development Board for the Department of
28    Human Services for the projects hereinafter enumerated:

29             ALTON MENTAL HEALTH CENTER - MADISON COUNTY
30    (From Article 56, Section 6 of Public Act 92-8)
31    For renovating the Forensic Complex and
 
                           -64-                     BOB-CDB03
 1      constructing two building additions, in
 2      addition to funds previously appropriated .... $  3,900,000
 3    (From Article 56a, Section 9 of Public Act 92-8)
 4    For renovating the central dietary,
 5      Phase II, in addition to funds previously
 6      appropriated .................................    1,205,365
 7    For constructing two building additions
 8      at the Forensic Complex ......................   10,903,549
 9    For rehabilitation of the central dietary ......      452,848
10                    CHESTER MENTAL HEALTH CENTER
11    (From Article 56, Section 6 of Public Act 92-8)
12    For renovating support and residential areas,
13      in addition to funds previously
14      appropriated .................................      996,000
15    For replacing smoke/heat detectors .............      395,000
16    (From Article 56a, Section 9 of Public Act 92-8)
17    For upgrading energy management system .........      234,334
18    For replacing sewer lines ......................      648,047
19    For upgrading access control/duress system .....    1,072,422
20    For renovating kitchen area ....................      891,592
21    For replacing fencing and upgrading
22      recreational yard ............................      141,667
23    For renovating support and residential
24      area .........................................      533,063
25             CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
26    For upgrading fire/life safety systems, in
27      addition to funds previously appropriated ....      114,374
28    For renovating residential units, in
29      addition to funds previously
30      appropriated .................................    2,171,000
31    For renovation of the West Campus Nurses'
32      Stations .....................................      228,250
33    For renovation of Henry Horner Children's
34      Center and West Campus for fire and
 
                           -65-                     BOB-CDB03
 1      life safety codes ............................       70,147
 2    For renovation of the West Campus shower
 3      and toilet rooms .............................      248,923
 4        CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
 5    For replacing cooling towers ...................      439,421
 6    For planning and beginning the
 7      renovation of Life Skills Building  ..........      845,939
 8              ELGIN MENTAL HEALTH CENTER - KANE COUNTY
 9    For replacing power plant and engineering
10      building .....................................    7,957,077
11    For renovating the central dietary
12      and kitchen ..................................    3,786,331
13    For construction of an Adult Psychiatric
14      Building, in addition to funds previously
15      appropriated .................................    3,681,000
16    For construction of roads, parking lots
17      and street lights ............................    1,130,038
18    For upgrading and expanding the mechanical
19      infrastructure, in addition to funds
20      previously appropriated ......................    2,144,367
21    For construction of a forensic services complex
22      at Elgin Mental Health Center, in addition
23      to funds previously appropriated .............    3,350,612
24    For construction of a forensic services
25      complex, in addition to funds previously
26      appropriated .................................       43,144
27    For renovation of the HVAC systems,
28      replacement of windows and installation
29      of security screens, in addition
30      to funds previously appropriated .............    2,062,047
31    For construction of a Forensic Services
32      Facility, in addition to funds
33      previously appropriated  .....................      227,380
34    For planning the renovation of the Forensic
 
                           -66-                     BOB-CDB03
 1      Building and abating asbestos ................      237,723
 2    For renovation of the Central Stores
 3      Building .....................................       85,679
 4    For the demolition of the Old Main Building
 5      and construction of an Adult
 6      Psychiatric Center ...........................       75,736
 7                  FOX DEVELOPMENTAL CENTER - DWIGHT
 8    (From Article 56, Section 6 of Public Act 92-8)
 9    For planning and beginning replacement
10      of interior doors and flooring
11      and repairing walls in the Main and
12      Administration Buildings .....................    1,205,000
13    (From Article 56a, Section 9 of Public Act 92-8)
14    For replacing sewer lines ......................       71,801
15    For upgrading electrical system and installing
16      an emergency generator .......................      523,185
17    For replacement of absorbers and
18      upgrading HVAC system ........................       35,808
19               HOWE DEVELOPMENTAL CENTER - TINLEY PARK
20    (From Article 56, Section 6 of Public Act 92-8)
21    For replacing HVAC and duct work ...............      480,003
22    (From Article 56a, Section 9 of Public Act 92-8)
23    For completing upgrade of tunnels,
24      Phase II, in addition to funds previously
25      appropriated .................................    2,970,000
26    For renovating the kitchen .....................      103,316
27    For renovating residences, in addition to
28      funds previously appropriated ................    2,230,384
29    For replacing roofs ............................       21,272
30    For planning and rehabilitation of
31      utility tunnels ..............................       48,655
32    For renovation of residential buildings ........      282,575
33             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
34    (From Article 56, Section 6 of Public Act 92-8)
 
                           -67-                     BOB-CDB03
 1    For renovating High School Building ............    1,200,000
 2    (From Article 56a, Section 9 of Public Act 92-8)
 3    For replacing HVAC, upgrading electrical
 4      and replacing doors, in addition to
 5      funds previously appropriated ................    1,700,000
 6    For renovating the fire alarm systems, in
 7      addition to funds previously appropriated ....       82,537
 8      ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
 9    (From Article 56, Section 6 of Public Act 92-8)
10    For planning and beginning renovation
11      of the Girls' Dormitory ......................      350,000
12    (From Article 56a, Section 9 of Public Act 92-8)
13    For installation of individual
14      package boilers, in addition
15      to funds previously appropriated .............      400,000
16          JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
17    (From Article 56, Section 6 of Public Act 92-8)
18    For planning and beginning the renovation
19      of the power house ...........................      800,000
20    (From Article 56a, Section 9 of Public Act 92-8)
21    For extending chilled water line ...............      110,945
22    For rehabilitation of bathrooms and
23      replacing doors ..............................      244,762
24                KILEY DEVELOPMENTAL CENTER - WAUKEGAN
25    For renovating homes, Phase II, in
26      addition to funds previously
27      appropriated .................................    1,135,000
28    For planning and beginning installation
29      of gas distribution system ...................       77,735
30    For renovating homes ...........................       45,831
31             LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
32    For completing installation of
33      rethermalization, in addition to funds
34      previously appropriated ......................      185,062
 
                           -68-                     BOB-CDB03
 1    For upgrading power plant and installing
 2      EMS, in addition to funds previously
 3      appropriated .................................      608,406
 4    For renovating or replacing
 5      Elmhurst Cottage .............................    1,603,317
 6    For renovating or replacing Elmhurst
 7      Cottage, in addition to funds
 8      previously appropriated ......................    1,351,795
 9             LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
10    For renovating residential and neighborhood
11      homes, in addition to funds previously
12      appropriated .................................    1,850,000
13    For replacing plumbing, HVAC and
14      boiler systems ...............................      782,985
15    For renovation of residential buildings,
16      in addition to funds previously
17      appropriated .................................    1,781,093
18    For renovation of residences ...................       35,293
19                 MABLEY DEVELOPMENTAL CENTER - DIXON
20    (From Article 56, Section 6 of Public Act 92-8)
21    For planning and beginning renovation
22      of residential buildings .....................    1,625,400
23                 MADDEN MENTAL HEALTH CENTER - HINES
24    (From Article 56a, Section 9 of Public Act 92-8)
25    For renovating pavilions for safety/
26      security, in addition to
27      funds previously appropriated ................    1,200,000
28    For renovating dietary .........................      876,700
29    For renovation of pavilions, in addition
30      to funds previously appropriated .............      525,624
31    For upgrading residences for safety and
32      security .....................................       24,339
33            MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
34    For renovating Kennedy Hall ....................    1,591,717
 
                           -69-                     BOB-CDB03
 1    For renovating Stevenson Hall ..................      836,663
 2               MURRAY DEVELOPMENTAL CENTER - CENTRALIA
 3    (From Article 56, Section 6 of Public Act 92-8)
 4    For planning and beginning boiler house
 5      renovation ...................................      182,165
 6    (From Article 56a, Section 9 of Public Act 92-8)
 7    For replacing energy management system .........      526,880
 8               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
 9    (From Article 56, Section 6 of Public Act 92-8)
10    For replacing water mains and valves,
11      in addition to funds previously
12      appropriated .................................    1,900,000
13    (From Article 56a, Section 9 of Public Act 92-8)
14    For replacing steam & condensate
15      lines, in addition to funds previously
16      appropriated .................................    2,800,000
17    For upgrading HVAC systems in four
18      residential buildings ........................    1,132,800
19    For planning and beginning the upgrade
20      of steam and condensate lines ................      219,883
21    For rehabilitating HVAC system .................    1,113,400
22    For replacing cooling towers and
23      rehabilitating absorbers .....................      104,715
24    For completion of the HVAC system, in
25      addition to funds previously
26      appropriated .................................       87,283
27    For replacement of boiler, in
28      addition to funds previously
29      appropriated .................................       20,216
30    For replacement of water mains
31      and valves ...................................      272,583
32    For planning and beginning sewer and
33      manhole renovation ...........................       12,911
34    For rehabilitation of the boilers ..............       53,797
 
                           -70-                     BOB-CDB03
 1    For planning and replacement of windows ........       51,774
 2    For upgrading fire safety systems in the
 3      support buildings ............................       34,563
 4    For installation of air conditioning in
 5      Building #704, in addition to funds
 6      previously appropriated ......................       75,695
 7    For replacement of cooling towers in
 8      Buildings #100A and #100B ....................       26,402
 9    For installation of air conditioning in
10      Buildings #502 and #514 ......................       37,554
11               SINGER MENTAL HEALTH CENTER - ROCKFORD
12    For renovating patient units, Phase II,
13      in addition to funds previously
14      appropriated  ................................    3,100,000
15    For replacing roofs ............................       12,534
16    For renovating mechanicals and
17      residential areas ............................      914,900
18                  TINLEY PARK MENTAL HEALTH CENTER
19    For upgrading fire/life safety systems
20      and bedroom lighting, in addition to
21      funds previously appropriated ................       39,332
22                  TINLEY PARK MENTAL HEALTH CENTER/
23                      HOWE DEVELOPMENTAL CENTER
24    For renovation for accessibility in four
25      buildings ....................................       78,206
26    For renovation for fire and life safety in
27      three residences .............................       71,467
28                ZELLER MENTAL HEALTH CENTER  - PEORIA
29    For upgrading HVAC and mechanical
30      systems ......................................      144,992
31                              STATEWIDE
32    (From Article 56, Section 6 of Public Act 92-8)
33    For planning and beginning construction
34      of a facility for the treatment and
 
                           -71-                     BOB-CDB03
 1      detention of sexually violent persons, in
 2     addition to funds previously appropriated .....    4,000,000
 3    For replacing and repairing roofing
 4      systems at the following locations, at
 5      the approximate cost set forth below .........    3,335,000
 6       Alton Mental Health Center ...........150,000
 7       Chicago-Read Mental Health
 8        Center ..............................800,000
 9       Howe Developmental Center -
10        Tinley Park .......................1,300,000
11       Shapiro Developmental Center -
12        Kankakee ............................415,000
13       Illinois School for the
14        Deaf - Jacksonville .................370,000
15       Kiley Developmental
16        Center - Waukegan ...................300,000
17    (From Article 56a, Section 9 of Public Act 92-8)
18    For repairing or replacing roofs
19      at the following locations, at
20      the approximate cost set forth below .........    2,548,908
21       Choate Mental Health and
22        Developmental Center - Anna ..........98,300
23       Illinois School for the
24        Visually Impaired -
25        Jacksonville .........................87,000
26       Jacksonville Developmental
27        Center - Morgan County ...............60,000
28       Lincoln Developmental Center -
29        Logan County ........................178,000
30       Murray Developmental Center -
31        Centralia ...........................842,608
32       Shapiro Developmental Center -
33        Kankakee ..........................1,283,000
34    For planning and beginning construction
 
                           -72-                     BOB-CDB03
 1      of a facility for sexually violent
 2      persons ......................................    1,860,481
 3    For replacing and repairing roofing systems
 4      at the following locations at the approximate
 5      cost set forth below .........................      595,002
 6        Choate Developmental Center -
 7         Anna .................................7,628
 8        Chicago-Read Mental Health Center ....66,363
 9        Tinley Park Mental Health Center.....167,648
10        Illinois School for the Visually
11         Impaired - Jacksonville .............19,414
12        Shapiro Developmental Center -
13         Kankakee ............................25,955
14        Kiley Developmental Center -
15         Waukegan ............................32,716
16        Ludeman Developmental Center -
17         Park Forest ........................275,278
18    For upgrading roads at the following
19      locations at the approximate
20      cost set forth below .........................      158,061
21        Howe Developmental Center -
22         Tinley Park ..........................5,000
23        Shapiro Developmental Center -
24         Kankakee ...........................153,061
25    For replacing roofing systems at the
26      following locations at the approximate
27      costs set forth below: .......................      102,417
28       Elgin Mental Health Center,
29         five buildings ......................59,071
30       Jacksonville Mental Health and
31         Developmental Center,
32         two buildings........................43,346
33    For replacement of roofing systems at the
34      following locations at the approximate costs
 
                           -73-                     BOB-CDB03
 1      set forth below: .............................      296,781
 2        Lincoln Development Center ...........74,196
 3        Murray Developmental Center ..........74,195
 4        Elgin Developmental Center ...........74,195
 5        Shapiro Developmental Center .........74,195
 6    For rehabilitation of water towers -
 7      Murray and Chester ...........................      135,694
 8    For replacement of roofs at the following
 9      locations at the approximate costs set
10      forth below: .................................      111,901
11        Elgin Mental Health Center -
12          Three buildings .....................3,284
13        Lincoln Developmental Center -
14          Three buildings .....................4,088
15        Ludeman Developmental Center -
16          Support buildings ...................4,492
17        Madden Mental Health Center -
18          Buildings and covered walkways ......1,000
19        McFarland Mental Health Center -
20          Three buildings .....................4,570
21        Meyer Mental Health Center -
22          One building ........................1,450
23        Shapiro Developmental Center -
24          Three buildings ....................90,232
25        Tinley Park Mental Health Center -
26          Oak Hall ............................2,785 ____________
27        Total, Section 9                             $105,473,575

28        Section 8.1.  The following named  amounts,  or  so  much
29    thereof  as  may  be  necessary  and remain unexpended at the
30    close of business on June  30,  2002,  from  reappropriations
31    heretofore  made for such purposes in Article 56a, Section 9A
32    of Public Act  92-8,  are  reappropriated  from  the  Capital
33    Development  Fund  to  the  Capital Development Board for the
 
