Public Act 90-0581 of the 90th General Assembly

State of Illinois
Public Acts
90th General Assembly

[ Home ] [ Public Acts ] [ ILCS ] [ Search ] [ Bottom ]


Public Act 90-0581

HB3202 Enrolled                                LRB9010681DJpc

    AN ACT to amend the Code of Civil Procedure  by  changing
Section 7-103.

    Be  it  enacted  by  the People of the State of Illinois,
represented in the General Assembly:

    Section 5. The Code of  Civil  Procedure  is  amended  by
changing Section 7-103 as follows:

    (735 ILCS 5/7-103) (from Ch. 110, par. 7-103)
    Sec.  7-103.  "Quick-take".  This Section applies only to
proceedings under this Article:
         (1)  by the State of  Illinois,  the  Illinois  Toll
    Highway  Authority  or  the  St.  Louis Metropolitan Area
    Airport  Authority  for  the  acquisition  of   land   or
    interests therein for highway purposes;
         (2)  (blank);
         (3)  by  the  Department  of  Commerce and Community
    Affairs for the purpose specified in  the  Illinois  Coal
    Development Bond Act;
         (4)  (blank);
         (5)  for  the  purpose  specified  in  the St. Louis
    Metropolitan Area Airport Authority Act;
         (6)  for a period of 24 months after May  24,  1996,
    by   the   Southwestern  Illinois  Development  Authority
    pursuant  to  the   Southwestern   Illinois   Development
    Authority Act;
         (7)  for  a  period  of  3  years after December 30,
    1987, by the Quad Cities  Regional  Economic  Development
    Authority   (except   for  the  acquisition  of  land  or
    interests therein that is  farmland,  or  upon  which  is
    situated  a  farm dwelling and appurtenant structures, or
    upon which is situated a residence, or  which  is  wholly
    within  an  area  that  is  zoned  for  residential  use)
    pursuant to the Quad Cities Regional Economic Development
    Authority Act;
         (8)  by   a  sanitary  district  created  under  the
    Metropolitan Water  Reclamation  District  Act   for  the
    acquisition  of  land  or  interests therein for purposes
    specified in that Act;
         (9)  by a rail carrier within the  time  limitations
    and  subject  to  the  terms  and conditions set forth in
    Section 18c-7501 of the Illinois Vehicle Code;
         (10)  for a period of 18 months  after  January  26,
    1987,  for  the  purpose  specified  in  Division  135 of
    Article  11  of  the  Illinois  Municipal  Code,   by   a
    commission   created   under   Section  2  of  the  Water
    Commission Act of 1985;
         (11)  by a village containing a population  of  less
    than  15,000  for the purpose of acquiring property to be
    used for a  refuse  derived  fuel  system    designed  to
    generate   steam  and  electricity,  and  for  industrial
    development that will utilize such steam and electricity,
    pursuant to Section 11-19-10 of  the  Illinois  Municipal
    Code;
         (12)  after receiving the prior approval of the City
    Council,  by  a  municipality having a population of more
    than 500,000  for  the  purposes  set  forth  in  Section
    11-61-1a and Divisions 74.2 and 74.3 of Article 11 of the
    Illinois  Municipal  Code, and for the same purposes when
    established pursuant to home rule powers;
         (13)  by a home rule municipality,  after  a  public
    hearing  held  by  the  corporate  authorities  or  by  a
    committee of the corporate authorities and after approval
    by  a  majority  of  the corporate authorities, within an
    area designated as an enterprise zone by the municipality
    under the Illinois Enterprise Zone Act;
         (14)  by the Illinois  Sports  Facilities  Authority
    for  the  purpose specified in Section 12 of the Illinois
    Sports Facilities Authority Act;
         (15)  by a municipality having a population of  more
    than  2,000,000 for the purpose of acquiring the property
    described in Section 3 of the Sports Stadium Act;
         (16)  for a period of 18 months after July 29, 1986,
    in any  proceeding  by  the  Board  of  Trustees  of  the
    University  of  Illinois  for  the acquisition of land in
    Champaign County or interests therein as  a  site  for  a
    building or for any educational purpose;
         (17)  for a period of 2 years after July 1, 1990, by
    a  home  rule  municipality  and  a  county  board,  upon
    approval  of  a  majority of the corporate authorities of
