Public Act 100-0523 Public Act 0523 100TH GENERAL ASSEMBLY |
Public Act 100-0523 | HB2953 Enrolled | LRB100 10637 AWJ 20860 b |
|
| AN ACT concerning government.
| Be it enacted by the People of the State of Illinois,
| represented in the General Assembly:
| Section 5. The Metropolitan Transit Authority Act is | amended by changing Section 32 as follows:
| (70 ILCS 3605/32) (from Ch. 111 2/3, par. 332)
| Sec. 32.
The Board shall adopt regulations to insure that | the
construction or acquisition by the Authority of services or | public
transportation facilities (other than real estate) | involving a cost of more
than the small purchase threshold set | by the Federal Transit Administration $40,000 and the | disposition of all property of the Authority shall be
after | public notice and with public bidding. The Board shall adopt | regulations to ensure that the construction, demolition, | rehabilitation, renovation, and building maintenance projects | by the Authority for services or public transportation | facilities involving a cost of more than $40,000 shall be after | public notice and with public bidding. The regulations may | provide
for exceptions to the requirements for the issuance and | sale of bonds or
notes of the Authority, to the acquisition of | professional or utility
services and to other matters for which | public bidding is disadvantageous. The
regulations may also | provide for the use of competitive negotiations or the
|
| prequalification of responsible bidders consistent with | applicable federal
regulations. The requirements set forth | therein shall not apply to
purchase of service agreements or | other contracts, purchases or sales
entered into by the | Authority with any transportation agency or unit of
local | government.
| (Source: P.A. 98-1156, eff. 1-9-15.)
| Section 10. The Local Mass Transit District Act is amended | by changing Section 5.5 as follows: | (70 ILCS 3610/5.5) | Sec. 5.5. Public bidding. The Board shall adopt regulations | to ensure that the construction or acquisition by the District | of services or public transportation facilities (other than | real estate) involving a cost of more than the small purchase | threshold set by the Federal Transit Administration $40,000 and | the disposition of all property of the District shall be after | public notice and with public bidding. The Board shall adopt | regulations to ensure that the construction, demolition, | rehabilitation, renovation, and building maintenance projects | by the District for services or public transportation | facilities involving a cost of more than $40,000 shall be after | public notice and with public bidding. The regulations may | provide for exceptions to the requirements for the issuance and | sale of bonds or notes of the District, to the acquisition of |
| professional or utility services and to other matters for which | public bidding is disadvantageous. The regulations may also | provide for the use of competitive negotiations or the | prequalification of responsible bidders consistent with | applicable federal regulations. The requirements set forth | therein shall not apply to purchase of service agreements or | other contracts, purchases or sales entered into by the | District with any transportation agency or unit of local | government.
| (Source: P.A. 98-1156, eff. 1-9-15.)
| Section 15. The Regional Transportation Authority Act is | amended by changing Section 4.06 as follows:
| (70 ILCS 3615/4.06) (from Ch. 111 2/3, par. 704.06)
| Sec. 4.06. Public bidding.
| (a) The Board shall adopt regulations to ensure
that the | construction or acquisition by the Authority or a Service Board
| other than the Chicago Transit Authority of services or public
| transportation facilities (other than real estate) involving a | cost of more
than the small purchase threshold set by the | Federal Transit Administration $40,000 and the disposition of | all property of the Authority or a
Service Board other than the | Chicago Transit Authority shall be after
public notice and with | public bidding. The Board shall adopt regulations to ensure | that the construction, demolition, rehabilitation, renovation, |
| and building maintenance projects by the Authority or a Service | Board other than the Chicago Transit Authority for services or | public transportation facilities involving a cost of more than | $40,000 shall be after public notice and with public bidding. | Such regulations may provide for
exceptions to such | requirements for acquisition of repair parts, accessories,
| equipment or services previously furnished or contracted for; | for the
immediate delivery of supplies, material or equipment | or performance of
service when it is determined by the | concurrence of two-thirds of the then
Directors that an | emergency requires immediate delivery or supply thereof;
for | goods or services that are economically procurable from only | one
source; for contracts for the maintenance or servicing of | equipment which
are made with the manufacturers or authorized | service agent of that
equipment where the maintenance or | servicing can best be performed by the
manufacturer or | authorized service agent or such a contract would be
otherwise | advantageous to the Authority or a Service Board, other
than | the Chicago Transit Authority, except that the exceptions in | this
clause shall not apply to contracts for plumbing, heating, | piping,
refrigeration and automatic temperature control | systems, ventilating and
distribution systems for conditioned | air, and electrical wiring; for goods
or services procured from | another governmental agency; for purchases and
contracts for | the use or purchase of data processing equipment and data
| processing systems software; for the acquisition of |
| professional or
utility services; and for the acquisition of | public transportation
equipment including, but not limited to, | rolling stock, locomotives and
buses, provided that: (i) it is | determined by a vote of 2/3 of the then
Directors of the | Service Board making the acquisition that a negotiated
| acquisition offers opportunities with respect to the cost or | financing of
the equipment, its delivery, or the performance of | a portion of the work
within the State or the use of goods | produced or
services provided within the State; (ii) a notice | of intention to negotiate
for the acquisition of such public | transportation equipment is published in
a newspaper of general | circulation within the City of Chicago inviting
proposals from | qualified vendors; and (iii) any contract with respect to
such | acquisition is authorized by a vote of 2/3 of the then | Directors of
the Service Board making the acquisition. The | requirements set forth
in this Section shall not apply to | purchase of service
agreements or other
contracts, purchases or | sales entered into by the Authority with any
transportation | agency or unit of local government.
