House Sponsors: NOVAK. Short description: NET METERING PILOT PROGRAMS Synopsis of Bill as introduced: Amends the Public Utilities Act. Provides that an electric utility must establish a "net metering" pilot program for its retail customers that own and operate a solar or wind electrical generating facility with a capacity of not more than 40 kilowatts located on the customer's premises and intended to offset part of the customer's electrical requirements. Requires a separate pilot program for residential and business customers. Provides that the electric utility must report the results of the pilot program to the Commerce Commission by July 1, 2002. Requires the Commission to provide a summary and an analysis of the reports to the General Assembly by September 1, 2002. Effective immediately. HOUSE AMENDMENT NO. 1. Provides that an electric utility that has conducted a net electrical energy metering pilot program for either its residential or business customers, or both, and the pilot program was initiated before the effective date of this amendatory Act, need only file a report of the results of the program with the Commerce Commission. Last action on Bill: SESSION SINE DIE Last action date: JAN-07-2003 Location: House Amendments to Bill: AMENDMENTS ADOPTED: HOUSE - 1 SENATE - 0 END OF INQUIRY Full Text Bill Status