    both the county board and  the  municipality,  within  an
    area designated as an enterprise zone by the municipality
    and   the   county  board  through  an  intergovernmental
    agreement under the Illinois Enterprise  Zone  Act,  when
    the  purpose of the condemnation proceeding is to acquire
    land for the construction of an industrial  harbor  port,
    and when the total amount of land to be acquired for that
    purpose  is  less  than  75  acres and is adjacent to the
    Illinois River;
         (18)  by an airport authority located solely  within
    the  boundaries of Madison County, Illinois, and which is
    organized pursuant  to  the  provisions  of  the  Airport
    Authorities Act, (i) for the acquisition of 160 acres, or
    less,  of  land  or  interests  therein  for the purposes
    specified in that Act which may be necessary  to  extend,
    mark,  and light runway 11/29 for a distance of 1600 feet
    in length by 100 feet in width with parallel taxiway,  to
    relocate  and  mark  County  Highway  19, Madison County,
    known  as  Moreland  Road,  to  relocate  the  instrument
    landing system including the approach lighting system and
    to construct associated  drainage,  fencing  and  seeding
    required  for the foregoing project and (ii) for a period
    of 6 months after December 28, 1989, for the  acquisition
    of  75  acres,  or less, of land or interests therein for
    the purposes specified in that Act which may be necessary
    to extend, mark and light the south end of  runway  17/35
    at such airport;
         (19)  by   any   unit  of  local  government  for  a
    permanent  easement  for  the  purpose  of   maintaining,
    dredging or cleaning the Little Calumet River;
         (20)  by   any   unit  of  local  government  for  a
    permanent  easement  for  the  purpose  of   maintaining,
    dredging or cleaning the Salt Creek in DuPage County;
         (21)  by   St.   Clair  County,  Illinois,  for  the
    development of a joint use facility at  Scott  Air  Force
    Base;
         (22)  by the Village of Summit, Illinois, to acquire
    land for a waste to energy plant;
         (23)  for  a  period of 15 months after September 7,
    1990, by the Department of Transportation or by any  unit
    of    local    government   under   the   terms   of   an
    intergovernmental  cooperation  agreement   between   the
    Department  of  Transportation  and  the  unit  of  local
    government   for   the  purpose  of  developing  aviation
    facilities in  and  around  Chanute  Air  Force  Base  in
    Champaign County, Illinois;
         (24)  for  a  period  of  1  year after December 12,
    1990, by the City of Morris for the  development  of  the
    Morris Municipal Airport;
         (25)  for a period of 1 year after June 19, 1991, by
    the   Greater  Rockford  Airport  Authority  for  airport
    expansion purposes;
         (26)  for a period of 24 months after June 30, 1991,
    by the City of Aurora for  completion  of  an  instrument
    landing system and construction of an east-west runway at
    the Aurora Municipal Airport;
         (27)  for  the  acquisition by the Metropolitan Pier
    and  Exposition  Authority  of  property   described   in
    subsection  (f) of Section 5 of the Metropolitan Pier and
    Exposition Authority Act for the  purposes  of  providing
    additional  grounds, buildings, and facilities related to
    the purposes of  the  Metropolitan  Pier  and  Exposition
    Authority;
         (28)  for a period of 24 months after March 1, 1992,
    by  the  Village  of  Wheeling  and  the City of Prospect
    Heights, owners of the Palwaukee  Municipal  Airport,  to
    allow for the acquisition of right of way to complete the
    realignment of Hintz Road and Wolf Road;
         (29)  for  a  period  of one year from the effective
    date  of  this   amendatory   Act   of   1992,   by   the
    Bloomington-Normal    Airport   Authority   for   airport
    expansion purposes;
         (30)  for a period of 24 months after September  10,
    1993,  by  the  Cook  County  Highway Department and Lake
    County Department of  Transportation  to  allow  for  the
    acquisition of necessary right-of-way for construction of
    underpasses   for   Lake-Cook   Road   at   the   Chicago
    Northwestern Railroad crossing, west of Skokie Boulevard,
    and the Chicago, Milwaukee, St. Paul and Pacific Railroad
