Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process.
Recent laws may not yet be included in the ILCS database, but they are found on this site as
Public
Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the
Guide.
Because the statute database is maintained primarily for legislative drafting purposes,
statutory changes are sometimes included in the statute database before they take effect.
If the source note at the end of a Section of the statutes includes a Public Act that has
not yet taken effect, the version of the law that is currently in effect may have already
been removed from the database and you should refer to that Public Act to see the changes
made to the current law.
(220 ILCS 50/4) (from Ch. 111 2/3, par. 1604)
(Text of Section before amendment by P.A. 103-614 )
Sec. 4. Required activities. Every person who engages in nonemergency
excavation or
demolition shall:
(a) take reasonable action to inform himself of the |
| location of any underground utility facilities in and near the area for which such operation is to be conducted;
|
|
(b) plan the excavation or demolition to avoid or
|
| minimize interference with underground utility facilities within the tolerance zone by utilizing such precautions that include, but are not limited to, hand excavation, vacuum excavation methods, and visually inspecting the excavation while in progress until clear of the existing marked facility;
|
|
(c) if practical, use white paint, flags, stakes, or
|
| both, to outline the dig site;
|
|
(d) provide notice not less than 48 hours but no
|
| more than 14 calendar days in advance of the start of the excavation or demolition to the owners or operators of the underground utility facilities in and near the excavation or demolition area through the State-Wide One-Call Notice System or, in the case of nonemergency excavation or demolition within the boundaries of a municipality of at least one million persons which operates its own one-call notice system, through the one-call notice system which operates in that municipality.
|
|
At a minimum, the notice required under this
|
| subsection (d) shall provide:
|
|
(1) the person's name, address, phone number at
|
| which a person can be reached, and fax number, if available;
|
|
(2) the start date and time of the planned
|
| excavation or demolition;
|
|
(3) all counties, cities, or townships, or any
|
| combination thereof, where the proposed excavation shall take place;
|
|
(4) the address at which the excavation or
|
| demolition shall take place;
|
|
(5) the type and extent of the work involved; and
(6) the section or quarter sections when the
|
| information in items (1) through (5) of this subsection (d) does not allow the State-Wide One-Call Notice System to determine the appropriate excavation or demolition site. This item (6) does not apply to residential property owners;
|
|
(e) provide, during and following excavation or
|
| demolition, such support for existing underground utility facilities in and near the excavation or demolition area as may be reasonably necessary for the protection of such facilities unless otherwise agreed to by the owner or operator of the underground facility;
|
|
(f) backfill all excavations in such manner and with
|
| such materials as may be reasonably necessary for the protection of existing underground utility facilities in and near the excavation or demolition area;
|
|
(g) after February 29, 2004, when the excavation or
|
| demolition project will extend past 28 calendar days from the date of the original notice provided under clause (d), the excavator shall provide a subsequent notice to the owners or operators of the underground utility facilities in and near the excavation or demolition area through the State-Wide One-Call Notice System or, in the case of excavation or demolition within the boundaries of a municipality having a population of at least 1,000,000 inhabitants that operates its own one-call notice system, through the one-call notice system that operates in that municipality informing utility owners and operators that additional time to complete the excavation or demolition project will be required. The notice will provide the excavator with an additional 28 calendar days from the date of the subsequent notification to continue or complete the excavation or demolition project;
|
|
(h) exercise due care at all times to protect
|
| underground utility facilities. If, after proper notification through the State-Wide One-Call Notice System and upon arrival at the site of the proposed excavation, the excavator observes clear evidence of the presence of an unmarked or incompletely marked utility in the area of the proposed excavation, the excavator shall not begin excavating until all affected facilities have been marked or 2 hours after an additional call is made to the State-Wide One-Call Notice System for the area. The owner or operator of the utility shall respond within 2 hours of the excavator's call to the State-Wide One-Call Notice System; and
|
|
(i) when factors, including, but not limited to,
|
| weather, construction activity, or vandalism, at the excavation site have caused the utility markings to become faded or indistinguishable, the excavator shall provide an additional notice through the State-Wide One-Call Notice System requesting that only the affected areas where excavation or demolition is to continue be re-marked. Facility owners or operators must respond to the notice to re-mark according to the requirements of Section 10 of this Act.
|
|
Nothing in this Section prohibits the use of any method of excavation if
conducted in a manner that would avoid interference with
underground utility facilities.
