5 Section 1. The following named amounts, or so much
6 thereof as may be necessary, are appropriated from the
7 Capital Development Fund to the Capital Development Board for
8 the Department of Agriculture for the projects hereinafter
9 enumerated:
10 DUQUOIN STATE FAIRGROUNDS
11 For renovating roundhouses ..................... $ 600,000
12 GALESBURG DIAGNOSTIC LABORATORY
13 For purchasing the facility .................... 3,200,000
14 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
15 For completing the HVAC replacement
16 in the Administration Building, in
17 addition to funds previously appropriated .... 485,000
18 For replacing and repairing roofs,
19 Phase II ..................................... 810,000
20 For extending the fiber optics system .......... 250,000
21 For installing HVAC system and
22 restrooms in the Orr Building ................ 1,100,000
23 Total, Section 1 $6,445,000
24 Section 2. The following named amounts, or so much
25 thereof as may be necessary, are appropriated from the
26 Capital Development Fund to the Capital Development Board for
27 the Department of Central Management Services for the
28 projects hereinafter enumerated:
29 CENTRAL COMPUTER FACILITY
30 For installing a cooling tower and fire alarm
SB598 Engrossed -2- BOB-CDBnew-re2000
1 system and various other improvements ........ $ 581,000
2 OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER
3 For planning and beginning the renovation
4 of the facility .............................. 2,500,000
5 SPRINGFIELD REGIONAL OFFICE BUILDING
6 For replacing the potable water system ......... 825,000
7 For upgrading the parking lot .................. 175,000
8 Total, Section 2 $4,081,000
9 Section 3. The following named amounts, or so much
10 thereof as may be necessary, are appropriated from the
11 Capital Development Fund to the Capital Development Board for
12 the Department of Corrections for the projects hereinafter
13 enumerated:
14 DWIGHT CORRECTIONAL CENTER
15 For upgrading the water treatment plant ........ $ 1,000,000
16 EAST MOLINE CORRECTIONAL CENTER
17 For upgrading fire alarm and building
18 automation systems ........................... 900,000
19 ILLINOIS YOUTH CENTER - HARRISBURG
20 For upgrading mechanical control system ........ 515,000
21 ILLINOIS YOUTH CENTER - VALLEY VIEW
22 For replacing boilers, controls, hot
23 water heaters and softeners in
24 residential units and administration
25 building ..................................... 1,300,000
26 ILLINOIS YOUTH CENTER - WARRENVILLE
27 For rehabilitation of the administration
28 building ..................................... 791,000
29 LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE
30 For constructing two cellhouses, in
31 addition to funds previously appropriated .... 14,300,000
32 MENARD CORRECTIONAL CENTER - CHESTER
33 For improving ventilation and dehumidification
SB598 Engrossed -3- BOB-CDBnew-re2000
1 systems in the kitchen and dining rooms ...... 500,000
2 For replacing shower room and guard tower ...... 500,000
3 For upgrading mechanical bar screen and storm
4 and sanitary sewer system .................... 1,300,000
5 SHERIDAN CORRECTIONAL CENTER
6 For replacing doors and locks .................. 150,000
7 STATEVILLE CORRECTIONAL CENTER - JOLIET
8 For constructing a housing unit, cellhouse,
9 vehicle maintenance building and
10 warehouse for the reception and
11 classification center, in addition to
12 funds previously appropriated ................ 28,500,000
13 For replacing windows in B House ............... 3,000,000
14 For replacing cell fronts in F House ........... 1,000,000
15 For upgrading plumbing system in F House,
16 in addition to funds previously
17 appropriated ................................. 3,500,000
18 TAYLORVILLE CORRECTIONAL CENTER
19 For upgrading shower ventilation system ........ 250,000
20 THOMSON CORRECTIONAL CENTER
21 For constructing three cellhouses and
22 expanding educational and vocational
23 space, in addition to funds previously
24 appropriated ................................. 38,400,000
25 VANDALIA CORRECTIONAL CENTER
26 For planning and beginning construction
27 for a slaughter house and meat plant ......... 500,000
28 For repairing exterior masonry, in addition
29 to funds previously appropriated ............. 750,000
30 VIENNA CORRECTIONAL CENTER
31 For replacing windows, in addition to
32 funds previously appropriated ................ 800,000
33 STATEWIDE
34 For planning, design, construction, equipment
SB598 Engrossed -4- BOB-CDBnew-re2000
1 and all other necessary costs for a
2 female multi-security level
3 correctional center .......................... 80,000,000
4 For replacing roofing systems at the
5 following locations at the approximate
6 cost set forth below ......................... 1,100,000
7 Vienna Correctional Center ..........500,000
8 Sheridan Correctional Center ........600,000
9 For replacing or installing mechanical bar
10 screens at the following locations at the
11 approximate cost set forth below ............. 840,000
12 Graham Correctional Center -
13 Hillsboro ..........................340,000
14 Western Illinois Correctional
15 Center - Mt. Sterling ..............350,000
16 Shawnee Correctional Center -
17 Vienna .............................150,000
18 For upgrading security control systems and
19 panels in housing units at the following
20 locations at the approximate cost set
21 forth below .................................. 4,850,000
22 Danville Correctional Center ........500,000
23 Hill Correctional Center -
24 Galesburg ........................1,500,000
25 Western Illinois Correctional
26 Center - Mt. Sterling ..............675,000
27 Illinois River Correctional
28 Center - Canton ....................675,000
29 Shawnee Correctional Center -
30 Vienna ...........................1,500,000 ____________
31 Total, Section 3 $184,746,000
32 Section 4. The following named amounts, or so much
33 thereof as may be necessary, are appropriated from the
SB598 Engrossed -5- BOB-CDBnew-re2000
1 Capital Development Fund to the Capital Development Board for
2 the Historic Preservation Agency for the projects hereinafter
3 enumerated:
4 FORT DE CHARTRES HISTORIC SITE - RANDOLPH COUNTY
5 For restoring the powder magazine .............. $ 305,000
6 LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
7 For rehabilitating site and providing
8 irrigation system ............................ 445,000
9 LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
10 For rehabilitating interior and exterior ....... 755,000
11 OLD STATE CAPITOL - SPRINGFIELD
12 For providing structural stabilization ......... 2,000,000
13 UNION STATION - SPRINGFIELD
14 For purchasing and rehabilitating .............. 2,810,000
15 Total, Section 4 $6,315,000
16 Section 5. The following named amounts, or so much
17 thereof as may be necessary, are appropriated from the
18 Capital Development Fund to the Capital Development Board for
19 the Department of Human Services for the projects hereinafter
20 enumerated:
21 CHESTER MENTAL HEALTH CENTER
22 For upgrading access control/duress system ..... $ 1,500,000
23 FOX DEVELOPMENTAL CENTER - DWIGHT
24 For upgrading electrical system and installing
25 an emergency generator ....................... 842,000
26 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
27 For renovating residences, in addition to
28 funds previously appropriated ................ 2,792,000
29 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
30 For renovating the fire alarm systems, in
31 addition to funds previously appropriated .... 500,000
32 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
33 For completing the powerhouse rehabilitation, in
SB598 Engrossed -6- BOB-CDBnew-re2000
1 addition to funds previously appropriated .... 400,000
2 JACKSONVILLE DEVELOPMENTAL CENTER
3 For rehabilitating cooling towers at
4 the power plant .............................. 270,000
5 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
6 For renovating residential and neighborhood
7 homes, in addition to funds previously
8 appropriated ................................. 1,850,000
9 MADDEN MENTAL HEALTH CENTER - HINES
10 For renovating pavilions for safety/security,
11 in addition to funds previously appropriated . 1,200,000
12 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
13 For renovating Kennedy Hall .................... 2,500,000
14 MURRAY MENTAL HEALTH CENTER - CENTRALIA
15 For replacing energy management system ......... 815,000
16 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
17 For upgrading HVAC systems in four
18 residential buildings ........................ 1,210,000
19 ZELLER MENTAL HEALTH CENTER - PEORIA
20 For upgrading HVAC and mechanical systems ...... 685,000
21 STATEWIDE
22 For replacing and repairing roofing systems
23 at the following locations at the approximate
24 cost set forth below ......................... 2,310,000
25 Choate Developmental Center -
26 Anna ...............................300,000
27 Chicago-Read Mental Health Center ...100,000
28 Tinley Park Mental Health Center.....185,000
29 Illinois School for the Visually
30 Impaired - Jacksonville ............160,000
31 Shapiro Developmental Center -
32 Kankakee ...........................545,000
33 Kiley Developmental Center -
34 Waukegan ...........................300,000
SB598 Engrossed -7- BOB-CDBnew-re2000
1 Ludeman Developmental Center -
2 Park Forest ........................720,000
3 For upgrading roads at the following
4 locations at the approximate
5 cost set forth below ......................... 1,000,000
6 Howe Developmental Center -
7 Tinley Park ........................520,000
8 Shapiro Developmental Center -
9 Kankakee ...........................480,000 ____________
10 Total, Section 5 $17,874,000
11 Section 7. The following named amounts, or so much
12 thereof as may be necessary, are appropriated from the
13 Capital Development Fund to the Capital Development Board for
14 the Department of Military Affairs for the projects
15 hereinafter enumerated:
16 CHAMPAIGN ARMORY
17 For replacing roofing systems and
18 rehabilitating exterior walls ................ $ 300,000
19 DELAVAN ARMORY
20 For rehabilitating the exterior and
21 replacing roofing system ..................... 700,000
22 PONTIAC ARMORY
23 For rehabilitating the exterior and
24 replacing the roofing system ................. 600,000
25 STREATOR ARMORY
26 For replacing the roofing system and
27 tuckpointing walls ........................... 300,000
28 Total, Section 7 $1,900,000
29 Section 8. The following named amounts, or so much
30 thereof as may be necessary, are appropriated from the
31 Capital Development Fund to the Capital Development Board for
32 the Department of Natural Resources for the projects
SB598 Engrossed -8- BOB-CDBnew-re2000
1 hereinafter enumerated:
2 BEAVER DAM STATE PARK - MACOUPIN COUNTY
3 For rehabilitating dams, spillway, and
4 boat access facilities ....................... 450,000
5 CHAIN O'LAKES STATE PARK - LAKE/MCHENRY COUNTIES
6 For upgrading sewage treatment system .......... 1,070,000
7 ILLINOIS BEACH STATE PARK - LAKE COUNTY
8 For rehabilitating lodge entrance .............. 250,000
9 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
10 For upgrading campground electrical ............ 250,000
11 KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES
12 For constructing sanitary sewer system, in
13 addition to funds previously appropriated .... 5,000,000
14 LAKE LE-AQUA-NA STATE PARK - STEPHENSON COUNTY
15 For replacing sewage treatment plant ........... 572,000
16 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
17 For rehabilitating levee and well, in
18 addition to funds previously appropriated .... 3,600,000
19 SANGCHRIS STATE PARK - SANGAMON COUNTY
20 For upgrading campground electrical
21 system ....................................... 193,500
22 SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY
23 For planning and beginning renovation
24 of hatchery .................................. 496,000
25 WHITE PINES FOREST STATE PARK - OGLE COUNTY
26 For planning and beginning lodge and cabin
27 restoration .................................. 150,000
28 STATEWIDE
29 For replacing roofing systems at the
30 following locations, at the approximate
31 cost set forth below ......................... 2,346,300
32 Beall Woods Conservation Area -
33 Wabash County .......................30,000
34 Eagle Creek State Park -
SB598 Engrossed -9- BOB-CDBnew-re2000
1 Shelby County .......................39,000
2 Eldon Hazlet State Park -
3 Clinton County ......................67,000
4 Fox Ridge State Park -
5 Coles County ........................34,000
6 Giant City State Park -
7 Jackson/Union Counties ..............96,000
8 Goose Lake Prairie State Park -
9 Grundy County ......................123,000
10 Hennepin Canal Parkway State Trail ..136,000
11 Illinois Beach State Park -
12 Lake County ........................787,000
13 Illinois Caverns Natural Area -
14 Monroe County .......................74,000
15 Kankakee River State Park -
16 Kankakee/Will Counties ..............74,000
17 Kickapoo State Park -
18 Vermilion County ....................41,000
19 Middle Fork State Fish & Wildlife
20 Area - Vermilion County .............12,900
21 Moraine Hills State Park -
22 McHenry County ......................91,000
23 Moraine View State Park -
24 McLean County.......................157,000
25 Ramsey Lake State Park -
26 Fayette County ......................69,000
27 Randolph County Conservation Area ....60,000
28 Red Hills State Park -
29 Lawrence County .....................17,000
30 Saline County Conservation Area ......20,000
31 Sam Dale Lake Conservation Area -
32 Wayne County ........................15,000
33 Spitler Woods State Natural Area -
34 Macon County .........................8,400
SB598 Engrossed -10- BOB-CDBnew-re2000
1 Stephen A. Forbes State Park -
2 Marion County .......................37,000
3 Ten Mile Creek State Fish &
4 Wildlife Area - Jefferson/
5 Hamilton Counties....................76,000
6 Union County Conservation Area .......97,000
7 Washington County Conservation Area ..49,000
8 Waste Management & Research Center -
9 Champaign ...........................43,000
10 William W. Powers Conservation Area -
11 Cook County .........................47,000
12 Wolf Creek State Park -
13 Shelby County .......................46,000
14 For replacing vault toilets at the following
15 locations, at the approximate cost set forth
16 below ........................................ 1,000,000
17 Anderson Lake Conservation Area -
18 Fulton/Schuyler Counties ...........156,000
19 Giant City State Park -
20 Jackson/Union Counties .............577,000
21 Randolph County Conservation Area ...230,000
22 Silver Springs State Park -
23 Kendall County .....................37,000 ____________
24 Total, Section 8 $15,377,800
25 Section 9. The following named amounts, or so much
26 thereof as may be necessary, are appropriated from the
27 Capital Development Fund to the Capital Development Board for
28 the Department of Revenue for the projects hereinafter
29 enumerated:
30 WILLARD ICE BUILDING - SPRINGFIELD
31 For replacing underground sprinkler system ..... $ 295,000
32 For replacing the roof ......................... 1,385,000
33 Total, Section 9 $1,680,000
SB598 Engrossed -11- BOB-CDBnew-re2000
1 Section 10. The following named amounts, or so much
2 thereof as may be necessary, are appropriated from the
3 Capital Development Fund to the Capital Development Board for
4 the Department of State Police for the projects hereinafter
5 enumerated:
6 STATE POLICE TRAINING ACADEMY - SPRINGFIELD
7 For replacing portable classroom building ...... $ 1,000,000
8 STATEWIDE
9 For replacing roofing system at the
10 following locations at the approximate
11 cost set forth below ......................... 452,600
12 District 13 Headquarters,
13 DuQuoin ............................$72,000
14 Joliet Laboratory .....................60,000
15 District 6 Headquarters,
16 Pontiac .............................58,900
17 District 9 Headquarters,
18 Springfield ........................141,700
19 State Police Training Center,
20 Pawnee ..............................30,000
21 District 18 Headquarters,
22 Litchfield ..........................45,000
23 District 19 Headquarters,
24 Carmi ...............................45,000 ____________
25 Total, Section 10 $1,452,600
26 Section 11. The following named amounts, or so much
27 thereof as may be necessary, are appropriated from the
28 Capital Development Fund to the Capital Development Board for
29 the projects hereinafter enumerated:
30 SPRINGFIELD SUPREME COURT
31 For installing humidifier and water
32 filtration systems ........................... $ 1,600,000
33 For upgrading the library, in
SB598 Engrossed -12- BOB-CDBnew-re2000
1 addition to funds previously appropriated .... 450,000
2 THIRD DISTRICT APPELLATE COURT - OTTAWA
3 For replacing the Annex roof ................... 50,000
4 Total, Section 11 $2,100,000
5 Section 12. The following named amounts, or so much
6 thereof as may be necessary, are appropriated from the
7 Capital Development Fund to the Capital Development Board for
8 the Office of the Secretary of State for the projects
9 hereinafter enumerated:
10 CAPITOL COMPLEX - SPRINGFIELD
11 For upgrading electrical lighting and replacing
12 ceilings - Stratton Office Building .......... $ 5,500,000
13 For replacing mechanical piping - Klein
14 and Mason Warehouse........................... 290,000
15 For renovating the exterior of the Capitol
16 and Howlett Buildings ........................ 2,000,000
17 For renovating 222 S. College, in addition
18 to funds previously appropriated ............. 1,200,000
19 Total, Section 12 $8,990,000
20 Section 13. The following named amounts, or so much
21 thereof as may be necessary, are appropriated from the
22 Capital Development Fund to the Capital Development Board for
23 the Department of Veterans' Affairs for the projects
24 hereinafter enumerated:
25 ILLINOIS VETERANS' HOME - LASALLE
26 For constructing additional parking areas ...... $ 350,000
27 ILLINOIS VETERANS' HOME - MANTENO
28 For upgrading the electrical system ............ 1,400,000
29 For upgrading storm sewer ...................... 150,000
30 Total, Section 13 $1,900,000
31 Section 14. The following named amounts, or so much
SB598 Engrossed -13- BOB-CDBnew-re2000
1 thereof as may be necessary, are appropriated from the
2 Capital Development Fund to the Capital Development Board for
3 the projects hereinafter enumerated:
4 STATEWIDE
5 For surveys and modifications to buildings
6 to meet requirements of the federal
7 Americans with Disabilities Act .............. $ 9,000,000
8 For abating hazardous materials ................ 5,000,000
9 For retrofitting or upgrading mechanized
10 refrigeration equipment (CFCs) ............... 7,000,000
11 For upgrading and remediating aboveground
12 and underground storage tanks ................ 3,500,000
13 Total, Section 14 $24,500,000
14 Section 14b. The amount of $2,000,000, or so much
15 thereof as may be necessary, is appropriated from the
16 Asbestos Abatement Fund to the Capital Development Board for
17 asbestos surveys and emergency abatement in relation to
18 asbestos abatement in state governmental buildings or higher
19 education residential and auxiliary enterprise buildings.
20 Section 15. The following named amounts, or so much
21 thereof as may be necessary, are appropriated from the
22 Capital Development Fund to the Capital Development Board for
23 the Illinois Community College Board for the projects
24 hereinafter enumerated:
25 BELLEVILLE AREA COLLEGE
26 For renovating campus buildings and site
27 improvements at the Belleville and Red
28 Bud campuses ................................. $ 2,216,000
29 CITY COLLEGES OF CHICAGO
30 For remodeling for Workforce Preparation
31 Centers ...................................... 3,862,000
32 JOHN WOOD COMMUNITY COLLEGE - QUINCY
SB598 Engrossed -14- BOB-CDBnew-re2000
1 For constructing campus buildings and site
2 improvements, in addition to funds
3 previously appropriated ...................... 12,240,000
4 LAKE LAND COLLEGE - MATTOON
5 For constructing a Technology Building, a
6 parking area and for site improvements ....... 2,992,000
7 PARKLAND COLLEGE - CHAMPAIGN
8 For constructing a classroom/instructional
9 support building, in addition to
10 funds previously appropriated ................ 10,688,000
11 PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS
12 For constructing an addition to the Adult
13 Training/Outreach Center, in addition to
14 funds previously appropriated ................ 10,961,000
15 RICHLAND COMMUNITY COLLEGE - DECATUR
16 For remodeling and constructing additions ...... 6,939,000
17 TRITON COLLEGE - RIVER GROVE
18 For rehabilitating the Liberal Arts
19 Building ..................................... 3,687,000
20 For rehabilitating the potable water
21 distribution system .......................... 659,000
22 Total, Section 15 $54,244,000
23 Section 16. The following named amounts, or so much
24 thereof as may be necessary, are appropriated from the
25 Capital Development Fund to the Capital Development Board for
26 the Illinois Board of Higher Education for the projects
27 hereinafter enumerated:
28 CHICAGO STATE UNIVERSITY
29 For planning and beginning to remodel
30 Building K and improving site ................ $ 1,100,000
31 EASTERN ILLINOIS UNIVERSITY - CHARLESTON
32 For planning and beginning to renovate
33 and expand the Fine Arts Center .............. 2,000,000
SB598 Engrossed -15- BOB-CDBnew-re2000
1 GOVERNORS STATE UNIVERSITY - UNIVERSITY PARK
2 For constructing a child development center
3 and an addition to the main building
4 and remodeling Wings E and F ................. 13,403,900
5 ILLINOIS STATE UNIVERSITY - NORMAL
6 For planning and beginning to rehabilitate
7 Schroeder Hall ............................... 1,200,000
8 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
9 For planning and beginning to remodel
10 Buildings A, B and E ......................... 800,000
11 NORTHERN ILLINOIS UNIVERSITY - DEKALB
12 For planning a classroom building and
13 developing site in Hoffman Estates ........... $1,314,500
14 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
15 For construction, renovation, and all other
16 costs necessary to replace the East St.
17 Louis Center, in addition to funds
18 previously appropriated ...................... 10,300,000
19 UNIVERSITY OF ILLINOIS - CHAMPAIGN/URBANA
20 For planning and beginning to construct
21 a central chiller plant ...................... 4,500,000
22 WESTERN ILLINOIS UNIVERSITY - MACOMB
23 For constructing a utility tunnel system, in
24 addition to funds previously appropriated .... 3,707,900
25 Total, Section 16 $49,326,300
26 Section 17. The sum of $10,869,200, is appropriated from
27 the Capital Development Fund to the Capital Development Board
28 for the Board of Higher Education for miscellaneous capital
29 improvements including construction, capital facilities, cost
30 of planning, supplies, equipment, materials, services and all
31 other expenses required to complete the work at the various
32 universities set forth below. This appropriated amount shall
33 be in addition to any other appropriated amounts which can be
SB598 Engrossed -16- BOB-CDBnew-re2000
1 expended for these purposes.
