[ Search ] [ PDF text ] [ Legislation ]
[ Home ] [ Back ] [ Bottom ]
[ Introduced ] | [ Engrossed ] | [ Enrolled ] |
[ Senate Amendment 001 ] |
92_SB1180sam002 LRB9204221LBmgam04 1 AMENDMENT TO SENATE BILL 1180 2 AMENDMENT NO. . Amend Senate Bill 1180, AS AMENDED, 3 by replacing everything after the enacting clause with the 4 following: 5 "Section 5. The Environmental Protection Act is amended 6 by changing and renumbering Section 58.15 (as added by Public 7 Act 91-442) as follows: 8 (415 ILCS 5/58.16) 9 Sec. 58.16.58.15.Construction of school; requirements. 10 This Section applies only to counties with a population of 11 more than 3,000,000. In this Section, "school" means any 12 public school located in whole or in part in a county with a 13 population of more than 3,000,000a school as defined in14Section 34-1.1 of the School Code. No person shall commence 15 construction on real property of a building intended for use 16 as a school unless: 17 (1) a Phase 1 Environmental Audit, conducted 18 in accordance with Section 22.2 of this Act, is 19 obtained; 20 (2) if the Phase 1 Environmental Audit 21 discloses the presence or likely presence of a 22 release or a substantial threat of a release of a -2- LRB9204221LBmgam04 1 regulated substance at, on, to, or from the real 2 property, a Phase II Environmental Audit, conducted 3 in accordance with Section 22.2 of this Act, is 4 obtained; and 5 (3) if the Phase II Environmental Audit 6 discloses the presence or likely presence of a 7 release or a substantial threat of a release of a 8 regulated substance at, on, to, or from the real 9 property, and (i) the real property is enrolled in 10 the Site Remediation Program, and (ii) the remedial 11 action plan is approved bythatthe Agency, if a 12 remedial action plan is required by Board 13 regulations.approves for the intended use of the14property is completed. 15 No person shall cause or allow any person to occupy a 16 building intended to be used as a school for which a remedial 17 action plan is required by Board regulations unless all work 18 pursuant to the remedial action plan is completed. 19 (Source: P.A. 91-442, eff. 1-1-00; revised 10-19-99.) 20 Section 99. Effective date. This Act takes effect upon 21 becoming law.".