(Source: P.A. 96-714, eff. 1-1-10.)
(Text of Section after amendment by P.A. 103-614 )
Sec. 4. Required activities. Every excavator who engages in nonemergency excavation or demolition shall:
(a) take reasonable action to inform the excavator of
|
| the location of any facilities in and near the area for which such operation is to be conducted;
|
|
(b) plan the excavation or demolition to avoid or
|
| minimize interference with facilities within the tolerance zone by utilizing such precautions that include, but are not limited to, hand or vacuum excavation methods to the depth of the proposed excavation or demolition, and visually inspecting the excavation while in progress until clear of the approximate location of the existing marked facility;
|
|
(c) pre-mark the area of excavation;
(d) provide notice not less than 2 days but no more
|
| than 10 days in advance of the start of the excavation or demolition to the owners or operators of the underground utility facilities at or near the excavation or demolition area through JULIE.
|
|
At a minimum, the notice required under this
|
| subsection (d) shall provide:
|
|
(1) the excavator's name, address, phone number
|
| at which the excavator can be reached, and, if available, a fax number and email address;
|
|
(2) the start date and time of the planned
|
| excavation or demolition;
|
|
(3) the county and place or places where the
|
| proposed excavation shall take place;
|
|
(4) the address or location at which the
|
| excavation or demolition shall take place;
|
|
(5) the type of work, extent, and description of
|
| the area where the excavation or demolition is to occur;
|
|
(6) the section or quarter sections when the
|
| information in items (1) through (5) of this subsection (d) does not allow JULIE to determine the appropriate excavation or demolition site. This item (6) does not apply to residential property owners;
|
|
(7) an indication of whether directional boring
|
| or horizontal directional drilling will be used;
|
|
(8) an indication of whether the excavation will
|
|
(9) an indication of how the proposed excavation
|
| or demolition has been pre-marked;
|
|
(10) the identity of the project owner; and
(11) the latitude and longitude of the relevant
|
|
The information specified in items (1) through (10)
|
| is still required when providing latitude and longitude;
|
|
(e) provide, during and following excavation or
|
| demolition, such support for existing facilities in and near the excavation or demolition area as may be reasonably necessary for the protection of such facilities and known service laterals unless otherwise agreed to by the owner or operator of the underground facility or owners of any known service laterals;
|
|
(f) backfill all excavations in such manner and with
|
| such materials as may be reasonably necessary for the protection of existing facilities in and near the excavation or demolition area;
|
|
(g) when the excavation or demolition project will
|
| extend past the 25-day expiration date of the original notice provided under clause (d) or a subsequent extension notice, if marks are requested, the excavator shall pre-mark prior to requesting any subsequent extension notice;
|
|
(h) exercise due care at all times to protect
|
| facilities and known service laterals. If, after proper notification through JULIE and upon arrival at the site of the proposed excavation, the excavator observes clear evidence of the presence of an unmarked or incompletely marked facility in the area of the proposed excavation, the excavator shall provide subsequent notice through JULIE of the unmarked or incompletely marked area and shall not begin excavating until all affected facilities have been marked or 2 hours, whichever is shorter, unless a greater time is provided by the excavator through JULIE. The underground utility facility owner or operator of the facility shall respond within 2 hours unless a greater time is provided by the excavator through JULIE;
|
|
(i) when factors, including, but not limited to,
|
| weather, construction activity, or vandalism, at the excavation site have caused the facility markings to become faded or indistinguishable, the excavator shall pre-mark again and provide a re-mark request through JULIE requesting that only the affected areas where excavation or demolition is to continue be re-marked. Underground utility facility owners or operators must respond to the notice to re-mark by the dig start date and time on the notice; and
|
|
(j) for informational and planning purposes only,
|
| prior notice of large projects may be provided to underground utility facility owners or operators through JULIE greater than 10 days in advance of the large project commencing.
|
|
Nothing in this Section prohibits the use of any method of excavation if conducted in a manner that would avoid interference with facilities.
(Source: P.A. 103-614, eff. 1-1-25.)
|