2 Chicago State University ..............218,500
3 Eastern Illinois University ...........409,000
4 Governors State University ............131,700
5 Illinois State University .............834,200
6 Northeastern Illinois University ......307,200
7 Northern Illinois University ..........933,600
8 Western Illinois University ...........625,200
9 Southern Illinois University -
10 Carbondale .........................1,443,800
11 Southern Illinois University -
12 Edwardsville .........................544,800
13 University of Illinois -
14 Chicago Campus .....................2,378,300
15 University of Illinois -
16 Springfield Campus ...................157,200
17 University of Illinois -
18 Champaign/Urbana Campus ............2,885,700
19 Section 18. The sum of $3,630,800, is appropriated from
20 the Capital Development Fund to the Capital Development Board
21 for the Illinois Community College Board for miscellaneous
22 capital improvements including construction, capital
23 facilities, cost of planning, supplies, equipment, materials,
24 services and all other expenses required to complete the work
25 at the various community colleges. This appropriated amount
26 shall be in addition to any other appropriated amounts which
27 can be expended for these purposes.
28 Section 19. The sum of $347,000,000, or so much thereof
29 as may be necessary, is appropriated from the School
30 Construction Fund to the Capital Development Board for school
31 construction grants pursuant to the School Construction Law,
SB598 Engrossed -17- BOB-CDBnew-re2000
1 in addition to amounts previously appropriated for such
2 purposes.
3 Section 20. The sum of $40,000,000, or so much thereof
4 as may be necessary, is appropriated from the School
5 Infrastructure Fund to the Capital Development Board for
6 school construction grants pursuant to the School
7 Construction Law, in addition to amounts previously
8 appropriated for such purposes.
9 Section 20a. The sum of $20,000,000, or so much thereof
10 as may be necessary, is appropriated from the General Revenue
11 Fund to the Capital Development Board for capital projects.
12 Section 21. No contract shall be entered into or
13 obligation incurred for any expenditures from appropriations
14 made in this Article until after the purposes and amounts
15 have been approved by the Governor.
16 ARTICLE 2
17 Section 1. The following named amounts, or so much
18 thereof as may be necessary and remain unexpended at the
19 close of business on June 30, 1999, from appropriations and
20 reappropriations heretofore made for such purposes in Article
21 90, Section 1, and Article 91, Section 1 of Public Act
22 90-585, are reappropriated from the Capital Development Fund
23 to the Capital Development Board for the Department of
24 Agriculture for the projects hereinafter enumerated:
25 ANIMAL DISEASE LABORATORY - CENTRALIA
26 (From Article 91, Section 1 of Public Act 90-585)
27 For upgrading the diagnostic laboratory
28 facility, in addition to funds previously
29 appropriated ................................. $ 200,000
SB598 Engrossed -18- BOB-CDBnew-re2000
1 For purchasing and upgrading
2 diagnostic laboratory ........................ 63,104
3 DUQUOIN STATE FAIRGROUNDS
4 (From Article 90, Section 1 of Public Act 90-585)
5 For constructing four livestock barns
6 (Phase II) ................................... 688,000
7 (From Article 91, Section 1 of Public Act 90-585)
8 For planning and beginning the
9 renovation of the Round Houses ............... 27,024
10 For replacement of the grandstand
11 bleachers .................................... 362,798
12 For planning and construction of
13 a livestock complex .......................... 6,837
14 For rehabilitation of the Grandstand ........... 13,403
15 For upgrading the racetrack, including the
16 racetrack walls .............................. 2,621,797
17 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
18 (From Article 90, Section 1 of Public Act 90-585)
19 For replacing and renovating
20 racehorse barns (Phase II) ................... 700,000
21 For replacing and rehabilitating roofs ......... 536,000
22 For replacing Series 14 Barns (Phase I) ........ 3,192,445
23 (From Article 91, Section 1 of Public Act 90-585)
24 For replacing the HVAC system in the
25 Administration Building ...................... 909,249
26 For replacing and/or repairing sidewalks,
27 curbs, gutters and streets, in addition
28 to funds previously appropriated ............. 46,448
29 For upgrading the storm/sanitary and water
30 systems, in addition to funds previously
31 appropriated ................................. 1,028,567
32 For renovation or replacement of
33 comfort stations, in addition
34 to funds previously appropriated ............. 1,273,000
SB598 Engrossed -19- BOB-CDBnew-re2000
1 For renovation of the comfort stations-
2 Phase I ...................................... 74,803
3 For renovation of the Jr. Livestock Building,
4 including the cover over the outdoor
5 arena, roof, HVAC, plumbing and electrical
6 systems and installation of an elevator
7 for accessibility, and for upgrading
8 the sewer system ............................. 11,009
9 For planning and beginning the renovation
10 of the show horse barns ...................... 192,258
11 For rehabilitation of six racehorse barns-
12 Phase I ...................................... 165,046
13 For planning and beginning the
14 rehabilitation of sidewalks, curbs,
15 gutters and streets .......................... 3,831
16 Total, Section 1 $12,115,619
17 Section 1.1. The following named amount, or so much
18 thereof as may be necessary and remains unexpended at the
19 close of business on June 30, 1999, from an appropriation
20 heretofore made for such purposes in Article 90, Section 1a
21 of Public Act 90-585, is reappropriated from the General
22 Revenue Fund to the Capital Development Board for the
23 Department of Agriculture for the project hereinafter
24 enumerated:
25 SPRINGFIELD
26 For surveying the electrical system ............ $ 195,000
27 Total, Section 1.1 $195,000
28 Section 2. The following named amounts, or so much
29 thereof as may be necessary and remain unexpended at the
30 close of business on June 30, 1999, from reappropriations
31 heretofore made for such purposes in Article 91, Section 2 of
32 Public Act 90-585, are reappropriated from the Capital
SB598 Engrossed -20- BOB-CDBnew-re2000
1 Development Fund to the Capital Development Board for the
2 Courts of Illinois for the projects hereinafter enumerated:
3 SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN
4 (From Article 91, Section 2 of Public Act 90-585)
5 For replacing the roof ......................... $ 47,639
6 SPRINGFIELD - SUPREME COURT BUILDING
7 For planning and beginning the
8 library upgrade .............................. 106,800
9 For installation of an elevator and
10 replacement of the exterior lights ........... 28,496
11 For repairing the ramp, drainage system,
12 retaining wall and landscaping ............... 12,786
13 Total, Section 2 $195,721
14 Section 2.1. The following named amount, or so much
15 thereof as may be necessary and remains unexpended at the
16 close of business on June 30, 1999, from a reappropriation
17 heretofore made for such purposes in Article 91, Section 2.1
18 of Public Act 90-585, is reappropriated from the General
19 Revenue Fund to the Capital Development Board for the project
20 hereinafter enumerated:
21 SUPREME COURT BUILDING - SPRINGFIELD
22 For tuckpointing and cleaning exterior ...........$ 209,781
23 Section 3. The following named amounts, or so much
24 thereof as may be necessary and remain unexpended at the
25 close of business on June 30, 1999, from appropriations and
26 reappropriations heretofore made for such purposes in Article
27 90, Section 2, and Article 91, Section 3 of Public Act
28 90-585, are reappropriated from the Capital Development Fund
29 to the Capital Development Board for the Department of
30 Central Management Services for the projects hereinafter
31 enumerated:
32 ELGIN REGIONAL OFFICE BUILDING
SB598 Engrossed -21- BOB-CDBnew-re2000
1 (From Article 91, Section 3 of Public Act 90-585)
2 For replacing the utility system ............... $ 2,625,000
3 ILLINOIS CENTER FOR REHABILITATION
4 AND EDUCATION (ROOSEVELT) - CHICAGO
5 (From Article 90, Section 2 of Public Act 90-585)
6 For converting and renovating tub rooms ........ 425,000
7 (From Article 91, Section 3 of Public Act 90-585)
8 For upgrading the HVAC system .................. 2,120,303
9 ILLINOIS CENTER FOR REHABILITATION AND
10 EDUCATION (WOOD) - CHICAGO
11 For replacing the skylight system
12 and roof flashing ............................ 40,775
13 For installing security system and
14 perimeter lighting ........................... 237,322
15 CENTRAL STATE GARAGE - SPRINGFIELD
16 For replacing the roof and drainage system ..... 287,827
17 CHICAGO - STATE OF ILLINOIS CENTER
18 (From Article 90, Section 2 of Public Act 90-585)
19 For replacing roofing system and
20 insulation, in addition to funds
21 previously appropriated ...................... 875,335
22 (From Article 91, Section 3 of Public Act 90-585)
23 For completing the installation of elevators, in
24 addition to funds previously appropriated .... 650,760
25 For the correction of design/construction
26 deficiencies, including remedial work in
27 the heating, refrigeration, temperature
28 control and ventilation systems at the
29 State of Illinois Center at Chicago .......... 254,199
30 CHICAGO - STATE OF ILLINOIS BUILDING
31 For planning and beginning the for
32 renovation of the building
33 at 160 North LaSalle ......................... 46,367
34 CHICAGO MEDICAL CENTER
SB598 Engrossed -22- BOB-CDBnew-re2000
1 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
2 For completing the upgrade of HVAC system, in
3 addition to funds previously appropriated .... 19,933
4 For construction of an independent living
5 apartment building ........................... 65,122
6 For rehabilitation of the air conditioning
7 system, installation of a sprinkler system
8 and improvements for handicapped
9 accessibility ................................ 51,764
10 CHICAGO MEDICAL CENTER
11 EVELYN EDWARDS CENTER
12 For replacement of the heating system .......... 25,274
13 CHICAGO MEDICAL CENTER
14 OFFICE AND LABORATORY FACILITY
15 For replacement of the electric autoclave
16 boilers ...................................... 13,093
17 CHICAGO MEDICAL CENTER
18 VISUALLY HANDICAPPED INSTITUTE
19 For renovation of the loading dock ............. 46,058
20 REGIONAL OFFICE BUILDING - CHAMPAIGN
21 For replacement of roofing system and
22 rooftop heating and cooling unit ............. 44,849
23 SUBURBAN NORTH REGIONAL OFFICE BUILDING -
24 DES PLAINES
25 (From Article 90, Section 2 of Public Act 90-585)
26 For renovating offices for Environmental
27 Protection Agency, in addition to funds
28 previously appropriated ...................... 1,635,000
29 (From Article 91, Section 3 of Public Act 90-585)
30 For renovation of Suburban North Regional
31 Office Building (formerly Maine Township
32 North High School building), in addition
33 to funds previously appropriated for such
34 purpose, Phase III ........................... 5,236,999
SB598 Engrossed -23- BOB-CDBnew-re2000
1 For renovation and expansion of garage ......... 353,586
2 For designing and beginning the
3 renovation, Phase III ........................ 269,338
4 For the purchase and renovation of the high
5 school ....................................... 17,210
6 OTTAWA STATE GARAGE
7 (From Article 90, Section 2 of Public Act 90-585)
8 For replacing state garage ..................... 1,400,000
9 (From Article 91, Section 3 of Public Act 90-585)
10 SPRINGFIELD - CAPITOL COMPLEX
11 For construction of a day care center, in
12 addition to funds previously appropriated
13 for such purpose ............................. 950,000
14 For construction of a day care center in the
15 Capitol Complex in Springfield ............... 244,348
16 COMPUTER FACILITY - SPRINGFIELD
17 For replacement of the halon fire
18 suppression system ........................... 813,330
19 ASH STREET COMPLEX -
20 MUSEUM AND COLLECTION CENTER -
21 SPRINGFIELD
22 For replacement of the roofing system .......... 667,928
23 MARION REGIONAL OFFICE BUILDING
24 (From Article 90, Section 2 of Public Act 90-585)
25 For replacing HVAC system and interior
26 lighting ..................................... 1,600,000
27 (From Article 91, Section 3 of Public Act 90-585)
28 For construction of a Regional Office
29 Building Addition ............................ 1,920,642
30 Total, Section 3 $22,937,362
31 Section 3.1. The following named amounts, or so much
32 thereof as may be necessary and remain unexpended at the
33 close of business on June 30, 1999, from appropriations and
SB598 Engrossed -24- BOB-CDBnew-re2000
1 reappropriations heretofore made for such purposes in Article
2 90, Section 2a, and Article 91, Section 3.1 of Public Act
3 90-585, are reappropriated from the General Revenue Fund to
4 the Capital Development Board for the Department of Central
5 Management Services for the projects hereinafter enumerated:
6 JAMES R. THOMPSON CENTER - CHICAGO
7 (From Article 91, Section 3.1 of Public Act 90-585)
8 For restoring the exterior plaza ............... $ 349,010
9 EAST ST. LOUIS - REGIONAL OFFICE
10 For replacing windows .......................... 59,308
11 CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY
12 (From Article 90, Section 2a of Public Act 90-585)
13 For rehabilitating exterior .................... 390,000
14 CHICAGO MEDICAL CENTER
15 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
16 (From Article 91, Section 3.1 of Public Act 90-585)
17 For rehabilitation for fire safety and
18 accessibility ................................ 11,086
19 Total, Section 3.1 $809,404
20 Section 4. The following named amounts, or so much
21 thereof as may be necessary and remain unexpended at the
22 close of business on June 30, 1999, from appropriations and
23 reappropriations heretofore made for such purposes in Article
24 90, Section 7, and Article 91, Section 4 of Public Act
25 90-585, are reappropriated from the Capital Development Fund
26 to the Capital Development Board for the Department of
27 Natural Resources for the projects hereinafter enumerated:
28 BABE WOODYARD STATE NATURAL AREA -
29 VERMILION COUNTY
30 (From Article 90, Section 7 of Public Act 90-585)
31 For developing the site and associated
32 land acquisition ............................. $ 3,300,000
33 BEALL WOODS STATE CONSERVATION AREA -
SB598 Engrossed -25- BOB-CDBnew-re2000
1 WABASH COUNTY
2 For replacing a visitors center ................ 488,000
3 CAVE-IN-ROCK STATE PARK - HARDIN COUNTY
4 For constructing a shower building
5 and upgrading the campground ................. 650,000
6 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
7 (From Article 91, Section 4 of Public Act 90-585)
8 For construction of a concession building
9 and upgrading the horse concession, in
10 addition to funds previously appropriated .... 477,590
11 For planning and beginning the replacement
12 of concession buildings ...................... 17,092
13 EAGLE CREEK STATE PARK - SHELBY COUNTY
14 For rehabilitation of the sewage treatment
15 system, in addition to funds previously
16 appropriated ................................. 217,750
17 For planning and rehabilitation of the
18 sewage treatment system ...................... 51,261
19 FORT MASSAC STATE PARK - MASSAC COUNTY
20 For planning and beginning the
21 reconstruction of the fort ................... 121,340
22 FERNE CLYFFE STATE PARK -
23 JOHNSON COUNTY
24 (From Article 90, Section 7 of Public Act 90-585)
25 For rehabilitating shower building ............. 215,000
26 FOX RIDGE STATE PARK - COLES COUNTY
27 For upgrading campground ....................... 340,000
28 (From Article 91, Section 4 of Public Act 90-585)
29 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
30 For stabilizing the feeder canal bank .......... 398,085
31 For replacement and rehabilitation
32 of arch culverts and canal ................... 542,636
33 HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
34 For dam rehabilitation and the State's share
SB598 Engrossed -26- BOB-CDBnew-re2000
1 to implement the ecological restoration
2 plan in cooperation with the U.S.