| (b) (1) In connection with two-phase design/build | selection procedures
authorized in this Section, a Service | Board may authorize, by
the affirmative vote of two-thirds of | the then members of the
Service Board, the use of competitive | selection and the prequalification of
responsible bidders | consistent with applicable federal regulations and this
| subsection (b).
|
| (2) Two-phase design/build selection procedures shall | consist of the
following:
| (i) A Service Board shall develop, through | licensed
architects or licensed engineers, a scope of | work statement for inclusion in
the solicitation for | phase-one proposals that defines the project and | provides
prospective offerors with sufficient | information regarding the
Service Board's | requirements. The statement shall include criteria and
| preliminary design, and general budget parameters and | general schedule or
delivery requirements
to enable | the offerors to submit proposals which meet the
Service | Board's needs.
When the two-phase design/build | selection procedure is used and the
Service Board | contracts for development of the scope of work | statement, the
Service Board shall contract for | architectural or engineering
services as defined by | and in accordance with the Architectural, Engineering,
| and Land Surveying Qualifications Based Selection Act | and all applicable
licensing statutes.
| (ii) The evaluation factors to be used in | evaluating phase-one proposals
must be stated in the | solicitation and must include specialized experience | and
technical competence, capability to perform, past | performance of the offeror's
team (including the | architect-engineer and construction members of the |
| team)
and other appropriate technical and | qualifications factors. Each solicitation
must | establish the relative importance assigned to the | evaluation factors and
the subfactors that must be | considered in the evaluation of phase-one proposals
on | the basis of the evaluation factors set forth in the | solicitation. Each
design/build team must include a | licensed design professional independent from
the | Service Board's licensed architect or engineer and a
| licensed design professional must be named in the | phase-one proposals submitted
to the
Service Board.
| (iii) On the basis of the phase-one proposal the | Service
Board shall select as the most highly qualified | the number of offerors
specified in the solicitation | and request the selected offerors to submit
phase-two | competitive proposals and cost or price information. | Each
solicitation must establish the relative | importance assigned to the evaluation
factors and the | subfactors that must be considered in the evaluation of
| phase-two proposals on the basis of the evaluation | factors set forth in the
solicitation. A Service Board | may negotiate with the selected
design/build team | after award but prior to contract execution for the | purpose
of securing better terms than originally | proposed, provided the salient
features of the | design/build solicitation are not diminished. Each |
| phase-two
solicitation evaluates separately (A) the | technical submission for the
proposal, including | design concepts or proposed solutions to requirements
| addressed within the scope of work, and (B) the | evaluation factors and
subfactors, including cost or | price, that must be considered in the evaluations
of | proposals.
| (iv) A design/build solicitation issued under the | procedures in this
subsection (b) shall state the | maximum number of offerors that are to be
selected to | submit competitive phase-two proposals. The maximum | number
specified in the solicitation shall not exceed 5 | unless the
Service Board with respect to an individual | solicitation determines that a
specified number | greater than 5 is in the best interest of the
Service | Board and is consistent with the purposes and | objectives of the
two-phase design/build selection | process.
| (v) All designs submitted as part of the two-phase | selection process and
not selected shall be | proprietary to the preparers.
| (Source: P.A. 98-1156, eff. 1-9-15.)
| Section 99. Effective date. This Act takes effect upon | becoming law.
|
Effective Date: 9/22/2017
|