    crossing, west of Waukegan Road;
         (31)  for  a  period  of one year after December 23,
    1993, by the City of Arcola and the City of  Tuscola  for
    the  development of the Arcola/Tuscola Water Transmission
    Pipeline  Project  pursuant  to   the   intergovernmental
    agreement  between  the  City  of  Arcola and the City of
    Tuscola;
         (32)  for a period of 24 months  from  December  23,
    1993,  by  the Village of Bensenville for the acquisition
    of property bounded by Illinois Route 83 to the west  and
    O'Hare  International  Airport  to the east to complete a
    flood control project known as the Bensenville Ditch;
         (33)  for a period of 9  months  after  November  1,
    1993, by the Medical Center Commission for the purpose of
    acquiring  a  site for the Illinois State Police Forensic
    Science Laboratory at Chicago, on the  block  bounded  by
    Roosevelt  Road on the north, Wolcott Street on the east,
    Washburn Street on the south, and  Damen  Avenue  on  the
    west in Chicago, Illinois;
         (34)  for a period of 36 months after July 14, 1995,
    by  White  County  for  the  acquisition  of a 3 1/2 mile
    section of Bellaire Road, which is described as  follows:
    Commencing  at  the Northwest Corner of the Southeast 1/4
    of Section 28, Township 6 South, Range 10 East of the 3rd
    Principal Meridian;  thence  South  to  a  point  at  the
    Southwest  Corner  of  the  Southeast  1/4  of Section 9,
    Township 7 South, Range 10  East  of  the  3rd  Principal
    Meridian;
         (35)  for  a period of one year after July 14, 1995,
    by  the  City  of  Aurora  for  permanent  and  temporary
    easements except over land adjacent to Indian  Creek  and
    west of Selmarten Creek located within the City of Aurora
    for  the  construction  of  Phase  II of the Indian Creek
    Flood Control Project;
         (35.1)  for a period beginning June  24,  1995  (the
    day following the effective date of Public Act 89-29) and
    ending  on July 13, 1995 (the day preceding the effective
    date of Public Act 89-134), by the  City  of  Aurora  for
    permanent and temporary easements for the construction of
    Phase II of the Indian Creek Flood Control Project;
         (36)  for a period of 3 years from July 14, 1995, by
    the  Grand  Avenue  Railroad Relocation Authority for the
    Grand Avenue Railroad Grade Separation Project within the
    Village of Franklin Park, Illinois;
         (37)  for a period of 3 years after July  14,  1995,
    by  the  Village  of  Romeoville  for  the acquisition of
    rights-of-way for the 135th Street Bridge Project,  lying
    within  the  South  1/2 of Section 34, Township 37 North,
    Range 10 East and the South 1/2 of Section  35,  Township
    37  North, Range 10 East of the Third Principal Meridian,
    and the North 1/2 of Section 2, Township 36 North,  Range
    10  East  and  the  North  1/2  of Section 3, Township 36
    North, Range 10 East of the 3rd  Principal  Meridian,  in
    Will County, Illinois;
         (37.1)  for a period of 3 years after June 23, 1995,
    by  the  Illinois  Department  of  Transportation for the
    acquisition of rights-of-way for the 135th Street  Bridge
    Project  between  the  Des  Plaines  River and New Avenue
    lying within the South 1/2 of  Section  35,  Township  37
    North, Range 10 East of the Third Principal Meridian  and
    the  North  1/2 of Section 2, Township 36 North, Range 10
    East of the  3rd  Principal  Meridian,  in  Will  County,
    Illinois;
         (38)  for  a period beginning June 24, 1995 (the day
    after the effective date of Public Act 89-29) and  ending
    18  months  after  July  14,  1995 (the effective date of
    Public  Act  89-134),   by   the   Anna-Jonesboro   Water
    Commission  for the acquisition of land and easements for
    improvements  to  its   water   treatment   and   storage
    facilities and water transmission pipes;
         (39)  for a period of 36 months after July 14, 1995,
    by  the City of Effingham for the acquisition of property
    which is described as follows:
    Tract 1:
         Lots 26 and 27 in Block 4 in  RAILROAD  ADDITION  TO
    THE  TOWN (NOW CITY) OF EFFINGHAM (reference made to Plat
    thereof recorded in Book "K", Page 769, in the Recorder's
    Office of Effingham County),  situated  in  the  City  of
    Effingham, County of Effingham and State of Illinois.