3 Army Corps of Engineers, and
4 land acquisition ............................. 858,655
5 For construction of a pole building
6 and hunter check station ..................... 83,816
7 (From Article 90, Section 7 of Public Act 90-585)
8 For replacing the hunter check station ......... 150,000
9 ILLINOIS-MICHIGAN CANAL STATE TRAIL
10 (From Article 91, Section 4 of Public Act 90-0585)
11 For stabilization of the aqueduct .............. 438,393
12 ILLINOIS BEACH STATE PARK - LAKE COUNTY
13 (From Article 90, Section 7 of Public Act 90-0585)
14 For constructing an office building ............ 650,000
15 For replacing sanitary sewer lines ............. 505,000
16 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
17 (From Article 91, Section 4 of Public Act 90-585)
18 For rehabilitation of the concession
19 building, in addition to funds
20 previously appropriated ...................... 140,000
21 For rehabilitation of the concession building .. 87,975
22 KANKAKEE STATE PARK - KANKAKEE COUNTY
23 For planning and constructing a
24 sanitary sewer system ........................ 182,700
25 KICKAPOO STATE PARK - VERMILION COUNTY
26 For construction of a sewage treatment
27 plant, in addition to funds
28 previously appropriated ...................... 110,575
29 LINCOLN TRAIL STATE RECREATION AREA -
30 CLARK COUNTY
31 (From Article 90, Section 7 of Public Act 90-585)
32 For rehabilitating the day use area
33 and site ..................................... 1,281,000
34 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
SB598 Engrossed -27- BOB-CDBnew-re2000
1 (From Article 91, Section 4 of Public Act 90-585)
2 For rehabilitating the levee system ............ 15,928
3 MORAINE HILLS STATE PARK - MCHENRY COUNTY
4 For renovation of the trail .................... 322,755
5 For replacement of restrooms and upgrading
6 the water system ............................. 725,811
7 MORAINE VIEW STATE PARK - MCLEAN COUNTY
8 For construction of a sewage treatment
9 system and plant ............................. 1,553,941
10 NORTH POINT MARINA - LAKE COUNTY
11 For construction of a breakwater structure ..... 1,048,259
12 For modifying the marina's docking system ...... 1,527,922
13 NAUVOO STATE PARK - HANCOCK COUNTY
14 (From Article 90, Section 7 of Public Act 90-585)
15 For replacing water distribution
16 system ....................................... 241,000
17 PERE MARQUETTE STATE PARK - JERSEY COUNTY
18 (From Article 90, Section 7 of Public Act 90-585)
19 For replacing the lodge HVAC condensing unit, in
20 addition to funds previously appropriated .... 327,344
21 (From Article 91, Section 4 of Public Act 90-585)
22 For renovation of two buildings and
23 replacement of a storage building ............ 132,119
24 RAMSEY LAKE STATE PARK - FAYETTE COUNTY
25 (From Article 90, Section 7 of Public Act 90-585)
26 For rehabilitating shower building ............. 188,000
27 RED HILLS STATE PARK - LAWRENCE COUNTY
28 (From Article 91, Section 4 of Public Act 90-585)
29 For replacing the sewage treatment system,
30 in addition to funds previously appropriated . 510,000
31 For rehabilitating the dam ..................... 90,000
32 SANGANOIS CONSERVATION AREA -
33 CASS, MASON AND SCHUYLER COUNTIES
34 For rehabilitating the levee system ............ 315,000
SB598 Engrossed -28- BOB-CDBnew-re2000
1 SPRINGFIELD
2 (From Article 90, Section 7 of Public Act 90-585)
3 For constructing an office building and
4 interpretive center .......................... 29,795,641
5 STARVED ROCK STATE PARK - LASALLE COUNTY
6 For rehabilitating the sewer system ............ 1,055,000
7 For rehabilitating trails, in addition
8 to funds previously appropriated ............. 500,000
9 For upgrading the HVAC system .................. 445,000
10 (From Article 91, Section 4 of Public Act 90-585)
11 For construction of a Visitors'
12 Center, in addition to funds
13 previously appropriated ...................... 365,000
14 For rehabilitation of trails, in addition
15 to funds previously appropriated ............. 402,777
16 For reconstruction of the seawall, in
17 addition to funds previously
18 appropriated ................................. 58,193
19 For rehabilitation of the sewer
20 system - Phase I ............................. 121,614
21 For planning and beginning the
22 reconstruction of the seawall ................ 39,827
23 TRI-COUNTY PARK - COOK/KANE/DUPAGE COUNTIES
24 For planning and beginning
25 construction of a park ....................... 78,148
26 VOLO BOG NATURAL AREA - LAKE COUNTY
27 For rehabilitation of the visitors' center ..... 9,425
28 WAYNE FITZGERRELL STATE PARK - FRANKLIN COUNTY
29 For rehabilitation of the sewage
30 treatment plant .............................. 164,072
31 For planning and construction of a marina,
32 installation of additional sewage lines,
33 recreational development and overnight
34 accommodations to be located on Rend
SB598 Engrossed -29- BOB-CDBnew-re2000
1 Lake ......................................... 14,599
2 TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
3 (From Article 90, Section 7 of Public Act 90-585)
4 For constructing a visitor center and
5 purchasing land .............................. 4,000,000
6 NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
7 (FORMERLY BURNHAM HOSPITAL)
8 (From Article 91, Section 4 of Public Act 90-585)
9 For construction of a Natural History
10 Research Center for the space needs of
11 the Illinois Natural History Survey on
12 the campus of the University of Illinois...... 6,000,000
13 For planning and construction of the
14 Natural History Research Center
15 for the space needs of the
16 Illinois Natural History Survey
17 on the campus of the University
18 of Illinois in Champaign ..................... 3,074,328
19 For planning and construction of
20 the Natural History Research Center
21 for the space needs of the Illinois
22 Natural History Survey on
23 the campus of the University of
24 Illinois in Champaign ........................ 41,834
25 NATURAL HISTORY SURVEY - CHAMPAIGN
26 For upgrading laboratories and installation
27 of storage units ............................. 96,562
28 STATE WATER SURVEY - CHAMPAIGN
29 (From Article 90, Section 7 of Public Act 90-585)
30 For upgrading and replacing the mechanical
31 system, in addition to funds
32 previously appropriated ...................... 2,200,000
33 (From Article 91, Section 4 of Public Act 90-585)
34 For renovation of office and
SB598 Engrossed -30- BOB-CDBnew-re2000
1 laboratory buildings ......................... 217,814
2 For replacement and upgrade of the
3 exterior lighting system ..................... 34,495
4 For planning and replacement of vehicle
5 storage/shop facilities ...................... 21,150
6 DICKSON MOUNDS - LEWISTOWN
7 For renovating Canton Liverpool
8 Toll Booth ................................... 68,100
9 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
10 For the completion of site improvements ........ 400,891
11 STATE MUSEUM - SPRINGFIELD
12 (From Article 90, Section 7 of Public Act 90-585)
13 For renovating or replacing exhibits, in
14 addition to funds previously appropriated .... 5,500,000
15 For planning and beginning replacement
16 of the state museum .......................... 800,000
17 (From Article 91, Section 4 of Public Act 90-585)
18 For planning and replacement of the main
19 museum exhibits, in addition to funds
20 previously appropriated ...................... 539,400
21 For planning renovation of main museum
22 exhibits and for renovation of basement
23 galleries .................................... 32,611
24 STATEWIDE
25 (From Article 90, Section 7 of Public Act 90-585)
26 For replacing roofing systems at the
27 following locations at the approximate
28 costs set forth below ........................ 370,000
29 Lincoln Trail Homestead State
30 Park, Four buildings ............... 38,000
31 Silver Springs State Park, Three
32 Buildings ......................... 278,000
33 Weldon Springs State Park, Nine
34 Buildings .......................... 54,000
SB598 Engrossed -31- BOB-CDBnew-re2000
1 For constructing vault toilets at the following
2 locations at the approximate costs set forth
3 below ........................................ 852,000
4 Cave-In-Rock State Park ............ 192,000
5 Frank Holten State Park ............ 285,000
6 Golconda/Rauchfuss Hill ............. 79,000
7 I&M Canal - Gebhard Woods State
8 Park ............................... 35,000
9 Prophetstown State Park ............ 155,000
10 William W. Powers State Park ....... 106,000
11 For constructing hazardous material storage
12 buildings .................................... 275,000
13 (From Article 91, Section 4 of Public Act 90-585)
14 For replacing concession buildings and
15 upgrading support facilities at the following
16 locations at the approximate costs set
17 forth below: ................................. 2,840,443
18 Kickapoo State Park ..................527,425
19 Rock Cut State Park ..................512,168
20 Stephen A. Forbes State Park .......1,800,850
21 For constructing vault toilets at the
22 following locations at the approximate
23 cost set forth below: ........................ 1,396,054
24 Apple River Canyon State Park ........285,000
25 Des Plaines Conservation Area ........240,000
26 Kankakee River State Park ............364,054
27 Lake Le-Aqua-Na State Park ...........231,000
28 Marshall County Conservation Area .....37,000
29 Morrison-Rockwood State Park .........202,000
30 Rice Lake Conservation Area ...........37,000
31 For replacing roofing systems and structural
32 repairs at the following locations at the
33 approximate costs set forth below: ........... 392,845
34 Mine Rescue Station, One building .....27,000
SB598 Engrossed -32- BOB-CDBnew-re2000
1 Castle Rock State Park,
2 One building .........................36,845
3 Dixon Springs State Park,
4 Three buildings ......................40,000
5 Cave-In-Rock State Park,
6 One building .........................25,000
7 Ferne Clyffe State Park,
8 One building .........................25,000
9 Hamilton County Conservation
10 Area, One building ...................29,000
11 Lake Murphysboro State Park
12 Two buildings ........................50,000
13 Red Hills State Park, Two
14 buildings ............................30,000
15 Fox Ridge State Park, Six
16 buildings ............................65,000
17 Shelbyville Fish and Wildlife
18 Area, Two buildings ..................40,000
19 Newton Lake Fish and Wildlife
20 Area, One building ...................25,000
21 For repair or replacement of roofs and
22 parapet walls and reconstruction of
23 chimneys at the following locations
24 at the approximate costs set forth below ..... 520,556
25 Geological Survey - Applied Lab ......189,026
26 Water Survey - Eight Buildings .......100,000
27 Natural History Survey - Natural
28 Resources Studies Annex ..............67,000
29 Geological Survey - Natural
30 Resources Building ...................10,000
31 Water Survey - Parapet walls at
32 Buildings No. 4, 5 and 6 .............10,000
33 Dickson Mounds - Exterior restroom
34 and picnic shelter ...................14,530
SB598 Engrossed -33- BOB-CDBnew-re2000
1 Jake Wolf Fish Hatchery -
2 one building ........................130,000
3 For land acquisition ........................... 576,472
4 For maintaining the lodge and concession
5 facilities ................................... 68,994
6 For repairing and maintaining facilities ....... 42,278
7 For construction of hazardous material
8 storage buildings ............................ 227,024
9 For abating hazards caused by the presence
10 of asbestos-containing materials ............. 51,622
11 For planning, construction, reconstruction,
12 land acquisition and related costs,
13 utilities, site improvements, and all other
14 expenses necessary for various capital
15 improvements at parks, conservation areas,
16 and other facilities under the jurisdiction
17 of the Department of Natural Resources ....... 7,368,260
18 For construction and development of
19 multiple use facilities on lands owned
20 or managed by the Department of
21 Natural Resources, including all costs
22 for supplies, materials, labor, and
23 services required for the completion
24 of the following projects at the
25 approximate costs set forth below: ........... 8,913
26 For Volo Bog Natural Area
27 for replacement of a roof
28 and rehabilitation of the
29 emergency exit stairs at the
30 visitor center ........................5,144
31 For Volo Bog Natural Area for
32 the upgrading of the
33 Interpretive Center, including
34 the heating, ventilation, and
SB598 Engrossed -34- BOB-CDBnew-re2000
1 air conditioning system ...............3,769 ____________
2 Total, Section 4 $89,371,889
3 Section 4.1. The following named amounts, or so much
4 thereof as may be necessary, from appropriations and
5 reappropriations heretofore made for such purposes in Article
6 90, Section 7a, and Article 91, Section 4.1 of Public Act
7 90-585, are reappropriated from the General Revenue Fund to
8 the Capital Development Board for the Department of Natural
9 Resources for the projects hereinafter enumerated:
10 APPLE RIVER CANYON STATE PARK -
11 JO DAVIESS COUNTY
12 (From Article 90, Section 7a of Public Act 90-585)
13 For stabilizing the river bank ................. $ 150,000
14 CHAIN O'LAKES STATE PARK - LAKE/MCHENRY COUNTIES
15 (From Article 91, Section 4.1 of Public Act 90-585)
16 For replacement of windows and floor tile
17 in Region 2 headquarters ..................... 80,585
18 GOLCONDA MARINA - POPE COUNTY
19 (From Article 90, Section 7a of Public Act 90-585)
20 For constructing a sewage lift station ......... 50,000
21 ILLINOIS BEACH STATE PARK - LAKE COUNTY
22 For stabilizing the shoreline .................. 400,000
23 (From Article 91, Section 4.1 of Public Act 90-585)
24 For stabilizing the shoreline .................. 65,477
25 For stabilization of the shoreline ............. 6,052
26 SPRING GROVE HATCHERY - MCHENRY COUNTY
27 For upgrading the septic system ................ 30,000
28 STARVED ROCK STATE PARK - LASALLE COUNTY
29 (From Article 90, Section 7a of Public Act 90-585)
30 For constructing erosion controls .............. 300,000
31 STATEWIDE
32 For maintaining lodge and concession
33 facilities ................................... 331,000
SB598 Engrossed -35- BOB-CDBnew-re2000
1 For rehabilitating or replacing playground
2 equipment .................................... 300,000
3 (From Article 91, Section 4.1 of Public Act 90-585)
4 For maintaining lodge and concession
5 facilities at various DNR locations .......... 135,508
6 For rehabilitating or replacing
7 playground equipment, in addition
8 to funds previously appropriated ............. 300,000
9 For maintenance of lodge and
10 concession facilities ........................ 63,907
11 For rehabilitation or replacement
12 of playground equipment ...................... 158,506
13 For rehabilitation of trail systems ............ 96,232
14 For rehabilitation and replacement of
15 playground equipment ......................... 96,137
16 Total, Section 4.1 $2,563,404
17 Section 5. The following named amounts, or so much
18 thereof as may be necessary and remain unexpended at the
19 close of business on June 30, 1999, from appropriations and
20 reappropriations heretofore made for such purposes in Article
21 90, Section 3, and Article 91, Section 5 of Public Act
22 90-585, are reappropriated from the Capital Development Fund
23 to the Capital Development Board for the Department of
24 Corrections for the projects hereinafter enumerated:
25 (From Article 91, Section 5 of Public Act 90-585)
26 DANVILLE CORRECTIONAL CENTER
27 For renovation of interior and
28 exterior walls, in addition to
29 funds previously appropriated ................ $ 1,194,152
30 For correction of construction defects ......... 249,801
31 For planning, utilities, site improvements,
32 and other expenses necessary for the
33 construction of a correctional facility ...... 32,511
SB598 Engrossed -36- BOB-CDBnew-re2000
1 DECATUR WOMEN'S CORRECTIONAL CENTER
2 For the planning and conversion of
3 Meyer Mental Health Center into a
4 correctional facility ........................ 12,136,420
5 DIXON CORRECTIONAL CENTER
6 For renovation of the groundwater storage
7 tank and abatement of crawlspace
8 pipes in Buildings 26, 27 and 29 ............. 585,888
9 For upgrading the steam distribution system
10 and replacement of the boiler system
11 including asbestos abatement ................. 87,937
12 DWIGHT CORRECTIONAL CENTER
13 For upgrading water and sewer systems .......... 200,988
14 For renovating buildings, in addition to
15 funds previously appropriated ................ 596,241
16 For constructing a gatehouse and
17 sally port and upgrading the
18 security system .............................. 2,301,455
19 For completion of medical unit,
20 in addition to funds previously
21 appropriated ................................. 369,489
22 For planning the expansion of the
23 Education Building and constructing
24 a dietary and a warehouse .................... 4,199,118
25 For renovation of buildings .................... 68,161
26 EAST MOLINE CORRECTIONAL CENTER
27 For upgrading the electrical
28 system ....................................... 2,142,024
29 For upgrading locking system, in addition
30 to funds previously appropriated ............. 44,965
31 HANNA CITY WORK CAMP
32 (From Article 90, Section 3 of Public Act 90-585)
33 For upgrading electrical system ................ 600,000
34 HILL CORRECTIONAL CENTER - GALESBURG
SB598 Engrossed -37- BOB-CDBnew-re2000
1 For upgrading and expanding freezer
2 capacity, in addition to funds
3 previously appropriated ...................... 950,000
4 For replacing domestic water lines ............. 410,000
5 ILLINOIS YOUTH CENTER - ST. CHARLES
6 For planning and beginning the upgrade
7 of existing facility ......................... 600,000
8 (From Article 91, Section 5 of Public Act 90-585)
9 ILLINOIS YOUTH CENTER - HARRISBURG
10 For upgrading the domestic water system ........ 619,149
11 For upgrading the HVAC system .................. 494,932
12 ILLINOIS YOUTH CENTER - JOLIET
13 For planning, site improvements,
14 utility upgrade, equipment and all
15 costs necessary to construct a
16 housing unit and dietary facility ............ 352,587
17 For completing the upgrade of electrical
18 systems, in addition to funds
19 previously appropriated ...................... 206,511
20 For upgrading the fire alarm system ............ 191,768
21 For completing the upgrade of the utilities, in
22 addition to funds previously appropriated .... 40,647
23 ILLINOIS YOUTH CENTER - PERE MARQUETTE
24 For upgrading the electrical
25 distribution system .......................... 35,281
26 ILLINOIS YOUTH CENTER - ST. CHARLES
27 For completing the upgrade of the water
28 distribution system, in addition to funds
29 previously appropriated ...................... 71,551
30 ILLINOIS YOUTH CENTER - VALLEY VIEW
31 For upgrading dormitory restrooms
32 and fixtures, in addition to
33 funds previously appropriated ................ 154,070
34 For planning and beginning the
SB598 Engrossed -38- BOB-CDBnew-re2000
1 upgrade of dormitory restrooms
2 and fixtures ................................. 54,213
3 JOLIET CORRECTIONAL CENTER
4 For correcting erosion and
5 stabilizing the masonry wall ................. 1,782,600
6 For upgrading the power house and
7 installation of a generator .................. 382,400
8 For completing the west cellhouse renovation,
9 including asbestos abatement, in addition
10 to funds previously appropriated ............. 538,762
11 LINCOLN CORRECTIONAL CENTER
12 For upgrading the water softener system ........ 93,258
13 For upgrading the locking systems and doors .... 42,374
14 For upgrading the water supply ................. 112,077
15 For renovation of the Dietary, construction
16 of a cooler addition and installation
17 of blast chillers ............................ 487,520
18 LOGAN CORRECTIONAL CENTER
19 (From Article 90, Section 3 of Public Act 90-585)
20 For planning and beginning replacement
21 of the Dietary and Medical Buildings ......... 400,000
22 (From Article 91, Section 5 of Public Act 90-585)
23 For renovation of sewer system ................. 826,383
24 For renovation of the water tower .............. 124,144
25 For rehabilitation of the roof ventilation
26 systems ...................................... 77,948
27 MENARD CORRECTIONAL CENTER - CHESTER
28 (From Article 90, Section 3 of Public Act 90-585)
29 For completing the upgrade of roads and
30 sidewalks, in addition to funds
31 previously appropriated ...................... 300,000
32 For completing upgrade of North Cellhouse
33 plumbing system, in addition to funds
34 previously appropriated ...................... 400,000
SB598 Engrossed -39- BOB-CDBnew-re2000
1 For planning and beginning upgrade
2 of the storm tunnel .......................... 100,000
3 For replacing toilets and waste lines
4 at E/W Cellhouse ............................. 2,600,000
5 (From Article 91, Section 5 of Public Act 90-585)
6 For renovation or replacement of the
7 Old Hospital Building, in addition to
8 funds previously appropriated ................ 4,700,000
9 For replacing and installing
10 water storage tank ........................... 1,200,000
11 For replacing Boiler #2, in addition
12 to funds previously appropriated ............. 800,000
13 For converting a room into a shower room ....... 366,412
14 For upgrading roads and sidewalks .............. 40,207
15 For upgrading the coal handling system
16 and repair or replace boiler system .......... 108,665
17 For conversion of the Maintenance Building
18 to an inmate dormitory ....................... 106,020
19 For conversion of the Administration
20 Building basement to a courtroom and
21 attorney offices ............................. 46,022
22 For upgrading the steam and water distribution
23 systems, in addition to funds previously
24 appropriated ................................. 729,410
25 For upgrading the steam and water distribution
26 systems and replacement of the MSU
27 "C" Building ................................. 67,624
28 For replacement of the chimney stack and
29 boilers, in addition to funds previously
30 appropriated ................................. 87,501
31 For replacement of hot water heaters and
32 deairing tanks ............................... 110,000
33 For planning and beginning the
34 renovation of the old
SB598 Engrossed -40- BOB-CDBnew-re2000
1 hospital building ............................ 175,135
2 For renovation of elements of the power
3 plants, including the main generator ......... 22,982
4 For planning and beginning the for
5 renovation of the Administration Building .... 15,604
6 PONTIAC CORRECTIONAL CENTER
7 (From Article 90, Section 3 of Public Act 90-585)
8 For completing replacement of hot water
9 lines, in addition to funds previously
10 appropriated ................................. 1,100,000
11 (From Article 91, Section 5 of Public Act 90-585)
12 For renovation of main sally port .............. 279,377
13 STATEVILLE CORRECTIONAL CENTER - JOLIET
14 (From Article 90, Section 3 of Public Act 90-585)
15 For replacing power plant ...................... 10,000,000
16 For planning, design, construction,
17 equipment and all other necessary costs
18 for an Adult Reception and Classification
19 Center ....................................... 44,000,000
20 For upgrading storm drainage and
21 wastewater systems ........................... 1,200,000
22 For upgrading electrical system and elevator
23 and installing HVAC system ................... 1,200,000
24 (From Article 91, Section 5 of Public Act 90-585)
25 For replacement of the MSU ..................... 6,456,800
26 For upgrading the doors, locks and hardware
27 in B Cellhouse ............................... 35,682
28 SOUTHWESTERN ILLINOIS CORRECTIONAL FACILITY
29 For completing the conversion of existing
30 buildings into a minimum security
31 correctional facility, in addition to
32 funds previously appropriated ................ 10,601
33 VANDALIA CORRECTIONAL CENTER
34 For renovation of dormitory shower rooms ....... 423,560
SB598 Engrossed -41- BOB-CDBnew-re2000
1 VIENNA CORRECTIONAL CENTER
2 (From Article 90, Section 3 of Public Act 90-585)
3 For completing upgrade of the steam
4 distribution system, in addition to
5 funds previously appropriated ................ 940,000
6 For upgrading electrical system and
7 installing emergency generator ............... 1,200,000
8 (From Article 91, Section 5 of Public Act 90-585)
9 For renovating the kitchen ..................... 1,942,465
10 For upgrading the steam distribution system
11 and renovation of Powerhouse, in addition
12 to funds previously appropriated ............. 2,465,042
13 For installation of security fencing ........... 173,201
14 For upgrading air conditioning system
15 and replacement of cooling tower ............. 1,100,000
16 For upgrading the electrical, plumbing and
17 HVAC systems in four buildings ............... 802,701
18 For completing the rehabilitation of duct
19 systems and walls, in addition to funds
20 previously appropriated ...................... 273,518
21 For planning and beginning the upgrade
22 of the steam distribution system ............. 148,888
23 For planning and beginning the replacement
24 of the absorption chiller and cooling tower .. 40,848
25 STATEWIDE
26 (From Article 90, Section 3 of Public Act 90-585)
27 For planning, design, construction,
28 equipment and all other necessary costs
29 for a juvenile facility ...................... 20,000,000
30 For replacing locks and doors at the
31 following locations at the approximate
32 cost set forth below ......................... 1,090,000
33 Dwight Correctional Center ......... 275,000
34 Illinois River Correctional
SB598 Engrossed -42- BOB-CDBnew-re2000
1 Center - Canton ................... 150,000
2 IYC - Joliet ....................... 500,000
3 IYC - Pere Marquette - Grafton ..... 165,000
4 For replacing roofing systems at the following
5 locations at the approximate cost set forth
6 below ........................................ 2,842,212
7 Dixon Correctional Center,
8 four buildings .................... 894,212
9 IYC - St. Charles, two buildings ... 440,000
10 Joliet Correctional Center,
11 six buildings ..................... 868,000
12 Logan Correctional Center - Lincoln
13 three buildings ................... 115,000
14 Menard Correctional Center - Chester
15 six buildings ..................... 270,000
16 Pontiac Correctional Center,
17 one building ...................... 255,000
18 For inspecting and upgrading water towers
19 at the following locations at the approximate
20 costs set forth below ........................ 3,590,000
21 Dixon Correctional Center,
22 Upgrade Water Tower ............. 1,000,000
23 Graham Correctional Center - Hillsboro
24 Upgrade Water Tower .............. 215,000
25 Joliet Correctional Center,
26 Upgrade Water Tower ............... 150,000
27 Logan Correctional Center - Lincoln
28 Complete Water Tower Upgrade ..... 600,000
29 Menard Correctional Center - Chester
30 Upgrade Water Tower .............. 325,000
31 Stateville Correctional Center - Joliet
32 Upgrade Water Tower ............ 1,000,000
33 Statewide, Inspect and Upgrade
34 Water Towers ...................... 300,000
SB598 Engrossed -43- BOB-CDBnew-re2000
1 For upgrading fire and safety systems at
2 the following locations at the approximate
3 costs set forth below, in addition to
4 funds previously appropriated ................ 3,370,000
5 Menard Correctional Center -
6 Chester ......................... 2,200,000
7 Sheridan Correctional Center ....... 320,000
8 Vienna Correctional Center ......... 850,000
9 (From Article 91, Section 5 of Public Act 90-585)
10 For replacing roofing systems at the
11 following locations at the approximate
12 costs set forth below: ....................... 1,635,772
13 Big Muddy Correctional Center, Ina
14 Two buildings ....................... 98,772
15 East Moline Correctional Center,
16 Three buildings .................... 398,000
17 Graham Correctional Center, Hillsboro
18 Seven buildings .................... 600,000
19 Sheridan Correctional Center, LaSalle
20 Three buildings .................... 379,000
21 Stateville Correctional Center, Joliet
22 One building ....................... 160,000
23 For replacing doors and locks at the
24 following locations at the approximate
25 costs set forth below: ....................... 2,433,795
26 IYC - St. Charles ................... 546,795
27 Lincoln Correctional Center ......... 300,000
28 Jacksonville Correctional Center .... 664,000
29 Sheridan Correctional Center ........ 923,000
30 For upgrading fire safety systems at the
31 following locations at the approximate
32 costs set forth below, in addition to
33 funds previously appropriated: ............... 6,469,442
34 Menard Correctional Center ........ 1,969,442
SB598 Engrossed -44- BOB-CDBnew-re2000
1 Pontiac Correctional Center ....... 3,000,000
2 Stateville Correctional Center .... 1,500,000
3 For upgrading water and wastewater
4 systems at the following locations
5 at the approximate costs set forth below: .... 4,218,208
6 Big Muddy Correctional Center
7 for installing mechanical
8 bar screen ......................... 300,000
9 Centralia Correctional Center
10 for upgrading water
11 treatment plant .................. 1,436,208
12 East Moline Correctional Center
13 for upgrading sewer system ......... 565,000
14 Ed Jenison Work Camp (Paris)
15 for installing mechanical
16 bar screen ......................... 120,000
17 IYC - Harrisburg for upgrading
18 water distribution system .......... 500,000
19 Kankakee MSU for constructing
20 well #2 ............................ 300,000
21 IYC - St. Charles for upgrading
22 sewage/storm system ................ 767,000
23 IYC - Valley View for installing
24 mechanical bar screen .............. 230,000
25 For correction of deficiencies in
26 water systems at three correctional
27 facilities ................................... 100,000
28 For replacement of locks, windows and
29 doors at the following locations
30 as set forth below: .......................... 3,085,103
31 Dwight ............................... 34,000
32 IYC Harrisburg ...................... 849,000
33 IYC Joliet .......................... 310,000
34 Menard .............................. 990,000
SB598 Engrossed -45- BOB-CDBnew-re2000
1 Pontiac .............................. 78,103
2 IYC Valley View ..................... 460,000
3 Vienna .............................. 364,000
4 For planning, design, construction,
5 equipment and other necessary costs
6 for a Maximum Security Correctional
7 Center, in addition to funds previously
8 appropriated ................................. 95,000,000
9 For planning, design, construction,
10 equipment and other necessary costs
11 for a Correctional Facility for
12 juveniles .................................... 42,577,305
13 For planning, design, construction,
14 equipment and other necessary costs
15 for a Medium Security Correctional
16 Facility ..................................... 66,998,938
17 For planning, construction, utilities, site
18 improvements, equipment and other expenses
19 necessary for the construction of a close
20 supervision super maximum security prison .... 1,113,373
21 For upgrading for fire safety at five
22 locations and replacing boilers............... 206,369
23 For correcting defects in the food preparation
24 areas, including roofs ....................... 125,979
25 For planning, construction, utilities,
26 site improvements, and other expenses
27 necessary for the construction of two
28 minimum and one medium security
29 prisons ...................................... 29,224
30 For renovation and improvements at various
31 correctional facilities at the approximate
32 costs set forth below: ....................... 117,693
33 Roof Replacement ......................70,000
34 Road Repavement .......................47,693
SB598 Engrossed -46- BOB-CDBnew-re2000
1 For replacement of cell doors and locks
2 and rehabilitation of locking systems at
3 the following locations at the approximate
4 costs set forth below: ....................... 118,902
5 Kankakee MSU
6 For rehabilitation of locking
7 systems .............................118,902
8 For renovation of roads and parking lots
9 and replacement of boilers at the
10 following locations at the approximate
11 costs set forth below ........................ 42,785
12 Dixon Correctional Center
13 For roads and parking .................6,000
14 Logan Correctional Center
15 For roads and parking .................5,656
16 Menard Correctional Center
17 For roads and parking and
18 replacement of boilers...............22,929
19 Vienna Correctional Center
20 For roads .............................8,200
21 For replacement of roofs at various Department of
22 Corrections locations ........................ 269,592
23 For roof replacement at the following
24 locations at the approximate costs
25 set forth below: ............................. 321,681
26 Graham Correctional Center
27 Five buildings ........................6,268
28 Graham Correctional Center
29 Thirty-two buildings ..................8,439
30 Menard Correctional Center
31 Warehouse Building ...................55,093
32 Menard Correctional Center
33 Five buildings ......................153,394
34 Pontiac Correctional Center
SB598 Engrossed -47- BOB-CDBnew-re2000
1 Eight buildings .......................6,221
2 Illinois Youth Center-St. Charles
3 Three buildings ......................29,830
4 Sheridan Correctional Center
5 Six buildings ........................15,482
6 Stateville Correctional Center
7 Seven buildings ......................23,000
8 Ill Youth Center-Valley View
9 Administration Building and
10 Kitchen Addition ....................23,954 ____________
11 Total, Section 5 $375,381,963
12 Section 5.1. The following named amounts, or so much
13 thereof as may be necessary and remain unexpended at the
14 close of business on June 30, 1999, from reappropriations
15 heretofore made for such purposes in Article 91, Section 5.1
16 of Public Act 90-585, are reappropriated from the General
17 Revenue Fund to the Capital Development Board for the
18 Department of Corrections for the projects hereinafter
19 enumerated:
20 (From Article 91, Section 5.1 of Public Act 90-585)