                           -74-                     BOB-CDB03
 1    Department of Human Services  for  the  projects  hereinafter
 2    enumerated:

 3             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
 4    (From Article 56a, Section 9A of Public Act 92-8)
 5    For installing HVAC and upgrading electrical
 6      and replacing doors .......................... $    202,565
 7    For completing the HVAC system upgrade,
 8      in addition to funds previously
 9      appropriated .................................       12,276
10    For the renovation of Cullom Hall ..............      578,873
11    For rehabilitation of the domestic hot and
12      cold water piping in six buildings ...........      185,728
13      ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
14    For constructing a new building to
15      replace buildings 2, 3 and 4,
16      in addition to funds previously
17      appropriated .................................      490,481
18    For installation of individual
19      package boilers ..............................      268,995
20    For the replacement of Buildings
21      #2, #3, and #4 ...............................       27,098
22        Total, Section 9A                              $1,766,016

23        Section  8.3.  The  following  named  amounts, or so much
24    thereof as may be necessary  and  remain  unexpended  at  the
25    close  of  business  on  June 30, 2002, from reappropriations
26    heretofore made for such purposes in  Article 56a, Section 9C
27    of Public Act  92-8,  are  reappropriated  from  the  General
28    Revenue  Fund  to  the  Capital  Development  Board  for  the
29    Department  of  Human  Services  for the projects hereinafter
30    enumerated:

31                     ALTON MENTAL HEALTH CENTER
 
                           -75-                     BOB-CDB03
 1    (From Article 56a, Section 9C of Public Act 92-8)
 2    For replacing windows in four buildings ........     $443,490
 3                    CHESTER MENTAL HEALTH CENTER
 4    For replacing backflow prevention
 5      devices ......................................       44,218
 6            CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
 7    For life/safety improvements ...................       45,732
 8             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
 9    For upgrading kitchen equipment ................      319,540
10                  JACKSONVILLE DEVELOPMENTAL CENTER
11    For upgrading HVAC systems in the Drake and
12      Gillespie buildings ..........................      118,927
13                    LINCOLN DEVELOPMENTAL CENTER
14    For replacing windows ..........................      292,081
15               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
16    For replacing windows in complex
17      buildings ....................................      326,469
18                              STATEWIDE
19    For resurfacing roads at Chicago-Read,
20      Tinley Park and Murray .......................      141,837
21        Total, Section 9C                              $1,732,294

22        Section 8a.  The following  named  amounts,  or  so  much
23    thereof  as  may  be  necessary  and remain unexpended at the
24    close of business  on  June  30,  2002,  from  appropriations
25    heretofore  made for such purposes in Article 56, Section 6.1
26    and  Article  56a,  Section  9.1  of  Public  Act  92-8,  are
27    reappropriated from the Tobacco Settlement Recovery  Fund  to
28    the  Capital  Development  Board  for the Department of Human
29    Services for the projects hereinafter enumerated:

30                          STATEWIDE PROGRAM
31    (From Article 56, Section 6.1 of Public Act 92-8)
32    For tuckpointing at the following locations
 
                           -76-                     BOB-CDB03
 1     at the approximate cost set forth below ....... $    497,476
 2      Howe Developmental Center -
 3       Tinley Park ..........................115,000
 4      Madden Mental Health
 5       Center - Hines .......................100,000
 6      Tinley Park Mental
 7       Health Center ........................282,476
 8    (From Article 56a, Section 9.1 of Public Act 92-8)
 9    For tuckpointing exterior and repairing
10      masonry at various facilities ................    1,424,536
11          JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
12    For replacing stoker system and boiler
13      controls, in addition to funds
14      previously appropriated ......................       68,335
15    For rehabilitation the water tower and
16      smokestack, Phase II, in addition to
17      funds previously appropriated ................      451,155
18             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
19    For completing installation of a running track
20      and upgrading field, in addition to
21      funds previously appropriated ................      301,725
22    For renovating buildings and abating lead
23      paint, in addition to funds
24      previously appropriated ......................       39,468
25                ZELLER MENTAL HEALTH CENTER - PEORIA
26    (From Article 56, Section 6.1 of Public Act 92-8)
27    For upgrading the energy management
28      system .......................................      245,000
29        Total, Section 9.1                             $3,027,695

30        Section 9.  The  following  named  amounts,  or  so  much
31    thereof  as  may  be  necessary  and remain unexpended at the
32    close of business on June 30, 2002,  from  appropriation  and
33    reappropriations heretofore made in Article 56, Section 5 and

 
                           -77-                     BOB-CDB03
 1    Article   56a,   Section   10   of   Public   Act  92-8,  are
 2    reappropriated from  the  Capital  Development  Fund  to  the
 3    Capital  Development  Board for the Illinois Medical District
 4    Commission for the projects hereinafter enumerated:

 5           ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
 6    (From Article 56, Section 5 of Public Act 92-8)
 7    For upgrading core utilities ................... $    800,000
 8    For upgrading research center ..................      710,000
 9    (From Article 56a, Section 10 of Public Act 92-8)
10    For constructing a Lab and Research
11      Biotech Grad Facility ........................    2,853,411
12        Total, Section 10                              $4,363,411

13        Section 9.1.  The following named  amounts,  or  so  much
14    thereof  as  may  be  necessary  and remain unexpended at the
15    close of business on June  30,  2002,  from  reappropriations
16    heretofore  made  in  Article 56a, Section 10.1 of Public Act
17    92-8, approved May 17,  2000,  are  reappropriated  from  the
18    General Revenue Fund to the Capital Development Board for the
19    Medical  District  Commission  for  the  projects hereinafter
20    enumerated:

21               CHICAGO TECHNOLOGY PARK RESEARCH CENTER
22    (From Article 56a, Section 10.1 of Public Act 92-8)
23    For renovating the Research Center ............. $    467,867
24    For upgrading centrifugal chillers .............       71,761
25        Total, Section 10.1                              $539,628

26        Section 9a.  The following  named  amounts,  or  so  much
27    thereof  as  may  be  necessary  and remain unexpended at the
28    close of business on June  30,  2002,  from  reappropriations
29    heretofore  made  in  Article  56a, Section 10a of Public Act
30    92-8, are reappropriated from the Tobacco Settlement Recovery
 
                           -78-                     BOB-CDB03
 1    Fund to  the  Capital  Development  Board  for  the  Illinois
 2    Medical  District  Commission  for  the  projects hereinafter
 3    enumerated:

 4           ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
 5    (From Article 56a, Section 10a of Public Act 92-8)
 6    For developing the site ........................ $     55,110
 7    For installing security fencing ................      145,000
 8        Total, Section 10a                               $200,110

 9        Section 10.  The following  named  amounts,  or  so  much
10    thereof  as  may  be  necessary  and remain unexpended at the
11    close of business on June 30, 2002, from  appropriations  and
12    reappropriations   heretofore   made  for  such  purposes  in
13    Article 56, Section 7, and Article 56a, Section 11 of  Public
14    Act  92-8,  as  amended,  are reappropriated from the Capital
15    Development Fund to the Capital  Development  Board  for  the
16    Department  of  Military Affairs for the projects hereinafter
17    enumerated:

18                            AURORA ARMORY
19    (From Article 56a, Section 11 of Public Act 92-8)
20    For planning and beginning construction of
21      an armory .................................... $     10,820
22                     CAMP LINCOLN - SPRINGFIELD
23    For converting commissary to a military
24      museum, in addition to funds
25      previously appropriated ......................      715,000
26    For renovating heating system and
27      replacing windows ............................      238,042
28    For construction of a military academy
29      facility .....................................      638,820
30    For site improvements and construction for
31      a military academy facility, including
 
                           -79-                     BOB-CDB03
 1      repair and reconstruction of access
 2      roads and drives at Camp Lincoln .............       24,062
 3    For planning, design, site improvements, and
 4      other costs associated with the conversion
 5      of the old "Castle" or Commissary Building
 6      for use as a military museum .................       61,052
 7                          CHAMPAIGN ARMORY
 8    (From Article 56, Section 7 of Public Act 92-8)
 9    For upgrading mechanical and electrical
10      systems and installing a kitchen .............    1,146,150
11    (From Article 56a, Section 11 of Public Act 92-8)
12    For replacing roofing systems and
13      rehabilitating exterior walls ................       74,967
14                           DANVILLE ARMORY
15    For planning and construction of a new armory ..      722,611
16                           DELAVAN ARMORY
17    For rehabilitating the exterior and
18      replacing roofing system .....................      123,347
19                      DIXON ARMORY - LEE COUNTY
20                         DONNELLEY BUILDING
21    For the rehabilitation and renovation of
22      the Donnelley Building and purchase of
23      land for parking .............................       82,082
24              EAST ST. LOUIS ARMORY - ST. CLAIR COUNTY
25    For upgrading mechanical systems
26      and rest rooms ...............................      602,996
27                     ELGIN ARMORY - KANE COUNTY
28    For upgrading heating and mechanical
29      systems ......................................    1,406,033
30                     GALVA ARMORY - HENRY COUNTY
31    (From Article 56, Section 7 of Public Act 92-8)
32    For replacing the roof and upgrading the
33      interior and exterior ........................      600,000
34    (From Article 56a, Section 11 of Public Act 92-8)
 
                           -80-                     BOB-CDB03
 1    For relocating kitchen .........................      751,830
 2                        GENERAL JONES ARMORY
 3    For rehabilitating the armory building,
 4      in addition to funds previously
 5      appropriated .................................    3,771,762
 6    For renovation of the exterior and interior,
 7      mechanical areas and expansion of the
 8      parking lot, in addition to amounts
 9      previously appropriated ......................      280,622
10    For replacement of the Assembly Hall
11      roofing system including its structural
12      system .......................................       43,399
13                     JOLIET ARMORY - WILL COUNTY
14    For renovating mechanical and electrical
15      systems and exterior .........................    2,219,462
16                           KEWANEE ARMORY
17    (From Article 56, Section 7 of Public Act 92-8)
18    For upgrading electrical and mechanical
19      systems and installing a kitchen .............    2,524,000
20                            MACOMB ARMORY
21    For replacing the mechanical and electrical
22      systems and installing a kitchen .............      945,033
23                  MACHESNEY PARK ARMORY (ROCKFORD)
24    (From Article 56a, Section 11 of Public Act 92-8)
25    For the state's share for additional planning
26      and construction of an armory and
27      Organizational Maintenance Shop ..............      218,047
28                       MIDWAY ARMORY - CHICAGO
29    For replacing the roof and
30      upgrading the interior .......................    1,000,360
31                       NORTH RIVERSIDE ARMORY
32    (From Article 56, Section 7 of Public Act 92-8)
33    For rehabilitating the interior and
34      exterior .....................................      618,000
 
                           -81-                     BOB-CDB03
 1                     NORTHWEST ARMORY - CHICAGO
 2    For replacing the mechanical systems ...........    2,145,000
 3    (From Article 56a, Section 11 of Public Act 92-8)
 4    For renovation of interior and exterior,
 5      in addition to funds previously
 6      appropriated for such purposes ...............      845,482
 7                 PONTIAC ARMORY - LIVINGSTON COUNTY
 8    For upgrading mechanical systems
 9      and rest rooms ...............................      679,601
10    For rehabilitating the exterior and
11      replacing the roofing system .................      134,652
12                          ROCK FALLS ARMORY
13    (From Article 56, Section 7 of Public Act 92-8)
14    For replacing the mechanical and
15      electrical systems and upgrading
16      the interior .................................    2,631,000
17                         ROCK ISLAND ARMORY
18    (From Article 56a, Section 11 of Public Act 92-8)
19    For construction of an armory and
20      maintenance shop .............................       64,292
21                 SAUK AREA CAREER SCHOOL - CRESTWOOD
22    For the purchase and renovation of the
23      former Sauk Area Career School, converting
24      to an armory and upgrading the parking
25      lot ..........................................       82,303
26                  STREATOR ARMORY - LASALLE COUNTY
27    For replacing the roofing system and
28      tuckpointing walls ...........................       55,442
29                            URBANA ARMORY
30    For renovating the interior and
31      replacing the upper roof .....................      365,283
32                           WAUKEGAN ARMORY
33    For replacing roofing system ...................       15,068
34               WEST FRANKFORT ARMORY - FRANKLIN COUNTY

 
                           -82-                     BOB-CDB03
 1    For replacing the HVAC and
 2      water distribution systems ...................      626,033
 3    For replacing roofs and rehabilitating
 4      exterior .....................................      251,045
 5                      WILLIAMSON COUNTY ARMORY
 6    For providing the State's share for planning
 7      and construction of a new armory, in
 8      addition to amounts previously
 9      appropriated .................................       14,316
10                              STATEWIDE
11    For replacing roofing systems, windows
12      and doors, and rehabilitating the
13      exterior walls at the following
14      locations, at the approximate cost
15      set forth below ..............................    2,407,007
16       Bloomington Armory ...................389,180
17       Kewanee Armory .......................143,267
18       Macomb Armory ........................419,500
19       Rock Falls Armory ....................294,870
20       Sycamore Armory ......................446,177
21    For replacement of roofs at the following
22      locations at the approximate costs set
23      forth below ..................................      115,420
24          Camp Lincoln - AGO Building .......115,420 ____________
25        Total, Section 11                             $29,250,441

26        Section 10.1.  The following named amounts,  or  so  much
27    thereof  as  may  be  necessary  and remain unexpended at the
28    close of business on June  30,  2002,  from  reappropriations
29    heretofore  made  for  such  purposes in Article 56a, Section
30    11.1 of Public Act 92-8, are reappropriated from the  General
31    Revenue  Fund  to  the  Capital  Development  Board  for  the
32    Department  of  Military Affairs for the projects hereinafter
33    enumerated:
 
                           -83-                     BOB-CDB03
 1                          CARBONDALE ARMORY
 2    (From Article 56a, Section 11.1 of Public Act 92-8)
 3    For rehabilitating the exterior and interior ... $    561,006
 4                          LITCHFIELD ARMORY
 5    For renovating the interior and exterior .......      231,494
 6        Total, Section 11.1                              $792,500

 7        Section 11.  The  following  named  amount,  or  so  much
 8    thereof  as  may  be  necessary and remains unexpended at the
 9    close of business on June 30, 2002,  from  a  reappropriation
10    heretofore  made  in  Article  56a,  Section 12 of Public Act
11    92-8, is reappropriated from the Capital Development Fund  to
12    the  Capital  Development  Board for the Department of Public
13    Health for the projects hereinafter enumerated:

14               OAKLAND STREET LABORATORY - CARBONDALE
15    (From Article 56a, Section 12 of Public Act 92-8)
16    For upgrading electrical and plumbing
17      systems ...................................... $    131,758
18        Total, Section 12                                $131,758

19        Section 12.  The following  named  amounts,  or  so  much
20    thereof  as  may  be  necessary  and remain unexpended at the
21    close of business on June 30, 2002, from  appropriations  and
22    reappropriations heretofore made for such purposes in Article
23    56, Section 9 and Article 56a, Section 13 of Public Act 92-8,
24    are  reappropriated  from the Capital Development Fund to the
25    Capital Development Board for the Department of  Revenue  for
26    the projects hereinafter enumerated:

27                 WILLARD ICE BUILDING - SPRINGFIELD
28    (From Article 56, Section 9 of Public Act 92-8)
29    For upgrading the plumbing system .............. $  3,000,000
30    For upgrading parking lot/parking deck
 
                           -84-                     BOB-CDB03
 1      structural repair ............................    1,250,000
 2    For renovating the interior and
 3      upgrading HVAC................................    3,855,000
 4    (From Article 56a, Section 13 of Public Act 92-8)
 5    For upgrading security system, in
 6      addition to funds previously appropriated ....      495,200
 7    For replacing the roof .........................      350,072
 8        Total, Section 13                              $8,950,272

 9        Section  12.1.  The  following  named amounts, or so much
10    thereof as may be necessary  and  remain  unexpended  at  the
11    close  of  business on June 30, 2002, from appropriations and
12    reappropriations heretofore made for such purposes in Article
13    56a, Section 13.1 of Public Act 92-8, are reappropriated from
14    the General Revenue Fund to the Capital Development Board for
15    the  Department  of  Revenue  for  the  projects  hereinafter
16    enumerated:

17                 WILLARD ICE BUILDING - SPRINGFIELD
18    (From Article 56a, Section 13.1 of Public Act 92-8)
19    For repairing the exterior of the building ..... $    281,260
20    For planning and rehabilitating the
21      plumbing system ..............................       45,800
22    For resealing and replacing atrium windows .....       62,145
23        Total, Section 13.1                              $389,205

24        Section 12a.  The following named  amounts,  or  so  much
25    thereof  as  may be necessary and as remain unexpended at the
26    close of business on June 30, 2002, from  appropriations  and
27    reappropriations  heretofore  made in Article 56, Section 9.1
28    and  Article  56a,  Section  13a  of  Public  Act  92-8,  are
29    reappropriated from the Tobacco Settlement Recovery  Fund  to
30    the  Capital  Development Board for the Department of Revenue
31    for the  project hereinafter enumerated:
 
                           -85-                     BOB-CDB03
 1                 WILLARD ICE BUILDING - SPRINGFIELD
 2    (From Article 56, Section 9.1 of Public Act 92-8)
 3    For completing security system upgrade, in
 4      addition to funds previously appropriated .... $    200,000
 5    (From Article 56a, Section 13a of Public Act 92-8)
 6    For structural analysis of parking deck ........       64,920
 7        Total, Section 13a                               $264,920

 8        Section 13.  The following  named  amounts,  or  so  much
 9    thereof  as  may  be  necessary  and remain unexpended at the
10    close of business on June 30, 2002, from  appropriations  and
11    reappropriations heretofore made for such purposes in Article
12    56,  Section  10,  and  Article 56a, Section 14 of Public Act
13    92-8, are reappropriated from the Capital Development Fund to
14    the Capital Development Board for  the  Department  of  State
15    Police for the projects hereinafter enumerated:

16                     CAIRO (ULLIN) - DISTRICT 22
17    (From Article 56a, Section 14 of Public Act 92-8)
18    For construction of a firing range and radio
19      tower ........................................ $    436,104
20                    CHICAGO FORENSIC LABORATORY
21    For construction of a laboratory and
22      parking facilities ...........................       84,737
23                 DISTRICT 13 HEADQUARTERS - DuQUOIN
24    For constructing a district 13
25      headquarters .................................    5,000,000
26    For planning the replacement of the
27      district headquarters facilities .............      348,536
28                  DISTRICT 6 HEADQUARTERS - PONTIAC
29    For planning, construction, reconstruction,
30      demolition of existing buildings, and
31      all costs related to replacing
32      the facilities ...............................    4,402,553
 
                           -86-                     BOB-CDB03
 1                         SPRINGFIELD ARMORY
 2    For planning and design of the rehabilitation
 3      and site improvements of the Springfield
 4      Armory, in addition to funds previously
 5      appropriated .................................    1,383,081
 6                    CAPITOL COMPLEX - SPRINGFIELD
 7    (From Article 56, Section 10 of Public Act 92-8)
 8    For constructing a central administrative
 9      office building and purchasing equipment, in
10      addition to funds previously appropriated ....   46,944,676
11             SPRINGFIELD - STATE POLICE TRAINING ACADEMY
12    (From Article 56a, Section 14 of Public Act 92-8)
13    For replacing portable classroom building ......      895,188
14                        STERLING - DISTRICT 1
15    For planning, construction, reconstruction,
16      demolition of existing buildings, and
17      all costs related to the relocation of
18      the headquarters, in addition to funds
19      previously appropriated ......................       55,818
20                              STATEWIDE
21    For replacing communications towers
22      equipment and tower buildings ................    4,170,687
23    For upgrading generators and UPS systems .......      200,000
24    For replacing roofing system at the
25      following locations at the approximate
26      cost set forth below .........................      304,622
27       District 13 Headquarters,
28         DuQuoin ............................$50,000
29       Joliet Laboratory .....................40,000
30       District 6 Headquarters,
31         Pontiac .............................38,900
32       District 9 Headquarters,
33         Springfield ........................113,022
34       State Police Training Center,
 
                           -87-                     BOB-CDB03
 1         Pawnee ..............................10,000
 2       District 18 Headquarters,
 3         Litchfield ..........................45,000
 4       District 19 Headquarters,
 5         Carmi ................................7,700
 6    For replacing radio communication towers,
 7      equipment buildings and installing emergency
 8      power generators at the following locations:
 9      Pecatonica, Elwood, Kingston, Mason
10      City .........................................    1,700,513
11    For replacing radio communication
12      towers and equipment buildings and
13      installing emergency power
14      generators at Andover, Eaton,
15      Pecatonica, and Cypress ......................      314,524
16        Total, Section 14                             $66,241,039

17        Section  13.1.  The  following  named  amount, or so much
18    thereof as may be necessary and  remains  unexpended  at  the
19    close  of  business  on June 30, 2002, from a reappropriation
20    heretofore made in Article 56a, Section 14.1  of  Public  Act
21    92-8,  is reappropriated from the General Revenue Fund to the
22    Capital Development Board for the Department of State  Police
23    for the project hereinafter enumerated:

24    (From Article 56a, Section 14.1 of Public Act 92-8)
25                   FORENSIC SCIENCE LAB - CHICAGO
26    For upgrading exterior penthouse louvers ....... $     88,345
27        Total, Section 14.1                               $88,345

28        Section  14.  The  following  named  amounts,  or so much
29    thereof as may be necessary  and  remain  unexpended  at  the
30    close  of  business on June 30, 2002, from appropriations and
31    reappropriations  heretofore  made  for  such   purposes   in
 
                           -88-                     BOB-CDB03
 1    Article 56, Section 11, and Article 56a, Section 15 of Public
 2    Act  92-8,  are  reappropriated  from the Capital Development
 3    Fund to the Capital Development Board for the  Department  of
 4    Veterans' Affairs for the projects hereinafter enumerated:

 5                  ILLINOIS VETERANS' HOME - LASALLE
 6    (From Article 56a, Section 15 of Public Act 92-8)
 7    For construction of a storage building  ........       67,927
 8              MANTENO VETERANS' HOME - KANKAKEE COUNTY
 9    For upgrading courtyard program spaces .........    3,720,700
10    For upgrading the electrical system ............      823,981
11    For upgrading storm sewer ......................      125,376
12    For constructing a multi-purpose
13      building .....................................       53,054
14    For construction of a special care facility ....      416,681
15                QUINCY VETERANS' HOME - ADAMS COUNTY
16    (From Article 56, Section 11 of Public Act 92-8)
17    For replacing roofing systems ..................      185,000
18    (From Article 56a, Section 15 of Public Act 92-8)
19    For installing rethermalization system .........      175,773
20    For improvements to various buildings
21      and replacement of Fletcher Building
22      to meet licensure standards ..................    5,050,045
23        Total, Section 15                             $10,618,537

24        Section  14.1.  The  following  named amounts, or so much
25    thereof as may be necessary  and  remain  unexpended  at  the
26    close  of  business  on  June 30, 2002, from reappropriations
27    heretofore made for such purposes  in  Article  56a,  Section
28    15.1  of Public Act 92-8, as amended, are reappropriated from
29    the General Revenue Fund to the Capital Development Board for
30    the  Department  of  Veterans'  Affairs  for   the   projects
31    hereinafter enumerated:
 
                           -89-                     BOB-CDB03
 1                   ILLINOIS VETERANS' HOME - ANNA
 2    (From Article 56a, Section 15.1 of Public Act 92-8)
 3    For repairing, upgrading and maintaining
 4      various systems .............................. $     60,268
 5    For installing lighting, benches,
 6      landscaping and ADA improvements .............      215,473
 7                  ILLINOIS VETERANS' HOME - MANTENO
 8    For upgrading generators for emergency power ...       72,596
 9        Total, Section 15.1                              $348,337

10        Section  14a.  The  following  named  amounts, or so much
11    thereof as may be necessary  and  remain  unexpended  at  the
12    close  of  business on June 30, 2002, from appropriations and
13    reappropriations heretofore made in Article 56, Section  11.1
14    and  Article  56a,  Section  15a  of  Public  Act  92-8,  are
15    reappropriated  from  the Tobacco Settlement Recovery Fund to
16    the Capital Development Board for the Department of Veterans'
17    Affairs for the projects hereinafter enumerated:

18                 ANNA VETERANS' HOME - UNION COUNTY
19    (From Article 56a, Section 15a of Public Act 92-8)
20    For expanding the emergency generator .......... $    137,521
21               LASALLE VETERANS' HOME - LASALLE COUNTY
22    (From Article 56, Section 11.1 of Public Act 92-8)
23    For installing wall protection .................      120,000
24    For upgrading tempered water systems ...........       50,000
25    For replacing lighting .........................       90,000
26              MANTENO VETERANS' HOME - KANKAKEE COUNTY
27    (From Article 56, Section 11.1 of Public Act 92-8)
28    For installing humidifiers and
29      dehumidifiers ................................      515,000
30    (From Article 56a, Section 15a of Public Act 92-8)
31    For resurfacing roads and parking lots .........    1,168,600
32    For enlarging doorways and main bathrooms ......      113,026
 
                           -90-                     BOB-CDB03
 1    For enlarging doorways in Support
 2      II Building ..................................       95,000
 3    For demolishing buildings ......................    2,456,040
 4                QUINCY VETERANS' HOME - ADAMS COUNTY
 5    (From Article 56, Section 11.1 of Public Act 92-8)
 6    For renovating power plant equipment ...........      709,000
 7        Total, Section 15a                             $5,454,187

 8        Section 15.  The following  named  amounts,  or  so  much
 9    thereof  as  may  be  necessary  and remain unexpended at the
10    close of business on June 30, 2002, from  appropriations  and
11    reappropriations heretofore made for such purposes in Article
12    56,  Section  14,  and  Article 56a, Section 16 of Public Act
13    92-8, are reappropriated from the Capital Development Fund to
14    the Capital Development Board for  the  projects  hereinafter
15    enumerated:

16                   EXECUTIVE MANSION - SPRINGFIELD
17    (From Article 56, Section 14 of Public Act 92-8)
18    For building improvements ......................      600,000
19                 LEGISLATIVE SPACE NEEDS COMMISSION
20    (From Article 56, Section 14 of Public Act 92-8)
21    For General Assembly renovations ...............    7,953,706
22              ATTORNEY GENERAL BUILDING - SPRINGFIELD
23    (From Article 56a, Section 16 of Public Act 92-8)
24    For planning an annex or addition and
25      beginning construction of
26      parking facilities ...........................       35,932
27                    SPRINGFIELD - CAPITOL COMPLEX
28    For upgrading HVAC system at the Archives
29      Building, in addition to funds previously
30      appropriated .................................       36,199
31    For upgrading environmental equipment
32      and HVAC, in addition to funds previously
 
                           -91-                     BOB-CDB03
 1      appropriated - Archives Building .............    1,183,215
 2    For planning and beginning the rehabilitation
 3      of the Power Plant ...........................      285,847
 4    For upgrading sewer system - Capitol Complex,
 5      in addition to funds previously
 6      appropriated .................................      225,223
 7    For upgrading the life/safety and security
 8      systems - Capitol Building ...................    1,668,728
 9    For upgrading the refrigeration equipment -
10      Capitol Complex ..............................       73,160
11    For renovating mechanical system -
12      Capitol Complex, in addition to funds
13      previously appropriated ......................       73,066
14    For providing a parking facility for the
15      Bloom and Harris Buildings, including
16      land acquisition .............................       91,803
17    For all costs associated with the design
18      and planning for asbestos abatement,
19      window replacement, energy conservation
20      improvements, replacement of carpeting and
21      ceiling tiles, handicap accessibility
22      improvements, and rehabilitation of the
23      water and air distribution systems in the
24      Stratton Office Building .....................       70,581
25    For renovation of the Waterways Building for
26      the Fourth District of the Appellate Court ...       45,945
27                       STATE CAPITOL BUILDING
28    For upgrading the life/safety and
29      security systems, in addition to
30      funds previously appropriated ................    2,600,000
31               STRATTON OFFICE BUILDING - SPRINGFIELD
32    For installing fire alarm system ...............       21,795
33                              STATEWIDE
34    (From Article 56, Section 14 of Public Act 92-8)
 