         Tract 2:
         The  alley  lying  South  and  adjoining Tract 1, as
    vacated by Ordinance recorded on July 28,  1937  in  Book
    183,  Page  465, and all right, title and interest in and
    to said alley as established by the Contract for Easement
    recorded on August 4, 1937 in Book 183, Page 472;
         (40)  for a period of one year after July 14,  1995,
    by  the  Village  of  Palatine  for  the  acquisition  of
    property  located  along  the  south  side of Dundee Road
    between  Rand  Road  and  Hicks  Road  for  redevelopment
    purposes;
         (41)  for a period of 6 years after  July  1,  1995,
    for  the  acquisition  by  the Medical Center District of
    property described in Section 3 of the  Illinois  Medical
    District  Act  within  the  District  Development Area as
    described in Section 4 of that Act for the  purposes  set
    forth in that Act;
         (41.5)  for  a  period  of  24 months after June 21,
    1996 by the City of Effingham, Illinois  for  acquisition
    of  property  for  the  South  Raney  Street  Improvement
    Project Phase I;
         (42)  for  a  period of 3 years after June 21, 1996,
    by the  Village  of  Deerfield  for  the  acquisition  of
    territory   within   the  Deerfield  Village  Center,  as
    designated as of that date by the Deerfield Comprehensive
    Plan, with the exception of that  area  north  of  Jewett
    Park  Drive  (extended)  between  Waukegan  Road  and the
    Milwaukee Railroad Tracks, for redevelopment purposes;
         (43)  for a period of 12 months after June 21, 1996,
    by the City of Harvard for the  acquisition  of  property
    lying  west  of  Harvard Hills Road of sufficient size to
    widen the Harvard Hills Road right of way and to  install
    and maintain city utility services not more than 200 feet
    west of the center line of Harvard Hills Road;
         (44)  for  a  period of 5 years after June 21, 1996,
    by the Village of River Forest, Illinois, within the area
    designated as a tax increment financing district when the
    purpose of the condemnation proceeding is to acquire land
    for any of the purposes contained in the River Forest Tax
    Increment  Financing  Plan  or  authorized  by  the   Tax
    Increment  Allocation  Redevelopment  Act,  provided that
    condemnation of any property zoned and  used  exclusively
    for residential purposes shall be prohibited;
         (45)  for a period of 18 months after June 28, 1996,
    by the Village of Schaumburg for the acquisition of land,
    easements,  and  aviation  easements for the purpose of a
    public airport in Cook and DuPage Counties; provided that
    if any proceedings under the provisions of  this  Article
    are pending on that date, "quick-take" may be utilized by
    the Village of Schaumburg;
         (46)  for  a period of one year after June 28, 1996,
    by the City of Pinckneyville for the acquisition of  land
    and  easements  to  provide for improvements to its water
    treatment and storage facilities and  water  transmission
    pipes,  and  for the construction of a sewerage treatment
    facility and sewerage transmission  pipes  to  serve  the
    Illinois    Department   of   Corrections   Pinckneyville
    Correctional Facility;
         (47)  for a period of 6 months after June 28,  1996,
    by  the  City of Streator for the acquisition of property
    described as follows for a  first  flush  basin  sanitary
    sewer system:
              Tract  5:  That part of lots 20 and 21 in Block
         6 in Moore and  Plumb's  addition  to  the  city  of
         Streator,  Illinois, lying south of the right of way
         of the switch  track  of  the  Norfolk  and  Western
         Railroad  (now  abandoned) in the county of LaSalle,
         state of Illinois;
              Tract 6:  That part of lots 30, 31  and  32  in
         Block 7 in Moore and Plumb's Addition to the city of
         Streator, Illinois, lying north of the centerline of
         Coal  Run Creek and south of the right of way of the
         switch track of the  Norfolk  and  Western  Railroad
         (now  abandoned)  in the county of LaSalle, state of
         Illinois;
         (48)  for a period of 36 months  after  January  16,
    1997,   by   the   Bi-State  Development  Agency  of  the
    Missouri-Illinois   Metropolitan    District   for    the
    acquisition   of  rights  of  way  and  related  property
    necessary for  the  construction  and  operation  of  the
    MetroLink Light Rail System, beginning in East St. Louis,
    Illinois,  and  terminating  at  Mid America Airport, St.
    Clair County, Illinois;
         (49)  for a period of  2  years  after  January  16,
    1997, by the Village of Schaumburg for the acquisition of
    rights-of-way,   permanent   easements,   and   temporary
    easements  for  the  purpose  of  improving  the  Roselle
    Road/Illinois   Route   58/Illinois  Route  72  corridor,
    including rights-of-way  along  Roselle  Road,  Remington
    Road,  Valley  Lake Drive, State Parkway, Commerce Drive,
    Kristin Circle,  and  Hillcrest  Boulevard,  a  permanent
    easement  along  Roselle  Road,  and  temporary easements
    along Roselle Road, State  Parkway,  Valley  Lake  Drive,
    Commerce  Drive, Kristin Circle, and Hillcrest Boulevard,
    in Cook County;
         (50)   (blank);
         (51)  for a period of 12 months after July 25,  1997
    the effective date of this amendatory Act of 1997, by the
    Village   of   Bloomingdale   for   utility   relocations
    necessitated  by  the  Lake Street Improvement Project on
    Lake Street between Glen Ellyn Road and Springfield Drive
    in the Village of Bloomingdale;
         (52)  for a period of 36 months after July 25,  1997
    the effective date of this amendatory Act of 1997, by the
    City   of  Freeport,  owners  of  the  Freeport  Albertus
    Municipal Airport, to allow for acquisition of any  land,
    rights,  or  other  property lying between East Lamm Road
    and East Borchers Road to complete realignment  of  South
    Hollywood  Road  and  to  establish  the necessary runway
    safety  zone  in   accordance   with   Federal   Aviation
    Administration  and Illinois Department of Transportation
    design criteria;
         (53)  for a period of 3 years after July 1, 1997, by
    the Village of Elmwood Park  to  be  used  only  for  the
    acquisition  of  commercially  zoned  property within the
    area  designated  as  the  Tax  Increment   Redevelopment
    Project Area by ordinance passed and approved on December
    15,  1986, as well as to be used only for the acquisition
    of commercially zoned property located at  the  northwest
    corner of North Avenue and Harlem Avenue and commercially
    zoned  property located at the southwest corner of Harlem
    Avenue and Armitage Avenue for redevelopment purposes, as
    set forth in Division 74.3 of Article 11 of the  Illinois
    Municipal Code;
         (54)  for  a  period  of 3 years after July 25, 1997
    the effective date of this amendatory Act of 1997, by the
    Village of Oak  Park  for  the  acquisition  of  property
    located  along  the  south  side  of North Avenue between
    Austin Boulevard and Harlem Avenue or along the north and
    south side of Harrison Street  between  Austin  Boulevard
    and  Elmwood  Avenue,  not  including residentially zoned
    properties   within   these   areas,    for    commercial
    redevelopment goals;.