21 MENARD CORRECTIONAL CENTER - CHESTER
22 For stabilizing dams ........................... 95,600
23 For repairing masonry and
24 waterproofing exterior ....................... 245,000
25 STATEVILLE CORRECTIONAL CENTER - JOLIET
26 For tuckpointing buildings ..................... 200,000
27 VANDALIA CORRECTIONAL CENTER
28 For tuckpointing, waterproofing and
29 replacing facade ............................. 149,719
30 STATEWIDE
31 For energy conservation improvements at the
32 following locations at the approximate
33 costs set forth below: ....................... 56,018
SB598 Engrossed -48- BOB-CDBnew-re2000
1 Dwight Correctional Center ............ 7,000
2 Joliet Correctional Center
3 School Building ...................... 4,500
4 Menard Psychiatric Center
5 Randolph Hall ........................ 7,500
6 Stateville Correctional Center
7 Law Library .......................... 7,400
8 Pontiac Correctional Center .......... 27,893
9 Vienna Correctional Center ............ 1,725
10 For upgrading doors and locking systems at
11 the following locations at the approximate
12 costs set forth below: ....................... 577,182
13 Illinois Youth Center-Warrenville
14 For replacement of doors
15 and locking systems ............... 577,182 ____________
16 Total, Section 5.1 $1,323,519
17 Section 5.2. The amount of $195,615, or so much thereof
18 as may be necessary and remains unexpended from the General
19 Revenue Fund at the close of business on June 30, 1999, from
20 a reappropriation heretofore made for such purposes in
21 Article 91, Section 5.4 of Public Act 90-585, is
22 reappropriated to the Capital Development Board for the
23 Department of Corrections for all costs associated with the
24 completion of the super maximum security prison at Tamms,
25 Illinois.
26 Section 5.3. The amount of $1,570,556, or so much
27 thereof as may be necessary and remains unexpended at the
28 close of business on June 30, 1999, from a reappropriation
29 heretofore made for such purposes in Article 91, Section 5.5
30 of Public Act 90-585, is reappropriated from the General
31 Revenue Fund to the Capital Development Board for the
32 Department of Corrections for the projects hereinafter
SB598 Engrossed -49- BOB-CDBnew-re2000
1 enumerated at the approximate costs set forth below:
2 Danville Correctional Center -
3 For upgrading the hot water
4 distribution system .................$175,000
5 Joliet Correctional Center -
6 For replacement of the deep well .......13,000
7 Stateville Correctional Center-
8 For upgrading the plumbing systems in
9 four buildings .....................1,216,556
10 Menard Correctional Center -
11 For planning and to begin upgrading
12 the plumbing systems in two
13 buildings .............................65,000
14 Pontiac Correctional Center -
15 For upgrading the mechanical systems
16 and renovation of shower rooms ........56,000
17 Shawnee Correctional Center -
18 For upgrading the hot water
19 distribution system ...................45,000
20 Section 5.4. The following named amounts, or so much
21 thereof as may be necessary and remain unexpended at the
22 close of business on June 30, 1999, from appropriations
23 heretofore made for such purposes in Article 91, Section 5.6
24 of Public Act 90-585, are reappropriated from the General
25 Revenue Fund to the Capital Development Board for the
26 Department of Corrections for the projects hereinafter
27 enumerated:
28 DIXON CORRECTIONAL CENTER
29 For tuckpointing two buildings ................. $ 65,000
30 STATEVILLE CORRECTIONAL CENTER - JOLIET
31 For tuckpointing seven buildings ............... 10,617
32 Total, Section 5.4 $75,617
SB598 Engrossed -50- BOB-CDBnew-re2000
1 Section 6. The following named amounts, or so much
2 thereof as may be necessary and remains unexpended at the
3 close of business on June 30, 1999, from appropriations and
4 reappropriations heretofore made for such purposes in Article
5 90, Section 4, and Article 91, Section 6 of Public Act 90-585
6 are reappropriated from the Capital Development Fund to the
7 Capital Development Board for the Historic Preservation
8 Agency for the projects hereinafter enumerated:
9 BISHOP HILL HISTORIC SITE -
10 HENRY COUNTY
11 (From Article 90, Section 4 of Public Act 90-585)
12 For rehabilitating Bjorkland Hotel ............. $ 1,010,000
13 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
14 (From Article 91, Section 6 of Public Act 90-585)
15 For renovation of the Cahokia Courthouse
16 and the Jarrot House ......................... 364,640
17 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
18 For replacement of Monk's Mounds stairs ........ 465,000
19 For restoration of Monk's Mound ................ 1,082,491
20 For purchasing private land within historic
21 site boundary ................................ 209,314
22 For replacement of Monk's Mounds stairs ........ 75,591
23 DAVID DAVIS MANSION - BLOOMINGTON
24 For renovation of the David Davis Mansion
25 to eliminate basement leakage ................ 145,936
26 DAVID DAVIS HOME
27 To acquire a residence to be
28 converted to a Visitors Center ............... 249,400
29 FORT DE CHARTRES - RANDOLPH COUNTY
30 For replacing Maintenance Building ............. 259,116
31 GALENA HISTORIC SITE
32 (From Article 90, Section 4 of Public Act 90-585)
33 For structural stabilization and
34 rehabilitation of five historic
SB598 Engrossed -51- BOB-CDBnew-re2000
1 structures in the Grant Home District
2 including the Biesman, Nolan, Gill,
3 Coville, and Donegan houses .................. 427,000
4 LEWIS AND CLARK STATE MEMORIAL -
5 MADISON COUNTY
6 For constructing interpretive center,
7 and development of the historic site
8 in addition to funds previously
9 appropriated ................................. 1,700,000
10 (From Article 91, Section 6 of Public Act 90-585)
11 For the construction of an interpretive
12 center and development of the historic
13 site ......................................... 440,000
14 LINCOLN LOG CABIN HISTORIC SITE -
15 COLES COUNTY
16 (From Article 90, Section 4 of Public Act 90-585)
17 For constructing visitors center, Phase II,
18 and developing day use area .................. 1,669,000
19 (From Article 91, Section 6 of Public Act 90-585)
20 For construction of a visitors center .......... 71,656
21 For replacement of bridges ..................... 49,137
22 For construction of a visitor center and
23 museum, Phase I .............................. 44,736
24 LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG
25 (From Article 90, Section 4 of Public Act 90-585)
26 For renovating village entrance and
27 completing visitors center ................... 735,000
28 (From Article 91, Section 6 of Public Act 90-585)
29 For rehabilitation of the sewage treatment
30 plant ........................................ 86,512
31 LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
32 (From Article 90, Section 4 of Public Act 90-585)
33 For planning and beginning the Lincoln
34 Presidential Center, in addition to
SB598 Engrossed -52- BOB-CDBnew-re2000
1 funds previously appropriated ................ 7,700,000
2 POSTVILLE COURTHOUSE HISTORIC SITE -
3 LINCOLN
4 For rehabilitating Courthouse and site ......... 368,000
5 PULLMAN FACTORY HISTORIC SITE - CHICAGO
6 (From Article 91, Section 6 of Public Act 90-585)
7 For stabilization of the structure and for planning
8 and beginning restoration .................... 751,151
9 OLD STATE CAPITOL - SPRINGFIELD
10 (From Article 90, Section 4 of Public Act 90-585)
11 For rehabilitating Old State Capitol ........... 1,159,000
12 (From Article 91, Section 6 of Public Act 90-585)
13 For renovating garage ramp ..................... 158,832
14 For renovation of the Old State
15 Capitol to eliminate basement
16 leakage ...................................... 162,714
17 VACHEL LINDSAY HOME
18 (From Article 90, Section 4 of Public Act 90-585)
19 For rehabilitating home ........................ 762,000
20 VANDALIA STATE HOUSE
21 (From Article 90, Section 4 of Public Act 90-585)
22 For replacing roof and rehabilitating
23 exterior ..................................... 508,000
24 (From Article 91, Section 6 of Public Act 90-585)
25 For rehabilitating HVAC and electrical
26 systems and interior ......................... 378,000
27 STATEWIDE
28 For replacing roofing systems at the
29 following locations at the approximate
30 costs set forth below: ....................... 325,543
31 Fort De Chartres, Randolph County .... 93,000
32 Washburne House, Galena .............. 12,543
33 David Davis Mansion, Bloomington ..... 25,000
34 Bishop Hill House, Henry County ..... 195,000
SB598 Engrossed -53- BOB-CDBnew-re2000
1 For matching ISTEA federal grant funds ......... 500,000
2 Total, Section 6 $21,857,769
3 Section 6.1. The amount of $54,510, or so much thereof
4 as may be necessary and remains unexpended at the close of
5 business on June 30, 1999, from a reappropriation heretofore
6 made for such purpose in Article 91, Section 6.1 of Public
7 Act 90-585, is reappropriated from the Capital Development
8 Fund to the Capital Development Board for the Historic
9 Preservation Agency for the purchase and rehabilitation of
10 the State Journal Register Building in Springfield.
11 Section 6.2. The amount of $52,326, or so much thereof
12 as may be necessary and remains unexpended at the close of
13 business on June 30, 1999, from a reappropriation heretofore
14 made for such purpose in Article 91, Section 6.2 of Public
15 Act 90-585, is reappropriated from the Capital Development
16 Fund to the Capital Development Board for the Historic
17 Preservation Agency for acquiring the Zimmerman
18 archaeological site in LaSalle County and for associated
19 costs, planning, stabilization, restoration and all other
20 expenses necessary to comply with the intent of this
21 appropriation.
22 Section 6.3. The amount of $2,300,000, or so much
23 thereof as may be necessary and remains unexpended at the
24 close of business on June 30, 1999, from a reappropriation
25 heretofore made for such purposes in Article 91, Section 6.3
26 of Public Act 90-585, is reappropriated from the Capital
27 Development Fund to the Capital Development Board for
28 planning and beginning the construction of a new historical
29 library and Lincoln Center.
30 Section 6.4. The sum of $800,000, or so much thereof as
SB598 Engrossed -54- BOB-CDBnew-re2000
1 may be necessary and as remains unexpended at the close of
2 business on June 30, 1999, from reappropriations heretofore
3 made in Article 78, Section 7 of Public Act 90-0585, is
4 reappropriated from the Capital Development Fund to the
5 Capital Development Board for the Historic Preservation
6 Agency (formerly appropriated to the Historic Preservation
7 Agency) for the construction of an interpretive center and
8 development of the historic site at the Lewis and Clark
9 National Trail Site No. 1 in Madison County.
10 Section 6.5. The following named amounts, or so much
11 thereof as may be necessary and remain unexpended at the
12 close of business on June 30, 1999, from appropriations
13 heretofore made for such purposes in Article 90, Section 4a,
14 and Article 91, Section 6.5 of Public Act 90-585, are
15 reappropriated from the General Revenue Fund to the Capital
16 Development Board for the Historic Preservation Agency for
17 the projects hereinafter enumerated:
18 FORT DE CHARTRES HISTORIC SITE -
19 RANDOLPH COUNTY
20 (From Article 90, Section 4a of Public Act 90-585)
21 For planning and beginning restoration
22 of powder magazine ........................... $ 100,000
23 LINCOLN'S NEW SALEM HISTORIC SITE -
24 PETERSBURG
25 For removing sewage lagoon and treatment
26 plant ........................................ 407,000
27 For rehabilitating saw mill and grist
28 mill ......................................... 219,000
29 METAMORA COURTHOUSE HISTORIC SITE
30 For rehabilitating courthouse .................. 474,000
31 (From Article 91, Section 6.5 of Public Act 90-585)
32 JOURNAL REGISTER BUILDING - SPRINGFIELD
SB598 Engrossed -55- BOB-CDBnew-re2000
1 For renovating building ........................ 648,213
2 DANA THOMAS HOUSE - SPRINGFIELD
3 For restoring the exterior and interior ........ 249,243
4 Total, Section 6.5 $2,097,456
5 Section 7. The sum of $71,890, or so much thereof as may
6 be necessary and remains unexpended at the close of business
7 on June 30, 1999, from a reappropriation heretofore made for
8 such purposes in Article 91, Section 7 of Public Act 90-585,
9 is reappropriated from the Capital Development Fund to the
10 Capital Development Board for the Legislative Space Needs
11 Commission for architectural/engineering fees, planning,
12 construction, reconstruction, rehabilitation, and all other
13 necessary costs for remodeling and relocation of various
14 legislative services agencies located in the Capitol and
15 Stratton Office buildings at the approximate costs set forth
16 below:
17 For the Joint Committee on
18 Administrative Rules ..............$ 71,890
19 Section 8. The following named amounts, or so much
20 thereof as may be necessary and remain unexpended at the
21 close of business on June 30, 1999, from appropriations and
22 reappropriations heretofore made for such purposes in Article
23 90, Section 5, and Article 91, Section 8 of Public Act
24 90-585, are reappropriated from the Capital Development Fund
25 to the Capital Development Board for the Department of Human
26 Services (formerly the Department of Mental Health and
27 Developmental Disabilities) for the projects hereinafter
28 enumerated:
29 ALTON MENTAL HEALTH CENTER - MADISON COUNTY
30 (From Article 91, Section 8 of Public Act 90-585)
31 For constructing two building additions
32 at the Forensic Complex ...................... 11,786,174
SB598 Engrossed -56- BOB-CDBnew-re2000
1 For rehabilitation of the central dietary ...... 1,803,719
2 For replacement of life/safety and
3 security system in a residential
4 building ..................................... 61,011
5 For replacement of the chiller and
6 connection of the HVAC to the energy
7 management system ............................ 5,048
8 For replacement of two cooling towers in
9 the Willow Building .......................... 4,631
10 CHESTER MENTAL HEALTH CENTER - CHESTER
11 (From Article 90, Section 5 of Public Act 90-585)
12 For renovating kitchen area .................... 967,000
13 (From Article 91, Section 8 of Public Act 90-585)
14 For replacing fencing and upgrading
15 recreational yard ............................ 1,342,930
16 For renovating support and residential
17 area ......................................... 3,831,353
18 For installation of emergency generator
19 and upgrading EMS system ..................... 57,985
20 For construction of a storage building ........ 25,003
21 For construction of a Rehabilitative
22 Services building ............................ 28,380
23 For replacement of the emergency generator ..... 11,435
24 SCHOOL OF PUBLIC HEALTH AND PSYCHIATRIC INSTITUTE
25 (FORMERLY THE CHICAGO METRO C&A)
26 For planning and renovation of residential
27 and program units for children and
28 adolescent services .......................... 794,770
29 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
30 (From Article 90, Section 5 of Public Act 90-585)
31 For upgrading fire/life safety systems, in
32 addition to funds previously appropriated .... 235,000
33 (From Article 91, Section 8 of Public Act 90-585)
34 For renovating residential units, in
SB598 Engrossed -57- BOB-CDBnew-re2000
1 addition to funds previously
2 appropriated ................................. 2,171,000
3 For renovation of utility rooms and installation
4 of drinking fountains ........................ 218,000
5 For renovation of the West Campus Nurses'
6 Stations ..................................... 381,713
7 For renovation of Henry Horner Children's
8 Center and West Campus for fire and
9 life safety codes ............................ 641,912
10 For renovation of the West Campus shower
11 and toilet rooms ............................. 303,615
12 For rehabilitation of the bathroom shower
13 walls in ten buildings ....................... 16,780
14 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
15 (From Article 90, Section 5 of Public Act 90-585)
16 For rehabilitating Cypress Building ............ 1,546,000
17 (From Article 91, Section 8 of Public Act 90-585)
18 For completing HVAC system upgrade,
19 in addition to funds previously
20 appropriated ................................. 1,405,677
21 For upgrading the mechanical equipment,
22 in addition to funds previously
23 appropriated ................................. 422,529
24 For renovating a residential building,
25 in addition to funds previously
26 appropriated ................................. 826,447
27 For upgrading the mechanical equipment,
28 in addition to funds previously
29 appropriated ................................. 57,556
30 For planning and beginning the renovation of a
31 residential building ......................... 6,268
32 For separating and upgrading of the combined
33 sewer system, in addition to funds
34 previously appropriated ...................... 20,674
SB598 Engrossed -58- BOB-CDBnew-re2000
1 For rehabilitation of resident buildings
2 and upgrading of temperature controls ........ 33,786
3 ELGIN MENTAL HEALTH CENTER - KANE COUNTY
4 (From Article 90, Section 5 of Public Act 90-585):
5 For replacing power plant and engineering
6 building ..................................... 8,029,000
7 (From Article 91, Section 8 of Public Act 90-585):
8 For renovating the central dietary
9 and kitchen .................................. 3,958,200
10 For construction of an Adult Psychiatric
11 Building, in addition to funds previously
12 appropriated ................................. 3,681,000
13 For construction of roads, parking lots
14 and street lights ............................ 2,414,095
15 For upgrading and expanding the mechanical
16 infrastructure, in addition to funds
17 previously appropriated ...................... 3,361,237
18 For construction of a forensic services complex
19 at Elgin Mental Health Center, in addition
20 to funds previously appropriated ............. 3,909,765
21 For construction of a forensic services
22 complex, in addition to funds previously
23 appropriated ................................. 365,494
24 For renovation of the HVAC systems,
25 replacement of windows and installation
26 of security screens, in addition
27 to funds previously appropriated ............. 2,062,047
28 For construction of a Forensic Services
29 Facility, in addition to funds
30 previously appropriated ..................... 371,116
31 For upgrading and expanding mechanical
32 infrastructure, in addition to funds
33 previously appropriated ...................... 13,918
34 For upgrading for fire and life safety ......... 368,270
SB598 Engrossed -59- BOB-CDBnew-re2000
1 For planning the renovation of the Forensic
2 Building and abating asbestos ................ 251,946
3 For renovation of the Central Stores
4 Building ..................................... 85,679
5 For upgrading the security systems and
6 constructing a multi-purpose building
7 for the Forensic Complex ..................... 8,910
8 For the demolition of the Old Main Building
9 and construction of an Adult
10 Psychiatric Center ........................... 357,773
11 FOX DEVELOPMENTAL CENTER - DWIGHT
12 (From Article 90, Section 5 of Public Act 90-585)
13 For renovating dietary, in addition
14 to funds previously appropriated ............. 842,445
15 (From Article 91, Section 8 of Public Act 90-585)
16 For replacement of absorbers and
17 upgrading HVAC system ........................ 724,467
18 For renovation of dietary ...................... 632,788
19 For renovation of Building #8 and
20 window replacement of Building
21 #1, in addition to funds
22 previously appropriated ...................... 299,963
23 HOWE DEVELOPMENTAL CENTER - TINLEY PARK
24 (From Article 90, Section 5 of Public Act 90-585)
25 For replacing roofs ............................ 81,000
26 For planning and beginning access
27 to water supply from village ................. 78,000
28 For planning and rehabilitation of
29 utility tunnels .............................. 250,000
30 (From Article 91, Section 8 of Public Act 90-585)
31 For renovation of residential buildings ........ 2,513,102
32 For replacement of steam and
33 condensate lines ............................. 79,275
34 For renovation of the boilers in the power
SB598 Engrossed -60- BOB-CDBnew-re2000
1 plant ........................................ 29,856
2 JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
3 For extending chilled water line ............... 312,085
4 For rehabilitation of bathrooms and
5 replacing doors .............................. 382,910
6 For rehabilitation of the electrical
7 distributions system, in addition to
8 Funds previously appropriated ................ 184,895
9 For installation of fire safety systems in
10 four buildings and replacement of a
11 code compliance generator .................... 94,758
12 KILEY DEVELOPMENTAL CENTER - WAUKEGAN
13 For renovating homes ........................... 741,000
14 For renovation of homes ........................ 31,718
15 LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
16 (From Article 90, Section 5 of Public Act 90-585)
17 For upgrading power plant and installing
18 EMS, in addition to funds previously
19 appropriated ................................. 1,794,838
20 For renovating Elmhurst Cottage ................ 1,905,000
21 (From Article 91, Section 8 of Public Act 90-585)
22 For installation of a rethermalization food
23 service system, in addition to funds
24 previously appropriated ...................... 706,518
25 For upgrading the architectural and mechanical