                           -92-                     BOB-CDB03
 1    For abating hazardous materials ................    2,050,000
 2    For retrofitting or upgrading mechanized
 3      refrigeration equipment (CFCs) ...............      650,000
 4    For surveys and modifications to buildings
 5      to meet requirements of the federal
 6      Americans with Disabilities Act (ADA) ........    2,000,000
 7    (From Article 56a, Section 16 of Public Act 92-8)
 8    For surveys and modifications to buildings
 9      to meet requirements of the federal
10      Americans with Disabilities Act (ADA) ........    4,000,000
11    For upgrading and remediating aboveground
12      and underground storage tanks ................    1,000,000
13    For abating hazardous materials ................    1,000,000
14    For retrofitting or upgrading mechanized
15      refrigeration equipment (CFCs) ...............    4,000,000
16    For surveys and modifications to buildings
17      to meet requirements of the federal
18      Americans with Disabilities Act ..............    9,000,000
19    For abating hazardous materials ................    2,757,677
20    For retrofitting or upgrading mechanized
21      refrigeration equipment (CFCs) ...............    6,608,280
22    For upgrading and remediating aboveground
23      and underground storage tanks ................    3,500,000
24    For surveys and modifications to buildings
25      to meets requirements of the federal
26      Americans With Disabilities Act ..............    1,327,567
27    For retrofitting or upgrading mechanized
28      refrigeration equipment (CFCs) ...............    1,857,807
29    For abating hazardous materials ................    1,851,320
30    For upgrading and remediating underground
31      storage tanks ................................    7,414,822
32    For surveys and modifications to
33      buildings to meet requirements of the
34      federal Americans with Disabilities Act ......      960,483
 
                           -93-                     BOB-CDB03
 1    For abatement of hazardous materials ...........      623,188
 2    For upgrading/retrofitting mechanized
 3      refrigeration equipment (CFC's) ..............       73,491
 4    For upgrade and remediation of underground
 5      storage tanks ................................      567,433
 6    For renovation to meet the requirements
 7      of the Americans with Disabilities Act .......       32,565
 8    For abatement of hazardous materials ...........      498,731
 9    For upgrade and remediation of
10      underground storage tanks ....................      277,245
11    For survey for and abatement of
12      asbestos-containing materials ................      181,783
13    For upgrade/retrofit of mechanized
14      refrigeration equipment (CFC's) ..............      112,748
15    For abatement of hazardous conditions,
16      including underground storage tanks,
17      in addition to funds previously
18      appropriated .................................      205,320
19    For surveys and modifications to buildings
20      to meet requirements of the federal
21      Americans with Disabilities Act ..............    5,934,238
22    For demolition of buildings ....................      185,700
23    For retrofitting/upgrading mechanical
24      refrigeration equipment ......................       32,628
25    For abating hazardous conditions, including
26      underground storage tanks, in addition to
27      funds previously appropriated ................       17,521
28    For the planning, upgrade and replacement of
29      potentially hazardous underground storage
30      tanks ........................................      121,644
31    For surveys and abatement of asbestos-
32      containing materials .........................      197,727
33    For asbestos abatement located during
34      Asbestos Abatement Authority and other
 
                           -94-                     BOB-CDB03
 1      surveys to eliminate significant health
 2      hazards ......................................       69,764
 3    For planning and abatement of asbestos,
 4      and replenishment of initial project
 5      construction costs in bondable projects
 6      at various state owned facilities ............       15,501
 7        Total, Section 16                             $74,090,383

 8        Section  15.1.  The  amount  of  $1,065,190,  or  so much
 9    thereof as may be necessary and  remains  unexpended  at  the
10    close  of  business  on June 30, 2002, from a reappropriation
11    heretofore made in Article 56a, Section 16.2  of  Public  Act
12    92-8,  is  reappropriated from the Asbestos Abatement Fund to
13    the Capital  Development  Board  for  surveying  and  abating
14    asbestos-containing materials statewide.

15        Section 15.2.  The sum of $238,251,006 or so much thereof
16    as  may  be  necessary and remains unexpended at the close of
17    business on June 30, 2002, from an  appropriation  heretofore
18    made  in  Article  56a,  Section  16.3 of Public Act 92-8, is
19    reappropriated from  the  School  Construction  Fund  to  the
20    Capital  Development  Board  for  school  construction grants
21    pursuant to the  School  Construction  Law,  in  addition  to
22    amounts previously appropriated for such purposes.

23        Section  15.3.  The sum of $2,201,799, or so much thereof
24    as may be necessary and remains unexpended at  the  close  of
25    business  on  June 30, 2002, from an appropriation heretofore
26    made in Article 56a, Section 16.4  of  Public  Act  92-8,  is
27    reappropriated  from  the General Revenue Fund for a grant to
28    the City of Normal for demolition of a  power  plant  at  the
29    former Department of Human Services facility.

30        Section  15a.  The  following  named  amounts, or so much
 
                           -95-                     BOB-CDB03
 1    thereof as may be necessary  and  remain  unexpended  at  the
 2    close  of  business  on  June 30, 2002, from an appropriation
 3    heretofore made in Article 56, Section 14.1 and Article  56a,
 4    Section  16a  of Public Act 92-8, are reappropriated from the
 5    Tobacco Settlement Recovery Fund to the  Capital  Development
 6    Board for the projects hereinafter enumerated:

 7                              STATEWIDE
 8    (From Article 56, Section 14.1 of Public Act 92-8)
 9    Survey for and abate hazardous
10      materials .................................... $  1,000,000
11    For repairing minor problems and
12      emergencies ..................................    1,000,000
13    (From Article 56a, Section 16a of Public Act 92-8)
14    For tuckpointing and repairing exterior
15      of buildings .................................      200,000
16    For demolition of buildings ....................    1,216,000
17    For archeological studies of
18      construction sites ...........................      100,000
19    For repairing minor problems and
20      emergencies ..................................    4,000,000
21        Total, Section 16a                             $7,516,000

22        Section  16.  The  following  named  amounts,  or so much
23    thereof as may be necessary  and  remain  unexpended  at  the
24    close  of  business  on  June 30, 2002, from reappropriations
25    heretofore made for such purposes in Article 56a, Section  17
26    of  Public  Act  92-8,  are  reappropriated  from the General
27    Revenue  Fund  to  the  Capital  Development  Board  for  the
28    projects hereinafter enumerated:

29    (From Article 56a, Section 17 of Public Act 92-8)
30                              STATEWIDE
31    For remediating minor problems and
 
                           -96-                     BOB-CDB03
 1      emergencies .................................. $  2,786,340
 2    For conducting construction site
 3      archeological studies ........................      245,000
 4    For demolition of buildings ....................    1,972,901
 5    For surveying and abating asbestos-
 6      containing materials .........................    1,000,000
 7    For surveying and abating asbestos-
 8      containing materials .........................      511,190
 9    For remediating minor problems
10      and emergencies ..............................      499,032
11    For conducting construction site
12      archeological studies ........................      216,888
13    For demolishing buildings ......................    4,668,174
14    For repair of minor problems and
15      emergencies ..................................      467,158
16    For construction site archeological
17      studies ......................................       33,583
18    For surveys for and abatement of
19      asbestos-containing material .................      317,009
20    For demolition of buildings ....................      833,030
21    For repair of minor problems and
22      emergencies ..................................       63,698
23    For surveys for asbestos containing
24      material .....................................       25,943
25    For survey of asbestos-containing
26      materials ....................................       22,524
27    For the planning and abatement of asbestos
28      hazards, and replenishment of initial
29      project construction costs in
30      non-bondable projects at various
31      state owned facilities .......................       79,209
32        Total, Section 17                             $13,741,679

33        Section 17.  The amount of $1,063,180, or so much thereof
 
                           -97-                     BOB-CDB03
 1    as may be necessary and remains unexpended at  the  close  of
 2    business  on June 30, 2002, from a reappropriation heretofore
 3    made in Article 56a, Section 18 of Public Act 92-8,  approved
 4    May  17,  2000, is reappropriated from the Asbestos Abatement
 5    Fund to the Capital Development Board  for  asbestos  surveys
 6    and  emergency abatement in relation to asbestos abatement in
 7    state governmental buildings or higher education  residential
 8    and auxiliary enterprise buildings.

 9        Section  18.  The  sum  of $27,229, or so much thereof as
10    may be necessary and  remains  unexpended  at  the  close  of
11    business  on June 30, 2002, from a reappropriation heretofore
12    made for such purposes in Article 56a, Section 19  of  Public
13    Act  92-8, is reappropriated from the General Revenue Fund to
14    the Capital Development Board for a  grant  to  Lincoln  Land
15    Community   College   for   all  costs  associated  with  the
16    construction of a new Rural Education and Technology Center.

17        Section 19.  The sum of $31,685, or so  much  thereof  as
18    may  be  necessary  and  remains unexpended on June 30, 2002,
19    from  a  reappropriation  heretofore  made  in  Article  56a,
20    Section 19.1 of Public Act 92-8, is reappropriated  from  the
21    General  Revenue  Fund  to  the Capital Development Board for
22    planning and  renovation  of  Founders  Memorial  Library  at
23    Northern Illinois University.

24        Section 20.  The amount of $1,287,487, or so much thereof
25    as  may  be  necessary and remains unexpended at the close of
26    business on June 30, 2002, from a reappropriation  heretofore
27    made  for  such purposes in Article 56a, Section 20 of Public
28    Act 92-8, is reappropriated from  the  School  Infrastructure
29    Fund to the Capital Development Board for school construction
30    project grants pursuant to the School Construction Law.
 
                           -98-                     BOB-CDB03
 1        Section  21.  The  sum of $15,012,483, or so much thereof
 2    as may be necessary and remains unexpended at  the  close  of
 3    business  on June 30, 2002, from a reappropriation heretofore
 4    made for such purposes in Article 56a, Section 21  of  Public
 5    Act  92-8,  is  reappropriated from the School Infrastructure
 6    Fund to the Capital Development Board for school construction
 7    grants pursuant to the School Construction Law.

 8        Section 22.  The sum of $7,046,611, or so much thereof as
 9    may be necessary and  remains  unexpended  at  the  close  of
10    business  on June 30, 2002, from a reappropriation heretofore
11    made for such purposes in Article 56a, Section 22  of  Public
12    Act 92-8, is reappropriated from the School Construction Fund
13    to  the  Capital  Development  Board  for school construction
14    grants pursuant to the School Construction Law.

15        Section 24.    The following named  amount,  or  so  much
16    thereof  as  may  be  necessary and remains unexpended at the
17    close of business on June 30, 2002,  from  a  reappropriation
18    heretofore  made  in  Article  56a,  Section 24 of Public Act
19    92-8, is reappropriated from the Capital Development Fund  to
20    the  Capital  Development  Board  for  the  Board  of  Higher
21    Education for the project hereinafter enumerated:

22                SIU SCHOOL OF MEDICINE - SPRINGFIELD
23    (From Article 56a, Section 24 of Public Act 92-8)
24    For constructing and for equipment for
25      an addition to the combined laboratory,
26      in addition to funds previously
27      appropriated ................................. $ 26,392,620
28        Total, Section 24                             $26,392,620

29        Section  24.1.  The  following  named amounts, or so much
30    thereof as may be necessary  and  remain  unexpended  at  the
 
                           -99-                     BOB-CDB03
 1    close  of  business on June 30, 2002, from appropriations and
 2    reappropriations heretofore made for such purposes in Article
 3    56, Section 17 and Article 56a, Section 24.1  of  Public  Act
 4    92-8,   as  amended,  are  reappropriated  from  the  Capital
 5    Development Fund to the Capital  Development  Board  for  the
 6    projects hereinafter enumerated:
 7                    SOUTHERN ILLINOIS UNIVERSITY
 8    (From Article 56, Section 17 of Public Act 92-8)
 9    For planning, construction and equipment
10      for a cancer center .......................... $ 14,500,000
11             SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
12    For planning, construction and equipment
13      for an advanced technical worker
14      training facility ............................    1,100,000
15                  UNIVERSITY OF ILLINOIS - CHICAGO
16    For planning, construction and equipment
17      for a chemical sciences building .............    6,400,000
18    (From Article 56a, Section 24.1 of Public Act 92-8)
19    To plan and begin construction of
20      a medical imaging research/clinical
21      facility .....................................    9,125,892
22              UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN
23    (From Article 56, Section 17 of Public Act 92-8)
24    For planning, construction and equipment
25      for a biotechnology genomic facility .........   67,500,000
26    For planning, construction and equipment
27      for a supercomputing application facility ....   27,000,000
28    For planning, construction and equipment
29      for a technology transfer incubator
30      facility .....................................    5,000,000
31    (From Article 56a, Section 24.1 of Public Act 92-8)
32    To plan and begin construction of a
33      biotechnology/genomic facility ...............    6,015,227
34    To plan and begin construction of a
 
                           -100-                    BOB-CDB03
 1      supercomputing application
 2      facility .....................................    1,767,534
 3    To plan and begin construction of a
 4      technology transfer incubator
 5      facility .....................................    2,612,967
 6        Total                                        $141,021,620

 7        Section  25.  The  following  named  amounts,  or so much
 8    thereof as may be necessary  and  remain  unexpended  at  the
 9    close  of  business on June 30, 2002, from appropriations and
10    reappropriations heretofore made for such purposes in Article
11    56a, Section 25 of Public Act 92-8, are  reappropriated  from
12    the Capital Development Fund to the Capital Development Board
13    for   the   Board   of  Higher  Education  for  the  projects
14    hereinafter enumerated:

15          ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA
16    (From Article 56a, Section 25 of Public Act 92-8)
17    For replacing the roof on the
18      Academic Building ............................ $    392,490
19    For replacing carpeting, constructing storage
20      building and various site improvements,
21      including extending communications
22      conduit system ...............................      285,437
23    For replacing air conditioning units,
24      controls and upgrading the energy
25      management system ............................      122,757
26    For remodeling the Information Resource
27      Technology Center ............................       50,665
28    For renovation of the laboratory areas,
29      including a greenhouse .......................       41,504
30    For the purchase, renovation and improvement
31      of the North Campus High School site of
32      the Aurora West School District 129,
 
                           -101-                    BOB-CDB03
 1      including construction of four dormitories,
 2      equipment purchases and other expenses for
 3      use by the Illinois Mathematics and Science
 4      Academy ......................................      211,948
 5        Total, Section 25                              $1,104,801

 6        Section 26.  The sum of $8,008,803, or so much thereof as
 7    may   be   necessary   and   remains   unexpended   from    a
 8    reappropriation heretofore made in Article 56a, Section 26 of
 9    Public  Act  92-8,  approved  May 17, 2000, is reappropriated
10    from the Capital Development Fund to the Capital  Development
11    Board  for the Illinois Community College Board for planning,
12    construction, utilities,  site  improvements,  equipment  and
13    other  costs  necessary  for  a new Workforce Development and
14    Community Education Facility at John A. Logan  College.   The
15    provisions  of  Article V of the Public Community College Act
16    are not applicable to this appropriation.