         (54.1)  (53)  for  a  period of 3 years after August
    14, 1997 the effective date of  this  amendatory  Act  of
    1997,  by  the Village of Oak Park for the acquisition of
    property within  the  areas  designated  as  the  Greater
    Downtown  Area  Tax  Increment  Financing  District,  the
    Harlem/Garfield Tax Increment Financing District, and the
    Madison  Street  Tax  Increment  Financing  District, not
    including residentially  zoned  properties  within  these
    areas, for commercial redevelopment goals;
         (54.2)  (54)  for  a  period of 3 years after August
    14, 1997 the effective date of  this  amendatory  Act  of
    1997,  by  the Village of Oak Park for the acquisition of
    property within the areas designated as the North  Avenue
    Commercial  Strip  and the Harrison Street Business Area,
    not including residentially zoned properties within these
    areas, for commercial redevelopment goals;
         (55) (51)  for a period of 3 years after August  14,
    1997 the effective date of this amendatory Act of 1997 by
    the  Village  of Morton Grove, within the area designated
    as the Waukegan Road Tax Increment Financing District  to
    be  used only for acquiring commercially zoned properties
    located on Waukegan Road for tax increment  redevelopment
    projects  contained  in  the  redevelopment  plan for the
    area;
         (56) (52)  For a period of 2 years after August  14,
    1997  the  effective date of this amendatory Act of 1997,
    by the Village of Rosemont for  the  acquisition  of  the
    property described as Tract 1, and the acquisition of any
    leasehold  interest of the property described as Tract 2,
    both described as follows:
                           Tract 1
    PARCEL 1:
    THAT PART OF THE SOUTHWEST 1/4 OF  SECTION  33,  TOWNSHIP
    41 NORTH, RANGE 12, EAST OF THE THIRD PRINCIPAL MERIDIAN,
    DESCRIBED AS FOLLOWS:
    COMMENCING  AT  THE INTERSECTION OF A LINE 50.00 FEET, AS
    MEASURED AT RIGHT ANGLES, NORTH OF AND PARALLEL WITH  THE
    SOUTH LINE OF SAID  SOUTHWEST  1/4  WITH  A  LINE  484.69
    FEET,  AS  MEASURED AT RIGHT ANGLES, EAST OF AND PARALLEL
    WITH THE WEST LINE OF SAID SOUTHWEST 1/4 (THE  WEST  LINE
    OF SAID SOUTHWEST 1/4 HAVING AN ASSUMED BEARING OF  NORTH
    00  DEGREES  00  MINUTES  00 SECONDS EAST FOR THIS  LEGAL
    DESCRIPTION); THENCE NORTH 00  DEGREES  00  MINUTES    00
    SECONDS  EAST  ALONG  SAID  LAST DESCRIBED PARALLEL LINE,
    427.26 FEET TO A POINT FOR A PLACE OF  BEGINNING;  THENCE
    CONTINUING  NORTH  00  DEGREES 00 MINUTES 00 SECONDS EAST
    ALONG SAID LAST DESCRIBED  PARALLEL  LINE,  251.92  FEET;
    THENCE  NORTH  45  DEGREES  00  MINUTES  00 SECONDS EAST,
    32.53  FEET;  THENCE  NORTH  90  DEGREES  00  MINUTES  00
    SECONDS EAST, 53.70 FEET;  THENCE  SOUTH  72  DEGREES  34
    MINUTES  18  SECONDS  EAST,  149.63 FEET; THENCE SOUTH 00
    DEGREES 00 MINUTES 00 SECONDS WEST, 230.11  FEET;  THENCE
    SOUTH 90 DEGREES 00 MINUTES 00 SECONDS WEST, 219.46 FEET,
    TO THE POINT OF BEGINNING IN COOK COUNTY, ILLINOIS.