26 systems, in addition to funds
27 previously appropriated ...................... 504,454
28 For installation of a code compliance
29 generator .................................... 18,466
30 For installation of rethermalization food
31 service system ............................... 40,842
32 For expansion of the sprinkler system in
33 four buildings ............................... 185,080
34 For installation of air conditioning in
SB598 Engrossed -61- BOB-CDBnew-re2000
1 Coty and Dietary Buildings ................... 37,371
2 For upgrading the HVAC systems, including
3 chillers ..................................... 25,157
4 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
5 (From Article 90, Section 5 of Public Act 90-585)
6 For replacing plumbing, HVAC and
7 boiler systems ............................... 796,000
8 (From Article 91, Section 8 of Public Act 90-585)
9 For renovation of residential buildings,
10 in addition to funds previously
11 appropriated ................................. 1,888,500
12 For rehabilitation of the roads and parking
13 areas and constructing walks ................. 597,571
14 For renovation of residences ................... 140,758
15 For renovation of restrooms for accessibility
16 in two buildings ............................. 4,538
17 For renovation of bathrooms in 15 residences ... 79,196
18 MADDEN MENTAL HEALTH CENTER - HINES
19 For renovating dietary ......................... 910,000
20 For renovation of pavilions, in addition
21 to funds previously appropriated ............. 844,000
22 For renovation of pavilions .................... 141,905
23 For upgrading residences for safety and
24 security ..................................... 80,382
25 For replacement of a cooling tower and
26 chiller and installation of an emergency
27 generator .................................... 223,621
28 For replacement of hot water heaters ........... 86,160
29 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
30 (From Article 90, Section 5 of Public Act 90-585)
31 For renovating Stevenson Hall .................. 984,000
32 (From Article 91, Section 8 of Public Act 90-585)
33 For replacement of the HVAC management
34 control panel, in addition to funds
SB598 Engrossed -62- BOB-CDBnew-re2000
1 previously appropriated ...................... 68,864
2 For rehabilitation of the dietary facility ..... 390,261
3 MURRAY DEVELOPMENTAL CENTER - CENTRALIA
4 For rehabilitating the emergency
5 electrical system ............................ 298,038
6 For renovating Elm Cottage ..................... 2,935,932
7 For installation of fire safety systems ........ 537,167
8 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
9 (From Article 90, Section 5 of Public Act 90-585)
10 For planning and beginning the upgrade
11 of steam and condensate lines ................ 320,000
12 For rehabilitating HVAC system ................. 1,166,000
13 (From Article 91, Section 8 of Public Act 90-585)
14 For replacing cooling towers and
15 rehabilitating absorbers ..................... 1,040,000
16 For completion of the HVAC system, in
17 addition to funds previously
18 appropriated ................................. 87,283
19 For replacement of boiler, in
20 addition to funds previously
21 appropriated ................................. 765,000
22 For replacement of water mains
23 and valves ................................... 1,750,205
24 For planning and beginning sewer and
25 manhole renovation ........................... 46,793
26 For rehabilitation of the boilers .............. 184,605
27 For planning and replacement of windows ........ 234,721
28 For installation of an emergency generator ..... 72,104
29 For upgrading fire safety systems in the
30 support buildings ............................ 163,978
31 For installation of air conditioning in
32 Building #704, in addition to funds
33 previously appropriated ...................... 104,551
34 For replacement of cooling towers in
SB598 Engrossed -63- BOB-CDBnew-re2000
1 Buildings #100A and #100B .................... 26,402
2 For installation of air conditioning in
3 Buildings #502 and #514 ...................... 42,938
4 SINGER MENTAL HEALTH CENTER - ROCKFORD
5 (From Article 90, Section 5 of Public Act 90-585)
6 For replacing roofs ............................ 248,000
7 (From Article 91, Section 8 of Public Act 90-585)
8 For renovating mechanicals and
9 residential areas ............................ 2,691,675
10 For replacement of absorbers ................... 186,339
11 (From Article 90, Section 5 of Public Act 90-585)
12 TINLEY PARK MENTAL HEALTH CENTER
13 For upgrading fire/life safety systems
14 and bedroom lighting, in addition to
15 funds previously appropriated ................ 236,000
16 TINLEY PARK MENTAL HEALTH CENTER/
17 HOWE DEVELOPMENTAL CENTER
18 (From Article 91, Section 8 of Public Act 90-585)
19 For replacement of the bar screen and
20 renovating the sewer system, in
21 addition to funds previously appropriated .... 180,005
22 For rehabilitation of the electrical
23 distribution system, in addition to
24 funds previously appropriated ................ 2,158,753
25 For renovating and making mechanical
26 improvements to Spruce Hall and Maple Hall ... 149,650
27 For renovation for accessibility in four
28 buildings .................................... 137,036
29 For planning the sewer system renovation and
30 replacement of the rag catcher ............... 197,071
31 For renovation for fire and life safety in
32 three residences ............................. 211,124
33 For renovation of nursing stations and
34 medication rooms in three residences ......... 17,741
SB598 Engrossed -64- BOB-CDBnew-re2000
1 For replacement of the windows in nine
2 buildings .................................... 28,935
3 ZELLER MENTAL HEALTH CENTER - PEORIA
4 For renovation of the nurses' stations,
5 in addition to funds previously
6 appropriated ................................. 1,720,000
7 For renovation of Nurses' Stations and
8 seclusion rooms .............................. 148,916
9 For replacement of the heating and cooling
10 pumps ........................................ 8,357
11 STATEWIDE
12 For replacing roofing systems at the
13 following locations at the approximate
14 costs set forth below: ....................... 207,600
15 Elgin Mental Health Center,
16 five buildings .....................150,000
17 Jacksonville Mental Health and
18 Developmental Center,
19 two buildings..........................57,600
20 For replacement of roofing systems at the
21 following locations at the approximate costs
22 set forth below: ............................. 1,334,305
23 Alton Mental Health Center ...........75,000
24 Choate Mental Health and
25 Developmental Center ...............45,000
26 Chester Mental Health Center ........663,305
27 Fox Developmental Center .............50,000
28 Howe Developmental Center ...........140,000
29 Jacksonville Developmental Center ....17,000
30 Lincoln Developmental Center ........344,000
31 For construction of a forensic services complex
32 at Alton Mental Health Center and Elgin
33 Mental Health Center, in addition to funds
34 previously appropriated ...................... 36,901
SB598 Engrossed -65- BOB-CDBnew-re2000
1 For conducting the preliminary design
2 and to begin to construct, convert and/
3 or rehabilitate a forensic facility .......... 94,918
4 For upgrading roads and parking lots at
5 the following locations at the
6 approximate costs set forth below: ........... 38,106
7 McFarland Mental Health Ctr ...........5,544
8 Shapiro Developmental Center .........32,562
9 For rehabilitation of water towers -
10 Murray and Chester ........................... 377,077
11 For replacement of roofs at the following
12 locations at the approximate costs set
13 forth below: ................................. 666,480
14 Alton Mental Health Center -
15 Five buildings .....................50,000
16 Elgin Mental Health Center -
17 Three buildings ....................52,000
18 Lincoln Developmental Center -
19 Three buildings ....................80,000
20 Lincoln Developmental Center -
21 Four buildings ......................6,601
22 Ludeman Developmental Center -
23 Support buildings ..................50,000
24 Ludeman Developmental Center-
25 Residences .........................22,158
26 Mabley Developmental Center -
27 One building ......................103,517
28 Madden Mental Health Center -
29 Buildings and covered walkways ......5,000
30 McFarland Mental Health Center -
31 Three buildings .....................5,000
32 Meyer Mental Health Center -
33 One building ........................2,000
34 Shapiro Developmental Center -
SB598 Engrossed -66- BOB-CDBnew-re2000
1 Three buildings ...................187,000
2 Shapiro Developmental Center -
3 Two buildings ......................16,351
4 Shapiro Developmental Center -
5 Five buildings .....................67,831
6 Tinley Park Mental Health Center -
7 One building ........................7,252
8 Tinley Park Mental Health Center -
9 Oak Hall ...........................11,770
10 STATEWIDE - FIRE SAFETY
11 For installation of fire safety systems
12 (Formerly for Murray Developmental Center) ..... 537,167
13 For installation of fire safety systems
14 (Formerly for Lincoln Developmental Center) .... 185,080
15 To renovate fire safety systems, including
16 installation of sprinklers, at the following
17 locations at the approximate costs set
18 forth below: ................................. 335,022
19 Singer Mental Health Center .........335,022
20 For fire safety and other work necessary to meet
21 state and federal certification standards for
22 the following projects:
23 For installation of sprinkler systems at
24 Chicago-Read Mental Health Center .......... 118,099
25 For installation of sprinkler systems at
26 Murray Developmental Center ................ 2,000
27 Total, Section 8 $99,282,417
28 Section 8A. The following named amounts, or so much
29 thereof as may be necessary and remain unexpended at the
30 close of business on June 30, 1999, from appropriations and
31 reappropriations heretofore made for such purposes in
32 Article 90, Section 5.1, and Article 91, Section 8A of Public
33 Act 90-585, are reappropriated from the Capital Development
SB598 Engrossed -67- BOB-CDBnew-re2000
1 Fund to the Capital Development Board for the Department of
2 Human Services (formerly the Department of Rehabilitation
3 Services) for the projects hereinafter enumerated:
4 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
5 (From Article 90, Section 5.1 of Public Act 90-585)
6 For installing HVAC and upgrading electrical
7 and replacing doors .......................... $ 1,400,000
8 (From Article 91, Section 8A of Public Act 90-585)
9 For completing the HVAC system upgrade,
10 in addition to funds previously
11 appropriated ................................. 300,000
12 For replacing the storm and sanitary
13 system ....................................... 1,922,385
14 For renovating Unit 5 .......................... 201,552
15 For planning and beginning the
16 upgrade of the heat and smoke
17 detection system ............................. 61,087
18 For the renovation of Cullom Hall .............. 1,977,831
19 For construction of an addition to Unit #5 ..... 20,634
20 For rehabilitation of the domestic hot and
21 cold water piping in six buildings ........... 190,056
22 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
23 (From Article 90, Section 5.1 of Public Act 90-585)
24 For installing sewers .......................... 1,200,000
25 For constructing a new building to
26 replace buildings 2, 3 and 4,
27 in addition to funds previously
28 appropriated ................................. 3,300,000
29 (From Article 91, Section 8A of Public Act 90-585)
30 For rehabilitating the power house ............. 275,000
31 For the replacement of Buildings
32 #2, #3, and #4 ............................... 628,083
33 For replacement of Buildings 5 and 6 for
34 an Independent Living Center ................. 824,291
SB598 Engrossed -68- BOB-CDBnew-re2000
1 Total, Section 8A $12,300,919
2 Section 8.1. The following named amounts, or so much
3 thereof as may be necessary and remain unexpended at the
4 close of business on June 30, 1999, from appropriations and
5 reappropriations heretofore made for such purposes in
6 Article 90, Section 5a, and Article 91, Section 8.1 of Public
7 Act 90-585, are reappropriated from the General Revenue Fund
8 to the Capital Development Board for the Department of Human
9 Services (formerly the Department of Mental Health and
10 Developmental Disabilities) for the projects hereinafter
11 enumerated:
12 ALTON MENTAL HEALTH CENTER
13 (From Article 91, Section 8.1 of Public Act 90-585)
14 For replacing windows in four buildings ........ $1,162,450
15 CHESTER MENTAL HEALTH CENTER
16 For replacing backflow prevention
17 devices ...................................... 76,864
18 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
19 For renovation of turbines in the powerhouse ... 28,364
20 FOX DEVELOPMENTAL CENTER - DWIGHT
21 (From Article 90, Section 5a of Public Act 90-585)
22 For replacing windows .......................... 578,000
23 JACKSONVILLE DEVELOPMENTAL CENTER
24 For replacing stoker and controls .............. 206,000
25 For planning and beginning the rehabilitation
26 of the water tower and smokestack ............ 80,000
27 (From Article 91, Section 8.1 of Public Act 90-585)
28 For the demolition of Carriel Hall,
29 rerouting utility lines,
30 providing parking lot, and planning
31 the demolition of Building 41 ................ 53,792
32 LINCOLN DEVELOPMENTAL CENTER
33 For replacing windows .......................... 723,511
SB598 Engrossed -69- BOB-CDBnew-re2000
1 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
2 For replacing windows in complex
3 buildings .................................... 486,000
4 TINLEY PARK MENTAL HEALTH CENTER
5 For installing windows in residential
6 buildings .................................... 748,375
7 For repairing the exterior of Spruce Hall ...... 56,350
8 For rehabilitating exterior of
9 residential building at Tinley ............... 19,683
10 ZELLER MENTAL HEALTH CENTER - PEORIA
11 For replacing windows .......................... 1,434,835
12 STATEWIDE
13 (From Article 90, Section 5a of Public Act 90-585)
14 For resurfacing roads at Chicago-Read,
15 Tinley Park and Murray ....................... 2,000,000
16 (From Article 91, Section 8.1 of Public Act 90-585)
17 For repair of the exterior masonry
18 walls, in addition to funds previously
19 appropriated ................................. 142,787
20 For repair of the exterior masonry walls
21 at Fox, Shapiro and Tinley Park/Howe ......... 138,521
22 For renovation of fire safety systems at the
23 following locations at the approximate
24 costs set forth below: ....................... 1,639
25 Singer Mental Health Center ...........1,639
26 For installation of smoke detection systems,
27 smoke compartmentation, and other fire
28 safety and certification improvements at
29 Murray Developmental Center .................. 225,449
30 Total, Section 8.1 $8,162,620
31 Section 8A.1. The following named amounts, or so much
32 thereof as may be necessary and remain unexpended at the
33 close of business on June 30, 1999, from appropriations and
SB598 Engrossed -70- BOB-CDBnew-re2000
1 reappropriations heretofore made for such purposes in Article
2 90, Section 5a.1, and Article 91, Section 8A.1 of Public Act
3 90-585, are reappropriated from the General Revenue Fund to
4 the Capital Development Board for the Department of Human
5 Services (formerly the Department of Rehabilitation Services)
6 for the projects hereinafter enumerated:
7 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
8 (From Article 90, Section 5a.1 of Public Act 90-585)
9 For installing humidity controls ............... $ 155,000
10 For installing an all-weather
11 running track ................................ 190,000
12 (From Article 91, Section 8A.1 of Public Act 90-585)
13 For installing an emergency generator .......... 501,710
14 For installing security systems in
15 three buildings .............................. 28,439
16 For renovation of buildings and lead
17 paint abatement .............................. 213,443
18 Total Section 8A.1 $1,088,592
19 Section 9. The following named amounts, or so much
20 thereof as may be necessary and remain unexpended at the
21 close of business on June 30, 1999, from appropriations and
22 reappropriations heretofore made for such purposes in
23 Article 90, Section 6, and Article 91, Section 9 of Public
24 Act 90-585, are reappropriated from the Capital Development
25 Fund to the Capital Development Board for the Department of
26 Military Affairs for the projects hereinafter enumerated:
27 AURORA ARMORY
28 (From Article 91, Section 9 of Public Act 90-585)
29 For planning and beginning construction of
30 an armory .................................... $ 10,820
31 CAMP LINCOLN - SPRINGFIELD
32 (From Article 90, Section 6 of Public Act 90-585)
33 For renovating heating system and
SB598 Engrossed -71- BOB-CDBnew-re2000
1 replacing windows ............................ 908,000
2 (From Article 91, Section 9 of Public Act 90-585)
3 For construction of a military academy
4 facility ..................................... 638,820
5 For site improvements and construction for
6 a military academy facility, including
7 repair and reconstruction of access
8 roads and drives at Camp Lincoln ............. 24,062
9 For planning, design, site improvements, and
10 other costs associated with the conversion
11 of the old "Castle" or Commissary Building
12 for use as a military museum ................. 122,068
13 CARBONDALE ARMORY
14 For upgrading mechanical systems ............... 1,335,539
15 CRESTWOOD ARMORY
16 (From Article 90, Section 6 of Public Act 90-585)
17 For replacing roofing system and
18 rehabilitating exterior ...................... 1,217,525
19 DANVILLE ARMORY
20 (From Article 91, Section 9 of Public Act 90-585)
21 For planning and construction of a new armory .. 1,070,000
22 DECATUR ARMORY
23 For the state's share for additional planning
24 and construction of a new armory and
25 Organizational Maintenance Shop .............. 9,594
26 DIXON ARMORY - LEE COUNTY
27 (From Article 90, Section 6 of Public Act 90-585)
28 For upgrading mechanical and
29 electrical systems ........................... 1,866,000
30 (From Article 91, Section 9 of Public Act 90-585)
31 For construction of an addition,
32 remodeling, extending utilities and
33 installing a kitchen ......................... 26,321
34 DONNELLEY BUILDING
SB598 Engrossed -72- BOB-CDBnew-re2000
1 For the rehabilitation and renovation of
2 the Donnelley Building and purchase of
3 land for parking ............................. 184,885
4 GENERAL JONES ARMORY
5 For renovation of the exterior and interior,
6 mechanical areas and expansion of the
7 parking lot, in addition to amounts
8 previously appropriated ...................... 1,165,919
9 For renovation of the exterior, including
10 windows ...................................... 11,405
11 For replacement of the Assembly Hall
12 roofing system including its structural
13 system ....................................... 210,904
14 For renovation of the armory, including
15 equipment, in addition to amounts
16 previously appropriated ...................... 33,725
17 For renovation of the armory, including
18 equipment, in addition to amounts
19 previously appropriated for this purpose ..... 11,276
20 For the state's share for renovation ........... 10,796
21 KANKAKEE ARMORY
22 For providing the State's share for
23 construction of an Armory and Army
24 Reserve Center, including equipment .......... 14,752
25 For the state's share for planning
26 and beginning an armory and Army
27 Reserve Center ............................... 2,064
28 LITCHFIELD ARMORY
29 For rehabilitation of exterior and upgrading
30 the interior ................................. 14,933
31 MACHESNEY PARK ARMORY (ROCKFORD)
32 For the state's share for additional planning
33 and construction of an armory and
34 Organizational Maintenance Shop .............. 218,047
SB598 Engrossed -73- BOB-CDBnew-re2000
1 MARSEILLES ARMORY
2 For planning and beginning four
3 buildings and wastewater facilities .......... 7,444
4 NORTHWEST ARMORY - CHICAGO
5 For renovation of interior and exterior,
6 in addition to funds previously
7 appropriated for such purposes ............... 1,200,000
8 PARIS ARMORY
9 For rehabilitation of the exterior and
10 upgrading the interior ....................... 30,796
11 PEORIA ARMORY
12 For providing the State's share for
13 construction of an armory and Army
14 Reserve Center, including equipment .......... 5,596
15 ROCK ISLAND ARMORY
16 For construction of an armory and
17 maintenance shop ............................. 78,850
18 SALEM ARMORY - MARION COUNTY
19 For replacement of the boiler and
20 all domestic plumbing, piping and
21 fixtures, and upgrading of the
22 kitchen, including equipment ................. 289,061
23 SAUK AREA CAREER SCHOOL - CRESTWOOD
24 For the purchase and renovation of the
25 former Sauk Area Career School, converting
26 to an armory and upgrading the parking
27 lot .......................................... 84,023
28 STREATOR ARMORY - LASALLE COUNTY
29 For renovation of the mechanical
30 systems, in addition to funds
31 previously appropriated ...................... 125,321
32 WAUKEGAN ARMORY
33 (From Article 90, Section 6 of Public Act 90-585)
34 For replacing roofing system ................... 415,000
SB598 Engrossed -74- BOB-CDBnew-re2000
1 (From Article 91, Section 9 of Public Act 90-585)
2 For renovation of exterior walls, and
3 replacement of doors and windows ............. 47,851
4 WEST FRANKFORT ARMORY