17        Section 27.  The following  named  amounts,  or  so  much
18    thereof  as  may  be  necessary  and remain unexpended at the
19    close of business on June 30, 2002, from  appropriations  and
20    reappropriations heretofore made for such purposes in Article
21    56,  Section 15, and Article 56a, Section 27 of of Public Act
22    92-8, are reappropriated from the Capital Development Fund to
23    the Capital Development  Board  for  the  Illinois  Community
24    College Board for the projects hereinafter enumerated:

25                        CARL SANDBURG COLLEGE
26    (From Article 56a, Section 27 of Public Act 92-8)
27    For constructing a computer/
28      student center ............................... $  2,334,129
29                CITY COLLEGES OF CHICAGO/KENNEDY KING
30    For remodeling for Workforce Preparation
31      Centers ......................................    3,862,000
 
                           -102-                    BOB-CDB03
 1    For remodeling for a culinary arts
 2      educational facility .........................   10,875,000
 3            CITY COLLEGES OF CHICAGO - MALCOLM X COLLEGE
 4    For remodeling the Allied Health
 5      program facilities ...........................    4,509,000
 6         DANVILLE AREA COMMUNITY COLLEGE - VERMILION COUNTY
 7    For renovating campus buildings ................    1,789,365
 8                          COLLEGE OF DUPAGE
 9    For upgrading the Instructional Center
10      heating, ventilating and air
11      conditioning systems .........................    2,228,000
12                       ELGIN COMMUNITY COLLEGE
13    For construction of addition, site improvements,
14      remodeling and purchasing equipment ..........       94,896
15              HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON
16    For constructing buildings and making
17      site improvements, including equipment .......       43,100
18           IL EASTERN COMMUNITY COLLEGE - FRONTIER COLLEGE
19    For constructing a learning resource
20      center.  The provisions of Article V of the
21      Public Community College Act are not
22      applicable to this appropriation .............      976,858
23            JOHN A. LOGAN COMMUNITY COLLEGE - CARTERVILLE
24    For constructing additions and site
25      improvements, in addition to funds
26      previously appropriated ......................    2,125,832
27                JOHN WOOD COMMUNITY COLLEGE - QUINCY
28    For constructing campus buildings and site
29      improvements, in addition to funds
30      previously appropriated ......................       21,139
31    For planning campus buildings and site
32      improvements .................................      394,828
33                     KANKAKEE COMMUNITY COLLEGE
34    For constructing a laboratory/classroom
 
                           -103-                    BOB-CDB03
 1      facility .....................................    6,820,000
 2                          KASKASKIA COLLEGE
 3    For renovating the learning
 4      resource center ..............................      255,568
 5                       COLLEGE OF LAKE COUNTY
 6    For planning and beginning construction
 7      of a technology building -
 8      Phase 1 ......................................    2,561,497
 9                     LAKE LAND COLLEGE - MATTOON
10    For constructing a Technology Building, a
11      parking area and for site improvements .......      884,714
12    For constructing a classroom/administration
13      building and purchasing equipment, in addition
14      to funds previously appropriated .............      190,416
15             LEWIS AND CLARK COMMUNITY COLLEGE - GODFREY
16    For constructing classroom
17      and office building and additions,
18      and remodeling of Haskell Hall ...............       57,147
19    For construction of health, mathematics and
20      science laboratory facilities and
21      remodeling Fobes Hall ........................       35,720
22            LINCOLN LAND COMMUNITY COLLEGE - SPRINGFIELD
23    For constructing a conference &
24      training facility addition to the
25      Millenium Center, in addition
26      to funds previously appropriated .............      795,402
27    For constructing an addition and remodeling
28      Sangamon and Menard Halls ....................    1,131,966
29           MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS
30    For constructing a classroom/administration
31      building, providing site improvements and
32      purchasing equipment, in addition to
33      funds previously appropriated ................      252,666
34                       MCHENRY COUNTY COLLEGE
 
                           -104-                    BOB-CDB03
 1    For constructing classrooms and a
 2      student services building and remodeling
 3      space, in addition to funds previously
 4      appropriated .................................    6,483,330
 5                      OAKTON COMMUNITY COLLEGE
 6    For planning an addition to Ray
 7      Harstein campus - Phase 1 ....................      392,000
 8                    PARKLAND COLLEGE - CHAMPAIGN
 9    For constructing a classroom/instructional
10      support building, in addition to
11      funds previously appropriated ................       42,299
12               PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS
13    For constructing an addition to the Adult
14      Training/Outreach Center, in addition to
15      funds previously appropriated ................   10,926,138
16                       REND LAKE COLLEGE - INA
17    For site development, design and
18      construction of an Industrial &
19      Community Training Center at Pinckneyville
20      Industrial Park ..............................      342,224
21    For replacing utility piping ...................      315,563
22                RICHLAND COMMUNITY COLLEGE - DECATUR
23    For remodeling and constructing additions ......    2,964,694
24                  SHAWNEE COMMUNITY COLLEGE - ULLIN
25    For constructing additions, parking
26      facilities, and renovating buildings,
27      including equipment ..........................      267,596
28                    SOUTHWESTERN ILLINOIS COLLEGE
29                 (Formerly BELLEVILLE AREA COLLEGE)
30    For renovating campus buildings and site
31      improvements at the Belleville and Red
32      Bud campuses .................................    2,020,454
33    For constructing a building, additions
34      and site improvements at the
 
                           -105-                    BOB-CDB03
 1      Belleville and Red Bud campuses,
 2      in addition to funds previously
 3      appropriated .................................       20,152
 4                       SOUTH SUBURBAN COLLEGE
 5    For improving flood retention ..................      437,000
 6                         SPOON RIVER COLLEGE
 7    For remodeling Engle Hall and
 8      constructing a maintenance building ..........    2,588,648
 9               TRITON COMMUNITY COLLEGE - RIVER GROVE
10    For rehabilitating the Liberal Arts
11      Building .....................................    3,486,381
12    For rehabilitating the potable water
13      distribution system ..........................      612,587
14                              STATEWIDE
15    (From Article 56, Section 15 of Public Act 92-8)
16    For miscellaneous capital improvements
17      including construction, capital facilities,
18      cost of planning, supplies, equipment,
19      materials, services and all other expenses
20      required to complete the work at the
21      various community colleges.  This appropriated
22      amount shall be in addition to any other
23      appropriated amounts which can be
24      expended for these purposes ..................    6,071,700
25    (From Article 56a, Section 27 of Public Act 92-8)
26    For miscellaneous capital improvements
27      including construction, capital facilities,
28      cost of planning, supplies, equipment,
29      materials, services and all other expenses
30      required to complete the work at the
31      various community colleges.  This appropriated
32      amount shall be in addition to any other
33      appropriated amounts which can be
34      expended for these purposes ..................    5,483,310
 
                           -106-                    BOB-CDB03
 1                  STATEWIDE - CONSTRUCTION DEFECTS
 2    For planning, construction and renovation
 3      to correct defectively designed or
 4      constructed community college facilities,
 5      provided that monies recovered based upon
 6      claims arising out of such defective design
 7      or construction shall be paid to the state
 8      as required by Section 105.12 of the Public
 9      Community College Act as reimbursement for
10      monies expended pursuant to this
11      appropriation ................................      525,529
12        Total, Section 27                             $85,218,848

13        Section  28.     The  following named amounts, or so much
14    thereof as may be necessary  and  remain  unexpended  at  the
15    close  of  business on June 30, 2002, from appropriations and
16    reappropriations heretofore made in Article  56,  Section  16
17    and   Article  56a,  Section  28  of  Public  Act  92-8,  are
18    reappropriated from  the  Capital  Development  Fund  to  the
19    Capital  Development  Board  for the Illinois Board of Higher
20    Education for the projects hereinafter enumerated:

21                              STATEWIDE
22    (From Article 56, Section 16 of Public Act 92-8)
23    For miscellaneous capital improvements
24      including construction, capital
25      facilities, cost of  planning, supplies,
26      equipment, materials, services and
27      all other expenses required to complete
28      the work at the various universities
29      This appropriated  amount shall be in
30      addition to any other appropriated amounts
31      which can be expended for these purposes...... $ 13,928,300
32       Chicago State University .............322,700
 
                           -107-                    BOB-CDB03
 1       Eastern Illinois University ..........515,500
 2       Governors State University ...........189,700
 3       Illinois State University ..........1,021,300
 4       Northeastern Illinois
 5        University ..........................383,700
 6       Northern Illinois University .......1,159,000
 7       Western Illinois University ..........792,200
 8       Southern Illinois University -
 9        Carbondale ........................1,624,700
10       Southern Illinois University -
11        Edwardsville ........................763,100
12       University of Illinois -
13        Chicago ...........................2,777,300
14       University of Illinois -
15        Springfield .........................229,100
16       University of Illinois -
17        Urbana/Champaign ..................4,150,000
18    (From Article 56a, Section 28 of Public Act 92-8)
19    For miscellaneous capital improvements,
20      including construction, capital
21      facilities, cost of  planning,
22      supplies, equipment, materials, services
23      and all other expenses required to
24      complete the work at the various universities.
25      This appropriated  amount shall be in
26      addition to any other appropriated
27      amounts which can be expended
28      for these purposes............................   12,165,873
29       Chicago State University .............117,644
30       Eastern Illinois University ..........507,290
31       Governors State University ...........196,500
32       Illinois State University ..........1,200,667
33       Northeastern Illinois
34        University ..........................375,400
 
                           -108-                    BOB-CDB03
 1       Northern Illinois University .......1,249,300
 2       Western Illinois University ..........851,000
 3       Southern Illinois University -
 4        Carbondale ........................1,178,252
 5       Southern Illinois University -
 6        Edwardsville ........................663,000
 7       University of Illinois -
 8        Chicago ...........................2,559,091
 9       University of Illinois -
10        Springfield .........................146,705
11       University of Illinois -
12        Urbana/Champaign ..................3,121,024
13                      CHICAGO STATE UNIVERSITY
14    (From Article 56, Section 16 of Public Act 92-8)
15    For constructing a new library facility,
16      site improvements, utilities, and
17      purchasing equipment, in addition
18      to funds previously appropriated .............   16,000,000
19    For technology improvements and
20      deferred maintenance .........................    3,000,000
21    (From Article 56a, Section 28 of Public Act 92-8)
22    For remodeling Building K, in addition
23      to funds previously appropriated .............    9,397,757
24                      CITY COLLEGES OF CHICAGO
25    (From Article 56, Section 16 of Public Act 92-8)
26    For various improvements for infrastructure
27      and technology associated with the Student
28      Administration System ........................    9,000,000
29                     EASTERN ILLINOIS UNIVERSITY
30    (From Article 56, Section 16 of Public Act 92-8)
31    For renovating and expanding the
32      Fine Arts Center, in addition to
33      funds previously appropriated ................   40,003,000
34    (From Article 56a, Section 28 of Public Act 92-8)
 
                           -109-                    BOB-CDB03
 1    For planning and beginning to renovate
 2      and expand the Fine Arts Center -
 3      Phase 1, in addition to funds
 4      previously appropriated ......................    3,160,920
 5                     GOVERNORS STATE UNIVERSITY
 6    For constructing addition and
 7      remodeling the teaching & learning
 8      complex, in addition to funds
 9      previously appropriated ......................   21,985,700
10                      ILLINOIS STATE UNIVERSITY
11    (From Article 56, Section 16 of Public Act 92-8)
12    For the upgrade and remodeling
13      of Schroeder Hall ............................   17,462,724
14                    NORTHERN ILLINOIS UNIVERSITY
15    (From Article 56a, Section 28 of Public Act 92-8)
16    For renovating the Founders Library
17      basement, in addition to funds previously
18      appropriated .................................    2,610,457
19                  NORTHEASTERN ILLINOIS UNIVERSITY
20    (From Article 56, Section 16 of Public Act 92-8)
21    For renovating Building "C" and
22      remodeling and expanding Building "E"
23      and Building "F" .............................    9,064,300
24              SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
25    (From Article 56a, Section 28 of Public Act 92-8)
26    For renovating Altgeld Hall and Old
27      Baptist Foundation, in addition to funds
28      previously appropriated ......................   10,292,480
29                     WESTERN ILLINOIS UNIVERSITY
30    (From Article 56, Section 16 of Public Act 92-8)
31    For improvements to Memorial
32      Hall .........................................   12,000,000
33        Total, Section 28                            $180,071,511
 
                           -110-                    BOB-CDB03
 1        Section 29.  The sum of $3,093,776, or so much thereof as
 2    may be necessary and  remains  unexpended  at  the  close  of
 3    business  on June 30, 2002, from a reappropriation heretofore
 4    made for such purposes in Article 56a, Section 29  of  Public
 5    Act 92-8, is reappropriated from the Capital Development Fund
 6    to  the  Capital Development Board for the Illinois Community
 7    College  Board   for   miscellaneous   capital   improvements
 8    including     construction,    reconstruction,    remodeling,
 9    improvement, repair and installation of  capital  facilities,
10    cost  of  planning,  supplies, equipment, materials, services
11    and all other expenses required to complete the work  at  the
12    various  community  colleges.  This appropriation shall be in
13    addition to any  other  appropriated  amounts  which  can  be
14    expended for these purposes.

15        Section 30.  The sum of $3,609,331, or so much thereof as
16    may  be  necessary  and  remains  unexpended  at the close of
17    business on June 30, 2002, from a reappropriation  heretofore
18    made  for  such purposes in Article 56a, Section 30 of Public
19    Act 92-8, is reappropriated from the Capital Development Fund
20    to the Capital Development Board for the  Illinois  Community
21    College   Board   for   miscellaneous   capital  improvements
22    including    construction,    reconstruction,     remodeling,
23    improvement,  repair  and installation of capital facilities,
24    cost of planning, supplies,  equipment,  materials,  services
25    and  all  other expenses required to complete the work at the
26    various community colleges.  This appropriation shall  be  in
27    addition  to  any  other  appropriated  amounts  which can be
28    expended for these purposes.

29        Section 31.  The sum of $1,540,729, or so much thereof as
30    may be necessary and  remains  unexpended  at  the  close  of
31    business  on June 30, 2002, from a reappropriation heretofore
32    made for such purposes in Article 56a, Section 31  of  Public
 
                           -111-                    BOB-CDB03
 1    Act 92-8, is reappropriated from the Capital Development Fund
 2    to  the  Capital Development Board for the Illinois Community
 3    College  Board  for  grants   to   community   colleges   for
 4    miscellaneous  capital  improvements  including construction,
 5    reconstruction,   remodeling,   improvements,   repair    and
 6    installation   of   capital  facilities,  cost  of  planning,
 7    supplies,  equipment,  materials,  services,  and  all  other
 8    expenses required to complete the  work.  This  appropriation
 9    shall  be in addition to any other appropriated amounts which
10    can be expended for these purposes.