    PARCEL 2:
    THAT  PART  OF  THE SOUTHWEST 1/4 OF SECTION 33, TOWNSHIP
    41 NORTH, RANGE 12, EAST OF THE THIRD PRINCIPAL MERIDIAN,
    DESCRIBED AS FOLLOWS:
    COMMENCING AT THE INTERSECTION OF A LINE 50.00  FEET,  AS
    MEASURED AT RIGHT ANGLES, NORTH OF AND PARALLEL WITH  THE
    SOUTH  LINE  OF  SAID  SOUTHWEST  1/4  WITH A LINE 484.69
    FEET, AS MEASURED AT RIGHT ANGLES, EAST OF  AND  PARALLEL
    WITH  THE  WEST LINE OF SAID SOUTHWEST 1/4 (THE WEST LINE
    OF SAID SOUTHWEST 1/4 HAVING AN ASSUMED BEARING OF  NORTH
    00 DEGREES, 00 MINUTES, 00 SECONDS EAST FOR THIS    LEGAL
    DESCRIPTION);  THENCE  NORTH  00 DEGREES, 00 MINUTES,  00
    SECONDS EAST ALONG SAID  LAST  DESCRIBED  PARALLEL  LINE,
    153.00  FEET;  THENCE  NORTH  90  DEGREES, 00 MINUTES, 00
    SECONDS EAST, 89.18 FEET; THENCE  NORTH  00  DEGREES,  00
    MINUTES,  00  SECONDS  EAST,  48.68 FEET; THENCE NORTH 90
    DEGREES, 00 MINUTES, 00 SECONDS EAST, 43.53 FEET;  THENCE
    SOUTH 00 DEGREES, 00 MINUTES, 00 SECONDS EAST, 8.00 FEET;
    THENCE  NORTH  90  DEGREES,  00 MINUTES, 00 SECONDS EAST,
    44.23 FEET; THENCE  NORTH  45  DEGREES,  00  MINUTES,  00
    SECONDS  EAST,  60.13  FEET;  THENCE NORTH 00 DEGREES, 00
    MINUTES, 00 SECONDS EAST, 141.06 FEET TO A  POINT  FOR  A
    PLACE  OF  BEGINNING,  SAID POINT BEING 447.18 FEET NORTH
    AND  704.15 FEET EAST OF  THE  SOUTHWEST  CORNER  OF  THE
    SOUTHWEST  1/4  OF SAID SECTION 33, AS MEASURED ALONG THE
    WEST LINE OF SAID SOUTHWEST 1/4 AND ALONG A LINE AT RIGHT
    ANGLES THERETO; THENCE NORTH 00 DEGREES, 00  MINUTES,  00
    SECONDS  EAST,  280.11  FEET; THENCE NORTH 72 DEGREES, 34
    MINUTES, 18 SECONDS WEST, 149.63 FEET;  THENCE  SOUTH  90
    DEGREES,  00 MINUTES, 00 SECONDS WEST, 53.70 FEET; THENCE
    SOUTH 45 DEGREES, 00 MINUTES, 00 SECONDS WEST, 32.53 FEET
    TO A POINT ON A LINE 484.69 FEET, AS  MEASURED  AT  RIGHT
    ANGLES,  EAST  OF AND PARALLEL WITH THE WEST LINE OF SAID
    SOUTHWEST 1/4, SAID POINT BEING 679.18 FEET, AS  MEASURED
    ALONG  SAID  PARALLEL  LINE,  NORTH OF THE AFOREDESCRIBED
    POINT  OF  COMMENCEMENT;  THENCE  NORTH  00  DEGREES,  00
    MINUTES,  00  SECONDS  EAST  ALONG  SAID  LAST  DESCRIBED
    PARALLEL LINE, 158.10 FEET; THENCE NORTH 39  DEGREES,  39
    MINUTES,  24  SECONDS EAST, 27.09 FEET TO AN INTERSECTION
    WITH THE SOUTHERLY LINE OF HIGGINS  ROAD,  BEING  A  LINE
    50.00  FEET,  AS  MEASURED  AT RIGHT ANGLES, SOUTHERLY OF
    AND PARALLEL WITH THE CENTER LINE OF  SAID  ROAD;  THENCE
    SOUTH  72 DEGREES, 34 MINUTES, 18 SECONDS EAST ALONG SAID
    LAST  DESCRIBED  SOUTHERLY  LINE,  382.55  FEET   TO   AN
    INTERSECTION  WITH  THE WESTERLY RIGHT OF WAY LINE OF THE
    MINNEAPOLIS, ST.  PAUL  AND  SAULT  STE.  MARIE  RAILROAD
    (FORMERLY  THE  CHICAGO  AND  WISCONSIN RAILROAD); THENCE
    SOUTH 14 DEGREES, 51 MINUTES, 36 SECONDS EAST ALONG  SAID
    LAST  DESCRIBED  WESTERLY LINE, 378.97 FEET; THENCE SOUTH
    90 DEGREES, 00 MINUTES, 00 SECONDS WEST, 260.00  FEET  TO
    THE PLACE OF BEGINNING, IN COOK COUNTY, ILLINOIS.