5 (From Article 90, Section 6 of Public Act 90-585)
6 For replacing roofs and rehabilitating
7 exterior ..................................... 1,197,000
8 (From Article 91, Section 9 of Public Act 90-585)
9 For remodeling and installation of a kitchen ... 52,428
10 WILLIAMSON COUNTY ARMORY
11 For providing the State's share for planning
12 and construction of a new armory, in
13 addition to amounts previously
14 appropriated ................................. 14,316
15 WOODSTOCK ARMORY
16 For the state's share for additional planning
17 and construction of an armory ................ 4,273
18 STATEWIDE
19 For replacement of roofs at the
20 following locations at the
21 approximate costs set forth below: ........... 40,238
22 Litchfield Armory ....................19,193
23 Springfield Military Academy .........21,045
24 For replacement of roofs at the following
25 locations at the approximate costs set
26 forth below .................................. 115,420
27 Camp Lincoln - AGO Building .......115,420 ____________
28 Total, Section 9 $12,815,072
29 Section 9.1. The following named amounts, or so much
30 thereof as may be necessary and remain unexpended at the
31 close of business on June 30, 1999, from reappropriations
32 heretofore made for such purposes in Article 91, Section 9.1
33 of Public Act 90-585, are reappropriated from the General
SB598 Engrossed -75- BOB-CDBnew-re2000
1 Revenue Fund to the Capital Development Board for the
2 Department of Military Affairs for the projects hereinafter
3 enumerated:
4 LAWRENCEVILLE ARMORY
5 For renovating interior ........................ $ 170,749
6 STATEWIDE
7 For the following projects at the approximate
8 costs set forth below: ....................... 86,000
9 Broadway Armory - Chicago
10 For repair of the heating
11 system .............................50,000
12 Freeport Armory
13 For renovation of the armory
14 and parking area, including
15 installation of a security
16 fence ..............................36,000 ____________
17 Total, Section 9.1 $256,749
18 Section 10. The following named amounts, or so much
19 thereof as may be necessary and remain unexpended at the
20 close of business on June 30, 1999, from reappropriations
21 heretofore made for such purposes in Article 91, Section 10
22 of Public Act 90-585, are reappropriated from the Capital
23 Development Fund to the Capital Development Board for the
24 Department of Revenue for the project hereinafter enumerated:
25 WILLARD ICE BUILDING - SPRINGFIELD
26 For upgrading the uninterruptible power
27 system, in addition to funds previously
28 appropriated ................................. $ 1,200,000
29 For replacing the halon fire suppression
30 system ....................................... 344,000
31 For completion of the replacement of the
32 fire alarm and security system ............... 70,000
33 For upgrade of the uninterruptible
SB598 Engrossed -76- BOB-CDBnew-re2000
1 power system ................................. 1,060,210
2 Total, Section 10 $2,674,210
3 Section 10.1. The following named amount, or so much
4 thereof as may be necessary and remains unexpended at the
5 close of business on June 30, 1999, from an appropriation
6 heretofore made for such purposes in Article 90, Section 8a
7 of Public Act 90-585, is reappropriated from the General
8 Revenue Fund to the Capital Development Board for the
9 Department of Revenue for the project hereinafter enumerated:
10 WILLARD ICE BUILDING - SPRINGFIELD
11 For resealing and replacing atrium windows ..... $ 1,208,000
12 Total, Section 10.1 $1,208,000
13 Section 11. The following named amounts, or so much
14 thereof as may be necessary and remain unexpended at the
15 close of business on June 30, 1999, from appropriations and
16 reappropriations heretofore made for such purposes in Article
17 90, Section 9, and Article 91, Section 12 of Public Act
18 90-585, are reappropriated from the Capital Development Fund
19 to the Capital Development Board for the Department of State
20 Police for the projects hereinafter enumerated:
21 (From Article 91, Section 12 of Public Act 90-585)
22 CAIRO (ULLIN) - DISTRICT 22
23 For construction of a firing range and radio
24 tower ........................................ $ 537,480
25 CARMI - DISTRICT 19 HEADQUARTERS
26 For planning and beginning the
27 rehabilitation of Headquarters
28 facilities ................................... 14,944
29 CHICAGO FORENSIC LABORATORY
30 For construction of a laboratory and
31 parking facilities ........................... 86,407
32 EAST MOLINE - DISTRICT 7
SB598 Engrossed -77- BOB-CDBnew-re2000
1 For rehabilitation of the headquarters
2 facilities and replacement of the
3 radio garage ................................. 70,726
4 LITCHFIELD - DISTRICT 18 HEADQUARTERS
5 For planning and beginning the
6 rehabilitation of Headquarters facilities ... 3,156
7 SPRINGFIELD ARMORY
8 (From Article 90, Section 9 of Public Act 90-585)
9 For planning and design of the rehabilitation
10 and site improvements of the Springfield
11 Armory, in addition to funds previously
12 appropriated ................................. 1,500,000
13 SPRINGFIELD - STATE POLICE TRAINING ACADEMY
14 (From Article 91, Section 12 of Public Act 90-585)
15 For rehabilitation of the facility, including
16 replacement of the HVAC system and
17 installation of an elevator .................. 28,818
18 STERLING - DISTRICT 1
19 For planning, construction, reconstruction,
20 demolition of existing buildings, and
21 all costs related to the relocation of
22 the headquarters, in addition to funds
23 previously appropriated ...................... 488,013
24 For land acquisition, planning, construction,
25 reconstruction, demolition of existing
26 buildings, and all costs related to the
27 relocation of the District 1 Police
28 Headquarters in Sterling ..................... 7,149
29 STATEWIDE
30 (From Article 90, Section 9 of Public Act 90-585)
31 For replacing the roofing systems at various
32 facilities at the approximate costs set
33 forth below .................................. 167,000
34 District 17 - LaSalle ............... 41,000
SB598 Engrossed -78- BOB-CDBnew-re2000
1 Springfield, Radio Repair
2 Laboratory ......................... 36,000
3 Springfield, Communications
4 Building ........................... 90,000
5 For replacing radio communication towers,
6 equipment buildings and installing emergency
7 power generators at the following locations:
8 Pecatonica, Elwood, Kingston, Mason
9 City ......................................... 2,000,000
10 (From Article 91, Section 12 of Public Act 90-585)
11 For replacing radio communication
12 towers and equipment buildings and
13 installing emergency power
14 generators at Andover, Eaton,
15 Pecatonica, and Cypress ...................... 1,150,000
16 For replacing the roofs and roof
17 drainage systems at various locations,
18 at the approximate costs set forth below: .... 110,904
19 DuQuoin, District #13 .................79,043
20 Springfield, District #9 and
21 Supply Building ......................31,861
22 For replacing radio communication
23 towers, equipment, buildings and
24 installing emergency power
25 generators at various locations .............. 1,037,536
26 District #22, Effingham (Mason site)
27 District #10, Pesotum
28 District #21, Askum
29 District #6, Pontiac
30 For replacing the roofing and roof
31 drainage systems at various facilities
32 at the approximate costs set forth
33 below ........................................ 1,352
34 District #8, Metamora ..................1,352 ____________
SB598 Engrossed -79- BOB-CDBnew-re2000
1 Total, Section 11 $7,203,485
2 Section 11.1. The following named amount, or so much
3 thereof as may be necessary and remains unexpended at the
4 close of business on June 30, 1999, from an appropriation
5 heretofore made in Article 90, Section 9a of Public Act
6 90-585, is reappropriated from the General Revenue Fund to
7 the Capital Development Board for the Department of State
8 Police for the project hereinafter enumerated:
9 TRAINING FACILITY - PAWNEE
10 For rehabilitating the driving track ........... $ 513,000
11 Total, Section 11.1 $513,000
12 Section 12. The following named amounts, or so much
13 thereof as may be necessary and remain unexpended at the
14 close of business on June 30, 1999, from appropriations and
15 reappropriations heretofore made for such purposes in
16 Article 90, Section 10, and Article 91, Section 13 of Public
17 Act 90-585, are reappropriated from the Capital Development
18 Fund to the Capital Development Board for the Department of
19 Veterans' Affairs for the projects hereinafter enumerated:
20 ILLINOIS VETERANS' HOME - ANNA
21 (From Article 91, Section 13 of Public Act 90-585)
22 For purchasing equipment, in addition to funds
23 previously appropriated ...................... $ 18,095
24 ILLINOIS VETERANS' HOME - LASALLE
25 For construction of a storage building ........ 178,380
26 For installation of a medical gas system
27 and for additional funding for a
28 Special Care Unit ............................ 8,366
29 ILLINOIS VETERANS' HOME - MANTENO
30 (From Article 90, Section 10 of Public Act 90-585)
31 For constructing a multi-purpose
32 building ..................................... 439,000
SB598 Engrossed -80- BOB-CDBnew-re2000
1 (From Article 91, Section 13 of Public Act 90-585)
2 For construction of a special care facility .... 5,456,887
3 For replacement of roofs and upgrade
4 of sewer system, in addition to funds
5 previously appropriated ...................... 47,886
6 For air conditioning the interconnects ......... 41,964
7 For replacement of the roof on Kilbourne,
8 Meyers and Billings and upgrade
9 of sewer system, in addition to
10 funds previously appropriated ................ 88,363
11 ILLINOIS VETERANS' HOME - QUINCY
12 (From Article 90, Section 10 of Public Act 90-585)
13 For improvements to meet licensure
14 standards .................................... 9,000,000
15 (From Article 91, Section 13 of Public Act 90-585)
16 For renovating Lippincott Hall ................. 164,542
17 For replacing steam lines ...................... 83,000
18 For replacing the domestic hot water loop ...... 221,449
19 For renovating the elevator .................... 72,319
20 Total, Section 12 $15,820,251
21 Section 12.1. The following named amounts, or so much
22 thereof as may be necessary and remain unexpended at the
23 close of business on June 30, 1999, from appropriations and
24 reappropriations heretofore made for such purposes in Article
25 90, Section 10a, and Article 91, Section 13.1 of Public Act
26 90-585, are reappropriated from the General Revenue Fund to
27 the Capital Development Board for the Department of Veterans'
28 Affairs for the projects hereinafter enumerated:
29 ILLINOIS VETERANS' HOME - ANNA
30 (From Article 90, Section 10a of Public Act 90-585)
31 Complete visitors center, in addition
32 to funds previously appropriated ............. $ 100,000
33 For installing lighting, benches,
SB598 Engrossed -81- BOB-CDBnew-re2000
1 landscaping and ADA improvements ............. 934,000
2 ILLINOIS VETERANS' HOME - LASALLE
3 For installing wall protection ................. 107,000
4 (From Article 91, Section 13.1 of Public Act 90-585)
5 For relocating security alarm
6 system ....................................... 37,800
7 ILLINOIS VETERANS' HOME - MANTENO
8 (From Article 90, Section 10a of Public Act 90-585)
9 For tuckpointing and repairing masonry ......... 1,026,000
10 (From Article 91, Section 13.1 of Public Act 90-585)
11 For replacing wiring in light poles ............ 144,615
12 For replacing exterior doors and frames ........ 179,715
13 For replacement of sewer lines, repair and
14 replacement of bar screens, and
15 rehabilitation of the water tower and
16 reservoir .................................... 172,532
17 ILLINOIS VETERANS' HOME - QUINCY
18 (From Article 90, Section 10a of Public Act 90-585)
19 For resurfacing Schapers Hospital
20 parking lot .................................. 91,000
21 Total, Section 12.1 $2,792,662
22 Section 13. The following named amounts, or so much
23 thereof as may be necessary and remain unexpended at the
24 close of business on June 30, 1999, from appropriations and
25 reappropriations heretofore made for such purposes in Article
26 90, Sections 11.01, 11.02, and 11.03; and Article 91, Section
27 14 of Public Act 90-585, are reappropriated from the Capital
28 Development Fund to the Capital Development Board for the
29 projects hereinafter enumerated:
30 ATTORNEY GENERAL BUILDING - SPRINGFIELD
31 (From Article 90, Section 11.01 of Public Act 90-585)
32 For planning and annex or addition and
33 beginning construction of
SB598 Engrossed -82- BOB-CDBnew-re2000
1 parking facilities ........................... $ 200,000
2 (From Article 91, Section 14 of Public Act 90-585)
3 For planning energy improvements and upgrading
4 HVAC and electrical systems .................. 6,329
5 For energy improvements and upgrading the
6 HVAC, security and electrical systems,
7 in addition to funds previously
8 appropriated - Attorney General's
9 Building ..................................... 179,772
10 MT. VERNON APPELLATE COURT BUILDING
11 (From Article 90, Section 11.01 of Public Act 90-585)
12 For expanding the courthouse ................... 1,625,000
13 SPRINGFIELD - SUPREME COURT BUILDING
14 (From Article 90, Section 11.01 of Public Act 90-585)
15 For replacing plumbing system .................. 1,000,000
16 (From Article 91, Section 14 of Public Act 90-585)
17 For replacement of side walls and steps, in addition
18 to funds previously appropriated ............. 74,857
19 SPRINGFIELD - CAPITOL COMPLEX
20 (From Article 90, Section 11.02 of Public Act 90-585)
21 For upgrading HVAC system at the Archives
22 Building, in addition to funds previously
23 appropriated ................................. 375,000
24 For renovating 222 South College
25 Building ..................................... 2,500,000
26 (From Article 91, Section 14 of Public Act 90-585)
27 For installing fire/security alarm
28 system ....................................... 1,050,800
29 For stabilizing the parking ramp ............... 493,719
30 For renovating the interior, exterior and
31 site improvements, in addition to
32 funds previously appropriated -
33 Executive Mansion ............................ 79,036
34 For upgrading environmental equipment
SB598 Engrossed -83- BOB-CDBnew-re2000
1 and HVAC, in addition to funds previously
2 appropriated - Archives Building ............. 2,150,000
3 For planning and beginning the rehabilitation
4 of the Power Plant ........................... 3,757,051
5 For upgrading sewer system - Capitol Complex,
6 in addition to funds previously
7 appropriated ................................. 1,157,366
8 For renovation of the lower level and
9 ground floor, in addition to funds
10 previously appropriated - Old Power Plant .... 367,703
11 For upgrading the life/safety and security
12 systems - Capitol Building ................... 2,105,256
13 For upgrading the refrigeration equipment -
14 Capitol Complex .............................. 2,317,409
15 For renovating mechanical system -
16 Capitol Complex, in addition to funds
17 previously appropriated ...................... 1,365,022
18 For planning and beginning the upgrade
19 of environmental equipment and HVAC .......... 54,437
20 For renovation of mechanical systems, in
21 addition to funds previously appropriated .... 19,804
22 For upgrading the elevators .................... 11,906
23 For providing a parking facility for the
24 Bloom and Harris Buildings, including
25 land acquisition ............................. 248,024
26 For all costs associated with the design
27 and planning for asbestos abatement,
28 window replacement, energy conservation
29 improvements, replacement of carpeting and
30 ceiling tiles, handicap accessibility
31 improvements, and rehabilitation of the
32 water and air distribution systems in the
33 Stratton Office Building ..................... 310,572
34 For planning and design and beginning of
SB598 Engrossed -84- BOB-CDBnew-re2000
1 the rehabilitation of the
2 Springfield Armory ........................... 527,823
3 For renovation of the Waterways Building for
4 the Fourth District of the Appellate Court ... 3,500,240
5 SPRINGFIELD - SIU CONSOLIDATED LABORATORIES
6 For construction of an addition to the
7 laboratory facility for Southern Illinois
8 University, Environmental Protection Agency
9 and Department of Public Health .............. 81,987
10 STATE CAPITOL BUILDING
11 For upgrading the life/safety and
12 security systems, in addition to
13 funds previously appropriated ................ 2,600,000
14 STRATTON OFFICE BUILDING - SPRINGFIELD
15 For installing fire alarm system ............... 400,000
16 STATEWIDE
17 (From Article 90, Section 11.03 of Public Act 90-585)
18 For surveys and modifications to buildings
19 to meets requirements of the federal
20 Americans With Disabilities Act .............. 5,000,000
21 For retrofitting or upgrading mechanized
22 refrigeration equipment (CFCs) ............... 7,000,000
23 For abating hazardous materials ................ 5,000,000
24 For upgrading and remediating underground
25 storage tanks ................................ 7,500,000
26 (From Article 91, Section 14 of Public Act 90-585):
27 For surveys and modifications to
28 buildings to meet requirements of the
29 federal Americans with Disabilities Act ...... 5,000,000
30 For abatement of hazardous materials ........... 5,000,000
31 For upgrading/retrofitting mechanized
32 refrigeration equipment (CFC's) .............. 4,598,112
33 For upgrade and remediation of underground
34 storage tanks ................................ 3,332,710
SB598 Engrossed -85- BOB-CDBnew-re2000
1 For renovation to meet the requirements
2 of the Americans with Disabilities Act ....... 3,000,000
3 For abatement of hazardous materials ........... 2,085,887
4 For upgrade and remediation of
5 underground storage tanks .................... 1,786,578
6 For survey for and abatement of
7 asbestos-containing materials ................ 1,389,934
8 For upgrade/retrofit of mechanized
9 refrigeration equipment (CFC's) .............. 3,984,861
10 For abatement of hazardous conditions,
11 including underground storage tanks,
12 in addition to funds previously
13 appropriated ................................. 895,197
14 For surveys and modifications to buildings
15 to meet requirements of the federal
16 Americans with Disabilities Act .............. 21,618,468
17 For demolition of buildings .................... 2,685,078
18 For retrofitting/upgrading mechanical
19 refrigeration equipment ...................... 304,455
20 For planning and beginning construction of
21 quick chill food factories ................... 133,946
22 For abating hazardous conditions, including
23 underground storage tanks, in addition to
24 funds previously appropriated ................ 117,584
25 For the planning, upgrade and replacement of
26 potentially hazardous underground storage
27 tanks ........................................ 607,016
28 For surveys and abatement of asbestos-
29 containing materials ......................... 1,073,533
30 For asbestos abatement located during
31 Asbestos Abatement Authority and other
32 surveys to eliminate significant health
33 hazards ...................................... 324,025
34 For planning and abatement of asbestos, and
SB598 Engrossed -86- BOB-CDBnew-re2000
1 replenishment of initial project
2 construction costs in bondable projects
3 at various state owned facilities ............ 391,427
4 Total, Section 13 $111,387,924
5 Section 13.1. The sum of $373,000, or so much thereof as
6 may be necessary and remains unexpended at the close of
7 business on June 30, 1999, from a reappropriation heretofore
8 made for such purpose in Article 90, Section 11.04 of Public
9 Act 90-585, is reappropriated from the Capital Development
10 Fund to the Capital Development Board for the Illinois
11 Medical District Commission, to renovate the Commission's
12 office building, including replacing the HVAC system and
13 roof.
14 Section 13.2. The amount of $51,193, or so much thereof
15 as may be necessary and remains unexpended at the close of
16 business on June 30, 1999, from a reappropriation heretofore
17 made for such purpose in Article 91, Section 14.1 of Public
18 Act 90-585, is reappropriated from the Capital Development
19 Fund to the Capital Development Board for planning,
20 construction and equipment for a joint laboratory facility
21 for the Illinois Environmental Protection Agency, the
22 Department of Public Health, and the Southern Illinois
23 University School of Medicine at the SIU Medical Facility in
24 Springfield.
25 Section 13.3. The sum of $825,000, or so much thereof as
26 may be necessary and remains unexpended on June 30, 1999,
27 from a reappropriation heretofore made for such purposes in
28 Article 91, Section 14.2 of Public Act 90-585, is
29 reappropriated from the Capital Development Fund to the
30 Capital Development Board for the Secretary of State for a
31 grant to the Edgebrook Library for all costs associated with
SB598 Engrossed -87- BOB-CDBnew-re2000
1 the miscellaneous costs incurred for construction or other
2 purposes.
3 Section 13.4. The sum of $40,000, or so much thereof as
4 may be necessary and remains unexpended at the close of
5 business on June 30, 1999, from an appropriation heretofore
6 made for such purposes in Article 91, Section 14.3 of Public
7 Act 90-585, is reappropriated from the Capital Development
8 Fund to the Capital Development Board for the Secretary of
9 State for a grant to the Wilmette Library for all costs
10 associated with planning, construction, reconstruction, and
11 rehabilitation or other purposes.