11        Section 32.  The sum of $2,769,950, or so much thereof as
12    may be necessary and  remains  unexpended  at  the  close  of
13    business  on June 30, 2002, from a reappropriation heretofore
14    made for such purpose in Article 56a, Section  32  of  Public
15    Act  92-8 is reappropriated from the Capital Development Fund
16    to the Capital Development Board for the  Illinois  Community
17    College   Board   for   miscellaneous   capital  improvements
18    including construction, capital facilities, cost of planning,
19    supplies,  equipment,  materials,  services  and  all   other
20    expenses  required  to  complete  the  work  at  the  various
21    community  colleges.  This appropriation shall be in addition
22    to any other appropriated amounts which can be  expended  for
23    these purposes.

24        Section  33.  The  following  named  amounts,  or so much
25    thereof as may be necessary  and  remain  unexpended  at  the
26    close  of  business  on  June 30, 2002, from reappropriations
27    heretofore made for such purposes in Article 56a, Section  33
28    of  Public  Act  92-8,  are  reappropriated  from the Capital
29    Development Fund to the Capital  Development  Board  for  the
30    Board  of  Higher  Education  for  the  projects  hereinafter
31    enumerated:
 
                           -112-                    BOB-CDB03
 1                      CHICAGO STATE UNIVERSITY
 2    (From Article 56a, Section 33 of Public Act 92-8)
 3    For planning and beginning to remodel
 4      Building K and improving site ................ $  1,005,474
 5    For planning, site improvements, utilities,
 6      construction, equipment and other costs
 7      necessary for a new library facility .........   17,849,745
 8    For upgrading campus infrastructure,
 9      in addition to the funds
10      previously appropriated ......................    2,700,000
11    For renovating buildings and upgrading
12      mechanical systems ...........................    1,430,791
13    For providing campus health and safety
14      improvements .................................       30,913
15              EASTERN ILLINOIS UNIVERSITY - CHARLESTON
16    For planning and beginning to renovate
17      and expand the Fine Arts Center ..............    2,000,000
18    For upgrading campus buildings for health,
19      safety and environmental improvements ........    1,162,169
20    For constructing an addition and
21      renovating Booth Library .....................    2,122,301
22    For construction of an addition and
23      remodeling Buzzard Building ..................       30,181
24              GOVERNORS STATE UNIVERSITY - PARK FOREST
25    For constructing a child development center
26      and an addition to the main building
27      and remodeling Wings E and F .................   11,956,077
28    For planning and beginning the
29      main building renovations,
30      a child development center, and
31      faculty offices ..............................      513,255
32    For upgrading and replacing cooling
33      and refrigeration systems and
34      equipment ....................................      260,036
 
                           -113-                    BOB-CDB03
 1    For remodeling the main building ...............      171,802
 2                 ILLINOIS STATE UNIVERSITY - NORMAL
 3    For planning and beginning to rehabilitate
 4      Schroeder Hall ...............................      694,614
 5    For planning, site improvements, utilities,
 6      construction, equipment and other costs
 7      necessary for a new facility for the
 8      College of Business ..........................   17,825,842
 9    For remodeling Julian and Moulton Halls ........    4,603,668
10             NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
11    For planning and beginning to remodel
12      Buildings A, B and E .........................    5,339,338
13    For remodeling in the Science Building
14      to upgrade heating, ventilating and air
15      conditioning systems .........................    2,021,400
16    For replacing fire alarm systems, lighting
17      and ceilings .................................    2,495,000
18    For renovating the auditorium in
19      Building E ...................................    4,520,932
20    For fire safety modifications at the
21      facility .....................................       79,668
22    For renovation of Buildings E, F, and
23      the auditorium, and demolition and
24      replacement of Buildings G, J and M,
25      in addition to amounts previously
26      appropriated .................................      102,848
27    For remodeling the library .....................      160,697
28                NORTHERN ILLINOIS UNIVERSITY - DEKALB
29    For planning a classroom building and
30      developing site in Hoffman Estates ...........    1,314,500
31    For completing the construction of the
32      Engineering Building, in addition to
33      amounts previously appropriated for
34      such purpose .................................    4,062,351
 
                           -114-                    BOB-CDB03
 1    For renovating Altgeld Hall and
 2      purchasing equipment .........................    5,162,292
 3    For upgrading storm waterway controls in
 4      addition to funds previously appropriated ....    6,404,139
 5              SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
 6    For upgrading and remodeling Anthony Hall ......      366,029
 7    For site improvements and purchasing
 8      equipment for the Engineering and
 9      Technology Building ..........................       56,470
10             SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
11    For construction of the Engineering Facility
12      building and related site improvements .......      302,231
13    For planning and beginning construction
14      or renovation for a classroom/administration
15      facility at East St. Louis in addition
16      to funds previously appropriated .............       27,420
17                  UNIVERSITY CENTER OF LAKE COUNTY
18    For land, planning, remodeling, construction
19      and all costs necessary to construct a
20      facility .....................................   10,622,467
21                  UNIVERSITY OF ILLINOIS - CHICAGO
22    For remodeling the Clinical
23      Sciences Building ............................    7,355,927
24    For the renovation of the court area and
25      Lecture Center, in addition to funds
26      previously appropriated ......................    2,414,662
27              UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN
28    For planning and beginning to construct
29      a central chiller plant ......................      541,625
30    For completion of campus flood control .........    3,095,806
31    For remodeling the Mechanical Engineering
32      Laboratory Building ..........................      730,588
33                UNIVERSITY OF ILLINOIS - SPRINGFIELD
34    For constructing and improving campus
 
                           -115-                    BOB-CDB03
 1      roadways, in addition to funds previously
 2      appropriated .................................        4,633
 3                WESTERN ILLINOIS UNIVERSITY - MACOMB
 4    For constructing a utility tunnel system, in
 5      addition to funds previously appropriated ....    2,530,148
 6    For remodeling Horrabin Hall and
 7      beginning to convert Simpkins Hall
 8      gymnasium and adjacent areas into
 9      a performing arts facility ...................      121,074
10    For construction of a steam and electrical
11      utility tunnel ...............................       31,903
12    For constructing a utility tunnel and
13      installing piping, lines and cables ..........      903,516
14    For remodeling Horrabin and Simpkins
15      Halls, in addition to funds
16      previously appropriated.......................      395,178
17        Total, Section 33                            $125,519,710

18        Section  34.  The  sum  of $14,951, or so much thereof as
19    may be necessary and  remains  unexpended  at  the  close  of
20    business  on June 30, 2002, from a reappropriation heretofore
21    made for such purposes in Article 56a, Section 34  of  Public
22    Act 92-8, is reappropriated from the Capital Development Fund
23    to  the  Capital  Development  Board  for the Board of Higher
24    Education for miscellaneous  capital  improvements  including
25    construction, reconstruction, remodeling, improvement, repair
26    and  installation  of  capital  facilities, cost of planning,
27    supplies,  equipment,  materials,  services  and  all   other
28    expenses required for completing the the work at the colleges
29    and universities.  This appropriation shall be in addition to
30    any  other  appropriated  amounts  which  can be expended for
31    these purposes.

32        Section 35.  The  following  named  amount,  or  so  much
 
                           -116-                    BOB-CDB03
 1    thereof  as  may  be  necessary and remains unexpended at the
 2    close of business on June 30, 2002,  from  a  reappropriation
 3    heretofore  made for such purposes in Article 56a, Section 35
 4    of Public  Act  92-8,  is  reappropriated  from  the  Capital
 5    Development  Fund  to  the  Capital Development Board for the
 6    Board  of  Higher   Education   for   miscellaneous   capital
 7    improvements    including    construction,    reconstruction,
 8    remodeling,  improvement,  repair and installation of capital
 9    facilities, cost of planning, supplies, equipment, materials,
10    services and all other expenses required to complete the work
11    at the colleges and universities hereinafter enumerated. This
12    appropriation shall be in addition to any other  appropriated
13    amounts which can be expended for these purposes:
14      Western Illinois University .................. $     19,577
15        Total, Section 35                                 $19,577

16        Section 36.  The sum of $4,630,226, or so much thereof as
17    may  be  necessary  and  remains  unexpended  at the close of
18    business on June 30, 2002, from a reappropriation  heretofore
19    made  for  such purposes in Article 56a, Section 36 of Public
20    Act 92-8, is reappropriated from the Capital Development Fund
21    to the Capital Development Board  for  the  Board  of  Higher
22    Education  for miscellaneous  capital improvements, including
23    construction, reconstruction, remodeling, improvement, repair
24    and installation of capital  facilities,  cost  of  planning,
25    supplies,   equipment,  materials,  services  and  all  other
26    expenses  required  to  complete  the  work  at  the  various
27    universities set forth below.  This appropriation shall be in
28    addition to any  other  appropriated  amounts  which  can  be
29    expended for these purposes.
30      For Chicago State University ....... $  33,747
31      For Eastern Illinois University ....... 36,177
32      For Governors State University ........ 90,561
33      For Illinois State University ......... 17,787
 
                           -117-                    BOB-CDB03
 1      For Northeastern Illinois University . 345,890
 2      For Northern Illinois University ..... 574,181
 3      For Western Illinois University .......... 308
 4      For Southern Illinois University -
 5       Carbondale .......................... 328,270
 6      For Southern Illinois University -
 7       Edwardsville ........................ 120,829
 8      For University of Illinois -
 9       Chicago ........................... 1,953,436
10      For University of Illinois -
11       Urbana-Champaign .................. 1,129,038

12        Section 37.  The sum of $5,414,571, or so much thereof as
13    may  be  necessary  and  remains  unexpended  at the close of
14    business on June 30, 2002, from a reappropriation  heretofore
15    made  for  such purposes in Article 56a, Section 37 of Public
16    Act 92-8, is reappropriated from the Capital Development Fund
17    to the Capital Development Board  for  the  Board  of  Higher
18    Education  for  miscellaneous  capital improvements including
19    construction, capital facilities, cost of planning, supplies,
20    equipment,  materials,  services  and  all   other   expenses
21    required to complete the work at the various universities set
22    forth  below.  This appropriation shall be in addition to any
23    other appropriated amounts which can be  expended  for  these
24    purposes.
25    For Chicago State University ........ $  187,051
26    For Eastern Illinois University ........ 406,707
27    For Governors State University .......... 69,229
28    For Illinois State University ........... 91,245
29    For Northeastern Illinois University ... 317,800
30    For Northern Illinois University ....... 409,808
31    For Western Illinois University ........ 242,966
32    For Southern Illinois University -
33      Carbondale ............................ 33,385
 
                           -118-                    BOB-CDB03
 1    For Southern Illinois University -
 2      Edwardsville ......................... 156,393
 3    For University of Illinois - Chicago . 1,735,342
 4    For University of Illinois -
 5      Urbana-Champaign ................... 1,764,645

 6        Section  38.  The  following  named  amounts,  or so much
 7    thereof as may be necessary  and  remain  unexpended  at  the
 8    close  of  business  on  June 30, 2002, from reappropriations
 9    heretofore made for such purposes in Article 56a, Section  38
10    of  Public  Act  92-8,  are  reappropriated  from the Capital
11    Development Fund to the Capital  Development  Board  for  the
12    Board  of  Higher  Education  for  the  projects  hereinafter
13    enumerated:

14                    NORTHERN ILLINOIS UNIVERSITY
15    (From Article 56a, Section 38 of Public Act 92-8)
16      HVAC system ..................................       10,529
17        Total, Section 38                                 $10,529

18        Section  39.  The  sum of $229,972, or so much thereof as
19    may be necessary and  remains  unexpended  at  the  close  of
20    business  on June 30, 2002, from a reappropriation heretofore
21    made for such purposes in Article 56a, Section 39  of  Public
22    Act 92-8, is reappropriated from the Capital Development Fund
23    to  the  Capital  Development  Board  for the Board of Higher
24    Education for miscellaneous capital  improvements,  including
25    construction, reconstruction, remodeling, improvement, repair
26    and  installation  of  capital  facilities, cost of planning,
27    supplies,  equipment,  materials,  services  and  all   other
28    expenses required for completing the the work at the colleges
29    and universities.  This appropriation shall be in addition to
30    any  other  appropriated  amounts  which  can be expended for
31    these purposes.
 
                           -119-                    BOB-CDB03
 1        Section 40.  The  following  named  amount,  or  so  much
 2    thereof  as  may  be  necessary and remains unexpended at the
 3    close of business on June 30, 2002,  from  a  reappropriation
 4    heretofore  made for such purposes in Article 56a, Section 40
 5    of Public  Act  92-8,  is  reappropriated  from  the  Capital
 6    Development  Fund  to  the  Capital Development Board for the
 7    Board  of  Higher   Education   for   miscellaneous   capital
 8    improvements,    including    construction,   reconstruction,
 9    remodeling, improvements, repair and installation of  capital
10    facilities, cost of planning, supplies, equipment, materials,
11    services,  and  all  other  expenses required to complete the
12    work at the colleges and universities hereinafter enumerated.
13    This  appropriation  shall  be  in  addition  to  any   other
14    appropriated   amounts   which  can  be  expended  for  these
15    purposes:
16    Northern Illinois University ................... $    267,217
17        Total, Section 40                                $267,217

18        Section 41.  The sum of $11,628, or so  much  thereof  as
19    may  be  necessary  and  remains  unexpended  at the close of
20    business on June 30, 2002, from a reappropriation  heretofore
21    made  for  such purposes in Article 56a, Section 41 of Public
22    Act 92-8, is reappropriated from the Capital Development Fund
23    to the Capital Development Board  for  the  Board  of  Higher
24    Education for Northern Illinois University, for the planning,
25    architectural  engineering,  purchase,  site improvements and
26    construction or remodeling of a site in Rockford for use as a
27    campus.