         Generally  comprising  approximately 3.8 acres along
    the south side of  Higgins Road, East of Mannheim Road.
                           Tract 2
    PARCEL 1:
         Any  leasehold  interest  of  any  portion  of   the
    property legally described as  follows:
    THAT  PART  OF  THE  EAST  8  ACRES OF LOT 2 IN FREDERICK
    JOSS'S JOSS92S DIVISION OF LAND IN SECTION 9, TOWNSHIP 40
    NORTH, RANGE 12  EAST OF  THE  THIRD  PRINCIPAL  MERIDIAN
    (EXCEPT  THE  NORTH   500 FEET THEREOF AS MEASURED ON THE
    EAST LINE) LYING  EASTERLY  OF  THE  FOLLOWING  DESCRIBED
    LINE: BEGINNING AT A  POINT ON THE NORTH LINE OF SAID LOT
    2,  19.07  FEET  WEST  OF   THE NORTHEAST CORNER THEREOF;
    THENCE SOUTHWESTERLY  ALONG A LINE FORMING AN ANGLE OF 73
    DEGREES 46 MINUTES  40 SECONDS (AS MEASURED FROM WEST  TO
    SOUTHWEST)  WITH    THE  AFORESAID NORTH LINE OF LOT 2, A
    DISTANCE OF 626.69  FEET TO A POINT; THENCE SOUTHEASTERLY
    ALONG A LINE  FORMING AN ANGLE OF 20 DEGREES  58  MINUTES
    25 SECONDS  (AS MEASURED TO THE LEFT) WITH A PROLONGATION
    OF  THE   LAST DESCRIBED COURSE A DISTANCE OF 721.92 FEET
    TO A  POINT IN THE SOUTH LINE OF SAID LOT WHICH IS  85.31
    FEET    WEST  OF  THE  SOUTHEAST  CORNER  OF  SAID LOT 2,
    EXCEPTING  THEREFROM THE  FOLLOWING  DESCRIBED  PREMISES:
    THE  SOUTH   50 FEET OF LOT 2 LYING EAST OF THE FOLLOWING
    DESCRIBED  LINE; BEGINNING AT A POINT IN THE  SOUTH  LINE
    OF  LOT  2,  WHICH    IS 85.31 FEET WEST OF THE SOUTHEAST
    CORNER OF SAID LOT;  THENCE NORTHERLY  ON  A  LINE  WHICH
    FORMS  AN  ANGLE  OF 85  DEGREES 13 MINUTES 25 SECONDS IN
    THE NORTHWEST 1/4 WITH    SAID  LAST  DESCRIBED  LINE  IN
    FREDERICK  JOSS'S  JOSS92S  DIVISION  OF    LANDS  IN THE
    NORTHEAST 1/4 OF SECTION 9, TOWNSHIP 40  NORTH, RANGE  12
    EAST OF THE THIRD PRINCIPAL MERIDIAN.
    PARCEL 2:
         Plus any rights of ingress and egress which the said
    holder  of  the   leasehold interest may have pursuant to
    the following described easement:
    GRANT OF EASEMENT FOR THE BENEFIT OF PARCEL 1 AS  CREATED
    BY GRANT FROM FRACAP SHEET METAL  MANUFACTURING  COMPANY,
    INC.  TO  JUNE  WEBER  POLLY DATED  NOVEMBER 16, 1970 AND
    RECORDED  APRIL  7,  1971  AS  DOCUMENT    21442818   FOR
    PASSAGEWAY  OVER  THE  EAST 20 FEET AS  MEASURED AT RIGHT
    ANGLES TO THE EAST LINE THEREOF OF  THE NORTH 500 FEET OF
    THAT PART OF THE EAST 8 ACRES OF    LOT  2  IN  FREDERICK
    JOSS'S  JOSS92S  DIVISION OF LAND IN SECTION 9,  TOWNSHIP
    40 NORTH, RANGE 12 EAST OF THE THIRD PRINCIPAL  MERIDIAN,
    LYING  EASTERLY  OF  THE  FOLLOWING  DESCRIBED      LINE:
    BEGINNING  AT  A  POINT  ON THE NORTH LINE OF SAID LOT 2,
    19.07 FEET WEST OF THE NORTHEAST CORNER THEREOF;   THENCE
    SOUTHWESTERLY  ALONG  A  LINE  FORMING  AN  ANGLE  OF  73
    DEGREES 46 MINUTES 40 SECONDS (AS MEASURED FROM  WEST  TO
    SOUTHWEST)  WITH  THE  AFORESAID  NORTH LINE OF LOT  2, A
    DISTANCE OF 626.69 FEET TO A POINT; THENCE  SOUTHEASTERLY
    ALONG A LINE FORMING AN ANGLE OF 20  DEGREES  58  MINUTES
    25 SECONDS (AS MEASURED TO THE LEFT)  WITH A PROLONGATION
    OF  THE  LAST DESCRIBED COURSE A  DISTANCE OF 721.92 FEET
    TO A POINT IN THE SOUTH LINE OF  SAID  LOT  2,  WHICH  IS
    85.31  FEET  WEST OF THE SOUTHEAST  CORNER OF SAID LOT 2,
    IN COOK COUNTY, ILLINOIS;
         (57) (55)  for a period of 24 months from August 14,
    1997 the effective date of this amendatory Act  of  1997,
    by  the City of Champaign for the acquisition of land and
    easements in and adjacent to the City  of  Champaign  for
    the  improvement  of Windsor Road and Duncan Road and for
    the  construction  of  the  Boneyard  Creek   Improvement
    Project;.