12 Section 14. The following named amounts, or so much
13 thereof as may be necessary and remain unexpended at the
14 close of business on June 30, 1999, from appropriations and
15 reappropriations heretofore made for such purposes in Article
16 90, Sections 11.01a and 11.03a, and Article 91, Section 15 of
17 Public Act 90-585, are reappropriated from the General
18 Revenue Fund to the Capital Development Board for the
19 projects hereinafter enumerated:
20 SECOND DISTRICT APPELLATE COURT - ELGIN
21 (From Article 90, Section 11.01a of Public Act 90-585)
22 For upgrading mechanical systems
23 and building exterior ........................ 190,000
24 EXECUTIVE MANSION - SPRINGFIELD
25 For renovating interior, exterior and site, in
26 addition to funds previously appropriated .... 190,000
27 STATEWIDE
28 (From Article 90, Section 11.03a of Public Act 90-585):
29 For surveying and abating asbestos-
30 containing materials ......................... 1,000,000
31 For remediating minor problems
32 and emergencies .............................. 3,002,000
SB598 Engrossed -88- BOB-CDBnew-re2000
1 For conducting construction site
2 archeological studies ........................ 245,000
3 For demolishing buildings ...................... 4,800,000
4 (From Article 91, Section 15 of Public Act 90-585):
5 For repair of minor problems and
6 emergencies .................................. 3,142,246
7 For construction site archeological
8 studies ...................................... 200,000
9 For surveys for and abatement of
10 asbestos-containing material ................. 915,902
11 For demolition of buildings .................... 5,000,000
12 For repair of minor problems and
13 emergencies .................................. 389,954
14 For tuckpointing and exterior repair
15 of state buildings ........................... 415,393
16 For surveys for asbestos containing
17 material ..................................... 131,410
18 For construction site archaeological
19 studies ...................................... 26,347
20 For survey of asbestos-containing
21 materials .................................... 139,312
22 For repairing minor problems and for
23 emergencies, in addition to funds
24 previously appropriated ...................... 31,934
25 For repairing minor problems and emergencies
26 for agencies ................................. 218,017
27 For the planning and abatement of asbestos
28 hazards, and replenishment of initial
29 project construction costs in
30 non-bondable projects at various
31 state owned facilities ....................... 150,055
32 Total, Section 14 $20,187,570
33 Section 14.1. The sum of $203,509, or so much thereof as
SB598 Engrossed -89- BOB-CDBnew-re2000
1 may be necessary and remains unexpended at the close of
2 business on June 30, 1999, from an appropriation heretofore
3 made for such purposes in Article 91, Section 15.4 of Public
4 Act 90-585, is reappropriated from the General Revenue Fund
5 to the Capital Development Board for a grant to Lincoln Land
6 Community College for all costs associated with the
7 remodeling of Cass Gymnasium.
8 Section 14.2. The sum of $1,408,035, or so much thereof
9 as may be necessary and remains unexpended at the close of
10 business on June 30, 1999, from an appropriation heretofore
11 made for such purposes in Article 91, Section 15.5 of Public
12 Act 90-585, is reappropriated from the General Revenue Fund
13 to the Capital Development Board for a grant to Lincoln Land
14 Community College for all costs associated with the
15 construction of a new Rural Education and Technology Center.
16 Section 14.3. The sum of $192,435, or so much of that
17 amount as may be necessary and remains unexpended at the
18 close of business on June 30, 1999, from a reappropriation
19 heretofore made for such purposes in Article 91, Section 15.6
20 of Public Act 90-585, is reappropriated to the Capital
21 Development Board from the General Revenue Fund for the
22 planning and construction of the Anna Veterans Home Visitor
23 Center.
24 Section 14.4. The amount of $121,342, or so much thereof
25 as may be necessary and remains unexpended at the close of
26 business on June 30, 1999, from an appropriation heretofore
27 made for such purposes in Article 91, Section 15.7 of Public
28 Act 90-585, is reappropriated from the General Revenue Fund
29 to the Capital Development Board for planning, design,
30 construction, renovation, and all other necessary costs for
31 the Market House in Galena.
SB598 Engrossed -90- BOB-CDBnew-re2000
1 Section 14.5. The sum of $738,010, or so much thereof as
2 may be necessary and remains unexpended on June 30, 1999,
3 from an appropriation heretofore made for such purposes in
4 Article 91, Section 15.8 of Public Act 90-585, is
5 reappropriated from the General Revenue Fund to the Capital
6 Development Board for planning and renovation of Founders
7 Memorial Library at Northern Illinois University.
8 Section 15. The amount of $26,942,277, or so much
9 thereof as may be necessary and remains unexpended at the
10 close of business on June 30, 1999, from an appropriation
11 heretofore made for such purposes in Article 91, Section 16
12 of Public Act 90-585, is reappropriated from the School
13 Infrastructure Fund to the Capital Development Board for
14 school construction project grants pursuant to the School
15 Construction Law.
16 Section 16. The sum of $67,000,000, or so much thereof
17 as may be necessary and remains unexpended at the close of
18 business on June 30, 1999, from an appropriation heretofore
19 made for such purposes in Article 90, Section 16 of Public
20 Act 90-585, is reappropriated from the School Infrastructure
21 Fund to the Capital Development Board for school construction
22 grants pursuant to the School Construction Law.
23 Section 17. The sum of $243,696,855, or so much thereof
24 as may be necessary and remains unexpended at the close of
25 business on June 30, 1999, from an appropriation heretofore
26 made for such purposes in Article 90, Section 17 of Public
27 Act 90-585, is reappropriated from the School Construction
28 Fund to the Capital Development Board for school construction
29 grants pursuant to the School Construction Law.
30 Section 18. The sum of $270,189, or so much thereof as
SB598 Engrossed -91- BOB-CDBnew-re2000
1 may be necessary and remains unexpended at the close of
2 business on June 30, 1999, from a reappropriation heretofore
3 made for such purposes in Article 91, Section 17 of Public
4 Act 90-585, is reappropriated from the Asbestos Abatement
5 Fund to the Capital Development Board for asbestos surveys in
6 relation to the asbestos abatement of State Governmental
7 Buildings.
8 Section 19. The following named amounts, or so much
9 thereof as may be necessary and remain unexpended at the
10 close of business on June 30, 1999, from appropriations and
11 reappropriations heretofore made for such purposes in Article
12 90, Section 13, and Article 91, Section 18 of Public Act
13 90-585, are reappropriated from the Capital Development Fund
14 to the Capital Development Board for the Board of Higher
15 Education for the projects hereinafter enumerated:
16 ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA
17 (From Article 90, Section 13 of Public Act 90-585)
18 For replacing carpeting, constructing storage
19 building and various site improvements,
20 including extending communications
21 conduit system ............................... $ 1,310,000
22 (From Article 91, Section 18 of Public Act 90-585)
23 For replacing air conditioning units,
24 controls and upgrading the energy
25 management system ............................ 2,330,390
26 For remodeling the Information Resource
27 Technology Center ............................ 59,521
28 For renovation of the laboratory areas,
29 including a greenhouse ....................... 59,817
30 For the purchase, renovation and improvement
31 of the North Campus High School site of
32 the Aurora West School District 129,
33 including construction of four dormitories,
SB598 Engrossed -92- BOB-CDBnew-re2000
1 equipment purchases and other expenses for
2 use by the Illinois Mathematics and Science
3 Academy ...................................... 1,198,505
4 Total, Section 19 $4,958,233
5 Section 20. The following named amounts, or so much
6 thereof as may be necessary and remain unexpended at the
7 close of business on June 30, 1999, from appropriations and
8 reappropriations heretofore made for such purposes in Article
9 90, Section 12, and Article 91, Section 19 of Public Act
10 90-585, are reappropriated from the Capital Development Fund
11 to the Capital Development Board for the Illinois Community
12 College Board for the projects hereinafter enumerated:
13 BELLEVILLE AREA COLLEGE
14 (From Article 91, Section 19 of Public Act 90-585)
15 For constructing a building, additions
16 and site improvements at the
17 Belleville and Red Bud campuses,
18 in addition to funds previously
19 appropriated ................................. $ 9,755,834
20 For planning buildings, additions and
21 site improvements ............................ 545,565
22 CITY COLLEGES OF CHICAGO/KENNEDY KING
23 (From Article 90, Section 12 of Public Act 90-585)
24 For remodeling for a culinary arts
25 educational facility ......................... 10,875,000
26 (From Article 91, Section 19 of Public Act 90-585)
27 DANVILLE AREA COMMUNITY COLLEGE - VERMILION COUNTY
28 To rehabilitate infrastructure,
29 construct a classroom facility
30 and a day care center, in addition
31 to funds previously appropriated ............. 1,722,476
32 For rehabilitation of infrastructure
33 and beginning construction of a
SB598 Engrossed -93- BOB-CDBnew-re2000
1 classroom facility ........................... 977,353
2 For rehabilitation of the infrastructure and
3 planning campus buildings .................... 727,990
4 COLLEGE OF DUPAGE
5 For completing the addition to
6 the Student Resource Center .................. 141,532
7 ELGIN COMMUNITY COLLEGE
8 For construction of addition, site improvements,
9 remodeling and purchasing equipment .......... 512,362
10 For planning, design, site improvements, utility
11 adjustments, and any other costs associated
12 with construction of a new Instructional
13 Building at Elgin Community College .......... 66,600
14 HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON
15 For constructing buildings and making
16 site improvements, including equipment ....... 19,208,135
17 For planning buildings, parking areas,
18 utilities, and site development and
19 preliminary site preparation
20 required to establish permanent
21 campus facilities ............................ 1,772,950
22 JOHN A. LOGAN COMMUNITY COLLEGE - CARTERVILLE
23 For constructing additions and site
24 improvements, in addition to funds
25 previously appropriated ...................... 10,840,477
26 For construction of classroom facility,
27 and remodeling the existing facility,
28 including utilities and site improvements .... 24,745
29 JOHN WOOD COMMUNITY COLLEGE - QUINCY
30 (From Article 90, Section 12 of Public Act 90-585)
31 For planning campus buildings and site
32 improvements ................................. 1,871,800
33 (From Article 91, Section 19 of Public Act 90-585)
34 For construction of a science and technology
SB598 Engrossed -94- BOB-CDBnew-re2000
1 center and access road ....................... 8,978
2 JOLIET JUNIOR COLLEGE
3 (From Article 90, Section 12 of Public Act 90-585)
4 For remodeling campus buildings ................ 220,900
5 (From Article 91, Section 19 of Public Act 90-585)
6 For construction of a business and technology
7 center and remodeling the main campus
8 building ..................................... 107,081
9 For planning, design and site preparation of
10 a Business Technology Center ................. 2,983
11 COLLEGE OF LAKE COUNTY
12 For construction of a multi-use Instructional
13 Center, including acquisition of equipment
14 and remodeling of existing facilities ........ 17,407
15 (From Article 90, Section 12 of Public Act 90-585)
16 LAKE LAND COLLEGE - MATTOON
17 For constructing a classroom/administration
18 building and purchasing equipment, in addition
19 to funds previously appropriated ............. 5,336,800
20 LEWIS AND CLARK COMMUNITY COLLEGE - GODFREY
21 For constructing a classroom/administration
22 building ..................................... 10,125,000
23 (From Article 91, Section 19 of Public Act 90-585)
24 For renovation of buildings, construction of an
25 addition and site improvements ............... 27,764
26 For construction of health, mathematics and
27 science laboratory facilities and
28 remodeling Fobes Hall ........................ 259,974
29 For renovation of the main complex ............. 14,925
30 For planning, design, and site preparation,
31 and construction of a multi-purpose
32 building ..................................... 22,932
33 LINCOLN LAND COMMUNITY COLLEGE - SPRINGFIELD
34 (From Article 90, Section 12 of Public Act 90-585)
SB598 Engrossed -95- BOB-CDBnew-re2000
1 For constructing an addition and remodeling
2 Sangamon and Menard Halls .................... 3,777,700
3 (From Article 91, Section 19 of Public Act 90-585)
4 MCHENRY COUNTY COLLEGE
5 For construction of an addition, including
6 equipment, a parking area and
7 site improvements ............................ 19,993
8 MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS
9 (From Article 90, Section 12 of Public Act 90-585)
10 For constructing a classroom/administration
11 building, providing site improvements and
12 purchasing equipment, in addition to
13 funds previously appropriated ................ 8,309,200
14 (From Article 91, Section 19 of Public Act 90-585)
15 For planning and constructing a new classroom
16 facility ..................................... 362,212
17 For providing for an architectural engineering
18 study, renovations, construction,
19 reconstruction and remodeling of Buildings
20 A, B and L ................................... 417,365
21 PRAIRIE STATE COMMUNITY COLLEGE - CHICAGO HEIGHTS
22 For construction of a Learning Resource
23 Center addition .............................. 19,180
24 REND LAKE COLLEGE - INA
25 (From Article 90, Section 12 of Public Act 90-585)
26 For constructing a north access road,
27 including security lighting and drainage ..... 365,269
28 For replacing utility piping ................... 1,546,400
29 (From Article 91, Section 19 of Public Act 90-585)
30 For construction of an aquatic and
31 rehabilitation center ........................ 13,443
32 SHAWNEE COMMUNITY COLLEGE - ULLIN
33 For constructing additions, parking
34 facilities, and renovating buildings,
SB598 Engrossed -96- BOB-CDBnew-re2000
1 including equipment .......................... 7,328,707
2 SOUTHEASTERN ILLINOIS COLLEGE - HARRISBURG
3 For construction of humanities,
4 administration, and child care facilities
5 and remodeling campus buildings .............. 61,417
6 TRITON COMMUNITY COLLEGE - RIVER GROVE
7 For planning, site improvements, construction
8 and other expenses necessary for the
9 construction of an addition to the Learning
10 Resource Center .............................. 115,893
11 WILLIAM RAINEY HARPER COMMUNITY COLLEGE - PALATINE
12 For constructing a Multi-purpose
13 Instructional Center and renovating
14 Building A Cafeteria ......................... 6,823,200
15 For planning, developing, and designing a
16 multi-purpose telecommunications
17 instructional delivery center ................ 113,812
18 STATEWIDE - CONSTRUCTION DEFECTS
19 For planning, construction and renovation
20 to correct defectively designed or
21 constructed community college facilities,
22 provided that monies recovered based upon
23 claims arising out of such defective design
24 or construction shall be paid to the state
25 as required by Section 105.12 of the Public
26 Community College Act as reimbursement for
27 monies expended pursuant to this
28 appropriation ................................ 1,016,231
29 Total, Section 20 $105,477,585
30 Section 20A. The sum of $4,941,654, or so much thereof
31 as may be necessary and remains unexpended at the close of
32 business on June 30, 1999, from a reappropriation heretofore
33 made for such purposes in Article 91, Section 19A of Public
SB598 Engrossed -97- BOB-CDBnew-re2000
1 Act 90-585, is reappropriated from the Capital Development
2 Fund to the Capital Development Board for the Illinois
3 Community College Board for miscellaneous capital
4 improvements including construction, reconstruction,
5 remodeling, improvement, repair and installation of capital
6 facilities, cost of planning, supplies, equipment, materials,
7 services and all other expenses required to complete the work
8 at the various community colleges. This appropriation shall
9 be in addition to any other appropriated amounts which can be
10 expended for these purposes.
11 Section 20B. The sum of $6,343,805, or so much thereof
12 as may be necessary and remains unexpended at the close of
13 business on June 30, 1999, from a reappropriation heretofore
14 made for such purposes in Article 91, Section 19B of Public
15 Act 90-585, is reappropriated from the Capital Development
16 Fund to the Capital Development Board for the Illinois
17 Community College Board for miscellaneous capital
18 improvements including construction, reconstruction,
19 remodeling, improvement, repair and installation of capital
20 facilities, cost of planning, supplies, equipment, materials,
21 services and all other expenses required to complete the work
22 at the various community colleges. This appropriation shall
23 be in addition to any other appropriated amounts which can be
24 expended for these purposes.
25 Section 20C. The sum of $2,521,400, or so much thereof
26 as may be necessary and remains unexpended at the close of
27 business on June 30, 1999, from a reappropriation heretofore
28 made for such purposes in Article 91, Section 19C of Public
29 Act 90-585, is reappropriated from the Capital Development
30 Fund to the Capital Development Board for the Illinois
31 Community College Board for grants to community colleges for
32 miscellaneous capital improvements including construction,
SB598 Engrossed -98- BOB-CDBnew-re2000
1 reconstruction, remodeling, improvements, repair and
2 installation of capital facilities, cost of planning,
3 supplies, equipment, materials, services, and all other
4 expenses required to complete the work. This appropriation
5 shall be in addition to any other appropriated amounts which
6 can be expended for these purposes.
7 Section 20D. The sum of $3,756,000, or so much thereof
8 as may be necessary and remains unexpended at the close of
9 business on June 30, 1999, from an appropriation heretofore
10 made for such purpose in Article 90, Section 15 of Public Act
11 90-585, is reappropriated from the Capital Development Fund
12 to the Capital Development Board for the Illinois Community
13 College Board for miscellaneous capital improvements
14 including construction, capital facilities, cost of planning,
15 supplies, equipment, materials, services and all other
16 expenses required to complete the work at the various
17 community colleges. This appropriation shall be in addition
18 to any other appropriated amounts which can be expended for
19 these purposes.
20 Section 21. The following named amounts, or so much
21 thereof as may be necessary and remain unexpended at the
22 close of business on June 30, 1999, from appropriations and
23 reappropriations heretofore made for such purposes in Article
24 90, Section 13 and Article 91, Section 20 of Public Act
25 90-585, are reappropriated from the Capital Development Fund
26 to the Capital Development Board for the Board of Higher
27 Education for the projects hereinafter enumerated:
28 CHICAGO STATE UNIVERSITY
29 (From Article 90, Section 13 of Public Act 90-585)
30 For upgrading campus infrastructure,
31 in addition to the funds
32 previously appropriated ...................... 2,700,000
SB598 Engrossed -99- BOB-CDBnew-re2000
1 (From Article 91, Section 20 of Public Act 90-585)
2 For renovating buildings and upgrading
3 mechanical systems ........................... $ 3,300,000
4 For renovating campus buildings and
5 upgrading mechanical systems ................. 2,432,200
6 For providing campus health and safety
7 improvements ................................. 40,221
8 EASTERN ILLINOIS UNIVERSITY - CHARLESTON
9 (From Article 90, Section 13 of Public Act 90-585)
10 For upgrading campus buildings for health,
11 safety and environmental improvements ........ 1,302,100
12 (From Article 91, Section 20 of Public Act 90-585)
13 For constructing an addition and
14 renovating Booth Library ..................... 16,764,500
15 For planning an addition and renovation
16 of Booth Library ............................. 771,992
17 For construction of an addition and
18 remodeling Buzzard Building .................. 199,327
19 For upgrading the energy management system
20 and HVAC systems and installation of a chilled
21 water loop between various buildings ......... 31,252
22 For completing conversion to a coal-fired
23 power plant .................................. 52,986
24 For completion of the construction and
25 renovation of the heating system ............. 37,703
26 For planning, equipment, site improvements,
27 construction and renovation of the heating
28 system to restore coal burning capability .... 30,429
29 GOVERNORS STATE UNIVERSITY - PARK FOREST
30 (From Article 90, Section 13 of Public Act 90-585)
31 For planning and beginning the
32 main building renovations,
33 a child development center, and
34 faculty offices .............................. 1,500,000
SB598 Engrossed -100- BOB-CDBnew-re2000
1 (From Article 91, Section 20 of Public Act 90-585)
2 For upgrading and replacing cooling
3 and refrigeration systems and
4 equipment .................................... 1,985,811
5 For renovation of the main building ............ 422,825
6 For remodeling Main Building ................... 346,063
7 For renovation of the main building ............ 49,954
8 For remodeling the main building ............... 171,802
9 (From Article 90, Section 13 of Public Act 90-585)
10 ILLINOIS STATE UNIVERSITY - NORMAL
11 For remodeling Julian and Moulton Halls ........ 7,050,000
12 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
13 For replacing fire alarm systems, lighting
14 and ceilings ................................. 2,561,800
15 (From Article 91, Section 20 of Public Act 90-585)
16 For renovating the auditorium in
17 Building E ................................... 7,131,614
18 For upgrading the boilers and related
19 control systems .............................. 12,626
20 For fire safety modifications at the
21 facility ..................................... 981,903
22 For renovation of Buildings E, F, and
23 the auditorium, and demolition and
24 replacement of Buildings G, J and M,
25 in addition to amounts previously
26 appropriated ................................. 829,569
27 For remodeling the library ..................... 171,978
28 NORTHERN ILLINOIS UNIVERSITY - DEKALB
29 For renovating Altgeld Hall and
30 purchasing equipment ......................... 19,150,400
31 (From Article 90, Section 13 of Public Act 90-585)
32 For upgrading storm waterway controls in
33 addition to funds previously appropriated .... 6,716,000
34 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
SB598 Engrossed -101- BOB-CDBnew-re2000
1 For upgrading and remodeling Anthony Hall ...... 3,131,100
2 (From Article 91, Section 20 of Public Act 90-585)
3 For site improvements and purchasing
4 equipment for the Engineering and
5 Technology Building .......................... 423,681
6 For planning addition, remodeling and
7 upgrading the HVAC system in Altgeld Hall .... 574,000
8 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
9 For construction of the Engineering Facility
10 building and related site improvements ....... 16,893,162
11 (From Article 90, Section 13 of Public Act 90-585)
12 For planning and beginning construction
13 or renovation for a classroom/administration
14 facility in addition to funds previously
15 appropriated ................................. 1,179,600
16 UNIVERSITY OF ILLINOIS - CHICAGO
17 For remodeling the Clinical
18 Sciences Building ............................ 15,000,000
19 (From Article 91, Section 20 of Public Act 90-585)
20 For the renovation of the court area and
21 Lecture Center, in addition to funds
22 previously appropriated ...................... 3,760,506
23 UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN
24 For constructing an Agricultural
25 Library ...................................... 9,500,000
26 For completion of campus flood control ......... 6,000,000
27 (From Article 90, Section 13 of Public Act 90-585)
28 For remodeling the Mechanical Engineering
29 Laboratory Building .......................... 7,365,000
30 UNIVERSITY OF ILLINOIS - SPRINGFIELD
31 For constructing and improving campus
32 roadways, in addition to funds previously
33 appropriated ................................. 2,252,855
34 WESTERN ILLINOIS UNIVERSITY - MACOMB
SB598 Engrossed -102- BOB-CDBnew-re2000
1 (From Article 91, Section 20 of Public Act 90-585)
2 For remodeling Horrabin Hall and
3 beginning to convert Simpkins Hall
4 gymnasium and adjacent areas into
5 a performing arts facility ................... 2,153,696
6 For construction of a steam and electrical
7 utility tunnel ............................... 211,374
8 (From Article 90, Section 13, Public Act 90-585)
9 For constructing a utility tunnel and
10 installing piping, lines and cables .......... 6,313,400
11 For remodeling Horrabin and Simpkins
12 Halls, in addition to funds
13 previously appropriated....................... 1,655,400
14 Total, Section 21 $153,158,829
15 Section 21.1. The sum of $237,635, or so much thereof as
16 may be necessary and remains unexpended at the close of
17 business on June 30, 1999, from a reappropriation heretofore
18 made for such purposes in Article 91, Section 20.1 of Public
19 Act 90-585, is reappropriated from the Capital Development
20 Fund to the Capital Development Board for the Board of Higher
21 Education for miscellaneous capital improvements including
22 construction, reconstruction, remodeling, improvement, repair
23 and installation of capital facilities, cost of planning,
24 supplies, equipment, materials, services and all other
25 expenses required for completing the work at the colleges and
26 universities. This appropriation shall be in addition to any
27 other appropriated amounts which can be expended for these
28 purposes.