28        Section 42.  The following  named  amounts,  or  so  much
29    thereof  as  may  be  necessary  and remain unexpended at the
30    close of business on June  30,  2002,  from  reappropriations
31    heretofore  made for such purposes in Article 56a, Section 42
32    of Public Act  92-8,  are  reappropriated  from  the  Capital
 
                           -120-                    BOB-CDB03
 1    Development  Fund  to  the  Capital Development Board for the
 2    Board  of  Higher   Education   for   miscellaneous   capital
 3    improvements    including    construction,    reconstruction,
 4    remodeling,  improvement,  repair and installation of capital
 5    facilities, cost of planning, supplies, equipment, materials,
 6    services and all other expenses required to complete the work
 7    at  the  various  universities  set  forth   below.      This
 8    appropriation  shall be in addition to any other appropriated
 9    amounts which can be expended for these purposes.
10      For Chicago State University ................. $    189,876
11      For Eastern Illinois University ..............      230,412
12      For Governors State University ...............       71,798
13      For Illinois State University ................      293,056
14      For Northeastern Illinois University .........      198,324
15      For Northern Illinois University .............      321,687
16      For Southern Illinois University .............       93,059
17      For University of Illinois ...................      896,298
18      For Western Illinois University ..............       10,445
19        Total, Section 42                              $2,304,955

20        Section 43.  The following  named  amounts,  or  so  much
21    thereof  as  may  be  necessary  and remain unexpended at the
22    close of business on June  30,  2002,  from  reappropriations
23    heretofore  made for such purposes in Article 56a, Section 43
24    of Public Act  92-8,  are  reappropriated  from  the  Capital
25    Development  Fund  to  the  Capital Development Board for the
26    Board of Trustees of Southern  Illinois  University  for  the
27    projects hereinafter enumerated:

28                          CARBONDALE CAMPUS
29    (From Article 56a, Section 43 of Public Act 92-8)
30    For construction of an engineering building
31      annex ........................................ $     63,948
32                         EDWARDSVILLE CAMPUS
 
                           -121-                    BOB-CDB03
 1    For replacement of the high temperature water
 2      distribution system ..........................      177,509
 3    For infrastructure, site development, and
 4      other necessary costs associated with
 5      the development of University Park ...........        7,501
 6    For costs associated with the consolidation
 7      of the music facilities ......................       24,136
 8    For planning and construction of an Art and
 9      Design Facility ..............................       24,089
10        Total, Section 43                                $297,183

11        Section  44.  The  sum of $162,691, or so much thereof as
12    may be necessary and  remains  unexpended  at  the  close  of
13    business  on June 30, 2002, from a reappropriation heretofore
14    made for such purposes in Article 56a, Section 44  of  Public
15    Act 92-8, is reappropriated from the Capital Development Fund
16    to  the  Capital  Development  Board  for  Southern  Illinois
17    University  for  miscellaneous capital improvements including
18    construction,   reconstruction,   remodeling,   improvements,
19    repair  and  installation  of  capital  facilities,  cost  of
20    planning, supplies, equipment, materials, services,  and  all
21    other   expenses   required   to  complete  the  work.   This
22    appropriation shall be in addition to any other  appropriated
23    amounts which can be expended for these purposes.

24        Section  45.  The  following  named  amounts,  or so much
25    thereof as may be necessary  and  remain  unexpended  at  the
26    close  of  business  on  June 30, 2002, from reappropriations
27    heretofore made for such purposes in Article 56a, Section  45
28    of  Public  Act  92-8,  are  reappropriated  from the Capital
29    Development Fund to the Capital  Development  Board  for  the
30    Board  of  Trustees  of  the  University  of Illinois for the
31    projects hereinafter enumerated:
 
                           -122-                    BOB-CDB03
 1                    UNIVERSITY CENTER - CHICAGO
 2    (From Article 56a, Section 45 of Public Act 92-8)
 3    For remodeling Alumni Hall, Phase II,
 4      including utilities .......................... $     33,547
 5                        HEALTH SCIENCE CENTER
 6    For remodeling the Neuropsychiatric
 7      Institute ....................................       35,260
 8                       URBANA-CHAMPAIGN CAMPUS
 9    For initiating a campus flood
10      control project ..............................      403,480
11        Total, Section 45                                $472,287

12        Section 46.  The sum of $359,366, or so much  thereof  as
13    may  be  necessary  and  remains  unexpended  at the close of
14    business on June 30, 2002, from a reappropriation  heretofore
15    made  for  such purposes in Article 56a, Section 46 of Public
16    Act 92-8, is reappropriated from the Capital Development Fund
17    to the Capital Development Board for the Board of Trustees of
18    the  University  of  Illinois   for   miscellaneous   capital
19    improvements    including    construction,    reconstruction,
20    remodeling,  improvement,  repair and installation of capital
21    facilities, cost of planning, supplies, equipment, materials,
22    services and all other expenses required for  completing  the
23    work  at  the  colleges and universities.  This appropriation
24    shall be in addition to any other appropriated amounts  which
25    can be expended for these purposes.

26        Section  47.  The  sum  of $26,630, or so much thereof as
27    may be necessary and  remains  unexpended  at  the  close  of
28    business  on June 30, 2002, from a reappropriation heretofore
29    made for such purposes in Article 56a, Section 47  of  Public
30    Act 92-8, is reappropriated from the Capital Development Fund
31    to the Capital Development Board for the Board of Trustees of
32    the  University  of  Illinois (formerly for the Department of
 
                           -123-                    BOB-CDB03
 1    Human Services) for renovation of the School of Public Health
 2    and Psychiatric Institute (formerly the ISPI building).

 3        Section 50.  The amount of $1,500,000, or so much thereof
 4    as may be necessary and remains unexpended at  the  close  of
 5    business  on June 30, 2002, from a reappropriation heretofore
 6    made in Article 56a,  Section  50  of  Public  Act  92-8,  is
 7    reappropriated  from  the  Capital  Development  Fund  to the
 8    Capital Development Board for a  grant  to  Lewis  and  Clark
 9    Community College for all costs associated with construction,
10    redevelopment, infrastructure and engineering costs at the

11        Section 55.  The amount of $6,675,722, or so much thereof
12    as  may  be  necessary and remains unexpended at the close of
13    business on June 30, 2002, from an  appropriation  heretofore
14    made  in  Article  56a,  Section  55  of  Public Act 92-8, is
15    reappropriated from  the  Capital  Development  Fund  to  the
16    Capital Development Board to construct an industrial training
17    center at Illinois Central College.

18        Section 56.  The amount of $5,000,000, or so much thereof
19    as  may  be  necessary and remains unexpended at the close of
20    business on June 30, 2002, from a reappropriation  heretofore
21    made  in  Article  56a,  Section  56  of  Public Act 92-8, is
22    reappropriated from  the  Capital  Development  Fund  to  the
23    Department  of Natural Resources for a grant to the Fox River
24    Water  Reclamation  District   for   skyline   sewer   system
25    renovations and improvements.

26        Section  57.  The  amount of $100,000, or so much thereof
27    as may be necessary and remains unexpended at  the  close  of
28    business  on June 30, 2002, from a reappropriation heretofore
29    made in Article 56a,  Section  57  of  Public  Act  92-8,  is
30    reappropriated  from  the  Capital  Development  Fund  to the
 
                           -124-                    BOB-CDB03
 1    Capital Development Board for a  grant  for  development  and
 2    improvements to the Newberry Library.

 3        Section  58.  The  amount  of  $16,527,493,  or  so  much
 4    thereof  as  may  be  necessary and remains unexpended at the
 5    close of business on June 30, 2002,  from  a  reappropriation
 6    heretofore  made  in  Article  56a,  Section 59 of Public Act
 7    92-8, is reappropriated from the Capital Development Fund  to
 8    the  Capital  Development  Board for grants to units of local
 9    government  and  other  eligible  entities  for   all   costs
10    associated    with   land   acquisition,   construction   and
11    rehabilitation projects.

12        Section 59.  The amount of $800,000, or so  much  thereof
13    as  may  be  necessary and remains unexpended at the close of
14    business on June 30, 2002, from a reappropriation  heretofore
15    made  in  Article  56a,  Section  59a  of Public Act 92-8, is
16    reappropriated from  the  Capital  Development  Fund  to  the
17    Capital  Development  Board  for  a  grant  to  the  City  of
18    Centreville for infrastructure improvements.

19        Section  61.  The  amount of $150,000, or so much thereof
20    as may be necessary and remains unexpended at  the  close  of
21    business  on June 30, 2002, from a reappropriation heretofore
22    made in Article 56a,  Section  61  of  Public  Act  92-8,  is
23    reappropriated  from  the  Capital  Development  Fund  to the
24    Capital Development Board for renovations and  rehabilitation
25    of the old Rosemont Fire Station in the Village of Washington
26    Park.

27        Section 63.  The amount of $7,685,000, or so much thereof
28    as  may  be  necessary and remains unexpended at the close of
29    business on June 30, 2002, from a reappropriation  heretofore
30    made  in  Article  56a,  Section  63  of  Public Act 92-8, is
 
                           -125-                    BOB-CDB03
 1    reappropriated from the Fund  for  Illinois'  Future  to  the
 2    Capital  Development  Board  for  grants  to  units  of local
 3    government,  educational   facilities,   and   not-for-profit
 4    organizations  for  expenses  and infrastructure improvements
 5    including,  but  not  limited  to   planning,   construction,
 6    reconstruction, renovation, utilities and equipment.

 7        Section  65.  The  sum of $100,000, or so much thereof as
 8    may be necessary, is and remains unexpended at the  close  of
 9    business  on June 30, 2002, from a reappropriation heretofore
10    made in Article 56a,  Section  65  of  Public  Act  92-8,  as
11    amended,  is reappropriated from the Capital Development Fund
12    to the Capital Development Board for  the  repaving  of  23rd
13    Street from Nameoki Road to Route 162 in Granite City.

14        Section  66.  The  sum of $100,000, or so much thereof as
15    may be necessary, is and remains unexpended at the  close  of
16    business  on June 30, 2002, from a reappropriation heretofore
17    made in Article 56a,  Section  66  of  Public  Act  92-8,  as
18    amended,  is reappropriated from the Capital Development Fund
19    to the Capital  Development  Board  for  the  resurfacing  of
20    Arlington Drive in Nameoki Township.

21        Section  67.  The  sum of $144,721, or so much thereof as
22    may be necessary and  remains  unexpended  at  the  close  of
23    business  on June 30, 2002, from a reappropriation heretofore
24    made for such purposes in Article 56a, Section 67  of  Public
25    Act 92-8, is reappropriated from the Capital Development Fund
26    to  the  Capital  Development  Board  for a grant to Parkland
27    College for capital improvements.

28        Section 68.  The sum of $32,563, or so  much  thereof  as
29    may  be  necessary  and  remains  unexpended  at the close of
30    business on June 30, 2002, from a reappropriation  heretofore
 
                           -126-                    BOB-CDB03
 1    made  for  such purposes in Article 56a, Section 68 of Public
 2    Act 92-8, is reappropriated from the General Revenue Fund  to
 3    the  Capital  Development  Board for a grant to Prairie State
 4    College for planning for Outreach/Adult Training Center.

 5        Section 70.  The sum of $65,537, or so  much  thereof  as
 6    may  be  necessary  and  remains  unexpended  at the close of
 7    business on June 30, 2002, from a reappropriation  heretofore
 8    made  for  such purposes in Article 56a, Section 70 of Public
 9    Act 92-8, is reappropriated from the General Revenue Fund  to
10    the  Capital  Development  Board  for  a grant to Spoon River
11    College  for   Macomb   Campus   renovation   and   classroom
12    enhancements.

13        Section  72.  The  following  named  amount,  or  so much
14    thereof as may be necessary and  remains  unexpended  at  the
15    close  of  business  on June 30, 2002, from a reappropriation
16    heretofore made in Article 56a,  Section  72  of  Public  Act
17    92-8,  approved  May  17,  2000,  is  reappropriated from the
18    Capital Development Fund to the Capital Development Board for
19    the project hereinafter enumerated:
20                    EAST ST. LOUIS COLLEGE CENTER
21    (From Article 56a, Section 72 of Public Act 92-8)
22    For construction of facilities, remodeling,
23      site improvements, utilities and other
24      costs necessary for adapting the former
25      campus of Metropolitan Community College
26      for a Community College Center and Southern
27      Illinois University, in addition to funds
28      previously appropriated ........................$25,248,857

29        Section 73.  The sum of $7,762,614, or so much thereof as
30    may be necessary and  remains  unexpended  at  the  close  of
31    business  on June 30, 2002, from a reappropriation heretofore
 
                           -127-                    BOB-CDB03
 1    made in Article 56a, Section 73 of Public Act 92-8,  approved
 2    May  17, 2000, is reappropriated from the Capital Development
 3    Fund to the Capital Development Board for the Board of Higher
 4    Education for miscellaneous  capital  improvements  including
 5    construction,   reconstruction,   remodeling,   improvements,
 6    repair  and  installation  of  capital  facilities,  cost  of
 7    planning,  supplies,  equipment,  materials, services and all
 8    other expenses required to complete the work at  the  various
 9    universities set forth below.  This appropriated amount shall
10    be in addition to any other appropriated amounts which can be
11    expended for these purposes.

12      Chicago State University ..............205,626
13      Eastern Illinois University ...........165,140
14      Governors State University ............131,700
15      Illinois State University .............800,823
16      Northeastern Illinois University ......307,200
17      Northern Illinois University ..........927,065
18      Western Illinois University ...........354,915
19      Southern Illinois University -
20       Carbondale ...........................619,145
21      Southern Illinois University -
22       Edwardsville .........................115,804
23      University of Illinois -
24       Chicago Campus .....................2,162,874
25      University of Illinois -
26       Springfield Campus ....................25,325
27      University of Illinois -
28       Champaign/Urbana Campus ............1,946,997

29        Section 74.  The sum of $2,966,356, or so much thereof as
30    may  be  necessary  and  remains  unexpended  at the close of
31    business on June 30, 2002, from a reappropriation  heretofore
32    made  in Article 56a, Section 74 of Public Act 92-8, approved
 
                           -128-                    BOB-CDB03
 1    May 17, 2000, is reappropriated from the Capital  Development
 2    Fund  to  the  Capital  Development  Board  for  the Illinois
 3    Community   College   Board   for    miscellaneous    capital
 4    improvements including construction, capital facilities, cost
 5    of planning, supplies, equipment, materials, services and all
 6    other  expenses  required to complete the work at the various
 7    community colleges.  This appropriated  amount  shall  be  in
 8    addition  to  any  other  appropriated  amounts  which can be
 9    expended for these purposes.

10        Section 75.  The sum of $70,797,099, or so  much  thereof
11    as  may  be  necessary and remains unexpended at the close of
12    business on June 30, 2002, from a reappropriation  heretofore
13    made  in Article 56a, Section 75 of Public Act 92-8, approved
14    May 17, 2000, is reappropriated from the School  Construction
15    Fund to the Capital Development Board for school construction
16    grants  pursuant  to the School Construction Law, in addition
17    to amounts previously appropriated for such purposes.