         (58)  for  a  period from the effective date of this
    amendatory Act  of  1998  to  August  30,  2000,  by  the
    Southwestern  Illinois  Development Authority pursuant to
    the Southwestern Illinois Development Authority Act for a
    project as defined in Section 3 of that Act.
    In a proceeding subject to this Section,  the  plaintiff,
at  any  time  after  the complaint has been filed and before
judgment is entered in the proceeding,  may  file  a  written
motion  requesting  that,  immediately  or  at some specified
later date, the plaintiff  either  be  vested  with  the  fee
simple title (or such lesser estate, interest or easement, as
may  be  required) to the real property, or specified portion
thereof, which is the  subject  of  the  proceeding,  and  be
authorized  to  take  possession of and use such property; or
only be authorized to take possession  of  and  to  use  such
property,  if such possession and use, without the vesting of
title, are sufficient to permit the plaintiff to proceed with
the project until the final  ascertainment  of  compensation;
however, no land or interests therein now or hereafter owned,
leased,  controlled or operated and used by, or necessary for
the actual  operation  of,  any  common  carrier  engaged  in
interstate  commerce,  or any other public utility subject to
the jurisdiction of the Illinois Commerce  Commission,  shall
be  taken or appropriated hereunder by the State of Illinois,
the Illinois Toll Highway Authority, the  sanitary  district,
the  St.  Louis  Metropolitan  Area  Airport Authority or the
Board of Trustees of the University of Illinois without first
securing the approval of such Commission.
    Except as hereinafter stated, the motion for taking shall
state: (1) an accurate description of the property  to  which
the  motion  relates  and the estate or interest sought to be
acquired therein; (2) the formally adopted schedule  or  plan
of  operation  for  the execution of the plaintiff's project;
(3) the  situation  of  the  property  to  which  the  motion
relates,  with  respect  to  the  schedule  or  plan; (4) the
necessity for taking such property in the manner requested in
the  motion;  and  (5)  if  the  property  (except   property
described in Section 3 of the Sports Stadium Act, or property
described as Site B in Section 2 of the Metropolitan Pier and
Exposition  Authority  Act)  to  be  taken  is owned, leased,
controlled or operated and used  by,  or  necessary  for  the
actual  operation  of, any interstate common carrier or other
public utility subject to the jurisdiction  of  the  Illinois
Commerce  Commission,  a  statement  to  the  effect that the
approval of such proposed taking has been secured  from  such
Commission,  and attaching to such motion a certified copy of
the order of such Commission granting such approval.  If  the
schedule  or  plan of operation is not set forth fully in the
motion, a copy of such schedule or plan shall be attached  to
the motion.
(Source: P.A.  89-29,  eff.  6-23-95;  89-134,  eff. 7-14-95;
89-343, eff. 8-17-95;  89-356,  eff.  8-17-95;  89-445,  eff.
2-7-96;  89-460,  eff. 5-24-96; 89-494, eff. 6-21-96; 89-502,
eff. 6-28-96; 89-504,  eff.  6-28-96;  89-592,  eff.  8-1-96;
89-626,  eff.  8-9-96;  89-683,  eff.  6-1-97;  89-699,  eff.
1-16-97;  90-6, eff. 6-3-97; 90-14, eff. 7-1-97; 90-232, eff.
7-25-97; 90-370, eff. 8-14-97; revised 9-29-97.)

    Section 99.  Effective date.  This Act takes effect  upon
becoming law.

[ Top ]