29 Section 21.2. The following named amounts, or so much
30 thereof as may be necessary and remain unexpended at the
31 close of business on June 30, 1999, from reappropriations
32 heretofore made for such purposes in Article 91, Section 20.2
SB598 Engrossed -103- BOB-CDBnew-re2000
1 of Public Act 90-585, are reappropriated from the Capital
2 Development Fund to the Capital Development Board for the
3 Board of Higher Education for miscellaneous capital
4 improvements including construction, reconstruction,
5 remodeling, improvement, repair and installation of capital
6 facilities, cost of planning, supplies, equipment, materials,
7 services and all other expenses required to complete the work
8 at the colleges and universities hereinafter enumerated. This
9 appropriation shall be in addition to any other appropriated
10 amounts which can be expended for these purposes:
11 Eastern Illinois University .................. $ 24,385
12 Northeastern Illinois University ............. 149,786
13 Western Illinois University .................. 455,704
14 Total, Section 21.2 $629,875
15 Section 21.3. The sum of $14,663,596, or so much thereof
16 as may be necessary and remains unexpended at the close of
17 business on June 30, 1999, from a reappropriation heretofore
18 made for such purposes in Article 91, Section 20.3 of Public
19 Act 90-585, is reappropriated from the Capital Development
20 Fund to the Capital Development Board for the Board of Higher
21 Education for miscellaneous capital improvements, including
22 construction, reconstruction, remodeling, improvement, repair
23 and installation of capital facilities, cost of planning,
24 supplies, equipment, materials, services and all other
25 expenses required to complete the work at the various
26 universities set forth below. This appropriation shall be in
27 addition to any other appropriated amounts which can be
28 expended for these purposes.
29 For Chicago State University ......... 301,400
30 For Eastern Illinois University ...... 564,100
31 For Governors State University ....... 122,972
32 For Illinois State University ...... 1,150,279
33 For Northeastern Illinois University . 423,700
SB598 Engrossed -104- BOB-CDBnew-re2000
1 For Northern Illinois University ... 1,287,700
2 For Western Illinois University ...... 858,250
3 For Southern Illinois University -
4 Carbondale ........................ 1,808,728
5 For Southern Illinois University -
6 Edwardsville ........................ 751,500
7 For University of Illinois -
8 Chicago ........................... 3,280,400
9 For University of Illinois -
10 Springfield ......................... 134,267
11 For University of Illinois -
12 Urbana-Champaign .................. 3,980,300
13 Section 21.4. The sum of $11,244,000, or so much thereof
14 as may be necessary and remains unexpended at the close of
15 business on June 30, 1999, from an appropriation heretofore
16 made for such purposes in Article 90, Section 14 of Public
17 Act 90-585, is reappropriated from the Capital Development
18 Fund to the Capital Development Board for the Board of Higher
19 Education for miscellaneous capital improvements including
20 construction, capital facilities, cost of planning, various
21 universities set forth below. This appropriation shall be in
22 addition to any other appropriated amounts which can be
23 expended for these purposes.
24 For Chicago State University ........... 226,000
25 For Eastern Illinois University ........ 423,100
26 For Governors State University ......... 136,200
27 For Illinois State University .......... 863,000
28 For Northeastern Illinois University ... 317,800
29 For Northern Illinois University ....... 965,800
30 For Western Illinois University ........ 646,800
31 For Southern Illinois University -
32 Carbondale ......................... 1,493,600
33 For Southern Illinois University -
SB598 Engrossed -105- BOB-CDBnew-re2000
1 Edwardsville ......................... 563,600
2 For University of Illinois - Chicago . 2,460,300
3 For University of Illinois -
4 Springfield .......................... 162,600
5 For University of Illinois -
6 Urbana-Champaign ................... 2,985,200
7 Section 22. The following named amounts, or so much
8 thereof as may be necessary and remain unexpended at the
9 close of business on June 30, 1999, from reappropriations
10 heretofore made for such purposes in Article 91, Section 21
11 of Public Act 90-585, are reappropriated from the Capital
12 Development Fund to the Capital Development Board for the
13 Board of Higher Education for the projects hereinafter
14 enumerated:
15 ILLINOIS STATE UNIVERSITY - NORMAL
16 For construction of science laboratory
17 facilities ................................... $ 173,569
18 NORTHERN ILLINOIS UNIVERSITY
19 For upgrading the storm waterway controls
20 and campus drives ............................ 1,023,738
21 For construction of tunnels and installation
22 of utility piping ............................ 30,177
23 For renovation of heating plants and the
24 HVAC system .................................. 54,699
25 NORTHERN ILLINOIS UNIVERSITY - ROCKFORD
26 For construction of the Rockford Center
27 facilities ................................... 35,982
28 Total, Section 22 $1,318,165
29 Section 22.1. The sum of $2,174,555, or so much thereof
30 as may be necessary and remains unexpended at the close of
31 business on June 30, 1999, from a reappropriation heretofore
32 made for such purposes in Article 91, Section 21.1 of Public
SB598 Engrossed -106- BOB-CDBnew-re2000
1 Act 90-585, is reappropriated from the Capital Development
2 Fund to the Capital Development Board for the Board of Higher
3 Education for miscellaneous capital improvements, including
4 construction, reconstruction, remodeling, improvement, repair
5 and installation of capital facilities, cost of planning,
6 supplies, equipment, materials, services and all other
7 expenses required for completing the work at the colleges and
8 universities. This appropriation shall be in addition to any
9 other appropriated amounts which can be expended for these
10 purposes.
11 Section 22.2. The following named amounts, or so much
12 thereof as may be necessary and remain unexpended at the
13 close of business on June 30, 1999, from reappropriations
14 heretofore made for such purposes in Article 91, Section 21.2
15 of Public Act 90-585, are reappropriated from the Capital
16 Development Fund to the Capital Development Board for the
17 Board of Higher Education for miscellaneous capital
18 improvements, including construction, reconstruction,
19 remodeling, improvements, repair and installation of capital
20 facilities, cost of planning, supplies, equipment, materials,
21 services, and all other expenses required to complete the
22 work at the colleges and universities hereinafter enumerated.
23 This appropriation shall be in addition to any other
24 appropriated amounts which can be expended for these
25 purposes:
26 Northern Illinois University ................... 1,185,487
27 Total, Section 22.2 $1,185,487
28 Section 22.3. The sum of $21,156, or so much thereof as
29 may be necessary and remains unexpended at the close of
30 business on June 30, 1999, from a reappropriation heretofore
31 made for such purposes in Article 91, Section 21.3 of Public
32 Act 90-585, is reappropriated from the Capital Development
SB598 Engrossed -107- BOB-CDBnew-re2000
1 Fund to the Capital Development Board for the Board of Higher
2 Education for Northern Illinois University, for the planning,
3 architectural engineering, purchase, site improvements and
4 construction or remodeling of a site in Rockford for use as a
5 campus.
6 Section 22.4. The following named amounts, or so much
7 thereof as may be necessary, and remain unexpended at the
8 close of business on June 30, 1999, from appropriations
9 heretofore made for such purposes in Article 91, Section 21.4
10 of Public Act 90-585, are reappropriated from the Capital
11 Development Fund to the Capital Development Board for the
12 Board of Higher Education for miscellaneous capital
13 improvements including construction, reconstruction,
14 remodeling, improvement, repair and installation of capital
15 facilities, cost of planning, supplies, equipment, materials,
16 services and all other expenses required to complete the work
17 at the various universities set forth below. This
18 appropriation shall be in addition to any other appropriated
19 amounts which can be expended for these purposes.
20 For Chicago State University ................. $ 508,212
21 For Eastern Illinois University .............. 528,004
22 For Governors State University ............... 185,351
23 For Illinois State University ................ 1,536,981
24 For Northeastern Illinois University ......... 735,000
25 For Northern Illinois University ............. 2,162,141
26 For Southern Illinois University ............. 1,564,754
27 For University of Illinois ................... 8,329,783
28 For Western Illinois University .............. 1,465,825
29 Total, Section 22.4 $17,016,051
30 Section 23. The following named amounts, or so much
31 thereof as may be necessary and remain unexpended at the
32 close of business on June 30, 1999, from reappropriations
SB598 Engrossed -108- BOB-CDBnew-re2000
1 heretofore made for such purposes in Article 91, Section 22
2 of Public Act 90-585, are reappropriated from the Capital
3 Development Fund to the Capital Development Board for the
4 Board of Trustees of Southern Illinois University for the
5 projects hereinafter enumerated:
6 CARBONDALE CAMPUS
7 For construction of an engineering building
8 annex ........................................ $ 77,968
9 For remodeling the Communications Building ..... 9,756
10 EDWARDSVILLE CAMPUS
11 For replacement of the high temperature water
12 distribution system .......................... 188,842
13 For infrastructure, site development, and
14 other necessary costs associated with
15 the development of University Park ........... 7,501
16 For costs associated with the consolidation
17 of the music facilities ...................... 24,336
18 For planning and construction of an Art and
19 Design Facility .............................. 25,089
20 Total, Section 23 $333,492
21 Section 23.1. The sum of $817,493, or so much thereof as
22 may be necessary and remains unexpended at the close of
23 business on June 30, 1999, from a reappropriation heretofore
24 made for such purposes in Article 91, Section 22.1 of Public
25 Act 90-585, is reappropriated from the Capital Development
26 Fund to the Capital Development Board for Southern Illinois
27 University for miscellaneous capital improvements including
28 construction, reconstruction, remodeling, improvements,
29 repair and installation of capital facilities, cost of
30 planning, supplies, equipment, materials, services, and all
31 other expenses required to complete the work. This
32 appropriation shall be in addition to any other appropriated
33 amounts which can be expended for these purposes.
SB598 Engrossed -109- BOB-CDBnew-re2000
1 Section 24. The following named amounts, or so much
2 thereof as may be necessary and remain unexpended at the
3 close of business on June 30, 1999, from reappropriations
4 heretofore made for such purposes in Article 91, Section 23
5 of Public Act 90-585, are reappropriated from the Capital
6 Development Fund to the Capital Development Board for the
7 Board of Trustees of the University of Illinois for the
8 projects hereinafter enumerated:
9 UNIVERSITY CENTER - CHICAGO
10 For remodeling Alumni Hall, Phase II,
11 including utilities .......................... 83,708
12 HEALTH SCIENCE CENTER
13 For remodeling the Neuropsychiatric
14 Institute .................................... 746,749
15 URBANA-CHAMPAIGN CAMPUS
16 For initiating a campus flood
17 control project .............................. 1,296,572
18 Total, Section 24 $2,127,029
19 Section 24.1. The sum of $3,715,959, or so much thereof
20 as may be necessary and remains unexpended at the close of
21 business on June 30, 1999, from a reappropriation heretofore
22 made for such purposes in Article 91, Section 23.1 of Public
23 Act 90-585, is reappropriated from the Capital Development
24 Fund to the Capital Development Board for the Board of
25 Trustees of the University of Illinois for miscellaneous
26 capital improvements including construction, reconstruction,
27 remodeling, improvement, repair and installation of capital
28 facilities, cost of planning, supplies, equipment, materials,
29 services and all other expenses required for completing the
30 work at the colleges and universities. This appropriation
31 shall be in addition to any other appropriated amounts which
32 can be expended for these purposes.
SB598 Engrossed -110- BOB-CDBnew-re2000
1 Section 24.2. The following named amount, or so much
2 thereof as may be necessary and remains unexpended at the
3 close of business on June 30, 1999, from a reappropriation
4 heretofore made for such purposes in Article 91, Section 23.2
5 of Public Act 90-585, is reappropriated from the General
6 Revenue Fund to the Capital Development Board for the Board
7 of Trustees of the University of Illinois for the project
8 hereinafter enumerated:
9 HEALTH SCIENCE CENTER - CHICAGO
10 For energy conservation improvements at
11 Taylor Street Hospital, the College of
12 Pharmacy Building, and the Clinical
13 Science Building ............................. $ 24,780
14 Total, Section 24.2 $24,780
15 Section 24.3. The sum of $4,500,000, or so much thereof
16 as may be necessary and remains unexpended at the close of
17 business on June 30, 1999, from a reappropriation heretofore
18 made for such purposes in Article 91, Section 23.3 of Public
19 Act 90-585, is reappropriated from the Capital Development
20 Fund to the Capital Development Board for the Board of
21 Trustees of the University of Illinois (formerly for the
22 Department of Human Services) for renovation of the School of
23 Public Health and Psychiatric Institute (formerly the ISPI
24 building).
25 Section 25. The following named amounts, or so much
26 thereof as may be necessary, and remain unexpended at the
27 close of business on June 30, 1999, from an appropriation and
28 reappropriations heretofore made for such purposes in Article
29 90, Section 13 and Article 91, Section 24 of Public Act
30 90-585, are reappropriated from the Capital Development Fund
31 to the following Universities (formerly to the Capital
32 Development Board for the Universities) for the projects
SB598 Engrossed -111- BOB-CDBnew-re2000
1 hereinafter enumerated:
2 (From Article 91, Section 24 of Public Act 90-585)
3 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
4 For purchasing equipment
5 for the Fine Arts Complex .................... 4,000,000
6 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
7 For purchasing Bio-Science building
8 equipment .................................... 8,086
9 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
10 (From Article 90, Section 13 of Public Act 90-585)
11 For purchasing equipment for the Engineering
12 Building ..................................... 6,000,000
13 UNIVERSITY OF ILLINOIS - URBANA-CHAMPAIGN
14 (From Article 91, Section 24 of Public Act 90-585)
15 For purchasing equipment for Temple
16 Hoyne Buell Hall ............................. 99,494
17 Total, Section 25 $10,107,580
18 Section 26. In addition to any amounts heretofore
19 appropriated for such purposes, the sum of $1,802, or so much
20 thereof as may be necessary and remains unexpended at the
21 close of business on June 30, 1999, from a reappropriation
22 heretofore made for such purposes in Article 91, Section 25
23 of Public Act 90-585, is reappropriated from the Capital
24 Development Fund to the Secretary of State for planning,
25 remodeling, relocation, permanent equipment, and any other
26 related expenses, including architectural and engineering
27 fees associated with construction and remodeling of office
28 space and other support areas under the jurisdiction of the
29 House of Representatives, and to various legislative services
30 agencies in both the Capitol and Stratton Office Buildings.
31 Section 27. The sum of $300,000, or so much thereof as
32 may be necessary and remains unexpended at the close of
SB598 Engrossed -112- BOB-CDBnew-re2000
1 business on June 30, 1999, from an appropriation heretofore
2 made for such purposes in Article 90, Section 19 of Public
3 Act 90-585, is reappropriated from the General Revenue Fund
4 to the Capital Development Board for a grant to the Nipper
5 School in Maryville for all costs associated with
6 infrastructure improvements, including, but not limited to,
7 roof and mechanical system replacement.
8 Section 28. The sum of $50,000, or so much thereof as
9 may be necessary and remains unexpended at the close of
10 business on June 30, 1999, from an appropriation heretofore
11 made for such purposes in Article 90, Section 24 of Public
12 Act 90-585, as amended by Section 8 of House Bill 871 of the
13 90th General Assembly, is reappropriated from the General
14 Revenue Fund to the Capital Development Board for a grant to
15 the Tilden Fire Protection District for land acquisition,
16 planning, design, construction, reconstruction, renovation,
17 rehabilitation, and all other costs associated with the fire
18 district building project.
19 Section 29. The sum of $189,987, or so much thereof as
20 may be necessary and remains unexpended at the close of
21 business on June 30, 1999, from an appropriation heretofore
22 made for such purposes in Article 90, Section 30 of Public
23 Act 90-585, is reappropriated from the Capital Development
24 Fund to the Capital Development Board for a grant to the City
25 of Mattoon for land acquisition, planning, design,
26 construction, reconstruction, renovation, rehabilitation,
27 equipping, and all other costs associated with a
28 police/public safety building.
29 Section 30. The sum of $350,000, or so much thereof as
30 may be necessary and remains unexpended at the close of
31 business on June 30, 1999, from an appropriation heretofore
SB598 Engrossed -113- BOB-CDBnew-re2000
1 made for such purposes in Article 90, Section 34 of Public
2 Act 90-585, is reappropriated from the General Revenue Fund
3 to the Capital Development Board for a grant to the
4 Argenta-Oreana Fire Protection District for land acquisition,
5 planning, design, construction, reconstruction, renovation,
6 rehabilitation, operation, and all other costs associated
7 with a new firehouse.
8 Section 31. The sum of $250,000, or so much thereof as
9 may be necessary and remains unexpended at the close of
10 business on June 30, 1999, from an appropriation heretofore
11 made for such purposes in Article 90, Section 37 of Public
12 Act 90-585, is reappropriated from the Capital Development
13 Fund to the Capital Development Board for a grant to the
14 College of Lake County for all costs associated with the
15 renovation of the Southlake Education Center.
16 Section 32. The sum of $30,000, or so much thereof as
17 may be necessary and remains unexpended at the close of
18 business on June 30, 1999, from an appropriation heretofore
19 made for such purposes in Article 90, Section 39 of Public
20 Act 90-585, is reappropriated from the General Revenue Fund
21 to the Capital Development Board for a grant to the Village
22 of St. Peter for all costs associated with the construction
23 and rehabilitation of community park restrooms to assure
24 compliance with the Americans With Disabilities Act.
25 Section 33. The sum of $1,000,000, or so much thereof as
26 may be necessary and remains unexpended at the close of
27 business on June 30, 1999, from an appropriation heretofore
28 made for such purposes in Article 90, Section 40 of Public
29 Act 90-585, is reappropriated from the Capital Development
30 Fund to the Capital Development Board for a grant to Parkland
31 College for capital improvements.
SB598 Engrossed -114- BOB-CDBnew-re2000
1 Section 34. The sum of $1,250,000, or so much thereof as
2 may be necessary and remains unexpended at the close of
3 business on June 30, 1999, from an appropriation heretofore
4 made for such purposes in Article 90, Section 42 of Public
5 Act 90-585, is reappropriated from the Capital Development
6 Fund to the Capital Development Board for a fish processing
7 center at Pinckneyville Correctional Center.
8 Section 35. The sum of $175,500, or so much thereof as
9 may be necessary and remains unexpended at the close of
10 business on June 30, 1999, from an appropriation heretofore
11 made for such purposes in Article 90, Section 43 of Public
12 Act 90-585, is reappropriated from the General Revenue Fund
13 to the Capital Development Board for a grant to Prairie State
14 College for planning for Outreach/Adult Training Center.
15 Section 36. The sum of $1,000,000, or so much thereof as
16 may be necessary and remains unexpended at the close of
17 business on June 30, 1999, from an appropriation heretofore
18 made for such purposes in Article 90, Section 44 of Public
19 Act 90-585, is reappropriated from the Capital Development
20 Fund to the Capital Development Board for planning for
21 expansion at McHenry County College at Crystal Lake.
22 Section 37. The sum of $500,000, or so much thereof as
23 may be necessary and remains unexpended at the close of
24 business on June 30, 1999, from an appropriation heretofore
25 made for such purposes in Article 90, Section 45 of Public
26 Act 90-585, is reappropriated from the General Revenue Fund
27 to the Capital Development Board for a grant to Spoon River
28 College for Macomb Campus renovation and classroom
29 enhancements.
30 Section 38. The sum of $250,000, or so much thereof as
SB598 Engrossed -115- BOB-CDBnew-re2000
1 may be necessary and remains unexpended at the close of
2 business on June 30, 1999, from an appropriation heretofore
3 made for such purposes in Article 90, Section 46 of Public
4 Act 90-585, is reappropriated from the Capital Development
5 Fund to the Capital Development Board for a grant to Rock
6 Valley College for planning for a new instructional building.
7 Section 39. The sum of $50,000, or so much thereof as
8 may be necessary and remains unexpended at the close of
9 business on June 30, 1999, from an appropriation heretofore
10 made for such purposes in Article 90, Section 49 of Public
11 Act 90-585, as amended by Section 8 of House Bill 871 of the
12 90th General Assembly, is reappropriated from the Capital
13 Development Fund to the Capital Development Board for all
14 costs associated with construction of the Silvis Community
15 Center in the City of Silvas.
16 Section 40. No contract shall be entered into or
17 obligation incurred for any expenditures from appropriations
18 made in this Article until after the purposes and amounts
19 have been approved in writing by the Governor.
20 Section 99. Effective date. This Act takes effect on
21 July 1, 1999.