18        Section 76.  The sum of $156,448, or so much  thereof  as
19    may  be  necessary  and  remains  unexpended  at the close of
20    business on June 30, 2002, from a reappropriation  heretofore
21    made  in Article 56a, Section 76 of Public Act 92-8, approved
22    May   17,   2000,   is   reappropriated   from   the   School
23    Infrastructure Fund to  the  Capital  Development  Board  for
24    school   construction   grants   pursuant   to   the   School
25    Construction   Law,   in   addition   to  amounts  previously
26    appropriated for such purposes.

27        Section 79.  The sum of $550,000, or so much  thereof  as
28    may  be  necessary  and  remains  unexpended  at the close of
29    business on June 30, 2002, from a reappropriation  heretofore
30    made  for  such purposes in Article 56a, Section 79 of Public
31    Act 92-8, approved May 17, 2000, is reappropriated  from  the
 
                           -129-                    BOB-CDB03
 1    Capital Development Fund to the Capital Development Board for
 2    a  grant to the Village of Arlington Heights for construction
 3    projects.

 4        Section 81.  The sum of $125,000, or so much  thereof  as
 5    may  be  necessary  and  remains  unexpended  at the close of
 6    business on June 30, 2002, from a reappropriation  heretofore
 7    made  for  such purposes in Article 56a, Section 81 of Public
 8    Act 92-8, approved May 17, 2000, is reappropriated  from  the
 9    Capital Development Fund to the Capital Development Board for
10    a grant to the City of Toulon for a new community center.

11        Section  82.  The  sum  of $29,580, or so much thereof as
12    may be necessary and  remains  unexpended  at  the  close  of
13    business  on June 30, 2002, from a reappropriation heretofore
14    made for such purposes in Article 56a, Section 82  of  Public
15    Act  92-8,  approved May 17, 2000, is reappropriated from the
16    Capital Development Fund to the Capital Development Board for
17    a grant to Waubonsee  Community  College  for  infrastructure
18    improvements (IT).

19        Section  83.  The  sum of $550,000, or so much thereof as
20    may be necessary and  remains  unexpended  at  the  close  of
21    business  on June 30, 2002, from a reappropriation heretofore
22    made for such purposes in Article 56a, Section 83  of  Public
23    Act  92-8,  approved May 17, 2000, is reappropriated from the
24    Capital Development Fund to the Capital Development Board for
25    a grant to the Village of Stickney for village hall &  public
26    safety facility (1/2).

27        Section  84.  The  sum of $105,000, or so much thereof as
28    may be necessary and  remains  unexpended  at  the  close  of
29    business  on June 30, 2002, from a reappropriation heretofore
30    made for such purposes in Article 56a, Section 84  of  Public
 
                           -130-                    BOB-CDB03
 1    Act  92-8,  approved May 17, 2000, is reappropriated from the
 2    Capital Development Fund to the Capital Development Board for
 3    a grant to the Town of Cicero for a police  station/community
 4    center.

 5        Section  85.  The  sum of $150,000, or so much thereof as
 6    may be necessary and  remains  unexpended  at  the  close  of
 7    business  on June 30, 2002, from a reappropriation heretofore
 8    made for such purposes in Article 56a, Section 85  of  Public
 9    Act  92-8,  approved May 17, 2000, is reappropriated from the
10    Capital Development Fund to the Capital Development Board for
11    a grant to the Village of Illiopolis for a new village hall.

12        Section 86.  The sum of $1,374,266, or so much thereof as
13    may be necessary and  remains  unexpended  at  the  close  of
14    business  on June 30, 2002, from a reappropriation heretofore
15    made for such purposes in Article 56a, Section 86  of  Public
16    Act  92-8,  approved May 17, 2000, is reappropriated from the
17    Capital Development Fund to the Capital Development Board for
18    a grant to the Lewis & Clark Community College for  buildings
19    and/or building improvements.  The provisions of Article V of
20    the  Public  Community College Act are not applicable to this
21    appropriation.

22        Section 87.  The sum of $119,000, or so much  thereof  as
23    may  be  necessary  and  remains  unexpended  at the close of
24    business on June 30, 2002, from a reappropriation  heretofore
25    made  for  such purposes in Article 56a, Section 87 of Public
26    Act 92-8, approved May 17, 2000, is reappropriated  from  the
27    Capital Development Fund to the Capital Development Board for
28    a grant to Triton College Library renovation.

29        Section  88.  The  sum of $125,000, or so much thereof as
30    may be necessary and  remains  unexpended  at  the  close  of
 
                           -131-                    BOB-CDB03
 1    business  on June 30, 2002, from a reappropriation heretofore
 2    made for such purposes in Article 56a, Section 88  of  Public
 3    Act  92-8,  approved May 17, 2000, is reappropriated from the
 4    Capital Development Fund to the Capital Development Board for
 5    a grant to the Village of Willow Springs for a public  safety
 6    building.

 7        Section  89.  The  amount of $400,000, or so much thereof
 8    as may be necessary and remains unexpended at  the  close  of
 9    business  on June 30, 2002, from a reappropriation heretofore
10    made for such purposes in Article 56a, Section 89  of  Public
11    Act   92-8,   approved   May   17,   2000,   as  amended,  is
12    reappropriated from  the  Capital  Development  Fund  to  the
13    Capital  Development  Board  for a grant to the Winnetka Park
14    District for the purpose of all  costs  associated  with  the
15    construction of a recreational center/ice arena.

16        Section  90.  The  amount of $100,000, or so much thereof
17    as may be necessary, and remains unexpended at the  close  of
18    business  on June 30, 2002, from a reappropriation heretofore
19    made in Article 56a,  Section  90  of  Public  Act  92-8,  as
20    amended,  is  reappropriated to the Capital Development Board
21    from the Capital  Development  Fund  to  the  North  Suburban
22    Special  Recreation  Association for the purpose of all costs
23    associated with the recreation center, offices, ice arena and
24    for acquiring and developing an office.

25        Section 91.  The amount of $100,000, or so  much  thereof
26    as  may  be  necessary and remains unexpended at the close of
27    business on June 30, 2002, from a reappropriation  heretofore
28    made  in Article 56a, Section 91 of Public Act 92-8, approved
29    May 17, 2000, is reappropriated from the Fund  for  Illinois'
30    Future  to  the  Capital Development Board for a grant to the
31    Clinton County Project for  Older  Americans  for  all  costs
 
                           -132-                    BOB-CDB03
 1    associated with building acquisition and improvements.

 2        Section  92.  The  amount of $113,903, or so much thereof
 3    as may be necessary and remains unexpended at  the  close  of
 4    business  on June 30, 2002, from a reappropriation heretofore
 5    made for such purposes in Article 56a, Section 92  of  Public
 6    Act  92-8,  approved May 17, 2000, is reappropriated from the
 7    Capital Development Fund to the Capital Development Board for
 8    a grant to the LaSalle Veterans Home for all costs associated
 9    with architectural and engineering designs.

10        Section 93.  The sum of $33,043, or so  much  thereof  as
11    may  be  necessary  and  remains  unexpended  at the close of
12    business on June 30, 2002, from a reappropriation  heretofore
13    made  for  such purposes in Article 56a, Section 93 of Public
14    Act 92-8, approved May 17, 2000, is reappropriated  from  the
15    Capital Development Fund to the Capital Development Board for
16    a  grant  to  Blackhawk East College for all costs associated
17    with  a  multi-purpose  agriculture  education  instructional
18    center.

19        Section 94.  The sum of $1,320,000, or so much thereof as
20    may be necessary and  remains  unexpended  at  the  close  of
21    business  on June 30, 2002, from a reappropriation heretofore
22    made in Article 56a, Section 94 of Public Act 92-8,  approved
23    May 17, 2000, is reappropriated from the General Revenue Fund
24    to  the  Capital Development Board for a grant to the Village
25    of Bridgeview for all costs  associated  with  infrastructure
26    improvements.

27        Section 96.  The sum of $9,476,266, or so much thereof as
28    may  be  necessary  and  remains  unexpended  at the close of
29    business on June 30, 2002, from a reappropriation  heretofore
30    made  for  such purposes in Article 56a, Section 96 of Public
 
                           -133-                    BOB-CDB03
 1    Act 92-8, approved May 17, 2000, is reappropriated  from  the
 2    Capital Development Fund to the Capital Development Board for
 3    a  grant to Chicago State University for all costs associated
 4    with construction of a Convocation Center.

 5        Section 97.  The sum of $900,000, or so much  thereof  as
 6    may  be  necessary  and  remains  unexpended  at the close of
 7    business on June 30, 2002, from a reappropriation  heretofore
 8    made  for  such purposes in Article 56a, Section 97 of Public
 9    Act 92-8, approved May 17, 2000, is reappropriated  from  the
10    Capital Development Fund to the Capital Development Board for
11    costs  associated  with establishing a campus-wide fire alarm
12    system at Governor's State University.

13        Section 98.  The sum of $100,000, or so much  thereof  as
14    may  be  necessary  and  remains  unexpended  at the close of
15    business on June 30, 2002, from a reappropriation  heretofore
16    made  in Article 56a, Section 98 of Public Act 92-8, approved
17    May 17, 2000, is reappropriated from the Fund  for  Illinois'
18    Future  to  the  Capital  Development  Board  for  a grant to
19    National Latinos with Disabilities for capital developments.

20        Section 100.  The sum of $95,000, or so much  thereof  as
21    may  be  necessary  and  remains  unexpended  at the close of
22    business on June 30, 2002, from a reappropriation  heretofore
23    made  for such purposes in Article 56a, Section 100 of Public
24    Act 92-8, approved May 17, 2000, is reappropriated  from  the
25    Capital Development Fund to the Capital Development Board for
26    a  grant  to  Kendall  County  for  all costs associated with
27    courthouse   renovation,   in   addition   to   other   funds
28    appropriated for such purpose.

29        Section 101.  The sum of $200,000, or so much thereof  as
30    may  be  necessary  and  remains  unexpended  at the close of
 
                           -134-                    BOB-CDB03
 1    business on June 30, 2002, from a reappropriation  heretofore
 2    made  for such purposes in Article 56a, Section 101 of Public
 3    Act 92-8, approved May 17, 2000, is reappropriated  from  the
 4    Capital Development Fund to the Capital Development Board for
 5    a  grant  to  the  Italian  American  Sports Hall of Fame for
 6    various improvements.

 7        Section 102.  The amount of $33,734, or so  much  thereof
 8    as  may  be  necessary and remains unexpended at the close of
 9    business on June 30, 2002, from  a  reappropriation  made  in
10    Article   56a,   Section   102   of   Public   Act  92-8,  is
11    reappropriated from  the  Capital  Development  Fund  to  the
12    Capital   Development  Board  for  the  Department  of  Human
13    Services to construct a detention and treatment facility.

14        Section 104.  The  amount  of  $32,000,000,  or  so  much
15    thereof  as  may  be  necessary and remains unexpended at the
16    close of business on June 30,  2002,  from  an  appropriation
17    heretofore made in Article 56, Section 19 of Public Act 92-8,
18    is  reappropriated  from  the Capital Development Fund to the
19    Board of Trustees of the University of Illinois for planning,
20    construction  and  equipment  for  a  computer   science   in
21    engineering facility.

22        Section  106.     The  amount  of $15,000,000, or so much
23    thereof as may be necessary and  remains  unexpended  at  the
24    close  of  business  on  June 30, 2002, from an appropriation
25    heretofore made in Article 56, Section 25 of Public Act 92-8,
26    is reappropriated from the Capital Development  Fund  to  the
27    University  of  Illinois  at  Springfield  for constructing a
28    classroom  and  office  building,  in   addition   to   funds
29    previously appropriated.

30                      STATE BOARD OF EDUCATION
 
                           -135-                    BOB-CDB03
 1        Section 107.  The sum of $619,914,688, or so much thereof
 2    as  may  be  necessary and remains unexpended at the close of
 3    business on June 30, 2002, from an  appropriation  heretofore
 4    made  in  Article  56,  Section  26  of  Public  Act 92-8, is
 5    reappropriated from  the  School  Construction  Fund  to  the
 6    Capital  Development  Board  for  school  construction grants
 7    pursuant to the  School  Construction  Law,  in  addition  to
 8    amounts previously appropriated for such purposes.

 9                      BOARD OF HIGHER EDUCATION
10              SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
11        Section  108.  The  sum of $1,918,900, or so much thereof
12    as may be necessary and remains unexpended at  the  close  of
13    business  on  June 30, 2002, from an appropriation heretofore
14    made in Article  56,  Section  27  of  Public  Act  92-8,  is
15    reappropriated  from  the  Capital  Development  Fund  to the
16    Capital Development  Board  for  planning  a  renovation  and
17    addition to the Morris Library.

18                  ILLINOIS VALLEY COMMUNITY COLLEGE
19        Section  109.  The  sum of $6,000,000, or so much thereof
20    as may be necessary and remains unexpended at  the  close  of
21    business  on  June 30, 2002, from an appropriation heretofore
22    made in Article  56,  Section  28  of  Public  Act  92-8,  is
23    reappropriated  from  the  Capital  Development  Fund  to the
24    Capital Development  Board  for  planning,  construction  and
25    renovations  necessary to abate asbestos containing materials
26    at Illinois Valley Community College campus facilities.

27                  ILLINOIS MATH AND SCIENCE ACADEMY
28        Section 110.  The sum of $2,000,000, or so  much  thereof
29    as  may  be  necessary and remains unexpended at the close of
30    business on June 30, 2002, from an  appropriation  heretofore
31    made  in  Article  56,  Section  29  of  Public  Act 92-8, is
 
                           -136-                    BOB-CDB03
 1    reappropriated from  the  Capital  Development  Fund  to  the
 2    Capital Development for the Illinois Math and Science Academy
 3    to  plan  and  begin construction of a mezzanine level in the
 4    east gymnasium.

 5        UNIVERSITY OF ILLINOIS COLLEGE OF MEDICINE AT PEORIA
 6        Section 111.  The sum of $1,500,000, or so  much  thereof
 7    as  may  be  necessary and remains unexpended at the close of
 8    business on June 30, 2002, from an  appropriation  heretofore
 9    made  in  Article  56,  Section  30  of  Public  Act 92-8, is
10    reappropriated from the Tobacco Settlement Recovery  Fund  to
11    the  Capital  Development Board for a grant to the University
12    of Illinois College of Medicine  at  Peoria  for  planning  a
13    Clinical and Basic Research Oncology Center.

14        Section  112.   No  contract  shall  be  entered  into or
15    obligation incurred for any expenditures from  appropriations
16    made  in  these Articles until after the purposes and amounts
17    have been approved by the Governor.

18        Section 999.  Effective date.  This Act takes  effect  on
19    July 1, 2002.

[ Top ]